Top Banner
ESBN Presentation to the IGG John Bracken 3 rd May 2018
16

ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

Jul 03, 2018

Download

Documents

trinhliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

ESBN Presentation to the IGG

John Bracken3rd May 2018

Page 2: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

2 esbnetworks.ie

Agenda

ESBN Meter Project Update

RM259 Update

Feedback on Atos Contract

Smart Update (Elaine Sexton)

I-SEM Update (Jim Long)

Page 3: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

3 esbnetworks.ie

ATOS Transition

Atos contract is up and running. Are Suppliers happy with

Service?

Comment @ January 2018 ..

“As far as we are concerned, all is going well with any wrinkles

hopefully addressed. I would however appreciate any feedback

from suppliers in case there are issues that are causing concerns”.

Gary McQuoid Client Executive Atos NI

m: +44077333 12759

e: [email protected]

Page 4: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

Smart Metering Project – IGG Update

Thursday 3rd May 2018

Elaine Sexton, SMART Project

Page 5: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

5 esbnetworks.ie

SMART

Agenda

• ESBN SMART Project

o Phased Approach

o Overview & Milestones

• Market Release Schema v12.00.00

o Scope

o Milestone Plan

o Progress

o Governance

• Future IGGs

o Implementation Details

o Cutover/Contingency Planning

Page 6: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

6 esbnetworks.ie

ESBN SMART - Phased Approach

2019 2020 2024

Phase 1 Phase 2 Phase 3

2022

Market Release 1

(April 19)

Market Release 2

(December 20)

Market Release 4

(December)

2018

• Procure, build & test new solution

• Two Market Schema releases to facilitate

Smart Metering (non -Smart MCRs also incl)

• Daily collection & processing of interval data.

• The opportunity for Suppliers to offer new

Time-of-Use based tariffs

• Enable remote operation

of the service switch in

Smart Electricity Meters

• Smart Pre-Payment

services with secure

remote de-

energisation/energisation

• Advanced meter alerts &

events

• Gas Meter integration

• Commence installation of

gas smart meters

• In-Home Channel (HAN)

• In-Home Displays for real-

time customer information

250K Smart Meters safely installed by

December 2020 1 million Smart Meters

installed by 2022Remaining Smart

Meters installed by

end of 2024

20232021

Market Release 3

(December)

2017

Page 7: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

7 esbnetworks.ie

ESBN SMART - Overview & Milestones

SMART

Drop High Level Scope Planned Go-Live Comment

0 RMP Extranet:

• MCR1176

• MCR1179

Sunday 25th April 2018 • Successfully Delivered

1 SAP IS-U Unicode Conversion August Bank Holiday 2018 • No Market Design Changes

• Market Assurance

2 Deployment & Logistics Q4 2018 • Updates provided at Smart ILG

3 Market Release v12.00.00

• MCRs

• SMART Enablement for Meter

Installation

• Technical Upgrades

Easter Weekend April 2019 • Significant body of work

• Market Assurance

• IPT

4 AMI Procurement & Enablement Q4 2019 • Updates provided at Smart ILG

5 Deployment Contractor Q4 2020 • Updates provided at Smart ILG

6 Market Release v13.00.00

• SMART MCRs

• Other Market Changes (TBC)

Dec 2020

(TBC-Prioritisation Process)

• Market Assurance

• IPT

* CoBLCR changes will be raised as required

Page 8: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

8 esbnetworks.ie

Market Release Schema v12.00.00 - OverviewElement Changing Comment

Market Design

Documentation• ESBN SMART supporting RMDS in providing additions to the Retail Market Design:

o 11 new Standard Profiles - (MCR1167)

o 25 new Burn Hour Calendars - (MCR1167)

o Effective wattage for every lamp type will be published by ESBN (MCR1167), CoBLCR

changes as needed

TIBCO\Supplier EMMAs • Schema changes in both jurisdictions

Schema• ROI – Schema Changes 3 Data Codes are being modified to include additional or updated values:

o ‘RejectReasonCode’ - 9 new values (MCR0175)

o ‘CustomerServiceDetailsCode’ - 3 new values for ROI CoBL – 2 of which

will be added to schema (MCR1173)

o ‘LoadProfileCode’ – 11 new values (MCR1167)

• NI – Schema Changes - Covered by ReMCoWG/CDA

ROI Webforms• Webforms for ROI will need to be changed to accommodate the new Customer Service Special

Needs Details.

