Page 1: ETABS Example RC Building Seismic Load Time History

Seismic Analysis & Design of

10 Story RC Building (Time History Analysis)

Using ETABS (Metric Units)

ACECOMS, AIT

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0 2 4 6 8 10 12

yg

Page 2: ETABS Example RC Building Seismic Load Time History
Page 3: ETABS Example RC Building Seismic Load Time History

Table of Content Objective 5

Problem 5

Step by Step 11

1. Open Existing Model and Unlock Model 11

2. Delete Existing Seismic Load Case 14

3. Define Time History Function 15

4. Specify Time History Cases 18

5. Run Analysis 23

6. View Modal Analysis Results 26

7. View Time History Analysis Results 29

8. Run Concrete Frame Design and View Results 38

9. Run Shear Wall Design and View Results 48

Page 4: ETABS Example RC Building Seismic Load Time History
Page 5: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 5/59

Objective To demonstrate and practice step-by-step on time history analysis and design of 10 story RC building.

Problem Carry out modal time history analysis, and design of 10 story RC building using ELCENTRO time history data.

3D View

Page 6: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

6/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Plan View (Unit in m)

BASE – STORY 7

STORY 8 – STORY 10

6.00

m

6.00

m

6.00

m

2.00 2.00 2.00

2.00

2.0

0 2.

00

6.00 m 6.00 m 6.00 m

6.00

m

6.00

m

6.00

m

2.00 2.00 2.00

2.00

2.0

0 2.

00

6.00 m 6.00 m 6.00 m

Page 7: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 7/59

Elevation View

Material Properties for Concrete (Unit in kg and cm)

Page 8: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

8/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Section Properties

Member Dimension

Beam (width x Height) 30 x 60 cm

Column 50 x 50 cm

Slab Thickness = 15 cm

Shear wall Thickness = 20 cm

Story Height Data

Story Height

Typical Story 3.00 m

Story at base of building 4.00 m

Static Load Cases

Load Name Load Type Details Value

Self Weight of Structural MembersCalculate automatically using Self

Weight Multiplier in ETABS -

Uniform Load on Slabs: (Finishing + Partition Load)

0.20 t/m2 DEAD Dead Load

Uniform Load on Beams: (Wall Load)

0.50 t/m

LIVE Reducible Live Load

Uniform Load on Slabs: (Use Tributary Area: UBC97) 0.25 t/m2

Page 9: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 9/59

ELCENTRO Time History Function

ELCENTRO Time History

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0 2 4 6 8 10 12 14 16 18

Time (Sec)

Gro

und

Acc

erel

atio

n N

orm

aliz

ed b

y g

Note: Use Built-in Time History Data in ETABS located at “Time History Functions” subfolder in main folder that ETABS has been installed (normally at C:\Program Files\Computers and Structures\ETABS\Time History Functions)

Page 10: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

10/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Wind Load Cases (UBC97)

Load Case Parameter

WINDX WINDY

Wind Direction X Y

Wind Speed 90 mph

Exposure Type B (Suburban area)

Importance Factor 1 (Building normal importance)

Page 11: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 11/59

Step by Step

1. Open Existing Model and Unlock Model

Step 1-1: Open Existing Model Start up screen of ETABS, click on Open button or go to File >> Open and find file from previous example.

Page 12: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

12/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 1-2: Save As to New File Go to File >> Save As and specify new file name.

Page 13: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 13/59

Step 1-3: Unlock Model Click on Unlock Model button

Click on “OK” to confirm to unlock the model and delete all analysis results

Note: ETABS has locked the model automatically from previous analysis. Model has to be unlocked first before do any modification by clicking on Unlock Model button . ETABS will delete all analysis and design results after unlock.

