ESTIMATING (QSB 60504) GROUP ASSIGNMENT PRESENTATION Group Members: Loh Pey Mun Loh Wei Ling Leong Karr Khei Ngeow Xuan Ying Michael Chang Chuang Jing Gan Xiao Ying Koh Wen Qi
ESTIMATING (QSB 60504)
GROUP ASSIGNMENT PRESENTATION
Group Members:Loh Pey Mun Loh Wei LingLeong Karr KheiNgeow Xuan YingMichael ChangChuang JingGan Xiao YingKoh Wen Qi
INTRODUCTION
• In 27th September 2017, we receive an invitation of tender:
• CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123, MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN.
• A single storey show house project.
CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123, MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN
INTRODUCTION
INTRODUCTIONWe submit the tender on 18th November 2017.
However, we have been disqualified and the tender has been rejected.
This presentation is to analyse the mistakes we made and the improvement we can have in the future, to prevent from repeating the same mistakes.
ORGANISATION CHART
ORGANISATION CHART
• General Manager- Emphasizes client relationships- Increase management’s effectiveness- Maintain quality service
• Special Project Division- Ensure smooth processes - Lead special projects- Drive operational efficiency
ORGANISATION CHART
ORGANISATION CHART
ORGANISATION CHART
STRENGTH OF COMPANY
WEAKNESSES OF COMPANY
EEROR IN TENDER
• Human Error
Error 1
Error 1 : The rate for mild
steel bar 8mm should be
RM1656.25
ERROR IN TENDER
ERROR IN TENDER
REASONS OF FAILURE
1. Poor Preparation• Didn’t get a clear picture of what we should do.
2. Lack of Communication • Workflow wasn’t at it’s optimum level as not
everyone is on the same page.
3. Late
CONCLUSION & RECOMMENDATION OF IMPROVEMENT