Top Banner
WIND FARMS IN PORTUGAL December 2010 [email protected]
32

Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

Jul 14, 2018

Download

Documents

doandiep
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

WIND FARMS IN PORTUGAL

December 2010

[email protected]

Page 2: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

Although collected in view of maximum accuracy,

the information contained in this document

doesn’t oblige INEGI, and shall not be used for other purposes

beyond helping anyone interested in the progress

of the use of wind as an energy source for electricity generation in Portugal.

INEGI – Instituto de Engenharia Mecânica e Gestão Industrial

Campus da FEUP | Rua Dr. Roberto Frias, 400 | 4200-465 Porto Tel: +351 22 957 87 10 | Fax: +351 22 953 73 52 | e-mail: [email protected] | site: www.inegi.up.pt

Page 3: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

1

Wind Farms in Portugal – December 2010

Growth of the wind energy based generating capacityGrowth of the wind energy based generating capacityGrowth of the wind energy based generating capacityGrowth of the wind energy based generating capacity

Wind energy based generating capacityWind energy based generating capacityWind energy based generating capacityWind energy based generating capacity

EuropEuropEuropEurope e e e ---- DecDecDecDec10101010

Page 4: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

2

Wind Farms in Portugal – December 2010

EuropeEuropeEuropeEurope ---- Share of new capacity installed duringShare of new capacity installed duringShare of new capacity installed duringShare of new capacity installed during 2010201020102010

EuropeEuropeEuropeEurope ---- Wind energy density indexesWind energy density indexesWind energy density indexesWind energy density indexes ---- DeDeDeDecccc10101010

Page 5: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

3

Wind Farms in Portugal – December 2010

Capacity and number of WECsCapacity and number of WECsCapacity and number of WECsCapacity and number of WECs

Dec10Dec10Dec10Dec10

Cumulative capacityCumulative capacityCumulative capacityCumulative capacity

Page 6: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

4

Wind Farms in Portugal – December 2010

Generating capacity installed Generating capacity installed Generating capacity installed Generating capacity installed annuallyannuallyannuallyannually

Annual growth of installed capacityAnnual growth of installed capacityAnnual growth of installed capacityAnnual growth of installed capacity

Page 7: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

5

Wind Farms in Portugal – December 2010

Wind based electricity contributionWind based electricity contributionWind based electricity contributionWind based electricity contribution

Capacity per district and autonomous regionCapacity per district and autonomous regionCapacity per district and autonomous regionCapacity per district and autonomous region

Dec10Dec10Dec10Dec10

Page 8: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

6

Wind Farms in Portugal – December 2010

Capacity Capacity Capacity Capacity per district and autonomous regionper district and autonomous regionper district and autonomous regionper district and autonomous region

Dec10Dec10Dec10Dec10

74,0 0,0

338,8 0,0

147,9 0,0

80.0 0.0

433.8 66,0

513,8 24.3

42,1 0,0

691,3 173,0 212.5

110.0

0,0 0,0

254.3 16.0

440,5 20,0

103,9 0,0 335.5

24.0

18,7 0,0

139,5 0,0

0,0 0,0

26,0 2,0

11,6 9,0

A. R. Azores

37.4 0.0

A. R. Madeira

Connected [MW]

Under construc. [MW]

Page 9: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

7

Wind Farms in Portugal – December 2010

Wind farmWind farmWind farmWind farmssss

DecDecDecDec10101010

Page 10: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

8

Wind Farms in Portugal – December 2010

Number of wind farms and Number of wind farms and Number of wind farms and Number of wind farms and installed capacityinstalled capacityinstalled capacityinstalled capacity

Dec10Dec10Dec10Dec10

Size of wind farmsSize of wind farmsSize of wind farmsSize of wind farms

Dec10Dec10Dec10Dec10

Page 11: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

9

Wind Farms in Portugal – December 2010

Number of WECs and mean Number of WECs and mean Number of WECs and mean Number of WECs and mean rated rated rated rated powerpowerpowerpower

DecDecDecDec10101010

Number of WECs and power classesNumber of WECs and power classesNumber of WECs and power classesNumber of WECs and power classes

DeDeDeDecccc10101010

Page 12: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

10

Wind Farms in Portugal – December 2010

Manufacturers market shareManufacturers market shareManufacturers market shareManufacturers market share –––– DeDeDeDecccc10101010

(WECs connected to grid(WECs connected to grid(WECs connected to grid(WECs connected to grid))))

Manufacturers market share Manufacturers market share Manufacturers market share Manufacturers market share –––– Dec10Dec10Dec10Dec10

((((WECs cWECs cWECs cWECs connectedonnectedonnectedonnected + construction + contracted+ construction + contracted+ construction + contracted+ construction + contracted))))

Page 13: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

11

Wind Farms in Portugal – December 2010

Promoters market share Promoters market share Promoters market share Promoters market share –––– Dec10Dec10Dec10Dec10

(WECs connected to grid)(WECs connected to grid)(WECs connected to grid)(WECs connected to grid)

Promoters market share Promoters market share Promoters market share Promoters market share –––– Dec10Dec10Dec10Dec10

(WECs connected + construction + contracted)(WECs connected + construction + contracted)(WECs connected + construction + contracted)(WECs connected + construction + contracted)

Page 14: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

12

Wind Farms in Portugal – December 2010

ManufacturersManufacturersManufacturersManufacturers

Dec10Dec10Dec10Dec10

PromotPromotPromotPromoteeeersrsrsrs

Dec10Dec10Dec10Dec10

Page 15: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

13

Wind Farms in Portugal – December 2010

Wind farms inWind farms inWind farms inWind farms in PortugalPortugalPortugalPortugal –––– DeDeDeDecccc10101010

Alphabetic orderAlphabetic orderAlphabetic orderAlphabetic order

(in italic wind farms not concluded(in italic wind farms not concluded(in italic wind farms not concluded(in italic wind farms not concluded))))

MAINLANDMAINLANDMAINLANDMAINLAND

NameNameNameName Manufac turerManufac turerManufac turerManufac turer ModelModelModelModel

[MW] [kW]

5 2000 E-70 E4 2008/09

28 2000 E-82 2007/09

13 2000 E-82 2008

13 2000 E-70 E4 2007/08

11 2000 E-70 E4

15 2000 E-82

5 2000 E-82

14 2000 E-70 E4

A. MINHO I - S to António Viana do Cas telo 32,0 16 2000 ENERCON E-70 E4 2008

ABOGALHEIRA Porto 3,3 2 1670 ECOTECNIA ECO80 2006

ACHADA Lis boa 6,9 3 2300 NORDEX N90 2005

AÇOR Coimbra 20,0 10 2000 ENERCON E-70 E4 2004

2,3 1 2300 E-82

2,0 1 2000 E-82

AÇOR II Coimbra 16,0 8 2000 ENERCON E-70 E4 2010

AGUIEIRA Vila Real 0,6 1 600 ENERCON E40/6.44 2003

ALAGOA DE C IMA Viana do Cas telo 13,5 9 1500 GEWE GEWE-1.5s 2004/05

ALFARROBEIRA Braga 0,6 1 600 ENERCON E-48 600 2005

ALMARGEM Lis boa 6,0 3 2000 ENERCON E-82 2007

ALROTA Lis boa 5,0 3 1670 ECOTECNIA ECO74 2008/09

Cas telo Branco 5 E-82

Coimbra 13 E-82

ALTO DA COUTADA I Vila Real 100,0 50 2000 ENERCON E-82 2010/?

ALTO DA FOLGOROSA Lis boa 18,0 9 2000 REpower MM92 2008/09

ALTO DO CÔTO Aveiro 4,5 5 900 NEG-MICON NM 900-52 2003

ALTO DO MARCO Vila Real 12,0 6 2000 ENERCON E-82 2009/?

ALTO DO MONÇÃO Viseu 32,0 16 2000 GAMESA G87 2006/07

ALTO DO SE IXAL Vila Real 1,6 2 800 ENERCON E-48 2006

ALTO DO TALEFE Viseu 13,5 9 1500 GEWE GEWE-1.5s 2004/05

ALVAIÁZERE Leiria 18,0 9 2000 ENERCON E-82 2010/?