Page 14: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

14/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

2. Delete Existing Seismic Load Case

Step 2-1: Delete Existing Seismic Load Case Case A: File from First Example (Equivalent Lateral Force) Go to Define >> Static Load Case, select “EQXA” and click on “Delete Load” Repeat this step to delete “EQXB”, “EQYA” and “EQYB”

Case B: File from Second Example (Modal Response Spectra Analysis) Go to Define >> Response Spectrum Case, select “EQX” and click on “Delete Spectrum”. Repeat this step to delete “EQY”

Page 15: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 15/59

3. Define Time History Function

Step 3-1: Add New Time History Function Go to Define >> Functions >> Time History, select “Function from File” and click on “Add New Function”.

Page 16: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

16/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 3-2: Locate ELCENTRO Time History Data Click on “Browse”, select “Files of type” to “All files (*.*)” and locate file named “ELCENTRO” (normally at “C:\Program Files\Computers and Structures\ETABS\Time History Functions”)

Page 17: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 17/59

Step 3-3: Display “ELCENTRO” Time History Function Select “Time and Function Values” and click on “Display Graph”.

Note: To view coordinate of each point on graph, move cursor over this graph, location of current point over cursor on graph will display as red dot and coordinate of cursor is shown at bottom of graph. From above graph found that total time is 12 sec.

Page 18: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

18/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

4. Specify Time History Cases

Step 4-1:Add New Time History Case Make sure that current working unit is “Ton-m” by checking in drop-down menu at right-bottom of page. Go to Define >> Time History Case and click on “Add New History”

Page 19: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 19/59

Step 4-2: Specify Time History Case for “EQX” Specify time history case as shown in figure below

Page 20: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

20/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Note:

1. Output time step size should be set such a way that the peak amplitude points on the time history function are not missed. (0.1 sec for this example)

2. Because the values along Y axis of time history function as specified in step 3 are normalized by ground acceleration (g), the scale factor will be value of g (9.81 in metric unit).

3. This scale factor can also be used to increase or decrease the time history magnitude for difference soil condition, site location…etc.

4. Total analysis time = Total time history function + 5 time of building period in first mode (for damping = 0.05).

= 12 + 5 x 1.2 = 18 sec

5. Number of output time steps = Total analysis time / Output time step size

ELCENTRO Time History

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0 2 4 6 8 10 12 14 16 18

Time (Sec)

Gro

und

Acc

erel

atio

n N

orm

aliz

ed b

y g

Output time step size

Total analysis time

Page 21: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 21/59

Step 4-3: Specify Damping for “EQX” Click on “Modify/Show” and enter “Damping for all Modes” as shown in figure below.

Page 22: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

22/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 4-4: Specify Time History Case and Damping for “EQY” Repeat Step 4-1 to 4-3 to add “EQY” Time History Case as shown in figures below

Page 23: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 23/59

5. Run Analysis Step 5-1: Set Dynamic Analysis Parameters Go to Analyze >> Set Analysis Options, select “Dynamic Analysis”, click on “Set Dynamic Parameters” and specify dynamic analysis parameters as shown in figure below

Page 24: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

24/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 5-2: Start Analysis Go to Analyze >> Run Analysis or click on Run Analysis button to start analysis. ETABS will display deformed shape of model when analysis complete.

Note: ETABS will lock the model automatically from accidental or undesired changes. Model will be unlocked by clicking on Unlock Model button . ETABS will delete all analysis and design results after unlock.

Page 25: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 25/59

Step 5-3: Check Error from Analysis Run Record Go to File >> Last Analysis Run Log and scroll down to check error message.

Page 26: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

26/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

6. View Modal Analysis Results

Step 6-1: Display Mode Shape in 3D View Select 3D view window, go to Display >> Show Mode Shape or click on Show Mode Shape button and select desired mode. To view deformed shape in animation, click on “Start Animation”.

Note: Time Period of current mode shows at top of 3D window

Page 27: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 27/59

Step 6-2: Display Modal Displacement at Particular node Right click on desired node to display modal displacement at current mode shape

Page 28: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

28/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 6-3: View Modal Analysis in Tabular Form Go to Display >> Set Output Table Mode and select items as shown in figure below

Select building modal information from drop-down menu

Note: This table can be copied to MS Excel by using Edit >> Copy menu in this window (Not main menu).

