Top Banner

of 27

Environmental Issues Having Impact on Project Implementation

Apr 05, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    1/27

    Click to edit Master subtitle style

    4/29/12

    Environmental Issues

    having impact onProject Implementation

    PRESENTED BY:

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    2/27

    Click to edit Master subtitle style

    4/29/12

    OBJECTIVES

    22

    1. To understand the environment issues on project

    management and its implications.2. To understand the various activities involved to

    counter these issues by the engineering ormanufacturing projects during the project life cycle.

    3. To learn the changing trends in projectmanagement in order to account for environmental

    issues.4. To understand the changing standards for

    environmental safety being adopted by companieswith their introduction of new technology.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    3/27

    Click to edit Master subtitle style

    4/29/12

    STAGES OF PROJECT

    Choosing a project Planning Design Implementation Choose

    aproject

    PlanningImplemen

    t

    Design

    Simple Projectlifecycle

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    4/27

    Click to edit Master subtitle style

    4/29/12

    1. Environmental issues onChoosing engineering projects:

    C02 Emission Energy Conservation Genetic Pollution Land pollution Carbon neutral Water pollution Waste disposal Toxins Metal-processing waste Plastic waste

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    5/27

    Click to edit Master subtitle style

    4/29/12

    Engineering projects are one of the kinds of projects

    that canbe chosen carefully by considering several issues that

    mightnot be environmental friendly and can pollute water,

    air orland.

    Environmental issues can be assessed initially todecide

    whether the project is feasible according to(Communities

    and local Government, 2000) - known asEnvironmental

    Impact Assessment.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    6/27

    Click to edit Master subtitle style

    4/29/12

    2. Planning Engineering

    Projects Project Planning An important phase ininitiating

    any engineering project on large scale. The project description is considered to be theheart

    of the project which can result in severeresults if it

    is not carefully planned. This project plan gives a laconic and standard

    summary of the project purpose and itsobjectives,

    any terms and conditions, mandate for

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    7/27

    Click to edit Master subtitle style

    4/29/12

    Engineering and industrial projects consumes

    alarge amount of metal, rubber, leather and

    plasticsmaterials which emits high level of Co2, toxic

    gases,and several hazardous industrial wastes Environmental pollution.

    It should insure waste management such as

    contamination of animal skin, toxic materials,impact

    of chemicals on land, water pollution, andother

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    8/27

    Click to edit Master subtitle style

    4/29/12

    The project plan must cover all aspects

    from:

    what is the scope of project; how to reduce emission that will be in legal

    limits and certified by the relevant authorities; stakeholders participation and consultation

    and what other environmental impacts and risk of theproject.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    9/27

    Click to edit Master subtitle style

    4/29/12

    There are several issues needs to be contemplated while

    planning any project :

    v Emission reduction measurement:v Methodology to measure emission:v Project Impact on large-scale:v Consultation:v

    Rights to reduce emission:v Certification of emission reduction:

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    10/27

    Click to edit Master subtitle style

    4/29/12

    3. Designing Phase United Nations of Environment Programme

    (UNEP) gave the concept of Ecodesign.

    Another design tool called Quality FunctionDeployment (QFD) used to dissect theusability of the product to give the

    understanding of environmental impact andtheir preventions in the early stages ofdesign.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    11/27

    Click to edit Master subtitle style

    4/29/12

    This concept of QFD can be applied to design of the products

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    12/27

    Click to edit Master subtitle style

    4/29/12

    These aspects of design of the product needs tobe considered to overcome environmentalaffects:

    q Material quantity must be used in smalleramount.

    q Logistics and transportation of the material

    should be easy to transport and retained.

    q Assembly process must be easy to process.

    q Energy consumption should be adequate duringeach phase of manufacturing.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    13/27

    Click to edit Master subtitle style

    4/29/12

    q Reusability of the product should be well kept in

    mind to gain more benefits in future

    q Disassembly should be easy to regulate in themaintenance phase.

    q Design of the product should be harmless to

    living organisms for example noise, smell orvibrations.

    q Emission of water, air and soil pollution shouldbe carefully taken into consideration.

    q Disposal activities must be easy to achieve atfinalization with less resources consumption.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    14/27

    Click to edit Master subtitle style

    4/29/12

    4. Implementation OfEngineering Projects Implementation phase requires a properframework and a complete strategy which

    includes staff, resources and management whomust be trained well for the new change in theorganization.

    While implementing new projects, companiesshould be well prepared for any future challengeor latent issues that may ascend.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    15/27

    Click to edit Master subtitle style

    4/29/12

    Management has to control all the possible

    issueswhile implementing any new projects.