6 1800 E66 2002

6 2000 E66/20.7 2004

ALVOAÇA Cas telo Branco 20,0 10 2000 ENERCON E-70 E4 2007

AMARAL 1 Lis boa 10,0 5 2000 GAMESA G80 2004/05

AMÊNDOA S antarém 14,9 9 1650 VESTAS NM82 2004

ARADA -Arada Viseu 50,0 25 2000 ENERCON E-82 2008

ARCELA Lis boa 11,5 5 2300 NORDEX N90 2005

ARCHEIRA Lisboa 0,6 1 600 ENERCON E40/6.44 2000

ARCHEIRA 2 Lis boa 2,0 1 2000 ENERCON E66/20.7 2004

ARCHEIRA 3 Lis boa 2,0 1 2000 ENERCON E-70 E4 2005

ARCHEIRA 4 Lisboa 0,6 1 600 ENERCON E40/6.44 2005

ARC IPRES TE Viseu 0,6 1 600 ENERCON E40/6.44 2003

ARGANIL/TOUTIÇO Coimbra 102,0 34 3000 VESTAS V90 2008/09

ARMAMAR Viseu 26,0 13 2000 ENERCON E-82 2010

ARRUDA I Lis boa 6,0 3 2000 GAMESA G83 2006

AVELOSO Viseu 6,0 3 2000 ENERCON E-82 2008

AZINHEIRA Braga 14,0 7 2000 ENERCON E-82 2007

ALVÃO Vila Real 22,8 ENERCON

38,0 ENERCON 2008

AÇOR (extensão) Coimbra ENERCON 2010/?

ALTO ARGANIL 36,0 2000 ENERCON 2009/10

A. MINHO I - Picoto/S S Viana do Cas telo

52,0 ENERCON 2008

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connec ted Connec ted Connec ted Connec ted

to gridto gridto gridto gridDis tric tDis tric tDis tric tDis tric t

A. MINHO I - Coris co Viana do Cas telo 66,0 ENERCON

A. MINHO I - Mend./Bus tav. Viana do Cas telo 52,0 ENERCON

A. MINHO I - P icos Viana do Cas telo

Page 16: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

14

Wind Farms in Portugal – December 2010

BAIÃO Porto 6,3 3 2100 SUZLON S -88 2009

BAIRRO Leiria 22,0 11 2000 ENERCON E-82 2009

BALOCAS Guarda 28,0 14 2000 ENERCON E-82 2010/?

BARÃO DE S . JOÃO Faro 50,0 25 2000 REpower MM92 2009

BARROSO Vila Real 18,0 9 2000 VES TAS V80 2003

BARROSO II Vila Real 10,0 5 2000 ENERCON E-82 2009

BARROSO III Vila Real 16,0 8 2000 ENERCON E-82 2009

BENESPERA Guarda 34,0 17 2000 ENERCON E-82 2010/?

BIGORNE Vis eu 7,0 4 1750 VES TAS V66-1.75 2002

BOLORES Lis boa 5,2 4 1300 BONUS 1.3 2003

BONECA Porto 0,6 1 600 ENERCON E40/6.44 2003

BONECA II Porto 8,0 4 2000 ENERCON E-70 E4 2005

BORDEIRA Faro 24,0 12 2000 ENERCON E-82 2008

BORNINHOS Bragança 2,0 1 2000 ENERCON E66/20.7 2004

BRAVO Cas telo Branco 16,0 8 2000 ENERCON E-82 2009

BULGUEIRA Vila Real 2,4 3 800 NORDEX N50 2003

BUSTELO Vila Real 18,0 9 2000 ENERCON E-82 2009

CABEÇO ALTO Vila Real 11,7 9 1300 NORDEX N60 2000

CABEÇO DA VACA Braga 1,2 2 600 ENERCON E40/6.44 2002

CABEÇO DA VACA II Braga 1,2 2 600 ENERCON E40/6.44 2003

17 600 E40/6.44 2000

3 2000 E66/20.7 2003

3 2000 E-82 2009

4 2300 ENERCON E-70 E4 2008

11 2000 ENERCON E-82 2008/09

9 1800 E66 2002

2 2000 E-70 E4 2005

CADAFAZ Coimbra 10,2 17 600 ENERCON E40/6.44 2001

CADAFAZ II Coimbra 18,0 9 2000 ENERCON E-82 2010

CADRAÇO Vis eu 1,2 1 1200 ENERCON E-58 2004

CALDAS I Lis boa 10,0 5 2000 GAMESA G83 2005

CANDAL/COELHEIRA Vis eu 40,0 20 2000 ENERCON E-70 E4 2006

CANDEEIROS S antarém/Leiria 111,0 37 3000 VES TAS V90 2005/06

3 2000 E-82 2007

42 2000 E-70 E4 2006

CARREÇO E OUTEIRO Viana do Cas telo 20,7 9 2300 NORDEX N90 2004/05

CARREÇO E OUTEIRO II Viana do Cas telo 12,0 6 2000 ENERCON E-82 2010

CARVALHOSA Vis eu 34,0 17 2000 ENERCON E-82 2008

CASA DA LAGOA Vila Real 0,6 1 600 ENERCON E-48 600 2006

CASAIS Vis eu 2,0 1 2000 ENERCON E-82 2007

CASTANHEIRA Bragança 4,0 2 2000 REpower MM82 2004

CATEFICA Lis boa 18,0 9 2000 GAMESA G80 2004/05

CELA Leiria 2,0 1 2000 REpower MM82 2006

CHÃ DO GUILHADO Vila Real 2,0 1 2000 ENERCON E-82 2009

CHAMINÉ S etúbal 6,9 3 2300 NORDEX N90 2004/05

CHÃO FALCÃO Leiria 34,5 15 2300 NORDEX N90 2005

CHÃO FALCÃO II Leiria 25,3 11 2300 NORDEX N90 2008/09

CHÃO FALCÃO III Leiria 20,7 9 2300 NORDEX N90 2009

CHAVÃES Viseu 30,0 15 2000 ENERCON E-82 2010/?

CHIQUEIRO Cas telo Branco 4,0 2 2000 VES TAS V80 2007

CHORIDA 1 Porto 0,6 1 600 ENERCON E-48 600 2006

CHORIDA 2 Porto 0,8 1 800 ENERCON E-48 2006

CINFÃES Vis eu 8,0 4 2000 ENERCON E-82 2009

CONTIM Vila Real 10,0 5 2000 ENERCON E-82 2010

COSTA VICENTINA S etúbal 10,0 5 2000 REpower MM82 2005

CÔTO DA ALDEIA Vila Real 0,6 1 600 ENERCON E40/6.44 2003

1 600 E40/6.44 1999

1 600 E-48 600 2006

CABRIL Vis eu 20,2 ENERCON

CARAMULO Vis eu 90,0 ENERCON

CRAVELAS Vila Real 1,2 ENERCON

CABEÇO RAINHA Cas telo Branco 22,2 ENERCON

CABEÇO RAINHA II Cas telo Branco 31,2

Page 17: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

15

Wind Farms in Portugal – December 2010

DEGRAC IAS Coimbra 20,0 10 2000 VESTAS V80 2005

1 2000 E66/20.7

1 600 E40/6.44

DONINHAS Aveiro 0,8 1 800 ENERCON E-48 2005

ENERWATT Lisboa 0,6 1 600 ENERCON E40/6.44 2002

ESP IGA Viana do Cas telo 6,0 3 2000 ENERCON E-70 E4 2005

ESPINHAÇO DE CÃO Faro 10,0 5 2000 REpower MM92 2008/09

FACHO COLMEIA Vila Real 36,0 18 2000 ENERCON E-82 2010

FANHÕES I Lisboa 12,0 6 2000 GAMESA G80 2005

FANHÕES II Lisboa 6,0 3 2000 GAMESA G80 2005/07

FELGAR Bragança 8,0 4 2000 VESTAS V80 2007

FONTE DA MESA Viseu 10,2 17 600 VESTAS V42 1996

FONTE DA MESA II Viseu 10,0 5 2000 ENERCON E-82 2010

FONTE DA QUELHA Viseu 13,5 9 1500 GEWE GEWE-1.5s 2004/05

FREITA I Aveiro 18,4 8 2300 NORDEX N90 2006

FREITA II Aveiro 18,4 8 2300 NORDEX N90 2006

2 2000 E-70 E4 2008

55 2000 E-82 2007/08

GUARDA Guarda 8,0 4 2000 ENERCON E-82 2007/08

GUERREIROS Faro 18,0 9 2000 ENERCON E-82 2008/10

2 1650 VESTAS V66-1.65 1999

3 1300 NORDEX N60 2002

JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002

JOGUINHO II Lis boa 26,0 13 2000 REpower MM82 2006

LAGOA D. JOÃO E FEIRÃO Viseu 34,0 17 2000 ENERCON E-82 2008

LAGOA FUNDA Faro 9,0 18 500 MITSUBISHI MHI-500 1998

LAMEIRA Viseu 10,4 8 1300 BONUS 1.3 2005

LEIRANCO Vila Real 0,6 1 600 ENERCON E-48 600 2006

LEOMIL Viseu 16,1 7 2300 NORDEX N90 2007

LOMBA da S E IXA I Vila Real 13,0 10 1300 NORDEX N60 2001

LOMBA DA SEIXA II Vila Real 12,0 8 1500 GEWE GEWE-1.5s 2004

7 2300

2 2500

LOUR INHÃ Lisboa 18,0 9 2000 ENERCON E-82 2010/?