Page 29: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 29/59

7. View Time History Analysis Results

Step 7-1: View Analysis Result Diagrams of Frame Elements (Beam or Column) Select “Plan View” window by clicking on it, go to Display >> Show Member Forces/Stress Diagram >> Frame/ Pier/Spandrel Forces and select time history analysis (“EQX” or “EQY”) from “Load” and “Component”. Desired time step can be specified from “Time” dialogue box or click on button to view previous time step or button to view next time step.

Page 30: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

30/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Note: Sign Convention for Frame Element

Page 31: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 31/59

Step 7-2: View Analysis Result Diagram at Particular Frame Element Right click on desired beam to display particular analysis result diagram

Note: To see analysis results in particular location, move mouse cursor over this diagram and see value at bottom of the window

Page 32: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

32/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 7-3: Change View to Elevation View at Elevator Location Click on Set Elevation View button and select elevation view at elevator location

Page 33: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 33/59

Step 7-4: View Analysis Result Diagrams of Shear Wall (Pier) Right click on desired shear wall panel to view particular diagram

Note: Same as frame element, move mouse cursor over this diagram and see value at bottom of this window to check analysis results in particular location

Page 34: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

34/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 7-5: View Analysis Result Contour in Shear Wall Panels (Elevation View) Change “Plan View” to “Elevation View” by clicking on Set Elevation View button and selecting desired elevation for elevator location, go to Display >> Show Member Forces/Stress Diagram >> Shell Stresses/Forces, select time history analysis case (“EQX” or “EQY”) from “Load” and “Component”. Right click on desired wall panel to view particular analysis result.

Note: Analysis results at particular location will display at the bottom of window when move mouse cursor over this diagram.

Page 35: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 35/59

Note: Sign Convention for Shell Element

Page 36: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

36/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 7-6: View Analysis Result Contour in Slab Panels (Plan View) Change to “Plan View” by clicking on Set Plan View button and selecting desired floor, go to Display >> Show Member Forces/Stress Diagram >> Shell Stresses/Forces and select time history analysis (“EQX” or “EQY”) and “Component”. Same as shear wall panel, right click on desired wall panel to view particular analysis result.

Page 37: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 37/59

Step 7-7: View Analysis Results in Tabular Form Go to Display >> Show Output table Mode, select desired items and click on “Select Loads” to specify load case/combination.

Select analysis results from drop-down menu at top-right of screen

Note: This table can be copied to MS Excel by using Edit >> Copy menu in this window (Not main menu).

Page 38: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

38/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

8. Run Concrete Frame Design and View Results ETABS will be defined load combination automatically based on load cases and select design code except time history analysis case that need to be defined manually as seismic load (E) for ACI load combination.

Step 8-1: Select Design Code Go to Options >> Preference >> Concrete Frame Design and select “ACI 318-99” from “Design Code”

Page 39: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 39/59

Step 8-2: View Load Combination for Concrete Frame Design Go to Design >> Concrete Frame Design >> Select Design Combo to view load combination for concrete frame design. Load combinations have been defined as selected code from previous step. Select desired load combination from “Design Combos” column and click on “Show” to view load combination parameters (load factors and details)

Note: There is no seismic load case (E) in all load combination that are defined automatically by ETABS.

Page 40: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

40/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 8-3: Add New Load Combination for Seismic Load (E) Go to Define >> Load Combinations, click on “Add New Combo”.

Page 41: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 41/59

Step 8-4: Specify Load Case and Load Factor for “CON11” Load Combination Select “Case Name”, enter “Scale Factor” and click on “Add” to specify load case and load factor one by one for “CON11” load combination

Note: “DCON11” name can be used for manual load combination because “DCON” is reserved for auto load combination for RC concrete frame design.

