Page 1: Estimating presentation

ESTIMATING (QSB 60504)

GROUP ASSIGNMENT PRESENTATION

Group Members:Loh Pey Mun Loh Wei LingLeong Karr KheiNgeow Xuan YingMichael ChangChuang JingGan Xiao YingKoh Wen Qi

Page 2: Estimating presentation
Page 3: Estimating presentation

INTRODUCTION

• In 27th September 2017, we receive an invitation of tender:

• CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123, MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN.

• A single storey show house project.

Page 4: Estimating presentation

CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123, MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN

Page 5: Estimating presentation

INTRODUCTION

Page 6: Estimating presentation

INTRODUCTIONWe submit the tender on 18th November 2017.

However, we have been disqualified and the tender has been rejected.

This presentation is to analyse the mistakes we made and the improvement we can have in the future, to prevent from repeating the same mistakes.

Page 7: Estimating presentation

ORGANISATION CHART

Page 8: Estimating presentation

ORGANISATION CHART

• General Manager- Emphasizes client relationships- Increase management’s effectiveness- Maintain quality service

• Special Project Division- Ensure smooth processes - Lead special projects- Drive operational efficiency

Page 9: Estimating presentation

ORGANISATION CHART

Page 10: Estimating presentation

ORGANISATION CHART

Page 11: Estimating presentation

ORGANISATION CHART

Page 12: Estimating presentation

STRENGTH OF COMPANY

Page 13: Estimating presentation

WEAKNESSES OF COMPANY

Page 14: Estimating presentation

EEROR IN TENDER

• Human Error

Error 1

Error 1 : The rate for mild

steel bar 8mm should be

RM1656.25

Page 15: Estimating presentation

ERROR IN TENDER

Page 16: Estimating presentation

ERROR IN TENDER

Page 17: Estimating presentation

REASONS OF FAILURE

1. Poor Preparation• Didn’t get a clear picture of what we should do.

2. Lack of Communication • Workflow wasn’t at it’s optimum level as not

everyone is on the same page.

3. Late

Page 18: Estimating presentation

CONCLUSION & RECOMMENDATION OF IMPROVEMENT