LOUSÃ Coimbra 35,0 14 2500 GEWE 2.5 2006

LOUSÃ II Coimbra 50,0 20 2500 NORDEX N90 2008/09

MAÇÃO S antarém 2,3 3 750 NEG-MICON NM 750-48 1999

MAÇÃO II S antarém 2,3 3 750 NEG-MICON NM 750-48 2000

MAÇÃO III S antarém 4,5 5 900 NEG-MICON NM 900-52 2002

MADR INHA Faro 10,0 5 2000 ENERCON E-70 E4 2006

MAFÔMEDES Porto 4,2 2 2100 SUZLON S -88 2008

1 2000 E-70 E4

1 600 E-48 600

MAIROS II Vila Real 0,6 1 600 ENERCON E-48 600 2006

MALHADAS Coimbra 9,9 15 660 VESTAS V47 2001

MALHADIZES Coimbra 12,0 6 2000 ENERCON E66/20.7 2005

MARAVILHA I Lis boa 6,0 3 2000 ENERCON E-82 2009

MARAVILHA II Lis boa 4,0 2 2000 ENERCON E-82 2009

MARVILA Lis boa 12,0 6 2000 REpower MM92 2008

MEADAS Viseu 9,0 3 3000 VESTAS V90 2005

3 2000 V80

1 3000 V90

MILAGRES Lis boa 6,0 3 2000 ENERCON E-82 2009

1 2000 E66/20.7

1 600 E40/6.44MOINHO DE MANIQUE Lisboa 2,6 ENERCON 2004

MAIROS I Vila Real 2,6 ENERCON 2006

MEROIC INHA Vila Real 9,0 VESTAS 2003

LOMBA DO VALE Vila Real 21,1 NORDEX N90 2010

IGREJA NOVA Lisboa 7,2

DIRÃO DE RUA Guarda 2,6 ENERCON 2004

GARDUNHA Cas telo Branco 114,0 ENERCON

Page 18: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

16

Wind Farms in Portugal – December 2010

MOINHO VELHO Lis boa 2,0 1 2000 ENERCON E66/20.7 2004

MOINHOS DO OESTE Lisboa 4,0 2 2000 ENERCON E66/20.7 2003

MONTALEGRE Vila Real 50,0 25 2000 ENERCON E-82 2010

MONTE VENDAVAIS Lisboa 0,6 1 600 ENERCON E40/6.44 2000

MONTIJO Lis boa 2,0 1 2000 ENERCON E-70 E4 2005

MORRO DE BOI Vila Real 0,6 1 600 ENERCON E40/6.44 2003

MOSQUEIROS Guarda 8,0 4 2000 ENERCON E-82 2008

MOSQUEIROS II Guarda 20,0 10 2000 ENERCON E-82 2009

MOSTE IRO Guarda 9,1 7 1300 BONUS 1.3 2004

MOUGUEIRAS Cas telo Branco 8,0 4 2000 ENERCON E-82 2009

MOURIS CA Viseu 38,0 19 2000 GAMESA G87 2007

NAVE Viseu 38,0 19 2000 GAMESA G90 2007

NEGRELO-GUILHADO Vila Real 20,0 10 2000 ENERCON E-82 2009

ORTIGA Leiria 13,4 8 1670 ECOTECNIA ECO74 2006/07

OUTE IRO Vila Real 30,0 15 2000 ENERCON E-70 E4 2005

PADRELA Vila Real 7,5 5 1500 GEWE GEWE-1.5s 2004

PAMPILHOSA Coimbra 114,0 38 3000 VESTAS V90 2005/06

PASS ARINHO Lisboa 8,0 4 2000 ENERCON E-70 E4 2005

PAS SAR INHO II Lis boa 4,0 2 2000 ENERCON E-82 2009

PEDRAS LAVRADAS Cas telo Branco 16,1 7 2300 ENERCON E-70 E4 2007

PEDRAS LAVRADAS II Cas telo Branco 20,0 10 2000 ENERCON E-82 2010/?

20 500 E40 1998

3 2000 E-70 E4 2005

PENAMACOR 1 Cas telo Branco 20,0 10 2000 GAMESA G83 2006

PENAMACOR 2 Guarda 14,7 7 2100 SUZLON S -88 2007

PENAMACOR 3A Cas telo Branco 20,0 10 2000 GAMESA G83 2006

PENAMACOR 3B Guarda 39,9 19 2100 SUZLON S -88 2007/08

PENEDO RUIVO Porto 13,0 10 1300 BONUS 1.3 2005/06

PENOUTA Braga 0,8 1 800 ENERCON E-48 2006

PERDIGÃO Cas telo Branco 2,0 1 2000 ENERCON E-82 2007

P ICÃO Viseu 22,0 11 2000 ENERCON E-82 2008

PICO ALTO Faro 6,0 3 2000 ENERCON E-82 2007

PICOS VERDES I Faro 2,0 4 500 ENERCON E40 1998

P ICOS VERDES II Faro 10,5 7 1500 FURLANDER MD70 2003

PINHAL INTER IOR I Cas telo Branco 54,0 18 3000 VESTAS V90 2006

13 2000 E-82 2007

32 2000 E-70 E4 2005/06

P INHEIRO Viseu 21,6 12 1800 ENERCON E66 2002

PLAINA DO VIS O Braga 1,2 2 600 ENERCON E-48 600 2006

PÓ Lis boa 9,1 7 1300 BONUS 1.3 2006

PORTAL DA FREITA Vila Real 0,5 1 500 ENERCON E40 1998

PORTAL DA FRE ITA II Vila Real 0,6 1 600 ENERCON E-48 600 2005

POUSAFOLES Guarda 20,0 10 2000 ENERCON E-82 2010/?

PRACANA S antarém 2,0 1 2000 ENERCON E-70 E4 2006

RABAÇAL Coimbra 2,0 1 2000 VESTAS V80 2005

RANHADOS Viseu 10,0 5 2000 ENERCON E-82 2010

R IBABELIDE Viseu 14,0 7 2000 ENERCON E-82 2008

R IBAMAR Lis boa 6,0 3 2000 REpower MM82 2004

RUIVÃES Braga 0,9 1 850 VESTAS V52 2008

P INHAL INTERIOR II Cas telo Branco 90,0 ENERCON

PENA SUAR Porto 16,0 ENERCON

Page 19: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

17

Wind Farms in Portugal – December 2010

S . CORNÉLIO Guarda 32,0 16 2000 ENERCON E-82 2010/?

2 1650 V66-1.65 2001

1 2000 V80 2007

S . JOÃO 1 Coimbra 8,4 5 1670 ECOTECNIA ECO74 2007

S . JOÃO 2 Coimbra 13,4 8 1670 ECOTECNIA ECO74 2007

S . MACÁRIO I Vis eu 11,5 5 2300 NORDEX N90 2007

S . MACÁR IO II Vis eu 23,0 10 2300 NORDEX N90 2010/?

S . MAMEDE Lis boa 6,9 3 2300 NORDEX N90 2006

S . PAIO Viana do Cas telo 10,0 5 2000 ENERCON E-70 E4 2005

S . PEDRO Vis eu 10,0 5 2000 ENERCON E-70 E4 2005

S .ª DAS NECES S IDADES Coimbra 8,0 4 2000 ENERCON E-82 2010/?

25,2 12 2100 SUZLON S -88 2009

4,0 2 2000 VES TAS V90 2010

SAFRA / COENTRAL Leiria 41,8 25 1670 ECOTECNIA ECO74 2006/07

S ALGUE IROS -GUILHADO Vila Real 8,0 4 2000 ENERCON E-82 2009

SANTA HELENA Vis eu 4,0 2 2000 REpower MM82 2005

SÃO JOÃO Lis boa 0,6 1 600 ENERCON E40/6.44 2000

SARDINHA Lis boa 26,0 13 2000 GAMESA G90 2008

SEBOLIDO Porto 0,8 1 800 ENERCON E-48 2006

SE IXINHOS Porto 10,4 8 1300 BONUS 1.3 2006

S ENDIM Vis eu 40,0 20 2000 ENERCON E-82 2010/?

S ERAMENA Lis boa 2,0 1 2000 ENERCON E-82 2009/?

SERRA ALTA Guarda 2,0 1 2000 REpower MM92 Evo 2009

SERRA DA BOA VIAGEM Coimbra 6,0 3 2000 VES TAS V90 2010

SERRA DA CABREIRA Braga 20,0 10 2000 ENERCON E-70 E4 2004

S ERRA DA CAPUCHA Lis boa 10,0 5 2000 ENERCON E-70 E4 2005

SERRA DA ES CUSA Lis boa 2,0 2 1000 WinWinD WWD 1 2005

SERRA DA NAVE Vis eu 38,0 19 2000 ENERCON E-82 2010/?

