Bella r r ENVIRONME B Danapur Village, Hospet Taluk, r ry District, PIN-583222, Karnata k k ENT MONITORING Stage 2 Units For JULY-2016 Prepared By GLOBAL ENVIRONMENT & MINING NABL Accredited Laboratory (Consulting Engineers, Mine Designers, Geolog 3 rd main road, Basaveswara badavane HOSPET – 583201, Dist., Bellary (Karnata Tel : 08394 – 651111,229433 Mobile : +919448479433/94498305 e-mail : [email protected]Website : globalmining.in BMM Ispat Ltd. k ka REPORT G SERVICES gists & Surveyors) aka) 533 .,
14
Embed
ENVIRONMENT MONITORING REPORT · BMM Ispat Ltd., for their valuable co-ordination & support during the sampling and reporting. for GLOBAL Environment & Mining Services Place: Hospet
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
, EAF, Steel Making Shop, CCM, Rolling Mill, Oxygen
Remaining units are under various stages of
s being carried out for 4 x 500 TPD sponge
ation, 1.2MTPA Pellet
The report includes environmental monitoring data collected at above site for the
ENVIRONMENTAL MONITORING
GLOBAL Environment & Mining Services
Important Note: Ambient Air Quality & Water Quality data are common for both
Stage-I & Stage-II. Hence,
1.5 Study:
The data collection programmeis givenbelow:
1.6 Fugitive Emission Monitoring
Ambient Air Quality was monitored
for SPM analyzed by gravimetric method
Plant area, and material handling
night) &Annexure – 1/B(2ndFort night)
1.7 Stack Monitoring
Vayubhodhan Stack sampler VSS1 stack
gas. Sulphur dioxide and oxides of Nitrogen in the flue gas
gas solution respectively and the analysis of the pollutants were done as per the Indian
Standard procedures prescribed by CPCB/BIS. Stack
the statutory requirement on twice in a month, and the results given in
Fort night)& Annexure – 2/B
1.8 Stack Emissions Monitoring Methodology
1.9 Sampling Procedure
Pre Sampling Activities
Weigh the properly conditioned thimble/filter and place it into the clean, air tight
Container. Designate appropriate label or ID No. to each thimble/filter container.
Particulate matter emission of “Stack Monitoring
Sampling.
Field activity starts with the collection of detailed information from the industry
about the products, raw materials, fuels, and stack dimensions.
1.10 Traverse Point Calculation
Calculate the traverse point and accordingly mark the distance from t
Nozzle, on Pitot tube and probe. Do not forget to add the collar length of port to the
RING REPORT M/S. BMM ISPAT LIMITED
GLOBAL Environment & Mining Services .4
Ambient Air Quality & Water Quality data are common for both
II. Hence, Please refers Stage-I report for the same.
collection programmeis givenbelow:
Emission Monitoring
Ambient Air Quality was monitored 48 samples were collected from the
by gravimetric method.Work Zone Air quality was monitored at all
handling area air quality status given in Annexure –
Fort night) .
ampler VSS1 stack monitoring was used for drawing the flue
gas. Sulphur dioxide and oxides of Nitrogen in the flue gas were sampled by bubbling flue
gas solution respectively and the analysis of the pollutants were done as per the Indian
Standard procedures prescribed by CPCB/BIS. Stack Emission level was monitored as per
the statutory requirement on twice in a month, and the results given in Annexure
2/B(2nd Fort night)
Stack Emissions Monitoring Methodology
Sampling Procedure Activities
Weigh the properly conditioned thimble/filter and place it into the clean, air tight
Container. Designate appropriate label or ID No. to each thimble/filter container.
matter emission of “Stack Monitoring – Material and Methodology for
Field activity starts with the collection of detailed information from the industry
about the products, raw materials, fuels, and stack dimensions.
Traverse Point Calculation
Calculate the traverse point and accordingly mark the distance from t
Nozzle, on Pitot tube and probe. Do not forget to add the collar length of port to the
. BMM ISPAT LIMITED.,
Ambient Air Quality & Water Quality data are common for both
samples were collected from the analyzed
Work Zone Air quality was monitored at all
1/A (1 st Fort
used for drawing the flue
by bubbling flue
gas solution respectively and the analysis of the pollutants were done as per the Indian
Emission level was monitored as per
Annexure – 2/A(1st
Weigh the properly conditioned thimble/filter and place it into the clean, air tight
Container. Designate appropriate label or ID No. to each thimble/filter container.