Page 42: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

42/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 8-5: Specify Load Case and Load Factor for the remaining of Load Combination Repeat Step 8-3 to 8-4 to define load combination as details shown in table below one by one.

Load Case/ Load Factor Load Comb. Name DEAD LIVE WINDX WINDY EQX EQY

CON11 1.05 1.275 - - 1.4025 -

CON12 1.05 1.275 - - -1.4025 -

CON13 1.05 1.275 - - - 1.4025

CON14 1.05 1.275 - - - -1.4025

CON15 0.9 - - - 1.43 -

CON16 0.9 - - - -1.43 -

CON17 0.9 - - - - 1.43

CON18 0.9 - - - - -1.43

Page 43: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 43/59

Step 8-6: Specify Load Combination for Concrete Frame Design Go to Design >> Concrete Frame Design >> Select Design Combo, select “CON11” to “CON18” from left column and click on “Add” to add manual load combination to Design combo list.

Page 44: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

44/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 8-7: Start Concrete Frame Design Go to Design >> Concrete Frame Design >> Start Design/Check of Structure

Page 45: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 45/59

Step 8-8: Display Longitudinal Reinforcing for Concrete Frame Design Select “kg-cm”, go to Design >> Concrete Frame Design >> Display Design Info, click on “Design Output” and select “Longitudinal Reinforcing” from first drop-down menu.

Page 46: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

46/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 8-9: Display Shear Reinforcing for Concrete Frame Design Go to Design >> Concrete Frame Design >> Display Design Info, click on “Design Output” and select “Shear Reinforcing” from first drop-down menu.

Page 47: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 47/59

Step 8-10: Display Concrete Frame Design in Details To see concrete frame design in details, right mouse click on desired element. The highlighted row is the critical location along the element length (maximum required reinforcement). More details can be displayed by clicking on button below. Click ”OK” to close this dialogue.

Page 48: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

48/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

9. Run Shear Wall Design and View Results

Typical Shear Wall Design Procedure Following is a typical shear wall design process that might occur for a new building. Note that the sequence of steps you may take in any particular design may vary from this but the basic process will be essentially the same.

1. After create the building model Use the Options menu > Preferences > Shear Wall Design command to review the shear wall design preferences and revise them if necessary. Note that there are default values provided for all shear wall design preferences so it is not actually necessary for you to define any preferences unless you want to change some of the default preference values.

2. Run the building analysis using the Analyze menu > Run Analysis command.

3. Assign the wall pier and wall spandrel labels. Use the Assign menu > Frame/Line > Pier Label, the Assign menu > Shell/Area > Pier Label, the Assign menu > Frame/Line > Spandrel Label, and the Assign menu > Shell/Area > Spandrel Label commands to do this.

Note that the labels can be assigned before or after the analysis is run.

4. Assign shear wall overwrites, if needed, using the Design menu > Shear Wall Design > View/Revise Pier Overwrites and the Design menu > Shear Wall Design > View/Revise Spandrel Overwrites commands. Note that you must select piers or spandrels first before using these commands. Also note that there are default values provided for all pier and spandrel design overwrites so it is not actually necessary for you to define any overwrites unless you want to change some of the default overwrite values.

Note that the overwrites can be assigned before or after the analysis is run.

Important note about selecting piers and spandrels: You can select a pier or spandrel simply by selecting any line or area object that is part of the pier or spandrel.

Page 49: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 49/59

5. If you want to use any design load combinations other than the default ones created by ETABS for your shear wall design then click the Design menu > Shear Wall Design > Select Design Combo command. Note that you must have already created your own design combos by clicking the Define menu > Load Combinations command.

6. Click the Design menu > Shear Wall Design > Start Design/Check of Structure command to run the shear wall design.

7. Review the shear wall design results. To do this you might do one of the following:

a. Click the Design menu > Shear Wall Design > Display Design Info command to display design information on the model.

b. Right click on a pier or spandrel while the design results are displayed on it to enter the interactive wall design mode. Note that while you are in this mode you can revise overwrites and immediately see the new design results.