SERRA D'ARGA Viana do Cas telo 36,0 12 3000 VES TAS V90 2006

S ERRA D'ARGA I Viana do Cas telo 0,6 1 600 ENERCON E40/6.44 2003

SERRA DE BORNES Bragança 60,0 24 2500 NORDEX N90 2009

S ERRA DE SAMPAIO Vis eu 18,0 9 2000 ENERCON E-82 2010/?

SERRA DE TODO O MUNDO Lis boa 10,0 5 2000 VES TAS V80 2004

S ERRA D'EL REI Leiria 21,7 13 1670 ECOTECNIA ECO80 2006

SERRA DO ALVÃO Vila Real 42,0 21 2000 GAMESA G87 2008/09

SERRA DO MÚ Beja 26,0 13 2000 ENERCON E-82 2008/09

SERRA DO MÚ (extensão) Beja 2,0 1 2000 ENERCON E-82 2010/?

S ICÓ Leiria 20,0 10 2000 ENERCON E-82 2008/09

S INES S etúbal 1,8 12 150 WINWORLD W-2800/150 1992

S IR IGO Vis eu 4,0 2 2000 ENERCON E-70 E4 2005

SOBRADO Vis eu 8,0 4 2000 REpower MM82 Evo 2009

SOBRAL II Lis boa 14,0 7 2000 GAMESA G83 2006/07

2 2000 E66/20.7 2003

2 600 E40/6.44 2003

S r.a da VITÓRIA Leiria 12,0 8 1500 GEWE GEWE-1.5s l 2004

3 2000 E-70 E4 2006

1 2000 E-82 2008

4 2000 MM82

3 2000 MM70

TENDAIS Vis eu 12,0 6 2000 ENERCON E-82 2007/10

TERRAS ALTAS FAFE Braga 106,0 53 2000 GAMESA G87 2004/052008

TERREIRO DAS BRUXAS Guarda 1,0 1 1000 WinWinD WWD 1 2006

TESTOS Vis eu 24,0 12 2000 ENERCON E-82 2008

TESTOS II Vis eu 44,0 22 2000 ENERCON E-82 2010/?

TORRÃO Porto 2,0 1 2000 REpower MM82 2007

TRANCOSO Guarda 28,0 14 2000 ENERCON E-82 2008

TRANDEIRAS Vila Real 18,2 14 1300 BONUS BONUS 1300 2003

TROVISCAL Guarda 14,0 7 2000 ENERCON E-82 2010/?

TEIXEIRÓ Porto 14,0 REpower 2004/05

S . CR IS TÓVÃO Vis eu 5,3 VES TAS

S r.ª SOCORRO I Lis boa 8,0 ENERCON

S r.a CASTELO Vis eu 5,2 ENERCON

SABUGAL Guarda

Page 20: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

18

Wind Farms in Portugal – December 2010

MADEIRAMADEIRAMADEIRAMADEIRA

AZAZAZAZORESORESORESORES

VALE DE GALEGOS Lisboa 26,0 13 2000 ENERCON E-82 2009/?

VALE GRANDE Coimbra 12,0 6 2000 REpower MM92 2010/?

VALÉRIOS Lisboa 2,0 1 2000 REpower MM82 2006

VENTOESTE Lisboa 0,6 1 600 ENERCON E40/6.44 2000

VERGÃO Cas telo Branco 13,0 10 1300 NORDEX N62 2003

VIDEIRA Leiria 6,0 3 2000 ENERCON E-70 E4 2005/06

VIDEMONTE Guarda 32 16 2000 GAMESA G87 2006

VIDUAL / CARVALHAL Coimbra 1,0 1 1000 WinWinD WWD 1 2006

VILA FRANCA DE XIRA Lis boa 12,6 6 2100 SUZLON S -88 2009

VILA LOBOS Viseu 10,0 20 500 ENERCON E40 1998

VILA NOVA Coimbra 26,0 13 2000 VESTAS V80 2004/05

VILA NOVA II Coimbra 24,0 12 2000 ENERCON E-82 2009

VILAR CHÃO Braga 2,0 1 2000 ENERCON E-70 E4 2005

NameNameNameName Manufac turerManufac turerManufac turerManufac turer ModelModelModelModel

[MW] [kW]

1 660 V47 2001

2 225 V29 1996

CANIÇAL Madeira 0,90 6 150 NORDTANK NTK150 1993

FONTE DO JUNCAL Madeira 6,0 4 1500 EOZEN-Vens ys 1,5 MW (70) 2009

LOIRAL Madeira 5,1 6 850 VESTAS V52 2009

PAUL DA SERRA Madeira 6,0 4 1500 EOZEN-Vens ys 1,5 MW (70) 2009

PAUL DA S ERRA (ENEREEM) Madeira 3,30 5 660 VESTAS V47 2003

PEDRAS Madeira 10,2 12 850 VESTAS V52 2009

PERFORM 1 Madeira 0,39 3 130 NORDTANK NTK130 1992

PERFORM 2/N Madeira 0,45 3 150 NORDTANK NTK150 1993

PERFORM 2/S Madeira 1,35 9 150 NORDTANK NTK150 1993

QUINTA DO LORDE Madeira 2,6 3 850 VESTAS V52 2009

Is landIs landIs landIs landCapac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of

WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connec tion Connec tion Connec tion Connec tion

to gridto gridto gridto grid

CABEÇO DO CARVALHO Porto S anto 1,1 VESTAS

NameNameNameName Manufac turerManufac turerManufac turerManufac turer ModelModelModelModel

[MW] [kW]

BOCA DA VEREDA Flores 0,60 2 300 ENERCON E30 2002

FIGUEIRAL S anta Maria 0,90 3 300 ENERCON E30 2002

GRAMINHAIS S . Miguel 9,00 10 900 ENERCON E-44 2010/?

2 100 NORDTANK NTK150 1992

2 300 ENERCON E30 2002

LOMBA DOS FRADES Faial 1,80 6 300 ENERCON E30 2002

PICO P ico 1,80 6 300 ENERCON E30 2005

2 300 ENERCON E30 2002

1 150 NORDTANK NTK150 1994

4 100 NORDTANK NTK150 1991

SERRA DO CUME Terceira 4,5 5 900 ENERCON E-44 2008

S ERRA BRANCA Gracios a 0,80

P ICO DA URZE São Jorge 1,15

Is landIs landIs landIs landCapac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of

WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connec tion Connec tion Connec tion Connec tion

to gridto gridto gridto grid

Page 21: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

19

Wind Farms in Portugal – December 2010

WInd farms inWInd farms inWInd farms inWInd farms in Portugal Portugal Portugal Portugal –––– DeDeDeDecccc10101010

Chronologically orderedChronologically orderedChronologically orderedChronologically ordered

MAINLANDMAINLANDMAINLANDMAINLAND

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

S ERRA DA BOA VIAGEM Coimbra 6,0 3 2000 VES TAS V90 2010

SABUGAL (ext.) Guarda 4,0 2 2000 VES TAS V90 2010

ALVAIÁZERE Leiria 2,0 1 2000 ENERCON E-82 2010

S ERRA DE SAMPAIO Vis eu 10,0 5 2000 ENERCON E-82 2010

BALOCAS Guarda 18,0 9 2000 ENERCON E-82 2010

S ERRA DA NAVE Vis eu 10,0 5 2000 ENERCON E-82 2010

AÇOR II Coimbra 16,0 8 2000 ENERCON E-70 E4 2010

RANHADOS Vis eu 10,0 5 2000 ENERCON E-82 2010

ALTO DA COUTADA I Vila Real 46,0 23 2000 ENERCON E-82 2010

CARREÇO E OUTEIRO II Viana do Cas telo 12,0 6 2000 ENERCON E-82 2010

CONTIM Vila Real 10,0 5 2000 ENERCON E-82 2010

FONTE DA MESA II Vis eu 10,0 5 2000 ENERCON E-82 2010

ARMAMAR Vis eu 26,0 13 2000 ENERCON E-82 2010

CADAFAZ II Coimbra 18,0 9 2000 ENERCON E-82 2010

FACHO COLMEIA Vila Real 36,0 18 2000 ENERCON E-82 2010

MONTALEGRE Vila Real 50,0 25 2000 ENERCON E-82 2010

VALE DE GALEGOS Lis boa 22,0 11 2000 ENERCON E-82 2010

LOMBA DO VALE Vila Real 16,1 7 2300 NORDEX N90 2010

LOMBA DO VALE Vila Real 5,0 2 2500 NORDEX N90 2010

Cas telo Branco 10,0 5

Coimbra 24,0 12

GUERREIROS (ext.) Faro 4,0 2 2000 ENERCON E-82 2010

TENDAIS (ext.) Vis eu 2,0 1 2000 ENERCON E-82 2010

ALTO ARGANIL 2000 ENERCON E-82 2010

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connection Connection Connection Connection