Material and Methodology for iskinetic
Field activity starts with the collection of detailed information from the industry
Calculate the traverse point and accordingly mark the distance from tip of the
Nozzle, on Pitot tube and probe. Do not forget to add the collar length of port to the
ENVIRONMENTAL MONITORING
GLOBAL Environment & Mining Services
calculated traverses. For detailed calculation of “Stack Monitoring
Methodology for iskinetic sampling
1.11 Determination of Dust Concentration
Determine the mass of dust collected in the thimble by difference i.e. weighing the
thimble before and after the run. Dry the thimble in an oven for about 2 hours at
120o C prior to sampling. After sampling, cool, dry and again weigh the thimble
along with dust maintaining the same condition as prior to sampling
1.12 Fortnightly fugitive air quality was 159.1 µg/m3, maximum valueFugitive Monitoring results of
0
500
1000
1500
2000
2500
3000
3500
1 2 3 4 5 6
1ST FORTNIGHT FUGITIVE AIR QUALITY DATA
SPM
(µg/m3)
0
500
1000
1500
2000
2500
1 2 3 4
2ND FORTNIGHT FUGITIVE AIR QUALITY DATA
RING REPORT M/S. BMM ISPAT LIMITED
GLOBAL Environment & Mining Services .5
calculated traverses. For detailed calculation of “Stack Monitoring– Material and
sampling.
Determination of Dust Concentration
Determine the mass of dust collected in the thimble by difference i.e. weighing the
thimble before and after the run. Dry the thimble in an oven for about 2 hours at
C prior to sampling. After sampling, cool, dry and again weigh the thimble
dust maintaining the same condition as prior to sampling
Fortnightly fugitive air quality was monitored all plant area SPM value , maximum value 1825 µg/m3,and average value 477.69
Fugitive Monitoring results of 2 nd
Fortnight is mentioned in graph.
7 8 9 10 11 12 13 14 15 16 17 18 19 20
1ST FORTNIGHT FUGITIVE AIR QUALITY DATA
SPM
(µg/m3) Standard
5 6 7 8 9 10 11 12 13
2ND FORTNIGHT FUGITIVE AIR QUALITY DATA
SPM
(µg/m3)
SPM
(µg/m3) Standard
. BMM ISPAT LIMITED.,
Material and
Determine the mass of dust collected in the thimble by difference i.e. weighing the
thimble before and after the run. Dry the thimble in an oven for about 2 hours at
C prior to sampling. After sampling, cool, dry and again weigh the thimble
SPM value minimum 477.69 µg/m3. The
20 21 22
13 14
ENVIRONMENTAL MONITORING
GLOBAL Environment & Mining Services
1.13 Stack emission level was
2nd Fort Night Minimum
Average Value 48.57 mg/Fortnight is mentioned in graph
1.15 Conclusion
All the monitored Environmental parameters were found to be well within the
statutory norms– and the same are enclose
0
20
40
60
80
100
120
1 2
1 st FORTNIGHT STACK MONITORING RESULTS
0
20
40
60
80
100
120
140
160
1 2 3
2 nd FORTNIGHT STACK MONITORING RESULTS
RING REPORT M/S. BMM ISPAT LIMITED
GLOBAL Environment & Mining Services .6
Stack emission level was monitored all chimneys’ PM values (g/Nm3)
Minimum Value 27.6 mg/Nm3, Maximum Value 92.4
mg/Nm3. The Stack Monitoring results of 1
st Fortnight
ortnight is mentioned in graph.
All the monitored Environmental parameters were found to be well within the
and the same are enclosed as follows.