    ISO 14000 - management tool which extractsinformation from the organizations on their

    currentenvironmental management system (EMS)

    andissue annual reports.

    This standard is subsequently important in theimplementation phase of any engineering

    projectbecause it revolves around govt laws,

    legislations

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    16/27

    Click to edit Master subtitle style

    4/29/12

    CASE STUDY

    PALM ISLAND DUBAICHALLENGES in the PROJECT

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    17/27

    Click to edit Master subtitle style

    4/29/12

    FACTS OF THE CASE Dubai is setting new records for the tallest building, hotel,

    and largest waterfront.

    Palm Island was built to increase its shore area as it is amajor place for tourism

    Palm Islands is composed of three islands: Palm Jumeirah,Palm Jebel Ali, and Palm Deira

    Built by the Dubai real estate firm Al Nakheel properties.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    18/27

    Click to edit Master subtitle style

    4/29/12

    Palm Jumeirah - 600 hectares of land

    and spans approx 4 by 5 kms Palm Jebel Ali covers 6 by 7 kms. Palm Deira - 80 square kms - the largestisland All three islands

    Similar palm-shaped structures, The size of each varies. They all follow more or less the same state of the art

    engineering and construction procedures.

    Palm Jumeirah began in August 2001 up to2006. They are made from all natural materials upon

    Prince Sheikh Mohammed Bin Rashid Al

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    19/27

    Click to edit Master subtitle style

    4/29/12

    CHALLENGES IN THE PROJECT

    How an island made out of sand, wouldremain in position

    The challenge of dumping this sand layer had to bedone when the sea was the calmest to ensure stability.

    How waves accumulated over long distancesvia persistent winds and large currentspotentially causing severe destruction to theislands.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    20/27

    Click to edit Master subtitle style

    4/29/12

    How the stone wall is expected to stay in

    placewithout concrete to secure it.

    The lack of adequate water circulationaround the

    fronds with the open sea. Natural beaches, do not naturally replenish

    itself on facing erosion Gradually, sand will wash way, piling up further

    along thestructure.

    If sand is not replaced or frequently monitored,the

    shoreline will no longer be straight. In extreme cases, the beach ma disa ear

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    21/27

    Click to edit Master subtitle style

    4/29/12

    STEPS TO OVERCOMEPROBLEMS Scientists said that the Arabian Gulf is the

    perfectplace for construction because with a depth

    of30 m and a width of 160 m, it is too short and

    shallow for the creation of immenselydestructivewaves.

    The islands - made out of an obscene amount

    of

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    22/27

    Click to edit Master subtitle style

    4/29/12

    Scientists designed the crescent breakwaterstructure to protect the islands for high

    waves and storms. Barge-loads of rubble were dumped on top of the sand layer to raise

    the breakwater crescent from 4 m below to approximately 4 m abovethe sea.

    The real protection comes from the outer armour, which is made out

    of huge boulders of rocks with each rock weighing up to 6 tons

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    23/27

    Click to edit Master subtitle style

    4/29/12

    Scientists claim that rocks were selected by

    sizeand weight and specially positioned bycranes.

    Each rock "interlock" with the adjacent one to tackleforces of the sea.

    Scientists send divers undersea to survey the ocean floor,every 27 m, looking for cracks and splinters in rocks or "rockfatigue" caused by strong waves.

    Scientists made two openings in the

    breakwater. Breaks were connected by bridges. These openings would prevent water

    stagnation and permit marine traffic.

    A tide would rush in two times a day,replenishing the water supply every 14 days.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    24/27

    Click to edit Master subtitle style

    4/29/12

    This calls for constant maintenance toensure that shorelines of the mainland and

    Palm islands remain relatively the sameover time.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    25/27

    Click to edit Master subtitle style

    4/29/12

    EFFECTS OF PALM ISLAND The Palm Jumeirah, has a major role indestroying its nearby ecosystem.

    According to a research project from the WorldEnvironmental and Water Resources Congress2009, the artificial islands are being built

    without proper environmental studies

    As a result the Persian Gulfs eco-system is indanger.

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    26/27

    Click to edit Master subtitle style

    4/29/12

    The islands damage the local aquatic environment, and cause rapid

    erosion of the sand.

    The islands are in danger of earthquakes because of liquefaction andslope failure.

    Eventually, the artificial Palm Island could be underwater in 50 years

  • 8/2/2019 Environmental Issues Having Impact on Project Implementation

    27/27

    Click to edit Master subtitle style

    4/29/12

    THANK YOU