to gridto gridto gridto grid

Page 22: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

20

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

ALTO ARGANIL Coimbra 2,0 1 2000 ENERCON E-82 2009

C INFÃES Vis eu 8,0 4 2000 ENERCON E-82 2009

GUERREIROS (ext.) Faro 2,0 1 2000 ENERCON E-82 2009

BUS TELO Vila Real 18,0 9 2000 ENERCON E-82 2009

BAIRRO Leiria 22,0 11 2000 ENERCON E-82 2009

VILA NOVA II Coimbra 24,0 12 2000 ENERCON E-82 2009

BARROSO III Vila Real 16,0 8 2000 ENERCON E-82 2009

MARAVILHA II Lis boa 4,0 2 2000 ENERCON E-82 2009

MARAVILHA I Lis boa 6,0 3 2000 ENERCON E-82 2009

CHÃ DO GUILHADO Vila Real 2,0 1 2000 ENERCON E-82 2009

BAIÃO Porto 6,3 3 2100 SUZLON S -88 2009

VILA FRANCA DE XIRA Lis boa 12,6 6 2100 SUZLON S -88 2009

S ERRA ALTA Guarda 2,0 1 2000 REpower MM92 Evo 2009

BARÃO DE S . JOÃO Faro 50,0 25 2000 REpower MM92 2009

SOBRADO Vis eu 8,0 4 2000 REpower MM82 Evo 2009

ALTO DA FOLGOROSA Lis boa 2,0 1 2000 REpower MM92 2009

ESPINHAÇO DE CÃO Faro 8,0 4 2000 REpower MM92 2009

ARGANIL/TOUTIÇO Coimbra 81,0 27 3000 VES TAS V90 2009

CHÃO FALCÃO III Leiria 20,7 9 2300 NORDEX N90 2009

CHÃO FALCÃO II Leiria 20,7 9 2300 NORDEX N90 2009

LOUSÃ II Coimbra 40,0 16 2500 NORDEX N90 2009

S ERRA DE BORNES Bragança 60,0 24 2500 NORDEX N90 2009

SERRA DO ALVÃO Vila Real 40,0 20 2000 GAMESA G87 2009

MOSQUEIROS II Guarda 20,0 10 2000 ENERCON E-82 2009

MOUGUEIRAS Cas telo Branco 8,0 4 2000 ENERCON E-82 2009

BRAVO Cas telo Branco 16,0 8 2000 ENERCON E-82 2009

PAS SARINHO II Lis boa 4,0 2 2000 ENERCON E-82 2009

MILAGRES Lis boa 6,0 3 2000 ENERCON E-82 2009

SALGUEIROS -GUILHADO Vila Real 8,0 4 2000 ENERCON E-82 2009

BARROSO II Vila Real 10,0 5 2000 ENERCON E-82 2009

NEGRELO-GUILHADO Vila Real 20,0 10 2000 ENERCON E-82 2009

SABUGAL Guarda 25,2 12 2100 SUZLON S -88 2009

ALROTA (ext.) Lis boa 1,7 1 1670 ECOTECNIA ECO74 2009

S ICÓ Leiria 16,0 8 2000 ENERCON E-82 2009

S ERRA DO MÚ Beja 12,0 6 2000 ENERCON E-82 2009

CABEÇO RAINHA (R ef. Pot.) Cas telo Branco 6,0 3 2000 ENERCON E-82 2009

CABEÇO RAINHA II Cas telo Branco 14,0 7 2000 ENERCON E-82 2009

A. MINHO I - C oris co Viana do Cas telo 16,0 8 2000 ENERCON E-82 2009

A. MINHO I - C oris co Viana do Cas telo 2,0 1 2000 ENERCON E-70 E4 2009

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connection Connection Connection Connection