3 4 5 6 7 8 9
1 st FORTNIGHT STACK MONITORING RESULTS
PM
(mg/ Nm3)
Standard
4 5 6 7 8 9 10 11 12 13
2 nd FORTNIGHT STACK MONITORING RESULTS
PM
(mg/ Nm3)
Standard
. BMM ISPAT LIMITED.,
)
92.4 mg/Nm3 &
ortnight & 2 nd
All the monitored Environmental parameters were found to be well within the
10
13 14
FORTNIGHTLY FUGITIVE AIR QUALITY
1. Name of the Industry : BMM Ispat
2. Sample collected by : GLOBAL Environment & Mining Services NABL Certificate No. Date of Validity 0
3. Particulars of sample collected : RDS Sampler
4. Report to sent : 05
5. Method adopted : IS 5182 (Part
Sl.N0. Location / Plant
I. Beneficiation Plant-II
1. Ball Mill Area (Zero Meter)
2. Between Concentrate & Tailing Thickner
3. FC 25 conveyor
II. Pellet Plant-II
4. TG Zero Meter
5. Boiler Furnace
6. PGP
III. Sponge Iron Division -2 (Kiln 1 & 2)
7. Control room
8. Near Weigh bridge (dispatch)
9. Pellet Storage bin
IV. Sponge Iron Division -2 (Kiln 3 & 4)
10. Near Control room
11. Near Coal crusher
12. Near Product bin
V. Wagon Tipper/RMHS
13. Near Tipping point
14. CPU DE System
15. Old Compressor room
VI. Power Plant-70 MW
16. 70MW-DM Plant (Near R.O. Plant)
17. Coal Screen (near gate weigh bridge)
18. CFBC boiler
VII. 2X70MW Power Plant
19. Near Boiler
20. Near Coal storage Shed
VIII . SMS Area
21 Stock House/Vibro feeders
22 Laddle Tapping
23 Slag Pouring Area
IX. BAR MILL
24 Near Reheating Furnace
Note: SPM - Suspended Particulate matter (µg/m
Analyzed By Environmental Engineer (G.Aarathi)
Note: 1. The result listed refers only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. 2. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.3. This report is not to be reproduced wholly or in part & cannot be used as
advertising media without special permission in writing.4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to
GLOBAL ENVIRONMENT & MINING SERVICES
Annexure-1/A (1 st Fort Night)FORTNIGHTLY FUGITIVE AIR QUALITY DATA MONITORING JU
µg/m3) INFERENCE: The Measured Values are within the limits
Authorised sign Technical Manager
(G.Aarathi) (K.Ramakrishna Reddy)
only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
ced wholly or in part & cannot be used as evidence in the Court of law & should not used any special permission in writing.
Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Hospet jurisdiction only.
ENVIRONMENT & MINING SERVICES
(1 st Fort Night) JULY -2016
03, GEMS-04)
SPM
µg/m3) Standard
334.5 2000
224.3 2000
617.8 2000
2000
2000
205.2 2000
441.2 2000
571.9 2000
217.4 2000
1014.0 2000
249.2 2000
1213.1 2000
464.5 2000
258.7 2000
402.3 2000
260.5 500
338.8 500
296.4 500
245.0 500
337.6 500
445.5 3000
208.9 3000
320.1 3000
235.0 3000
Authorised signatory Technical Manager
(K.Ramakrishna Reddy)
only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
in the Court of law & should not used any
jurisdiction only.
FORTNIGHTLY FUGITIVE AIR QUALITY
1. Name of the Industry 2. Sample collected by : GLOBAL Environment & Mining Services
3. Particulars of sample collected 4. Report to be sent 5. Method adopted
Sl.N0. Location / Plant
I. Beneficiation Plant-II
1. Ball Mill Area (Zero Meter)
2. Between Concentrate & Tailing Thickner
3. FC 25 conveyor
II. Pellet Plant-II
4. TG Zero Meter
5. Boiler Furnace
6. PGP
III. Sponge Iron Division -2 (Kiln 1 & 2)
7. Control room
8. Near Weigh bridge (dispatch)
9. Pellet Storage bin
IV. Sponge Iron Division -2 (Kiln 3 & 4)
10. Near Control room
11. Near Coal crusher
12. Near Product bin
V. Wagon Tipper/RMHS
13. Near Tipping point
14. CPU DE System
15. Old Compressor room
VI. Power Plant-70 MW
16. 70MW-DM Plant (Near R.O. Plant)
17. Coal Screen (near gate weigh bridge)
18. CFBC boiler
VII. 2X70MW Power Plant
19. Near Boiler
20. Near Coal storage Shed
VIII . SMS Area
21 Stock House/Vibrofeeders
22 Laddle Tapping
23 Slag Pouring Area
IX.BAR MILL
24 Near Reheating Furnace
Note: SPM - Suspended Particulate matter
Analyzed By
Environmental Engineer G.Aarathi