If you are not currently displaying design results you can click the Design menu > Shear Wall Design > Interactive Wall Design command and then right click a pier or spandrel to enter the interactive design mode for that element.

1. Use the File menu > Print Tables > Shear Wall Design command to print shear wall design data. If you select a few piers or spandrels before using this command then data is printed only for the selected elements.

2. If desired, revise the wall pier and/or spandrel overwrites, rerun the shear wall design, and review the results again. Repeat this step as many times as needed.

3. If desired, create wall pier check sections with user-defined (actual) reinforcing specified for the wall piers using the Section Designer utility. Use the Design menu > Shear Wall Design > Define Pier Sections for Checking command to define the sections in Section Designer. Be sure to indicate that the reinforcing is to be checked. Use the Design menu > Shear Wall Design > Assign Pier Sections for Checking command to assign these sections to the piers. Rerun the design and verify that the actual flexural reinforcing provided is adequate.

Page 50: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

50/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

4. Assign these check sections to the piers, change the pier mode from Design to Check, and rerun the design. Verify that the actual flexural reinforcing provided is adequate.

5. If necessary, revise the geometry or reinforcing and rerun the design.

6. Print or display selected shear wall design results if desired.

Note that shear wall design is performed as an iterative process. You can change your wall design dimensions and reinforcing during the design process without rerunning the analysis. However, you always want to be sure that your final design is based on analysis properties (wall dimensions) that are consistent with your design (actual) wall dimensions.

3 per rigid zone

Rigid

Beam

Column

A: Shear Wall with Line Loads B: Finite Element Model

C: Define Beams & Columns D: Beam-Column Model

Page 51: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 51/59

Step 9-1: Change view to “Elevation View” Click on Set Elevation View button , select desired elevation and use Rubber Band Zoom button to zoom shear wall view.

Page 52: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

52/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 9-2: Select Design Code for Shear Wall Design Go to Options >> Preference >> Shear Wall Design and select parameters as shown in figure below.

Page 53: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 53/59

Step 9-3: View Load Combination for Shear Wall Design Go to Design >> Shear Wall Design >> Select Design Combo to view load combination for shear wall design. Load combinations have been defined as selected code from previous step. Select desired load combination from “Design Combos” column and click on “Show” to view load combination parameters (load factors and details)

Note: Same as concrete frame design, load combination for seismic load (E) from time history analysis are required to be defined manually.

Page 54: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

54/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 8-11: Specify Load Combination for Shear Wall Design From “Design Load Combination Selection” dialogue, select “CON11” to “CON18” from left column and click on “Add” to add manual load combination to Design combo list.

Note: Load combination for concrete frame design that have been defined in step

8-3 to 8-5 can be used for shear wall design

Page 55: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 55/59

Step 9-4: Start Shear Wall Design Go to Design >> Shear Wall Design >> Start Design/Check Structure

Page 56: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

56/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Step 9-5: Display Pier Design Information for Shear Wall Design Go to Design >> Shear Wall Design >> Display Design Info, click on “Design Output” and select “Pier Longitudinal Reinforcing”.

Note: Longitudinal reinforcing area displayed in above figure is for all 3 shear wall panels because all of them have been assigned in same pier label (P1) from previous example

Page 57: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 57/59

Step 9-6: Display Pier Design Details for Shear Wall Design To see pier design in details, right mouse click on desired pier panel.

Page 58: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

58/59 Seismic Analysis & Design of 10 Story RC Building (Time History Analysis)

Reinforcement Location for Pier

Page 59: ETABS Example RC Building Seismic Load Time History

ETABS Tutorial Example ACECOMS, AIT

Seismic Analysis & Design of 10 Story RC Building (Time History Analysis) 59/59

Note: Typical Detailing of Shear Wall