to gridto gridto gridto grid

Page 23: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

21

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

BORDEIRA Faro 24,0 12 2000 ENERCON E-82 2008

8,0 4 2000 E-82

9,2 4 2300 E-70 E4

GUERREIROS Faro 12,0 6 2000 ENERCON E-82 2008

TERRAS ALTAS DE FAFE (ext.) Braga 26,0 13 2000 GAMESA G87 2008

SERRA DO ALVÃO Vila Real 2,0 1 2000 GAMESA G87 2008

CHÃO FALCÃO II Leiria 4,6 2 2300 NORDEX N90 2008

LOUSÃ II Coimbra 10,0 4 2500 NORDEX N90 2008

R IBABELIDE Vis eu 14,0 7 2000 ENERCON E-82 2008

S ICÓ Leiria 4,0 2 2000 ENERCON E-82 2008

LAGOA D. JOÃO / P ICÃO Vis eu 34,0 17 2000 ENERCON E-82 2008

MAFÔMEDES Porto 4,2 2 2100 SUZLON S -88 2008

PENAMACOR 3B (ext.) Guarda 14,7 7 2100 SUZLON S -88 2008

MARVILA Lis boa 12,0 6 2000 REpower MM92 2008

ALTO DA FOLGOROSA Lis boa 16,0 8 2000 REpower MM92 2008

ESPINHAÇO DE CÃO Faro 2,0 1 2000 REpower MM92 2008

ARGANIL/TOUTIÇO Coimbra 21,0 7 3000 VES TAS V90 2008

ARADA - Avelos o Vis eu 6,0 3 2000 ENERCON E-82 2008

ARADA - P icão Vis eu 22,0 11 2000 ENERCON E-82 2008

ARADA - Carvalhos a Vis eu 34,0 17 2000 ENERCON E-82 2008

ARADA - Arada Vis eu 50,0 25 2000 ENERCON E-82 2008

RUIVÃES Braga 0,9 1 850 VES TAS V52 2008

S ERRA DO MÚ Beja 14,0 7 2000 ENERCON E-82 2008

MOSQUEIROS Guarda 8,0 4 2000 ENERCON E-82 2008

S r.ª SOCORRO (ext.) Lis boa 2,0 1 2000 ENERCON E-82 2008

TES TOS Vis eu 24,0 12 2000 ENERCON E-82 2008

4,0 2 E-70 E4

38,0 19 E-82

TRANCOSO Guarda 28,0 14 2000 ENERCON E-82 2008

SARDINHA Lis boa 26,0 13 2000 GAMESA G87 2008

TENDAIS Vis eu 8,0 4 2000 ENERCON E-82 2008

GUARDA (ext.) Guarda 4,0 2 2000 ENERCON E-82 2008

ALROTA Lis boa 3,3 2 1670 ECOTECNIA ECO74 2008

30,0 15 E-82

22,0 11 E-70 E4

38,0 20 E-82

8,0 4 E-70 E4

A. MINHO I - S to António Viana do Cas telo 32,0 16 2000 ENERCON E-70 E4 2008

26,0 13 E-82

24,0 11 E-70 E4

10,0 5 E-82

28,0 14 E-70 E4

A. MINHO I - Mend./Bus tav. Viana do Cas telo 2000 ENERCON 2008

A. MINHO I - P icoto/S S Viana do Cas telo 2000 ENERCON 2008

A. MINHO I - Picos Viana do Cas telo 2000 ENERCON 2008

A. MINHO I - C oris co Viana do Cas telo 2000 ENERCON 2008

Connection Connection Connection Connection to gridto gridto gridto grid

Cas telo Branco ENERCON 2008

GARDUNHA Cas telo Branco 2000 ENERCON 2008

CABEÇO RAINHA II

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower

Page 24: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

22

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

A. MINHO I - Mend./Bus tav. Viana do Cas telo 2,0 1 2000 ENERCON E-70 E4 2007

A. MINHO I - Picos Viana do Cas telo 2,0 1 2000 ENERCON E-70 E4 2007

LEOMIL Vis eu 16,1 7 2300 NORDEX N90 2007

TENDAIS Vis eu 2,0 1 2000 ENERCON E-82 2007

S . JOÃO 1 Coimbra 8,4 5 1670 ECOTECNIA ECO74 2007

S . JOÃO 2 Coimbra 13,4 8 1670 ECOTECNIA ECO74 2007

ORTIGA (ext.) Leiria 1,7 1 1670 ECOTECNIA ECO74 2007

PENAMACOR 2 Guarda 14,7 7 2100 SUZLON S -88 2007

PENAMACOR 3B Guarda 25,2 12 2100 SUZLON S -88 2007

S . CR ISTÓVÃO (ext.) Vis eu 2,0 1 2000 VES TAS V80 2007

S . MACÁR IO I Vis eu 11,5 5 2300 NORDEX N90 2007

PICO ALTO Faro 6,0 3 2000 ENERCON E-82 2007

CHIQUEIRO Cas telo Branco 4,0 2 2000 VES TAS V80 2007

ALVOAÇA Cas telo Branco 20,0 10 2000 ENERCON E-70 E4 2007

PEDRAS LAVRADAS Cas telo Branco 16,1 7 2300 ENERCON E-70 E4 2007

FELGAR Bragança 8,0 4 2000 VES TAS V80 2007

FANHÕES II Lis boa 2,0 1 2000 GAMESA G80 2007

ALMARGEM Lis boa 6,0 3 2000 ENERCON E-82 2007

CASAIS Vis eu 2,0 1 2000 ENERCON E-82 2007

SAFRA / COENTRAL Leiria 38,4 23 1670 ECOTECNIA ECO74 2007

PINHAL INTER IOR II Cas telo Branco 26,0 13 2000 ENERCON E-82 2007

CARAMULO Vis eu 6,0 3 2000 ENERCON E-82 2007

GUARDA Guarda 4,0 2 2000 ENERCON E-82 2007

GARDUNHA Cas telo Branco 72,0 36 2000 ENERCON E-82 2007

AZINHEIRA Braga 14,0 7 2000 ENERCON E-82 2007

NAVE Vis eu 38,0 19 2000 GAMESA G90 2007

MOUR ISCA Vis eu 38,0 19 2000 GAMESA G87 2007

ALTO DO MONÇÃO Vis eu 30,0 15 2000 GAMESA G87 2007

PERDIGÃO Cas telo Branco 2,0 1 2000 ENERCON E-82 2007

SOBRAL II Lis boa 6,0 3 2000 GAMESA G83 2007

TORRÃO Porto 2,0 1 2000 REpower MM82 2007

Nominal Nominal Nominal Nominal powerpowerpowerpower Connection Connection Connection Connection

to gridto gridto gridto grid

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Page 25: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

23

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

ALTO DO MONÇÃO Vis eu 2,0 1 2000 GAMESA G87 2006

LOUSÃ Coimbra 35,0 14 2500 GEWE 2.5 2006

JOGUINHO II Lis boa 26,0 13 2000 REpower MM82 2006

SAFRA / COENTRAL Leiria 3,3 2 1670 ECOTECNIA ECO74 2006

MADRINHA Faro 10,0 5 2000 ENERCON E-70 E4 2006

PENAMACOR 1 Cas telo Branco 20,0 10 2000 GAMESA G83 2006

PENAMACOR 3A Cas telo Branco 20,0 10 2000 GAMESA G83 2006

CELA Leiria 2,0 1 2000 REpower MM82 2006

FANHÕES II Lis boa 2,0 1 2000 GAMESA G80 2006

PÓ Lis boa 9,1 7 1300 BONUS 1.3 2006

PINHAL INTER IOR I Cas telo Branco 54,0 18 3000 VES TAS V90 2006

S ERRA D'EL R EI Leiria 21,7 13 1670 ECOTECNIA ECO80 2006

ARRUDA I Lis boa 6,0 3 2000 GAMESA G83 2006

SOBRAL II Lis boa 8,0 4 2000 GAMESA G83 2006

ABOGALHEIRA Porto 3,3 2 1670 ECOTECNIA ECO80 2006

FREITA II Aveiro 18,4 8 2300 NORDEX N90 2006

FREITA I Aveiro 18,4 8 2300 NORDEX N90 2006

VIDEMONTE Guarda 32 16 2000 GAMESA G87 2006

ORTIGA Leiria 11,7 7 1670 ECOTECNIA ECO74 2006

CANDEEIROS (ext.) Leiria 33,0 11 3000 VES TAS V90 2006

CHORIDA 2 Porto 0,8 1 800 ENERCON E-48 2006

CHORIDA 1 Porto 0,6 1 600 ENERCON E-48 600 2006

PLAINA DO VISO Braga 1,2 2 600 ENERCON E-48 600 2006

2,0 1 2000 E-70 E4

0,6 1 600 E-48

S ERRA D'ARGA Viana do Cas telo 36,0 12 3000 VES TAS V90 2006

S r.ª SOCORRO I Lis boa 6,0 3 2000 ENERCON E-70 E4 2006

VIDUAL / CARVALHAL Coimbra 1,0 1 1000 WinWinD WWD 1 2006

TERREIRO DAS BRUXAS Guarda 1,0 1 1000 WinWinD WWD 1 2006

VALÉRIOS Lis boa 2,0 1 2000 REpower MM82 2006

PRACANA S antarém 2,0 1 2000 ENERCON E-70 E4 2006

MAIROS II Vila Real 0,6 1 600 ENERCON E-48 600 2006

CASA DA LAGOA Vila Real 0,6 1 600 ENERCON E-48 600 2006

LEIRANCO Vila Real 0,6 1 600 ENERCON E-48 600 2006

PINHAL INTER IOR II Cas telo Branco 60,0 30 2000 ENERCON E-70 E4 2006

CARAVELAS (ext.) Vila Real 0,6 1 600 ENERCON E-48 600 2006

S EBOLIDO Porto 0,8 1 800 ENERCON E-48 2006

S . MAMEDE Lis boa 6,9 3 2300 NORDEX N90 2006

PENOUTA Braga 0,8 1 800 ENERCON E-48 2006

PAMPILHOSA Coimbra 81,0 27 3000 VES TAS V90 2006

ALTO DO S EIXAL Vila Real 1,6 2 800 ENERCON E-48 2006

VIDEIRA Leiria 4,0 2 2000 ENERCON E-70 E4 2006

CANDAL/COELHEIRA Vis eu 40,0 20 2000 ENERCON E-70 E4 2006

CARAMULO Vis eu 84,0 42 2000 ENERCON E-70 E4 2006

S EIXINHOS Porto 10,4 8 1300 BONUS 1.3 2006

PENEDO RUIVO Porto 10,4 8 1300 BONUS 1.3 2006

Connection Connection Connection Connection to gridto gridto gridto grid

Nominal Nominal Nominal Nominal powerpowerpowerpower

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Vila Real 2006ENERCONMAIROS I

Page 26: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

24

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

PENEDO RUIVO Porto 2,6 2 1300 BONUS 1.3 2005

VIDEIRA Leiria 2,0 1 2000 ENERCON E-70 E4 2005

PINHAL INTER IOR II Cas telo Branco 4,0 2 2000 ENERCON E-70 E4 2005

ARCHEIRA 3 Lis boa 2,0 1 2000 ENERCON E-70 E4 2005

S . PEDRO Vis eu 10,0 5 2000 ENERCON E-70 E4 2005

DONINHAS Aveiro 0,8 1 800 ENERCON E-48 800 2005

S . PAIO Viana do Cas telo 10,0 5 2000 ENERCON E-70 E4 2005

SANTA HELENA Vis eu 4,0 2 2000 REpower MM82 2005

ALTO DO TALEFE (ext.) Vis eu 1,5 1 1500 GEWE GEWE-1.5s 2005

FONTE DA QUELHA (ext.) Vis eu 1,5 1 1500 GEWE GEWE-1.5s 2005

ALFARROBEIRA Braga 0,6 1 600 ENERCON E-48 2005

PORTAL DA FREITA II Vila Real 0,6 1 600 ENERCON E-48 2005

PAMPILHOSA Coimbra 33,0 11 3000 VES TAS V90 2005

ES PIGA Viana do Cas telo 6,0 3 2000 ENERCON E-70 E4 2005

PENA SUAR (ext.) Porto 6,0 3 2000 ENERCON E-70 E4 2005

LAMEIRA Vis eu 10,4 8 1300 BONUS 1.3 2005

S IR IGO Vis eu 4,0 2 2000 ENERCON E-70 E4 2005

CABRIL (ext.) Vis eu 4,0 2 2000 ENERCON E-70 E4 2005

ARCELA Lis boa 11,5 5 2300 NORDEX N90 2005

DEGRACIAS Coimbra 20,0 10 2000 VES TAS V80 2005

RABAÇAL Coimbra 2,0 1 2000 VES TAS V80 2005

AMARAL (ext.) Lis boa 2,0 1 2000 GAMESA G80 2005

FANHÕES II Lis boa 2,0 1 2000 GAMESA G80 2005

BONECA II Porto 8,0 4 2000 ENERCON E-70 E4 2005

MONTIJO Lis boa 2,0 1 2000 ENERCON E-70 E4 2005

COSTA VICENTINA S etúbal 10,0 5 2000 REpower MM82 2005

PASSARINHO Lis boa 8,0 4 2000 ENERCON E-70 E4 2005

FANHÕES I Lis boa 12,0 6 2000 GAMESA G80 2005

CANDEEIROS S antarém 78,0 26 3000 VES TAS V90 2005

ACHADA Lis boa 6,9 3 2300 NORDEX N90 2005

VILA NOVA (ext.) Coimbra 6,0 3 2000 VES TAS V80 2005

S ERRA DA CAPUCHA Lis boa 10,0 5 2000 ENERCON E-70 E4 2005

OUTEIRO Vila Real 30,0 15 2000 ENERCON E-70 E4 2005

ARCHEIRA 4 Lis boa 0,6 1 600 ENERCON E40/6.44 2005

CALDAS I Lis boa 10,0 5 2000 GAMESA G83 2005

CHÃO FALCÃO Leiria 34,5 15 2300 NORDEX N90 2005

MALHADIZES Coimbra 12,0 6 2000 ENERCON E66/20.7 2005

CATEFICA Lis boa 16,0 8 2000 GAMESA G80 2005

TERRAS ALTAS DE FAFE Braga 78,0 39 2000 GAMESA G87 2005

ALAGOA DE C IMA Viana do Cas telo 12,0 8 1500 GEWE GEWE-1.5s 2005

MEADAS Vis eu 9,0 3 3000 VES TAS V90 2005

S ERRA DA ES CUSA Lis boa 2,0 2 1000 WinWinD WWD 1 2005

CHAMINÉ S etúbal 4,6 2 2300 NORDEX N90 2005

VILAR CHÃO Braga 2,0 1 2000 ENERCON E-70 E4 2005

CARREÇO E OUTEIRO Viana do Cas telo 2,3 1 2300 NORDEX N90 2005

4,0 2 2000 MM82

2,0 1 2000 MM70TEIXEIRÓ Porto

Capac ityCapac ityCapac ityCapac ityNominal Nominal Nominal Nominal powerpowerpowerpowerNumber of Number of Number of Number of

