Top Banner

Click here to load reader

Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CAT’S

Dec 19, 2015

ReportDownload

Documents

  • Slide 1
  • Eric Buddrius Amanda Bolland Ian Lootens Greg Hilbert STEALTH CATS
  • Slide 2
  • SPECIFICATIONS
  • Slide 3
  • CATALYST Aristo Contact is Bob McDowell Goal: to meet National Park Standards Focus: Carbon Monoxide and Unburned Hydrocarbons emissions Emissions Data 2010 Results CSC LimitNPS BAT CO209.94< 275< 120 HC41.6-< 15 NOX5.8-- HC+NOX47.36< 90- E-Score125.9> 100- Units: g/kW-hr
  • Slide 4
  • MUFFLER BASICS Two Main Functions Reflection Most Effective Destructive Interference High Back Pressure Restriction Most Common Cheapest Absorption Simple with Low Back Pressure Low Damping
  • Slide 5
  • HUSHPOWER TECHNOLOGY A.Entry Cone B. Laminar Flow Area C. Thermal Barrier D. Exit Cone
  • Slide 6
  • DESIGN EVALUATION Flow Bench Ricardo Wave J 192 Testing Procedure Timeline
  • Slide 7
  • FLOW BENCH Test Stand Settling Chamber Mass Flow Meter Vacuum Supply
  • Slide 8
  • FLOW BENCH Active Flow Bench Vacuum source Test Part Multiple uses Cylinders Porting Mufflers Air filters Measures Pressure differential with respect to mass flow
  • Slide 9
  • WHAT IS RICARDO WAVE?
  • Slide 10
  • MUFFLERS IN RICARDO WAVE
  • Slide 11
  • RICARDO WNOISE
  • Slide 12
  • RICARDO WNOISE OUTPUT
  • Slide 13
  • J 192 SOUND TEST
  • Slide 14
  • SOUND TESTING Existing Muffler Laminar Flow Muffler Hushpower Muffler Affect of Packing Small vs. Large Cone Perforation Series Parallel
  • Slide 15
  • TIMELINE November 29 th Start J192 Sound Testing of Existing Mufflers December 10 th Complete Flow Bench December 15 th Flow Test Existing Mufflers December 17 th Final Muffler Designed January 15 th Receive Final CAT January 21st Final Muffler Built January 22 nd Begin Testing Final Muffler on Sled March 4 th Leave for Competition
  • Slide 16
  • QUESTIONS?