• ROI Webforms affected by these changes are those associated with the following MM: 010, 013,

016, 017

ROI Extranet • MCR1173,MCR1140 & MCR1167

Downloadable Files • 3 Downloadable files changing: DOM_CUST, COMM_CUST & UNMET_CUST (MCR1173,

MCR1140, MCR1169 & MCR1167)* CoBLCR changes will be raised as required

Page 9: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

9 esbnetworks.ie

Market Release Schema v12.00.00 – Scope

MCR Version

Number

Description Schema/

Non-Schema

MCR0175 V5.0 New Reject Reasons for Address Change Rejection Schema

MCR1173 V2.0 Vulnerable Customer Implementation in ROI of SI 463 Schema

MCR1167** V3.0 Facilitate energy efficiencies in Local Authority Public Lighting Schema

MCR1140 V3.0 Introduction of Eircodes into the Retail Market Design in Ireland Non-Schema

MCR1169 V2.0 Addition of Postal Code to two Downloadable Meter Point Details Files Non-Schema

MCR1175 V3.0 Provide Market Participant Business Reference (MPBusinessReference) for Reading Non-Schema

MCR1180 V4.0 New Registration Default Supplier Non-Schema

MCR1183 V2.0 010 Customer Validation Agreement (NI) Schema

MCR1154 V2.0 New Unmetered Tariff for NI Schema

Other Comment

Smart Enablement • SAP IS-U Enhancement Pack (8.0)

• SMART Enablement for Meter Installation

• SAP Hana

** Pending IGG approval for re-versioning

Page 10: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

10 esbnetworks.ie

Market Release v.12.00.00 – Milestone Plan

2018 2019

Q1 Q2 Q3 Q4 Q1 Q2 Q3

Design/Build/Test

V.12.00.00 Schema Published

Jan 28th

Go Live Easter 2019

IPT Prep

Market Engagement

CRU go/no Decision

v

Other

Unicode ConversionGo live August 2018

SAP Hana

SAP IS-U Enhancement Pack (8.0)

Smart Enablement for Meter Installation

5th16th 7th 7th 4th 27th 25th 29th 3rd 8th30th

Key

IGG (Meetings & Calls)

Key Milestone

Go lives

3rd

Go Live Easter 2019

Go Live Easter 2019

Go Live Easter 2019

IPT Exec

Page 11: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

11 esbnetworks.ie

Market Release v12.00.00 – Status

MCR Description Status

MCR0175 New Reject Reasons for Address Change Rejection

MCR1173 Vulnerable Customer Implementation in ROI of SI 463

MCR1167** Facilitate energy efficiencies in Local Authority Public Lighting

MCR1140 Introduction of Eircodes into the Retail Market Design in Ireland

MCR1169 Addition of Postal Code to two Downloadable Meter Point Details Files

MCR1175 Provide Market Participant Business Reference (MPBusinessReference) for Reading

MCR1180 New Registration Default Supplier

MCR1183 010 Customer Validation Agreement (NI) ReMCoWG/CDA

MCR1154 New Unmetered Tariff for NI ReMCoWG/CDA

Other Comment Status

Smart

Enablement

• SAP IS-U Enhancement Pack (8.0)

• SMART Enablement for Meter Installation

• SAP Hana

** Pending IGG approval for re-versioning, version numbers above will change

Page 12: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

esb.ie

Market Release Schema v12.00.00 – Governance

Topic Channel Frequency

• Periodic Update IGG As per agreed schedule

• Participant Queries RMDS Email/Phone Ad-hoc

• Market Design

• Market Release

Timelines

• Publications

RMDS Email/Web As Required

• Market Assurance RMDS/Gemserv As Required

• Existing Governance model will be used

RMDS – Contact Details

o E-Mail: [email protected]

o Website: https://rmdservice.com

o Phone: (01) 669 2410

Page 13: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

esb.ie

Topic MCR# Description Topic IGG Meeting

(Indicative

Dates-TBC)

Implementation

Details

MCR1167 Public Lighting ESBN Publication:

• Standard Profiles

• Burn Hour Calendars

• Effective Wattages

Aug 2018

MCR1140 Eircodes Upload mechanism and schedule

for circa 1.5 Million Eircodes

Nov 2018

MCR1180 New Registration Default

Supplier

‘Work In Progress’ items will be

discussed

Nov 2018

MCR1173 Vulnerable Customers Reconciliation with suppliers for

new codes & Rejection Reasons

Nov 2018

MCR1140

MCR1173

MCR1167

MCR1169

Downloadable Meter Point Files Samples files Jan 2019

MCR1140

MCR1173

MCR1167

RMP Extranet screenshots Samples screenshots Jan 2019

MCR1167 700 Series MMs Samples 700MMs Feb 2019

Cutover &

Contingency

Planning

All Cutover & Contingency Planning Cutover & Contingency Approach Nov 2018

Market Release Schema v12.00.00 – Future IGGs

Page 14: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

esb.ie

Appendix

Page 15: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

esb.ie

ROI Market Release 2019 – Schema MCRs

MCR Description Change Details Comments

MCR0175

Version

5.0

New Reject Reasons for

Address Change Rejection

Nine New code

values are being

added (I.e. AD1-

>AD9)