WECsWECsWECsWECs

2005REpower

Connection Connection Connection Connection to gridto gridto gridto grid

Page 27: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

25

Wind Farms in Portugal – December 2010

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

CHAMINÉ S etúbal 2,3 1 2300 NORDEX N90 2004

TERRAS ALTAS DE FAFE Braga 2,0 1 2000 GAMESA G87 2004

CATEFICA Lis boa 2,0 1 2000 GAMESA G80 2004

4,0 2 2000 MM82

4,0 2 2000 MM70

AMARAL 1 Lis boa 8,0 4 2000 GAMESA G80 2004

ALAGOA DE C IMA Viana do Cas telo 1,5 1 1500 GEWE GEWE-1.5s 2004

MOSTEIRO Guarda 9,1 7 1300 BONUS 1.3 2004

S r.a DA VITÓR IA Leiria 12,0 8 1500 GEWE GEWE-1.5s l 2004

CARREÇO E OUTEIRO Viana do Cas telo 18,4 8 2300 NORDEX N90 2004

AMÊNDOA Santarém 14,9 9 1650 VES TAS NM82 2004

CAS TANHEIRA Bragança 4,0 2 2000 REpower MM82 2004

2,0 1 2000 E66/20.7

0,6 1 600 E40/6.44

CADRAÇO Vis eu 1,2 1 1200 ENERCON E-58 2004

AÇOR Coimbra 20,0 10 2000 ENERCON E-70 E4 2004

S ERRA DA CABREIRA Braga 20,0 10 2000 ENERCON E-70 E4 2004

S ERRA DE TODO O MUNDO Lis boa 10,0 5 2000 VES TAS V80 2004

R IBAMAR Lis boa 6,0 3 2000 REpower MM82 2004

2,0 1 2000 E66/20.7

0,6 1 600 E40/6.44

VILA NOVA Coimbra 20,0 10 2000 VES TAS V80 2004

BORNINHOS Bragança 2,0 1 2000 ENERCON E66/20.7 2004

LOMBA DA S EIXA II Vila Real 12,0 8 1500 GEWE GEWE-1.5s 2004

ARCHEIRA 2 Lis boa 2,0 1 2000 ENERCON E66/20.7 2004

MOINHO VELHO Lis boa 2,0 1 2000 ENERCON E66/20.7 2004

PADRELA Vila Real 7,5 5 1500 GEWE GEWE-1.5s 2004

ALTO DO TALEFE Vis eu 12,0 8 1500 GEWE GEWE-1.5s 2004

FONTE DA QUELHA Vis eu 12,0 8 1500 GEWE GEWE-1.5s 2004

ALVÃO (ext.) Vila Real 12,0 6 2000 ENERCON E66/20.7 2004

BOLORES Lis boa 5,2 4 1300 BONUS 1.3 2003

ARCIPRES TE Vis eu 0,6 1 600 ENERCON E40/6.44 2003

PICOS VERDES II Faro 10,5 7 1500 FURLANDER MD70 2003

BONECA Porto 0,6 1 600 ENERCON E40/6.44 2003

AGUIEIRA Vila Real 0,6 1 600 ENERCON E40/6.44 2003

CABEÇO DA VACA II Braga 1,2 2 600 ENERCON E40/6.44 2003

VERGÃO Cas telo Branco 13,0 10 1300 NORDEX N62 2003

TRANDEIRAS Vila Real 18,2 14 1300 BONUS BONUS 1300 2003

3,0 1 3000 V90

6,0 3 2000 V80

S ERRA D'ARGA Viana do Cas telo 0,6 1 600 ENERCON E40/6.44 2003

ALTO DO CÔTO Aveiro 4,5 5 900 NEG-MICON NM 900-52 2003

MOINHOS DO OES TE Lis boa 4,0 2 2000 ENERCON E66/20.7 2003

Sr.a do CAS TELO II Vis eu 4,0 2 2000 ENERCON E66/20.7 2003

BARROSO Vila Real 18,0 9 2000 VES TAS V80 2003

CABEÇO DA RAINHA (ext.) C as telo Branco 6,0 3 2000 ENERCON E66/20.7 2003

BULGUEIRA Vila Real 2,4 3 800 NORDEX N50 2003

S r.a do CASTELO I Vis eu 1,2 2 600 ENERCON E40/6.44 2003

CÔTO DA ALDEIA Vila Real 0,6 1 600 ENERCON E40/6.44 2003

MORRO DE BOI Vila Real 0,6 1 600 ENERCON E40/6.44 2003

DIRÃO DA RUA

REpower

ENERCON

Nominal Nominal Nominal Nominal powerpowerpowerpower

2004

Connection Connection Connection Connection to gridto gridto gridto grid

Vila Real

Guarda

Capac ityCapac ityCapac ityCapac ity

MOINHO DE MANIQUE Lis boa

MEROIC INHA

Porto

2004

2003

ENERCON

VES TAS

TEIXEIRÓ 2004

Number of Number of Number of Number of WECsWECsWECsWECs

Page 28: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

26

Wind Farms in Portugal – December 2010

WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal –––– Dec10Dec10Dec10Dec10

Turbines disconnected Turbines disconnected Turbines disconnected Turbines disconnected from gridfrom gridfrom gridfrom grid

MAINLANDMAINLANDMAINLANDMAINLAND

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

IGREJA NOVA (ext.) Lis boa 3,9 3 1300 NORDEX N60 2002

PINHEIRO Vis eu 21,6 12 1800 ENERCON E66 2002

JARMELEIRA Lis boa 0,9 1 850 VES TAS V52-850 2002

MAÇÃO III S antarém 4,5 5 900 NEG-MICON NM 900-52 2002

CABRIL Vis eu 16,2 9 1800 ENERCON E66 2002

BIGORNE Vis eu 7,0 4 1750 VES TAS V66-1.75 2002

ALVÃO Vila Real 10,8 6 1800 ENERCON E66 2002

ENERWATT Lis boa 0,6 1 600 ENERCON E40/6.44 2002

CABEÇO DA VACA Braga 1,2 2 600 ENERCON E40/6.44 2002

MALHADAS Coimbra 9,9 15 660 VES TAS V47 2001

LOMBA da S EIXA I Vila Real 13,0 10 1300 NORDEX N60 2001

S . CR ISTÓVÃO Vis eu 3,3 2 1650 VES TAS V66-1.65 2001

CADAFAZ Coimbra 10,2 17 600 ENERCON E40/6.44 2001

MAÇÃO II S antarém 2,3 3 750 NEG-MICON NM 750-48 2000

CABEÇO RAINHA Cas telo Branco 10,2 17 600 ENERCON E40/6.44 2000

CABEÇO ALTO Vila Real 11,7 9 1300 NORDEX N60 2000

ARCHEIRA Lis boa 0,6 1 600 ENERCON E40/6.44 2000

VENTOES TE Lis boa 0,6 1 600 ENERCON E40/6.44 2000

SÃO JOÃO Lis boa 0,6 1 600 ENERCON E40/6.44 2000

MONTE VENDAVAIS Lis boa 0,6 1 600 ENERCON E40/6.44 2000

MAÇÃO Santarém 2,3 3 750 NEG-MICON NM 750-48 1999

IGREJA NOVA Lis boa 3,3 2 1650 VES TAS V66-1.65 1999

CARAVELAS Vila Real 0,6 1 600 ENERCON E40/6.44 1999

PENA SUAR Porto 10,0 20 500 ENERCON E40 1998

VILA LOBOS Vis eu 10,0 20 500 ENERCON E40 1998

LAGOA FUNDA Faro 10,0 20 500 MITSUBISHI MHI-500 1998

PICOS VERDES I Faro 2,0 4 500 ENERCON E40 1998

PORTAL DA FREITA Vila Real 0,5 1 500 ENERCON E40 1998

FONTE DA MESA Vis eu 10,2 17 600 VES TAS V42 1996

S INES S etúbal 1,8 12 150 WINWORLD W-2800/150 1992

LOUREL Lis boa 0,02 1 20 AEROMAN 12/20 1985

Connection Connection Connection Connection to gridto gridto gridto grid

Capac ityCapac ityCapac ityCapac ityNominal Nominal Nominal Nominal powerpowerpowerpowerNumber of Number of Number of Number of

WECsWECsWECsWECs

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

Lagoa Funda Faro -1,0 -2 500 MITSUBISHI MHI-500 2006

LOUREL Lis boa -0,02 -1 20 AEROMAN 12/20 1999

Nominal Nominal Nominal Nominal powerpowerpowerpower Out of Out of Out of Out of

s ervices ervices ervices erviceNumber of Number of Number of Number of WECsWECsWECsWECs

Capac ityCapac ityCapac ityCapac ity

Page 29: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

27

Wind Farms in Portugal – December 2010

WWWWiiiind farms in Portugal nd farms in Portugal nd farms in Portugal nd farms in Portugal –––– Dec10Dec10Dec10Dec10

Chronologically orderedChronologically orderedChronologically orderedChronologically ordered (reverse)(reverse)(reverse)(reverse)

AUTONOMOUS REGIONSAUTONOMOUS REGIONSAUTONOMOUS REGIONSAUTONOMOUS REGIONS

WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal –––– Dec10Dec10Dec10Dec10

Turbines disconnected from gridTurbines disconnected from gridTurbines disconnected from gridTurbines disconnected from grid

AUTONOMOUS REGIONSAUTONOMOUS REGIONSAUTONOMOUS REGIONSAUTONOMOUS REGIONS

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

FONTE DO JUNCAL Madeira 6,0 4 1500 EOZEN-Vens ys 1,5 MW (70) 2009

PAUL DA S ERRA Madeira 6,0 4 1500 EOZEN-Vens ys 1,5 MW (70) 2009

QUINTA DO LORDE Madeira 2,6 3 850 VES TAS V52 2009

LOIRAL Madeira 5,1 6 850 VES TAS V52 2009

PEDRAS Madeira 10,2 12 850 VES TAS V52 2009

PAÚL DA S ERRA (ENEREEM) Madeira 3,30 5 660 VES TAS V47 2003

CANIÇAL (EEM) " 3,30 5 660 VES TAS V47 2001

0,66 1 660 V47 2001

0,45 2 225 V29 1996

BICA DA CANA Madeira 1,80 12 150 NORDTANK NTK150 1993

CANIÇAL Madeira 0,90 6 150 NORDTANK NTK150 1993

PERFORM 2/S Madeira 1,35 9 150 NORDTANK NTK150 1993

PERFORM 2/N Madeira 0,90 6 150 NORDTANK NTK150 1993

PER FORM 1 Madeira 0,39 3 130 NORDTANK NTK130 1992

CABEÇO DO CARVALHO Porto S anto 0,27 9 30 AEROMAN 14/30 1985

S ERRA DO CUME Terceira 4,5 5 900 ENERCON E-44 2008

PICO Pico 1,80 6 300 ENERCON E30 2005

LOMBA DOS FRADES Faial 1,80 6 300 ENERCON E30 2002

FIGUEIRAL S anta Maria 0,90 3 300 ENERCON E30 2002

BOCA DA VEREDA Flores 0,60 2 300 ENERCON E30 2002

S ERRA BRANCA (ext.) Gracios a 0,60 2 300 ENERCON E30 2002

PICO DA URZE (ext. II) S ão Jorge 0,60 2 300 ENERCON E30 2002

FIGUEIRAL (ext.) S anta Maria 0,03 1 30 AEROMAN 14/30 1996

PICO DA URZE (ext.) S ão Jorge 0,15 1 150 NORDTANK NTK150 1994

S ERRA BRANCA Gracios a 0,20 2 100 NORDTANK NTK150 1992

PICO DA URZE S ão Jorge 0,40 4 100 NORDTANK NTK150 1991

FIGUEIRAL S anta Maria 0,24 8 30 AEROMAN 14/30 1988

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Connection Connection Connection Connection to gridto gridto gridto grid

Porto S anto VES TASCABEÇO DO CARVALHO

Nominal Nominal Nominal Nominal powerpowerpowerpower

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

BICA DA CANA Madeira -0,90 -6 150 NORDTANK NTK150 2010

PERFORM 2/N Madeira -0,30 -2 150 NORDTANK NTK150 2009

BICA DA CANA Madeira -0,90 -6 150 NORDTANK NTK150 2008

CANIÇAL (EEM) Madeira -3,30 -5 660 VES TAS V47 2003

FIGUEIRAL S anta Maria -0,18 -6 30 AEROMAN 14/30 2001

FIGUEIRAL S anta Maria -0,06 -2 30 AEROMAN 14/30 2000

FIGUEIRAL S anta Maria -0,03 -1 30 AEROMAN 14/30 1999

PORTO SANTO " -0,27 -9 30 AEROMAN 14/30 1996

PERFORM 2/N " -0,15 -1 150 NORDTANK NTK150 1993

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Out of Out of Out of Out of

s ervices ervices ervices ervice

Page 30: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO

28

Wind Farms in Portugal – December 2010

WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal WInd farms in Portugal –––– Dec10Dec10Dec10Dec10

Projects under construction Projects under construction Projects under construction Projects under construction and contractedand contractedand contractedand contracted

MMMMAINLANDAINLANDAINLANDAINLAND

AAAAUTONOMOUS UTONOMOUS UTONOMOUS UTONOMOUS RRRREGIONSEGIONSEGIONSEGIONS

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

CHAVÃES Viseu 30 15 2000 ENERCON E-82 cons tr.

S ENDIM Viseu 40 20 2000 ENERCON E-82 cons tr.

LOURINHÃ Lisboa 18 9 2000 ENERCON E-82 cons tr.

VALE GRANDE Coimbra 12 6 2000 REpower MM92 constr.

2,3 1 2300 ENERCON E-82 constr.

2 1 2000 ENERCON E-82 constr.

S ERRA DO MÚ (ext.) Beja 2 1 2000 ENERCON E-82 constr.

S . MACÁR IO II Viseu 23 10 2300 NORDEX N90 constr.

ALTO DA COUTADA I Vila Real 54 27 2000 ENERCON E-82 constr.

S ERRA DE SAMPAIO Viseu 8 4 2000 ENERCON E-82 constr.

S ERRA DA NAVE Viseu 28 14 2000 ENERCON E-82 constr.

S .ª DAS NECES S IDADES Coimbra 8 4 2000 ENERCON E-82 constr.

TROVIS CAL Guarda 14 7 2000 ENERCON E-82 constr.

S . CORNÉLIO Guarda 32 16 2000 ENERCON E-82 constr.

BALOCAS Guarda 10 5 2000 ENERCON E-82 constr.

PEDRAS LAVRADAS II C astelo Branco 20 10 2000 ENERCON E-82 constr.

POUSAFOLES Guarda 20 10 2000 ENERCON E-82 constr.

BENES PERA Guarda 34 17 2000 ENERCON E-82 constr.

TES TOS II Viseu 44 22 2000 ENERCON E-82 constr.

SERAMENA Lisboa 2 1 2000 ENERCON E-82 constr.

ALVAIÁZERE Leiria 16 8 2000 ENERCON E-82 constr.

ALTO DO MARCO Vila Real 12 6 2000 ENERCON E-82 constr.

VALE DE GALEGOS Lisboa 4 2 2000 ENERCON E-82 constr.

Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connection Connection Connection Connection

to gridto gridto gridto grid

AÇOR (ext.) Coimbra

Capac ityCapac ityCapac ityCapac ity

NameNameNameName Dis tric tDis tric tDis tric tDis tric t ManufacturerManufacturerManufacturerManufacturer ModelModelModelModel

[MW] [kW]

GRAMINHAIS S . Miguel 9,0 10 900 ENERCON E-44 cons tr.

Capac ityCapac ityCapac ityCapac ity Number of Number of Number of Number of WECsWECsWECsWECs

Nominal Nominal Nominal Nominal powerpowerpowerpower Connection Connection Connection Connection

to gridto gridto gridto grid

Page 31: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO
Page 32: Wind Farms Portugal Dec10 final - UPe2p.inegi.up.pt/relatorios/Wind_Farms_Portugal_Dec10_final.pdf · 3 1300 NORDEX N60 2002 JARMELEIRA Lisboa 0,9 1 850 VESTAS V52-850 2002 JOGUINHO