• Market Message (MM): 014R

• 9 New Data Codes – Appendix – MCR0175 in March deck refers

MCR1173

Version

2.0

Vulnerable Customer

Implementation in ROI of SI

463

Change existing

Code 0008 to be

valid in ROI

&

Two new code values

(I.e. 0009 & 0010)

• Market Messages (MM): 010, 013 , 016 & 017

• 3 New Data Codes for ROI CoBL, 2 of which will be added to schema – Appendix – MCR1173 in March

deck refers

• Data Code values will now be used on Extranet and Downloadable files – not the Central Market System

Codes as per current design – Appendix – MCR1173 in March deck refers

• Code 0010 should not be used at this time – it’s being introduced for future proofing and will be rejected.

Rejection reasons and associated rejection messages will be communicated at a future IGG.

• The codes will appear in confirmation messages in line with current market rules

• Modified downloadable files will be available to Suppliers from May 2019 – Appendix MCR1173 in March

deck refers

• ROI Webforms :code 0010 will be selectable, not display only as originally communicated – Appendix

MCR1173 in March deck refers

MCR1167*

*

Version

3.0

Facilitate energy efficiencies

in Local Authority Public

Lighting

Eleven New code

values are being

added

(I.e.

U13->U23)

• Market Messages (MM): 591, 700, 700W, 701 & 701W

• 11 New Data Codes & 11 New Standard Profiles – Appendix MCR1167 in March deck refers

• 25 New Burn Hour Calendars – Appendix MCR1167 in March deck refers

• Effective wattage for every lamp type will be published by ESBN (when available)

• CoBLCR changes will be raised, as needed

• Downloadable file with new data values and structure will be available to Suppliers from May 2019 –

Appendix MCR1167 in March deck refers

MCR1183 010 Customer Validation

Agreement (NI)

NI Requirements NI Schema changes are covered in ReMCoWG/CDA

MCR1154 New Unmetered Tariff for NI

** Pending IGG approval for re-versioning, version numbers above will change

Page 16: ESBN Presentation to the IGG John Bracken · 1 SAP IS-U Unicode Conversion August Bank Holiday 2018 ... • Other Market Changes (TBC) Dec 2020 (TBC-Prioritisation Process)

esb.ie

ROI Market Release 2019 – Non-Schema MCRs

MCR Description Comments

MCR1140

Version 3.0

Introduction of

Eircodes into the

Retail Market

Design in Ireland

• Eircodes can be submitted on MMs in the existing Postal Code field : 010, 012, 012W,013 & 021

• Eircodes where available will be returned in the existing Postal Code fields on MM: 014R, 101, 101P, 101R, 102,

102P, 102R, 105, 105L, 110, 112, 112R, 112W, 114, 301, 301N& 330

• ESBN will agree schedule for mass uploads of Eircodes into the Meter Point Address Postal Code field in the Central

Market System at a future IGG.

• ESBN intend to update these in batch – mechanism and schedule to be discussed at a future IGG

• Once the Postal Code field has been populated it will be visible on the Retail Market Participant Extranet – Appendix

in March deck MCR1140 refers

Note: Existing Market Defect originally intended to go-live with MCR1187 will now be implemented alongside

this MCR.

MCR1169

Version 2.0

Addition of Postal

Code to two

Downloadable

Meter Point Details

Files

• Modified downloadable files will be available to Suppliers from May 2019 – Appendix MCR1169 in March deck

refers

• However, population of field will be determined by the Eircode upload schedule for MCR1140

• ESB Networks intend to discuss the upload schedule for these two files at future IGGs

MCR1175

Version 3.0

Provide Market

Participant Business

Reference

(MPBusinessRefere

nce) for Reading

• The Market Participant Business Reference (MPBusinessReference) on the 300MM will be populated with that from

the associated original 210MM (i.e. where it populated a periodic meter reading order)

• Read Reason 95/’Not for COS’ is the only case for which the above applies

o If the customer reading which populates the open Meter Reading Order is implausible and is estimated

populate the MPBusinessReference on the corresponding 305MM

o If the customer reading which populates the open Meter Reading Order is withdrawn populate

the MPBusinessReference on the corresponding 300WMM

MCR1180

Version 4.0

New Registration

Default Supplier

• For sites with MIC <30kVa, the Customer must now register with a Supplier

• The 010MM must be received by the Central Market system before a connection point can be energised

** Pending IGG approval for re-versioning, version numbers above will change