Note: 1. The result listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor i2. Samples will be destroyed after one month from 3. This report is not to be reproduced wholly or in part & cannot be used as
advertising media without special permission in writing.4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to
GLOBAL ENVIRONMENT & MINING SERVICES
Annexure-1/BFORTNIGHTLY FUGITIVE AIR QUALITY DATA MONITORING JU
Name of the Industry : BMM Ispat Ltd., Danapur, Hospet Taluk, Bellary District Sample collected by : GLOBAL Environment & Mining Services
NABL Certificate No.T- 3553 Date of Validity 06.08.2017
Between Concentrate & Tailing Thickner 25.07.2016 26.07.2016 243.9
25.07.2016 26.07.2016 159.1
SHUTDOWN
25.07.2016 26.07.2016 216.2
2 (Kiln 1 & 2)
26.07.2016 27.07.2016 530.8
Near Weigh bridge (dispatch) 26.07.2016 27.07.2016 314.3
26.07.2016 27.07.2016 187.4
2 (Kiln 3 & 4)
26.07.2016 27.07.2016 712.8
27.07.2016 28.07.2016 817.9
27.07.2016 28.07.2016 1672.6
27.07.2016 28.07.2016 361.9
27.07.2016 28.07.2016 1825.4
28.07.2016 Due to Rain
Plant) 28.07.2016
Due to Rain Coal Screen (near gate weigh bridge) 28.07.2016
28.07.2016
30.07.2016 31.07.2016 1
30.07.2016 31.07.2016 824.7
29.07.2016
Due to Rain 29.07.2016
29.07.2016
29.07.2016 Due to Rain
Suspended Particulate matter (µg/m3) INFERENCE: The Measured Values are within the limits
Analyzed By Authorised signatory Environmental Engineer Technical Manager
K.Ramakrishna Reddy
The result listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor iSamples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.This report is not to be reproduced wholly or in part & cannot be used as evidence in the Court of law & should not used any
special permission in writing. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Hospet jurisdiction only.
ENVIRONMENT & MINING SERVICES
/B (2nd Fort Night) JULY-2016
: BMM Ispat Ltd., Danapur, Hospet Taluk, Bellary District
The result listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. the date of issue of test certificate unless otherwise specified.
in the Court of law & should not used any
jurisdiction only.
STACK MONITORING RESULTS
1. Name of the Industry : BMM Ispat Ltd., Danapur,
2. Sample collected by : GLOBAL Environment & Mining Services
3. Particulars of sample collected : Vayubodhan Stack sampler
Si.
No Stack Attached to
Date of
Monitoring Fuel Used
1 Pellet Plant-2 ESP
2 2X500TPD Sponge iron kiln1&2 ESP 02.07.2016
3 2X500TPD Sponge iron kiln3&4 ESP 04.06.2016
4 1 X 70MW-CFBC Boiler ESP 01.07.2016
5 2X70MW -CFBC Boiler ESP 01.07.2016
6 SMS 05.07.2016
7 Bar mill 05.06.2016 Furnace Oil
Chimneys attached to Bag Filter (De dusting Units)
Beneficiation Plant-2
1 Iron Ore Cone Crusher
2 Iron Ore Screening
Pellet Plant-2
3 Additive grinding mill
4 Mixer building
5 Pellet discharge point
2 X 500 TPD Sponge Iron Kiln 1 & 2
6 Cooler Discharge -1&2 02.07.2016
7 Coal stock house 02.07.2016
8 Production Separation bin-1&2 02.07.2016
9 Production Separation bin-3&4 04.06.2016
10 Transfer House 04.06.2016
Analyzed By Environmental Engineer
G.Aarathi Note:
1. The results listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. 2. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.3. This report is not to be reproduced wholly or in part & cannot be used as 4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdic
SO2 (mg/Nm3) IS :11255 (Part 2) : 1985 (reaffirmed
NO2 (mg/Nm3) IS :11255 (Part 7) : 2005
GLOBAL ENVIRONMENT & MINING SERVICES
STACK MONITORING RESULTS Annexure
Danapur, Hospet Taluk, Bellary district
: GLOBAL Environment & Mining Services NABL Certificate No.T- 3553 Date of Validity 06.08.2017Particulars of sample collected : Vayubodhan Stack sampler VSS 1 Sl.No. 304 DTB 07 Month : JULY
Fuel Used Ta OC
TS OC
V
m/Sec
HEIGHT
(m)
Diameter
(m) PM
mg/Nm3 mg/Nm
Coal SHUTDOWN
Coal 29 148 5.93 70 3.00 68.2
Coal 29 147 5.97 70 3.00 72.4
Coal 70 3.00 Due to Rain
Coal 110 8.00 Due to Rain
Coal 86 2.40 Due to Rain
Furnace Oil 87 3.00 Due to Rain
NOT IN OPERATION
SHUTDOWN
--- --- 30 1.20 46.4
--- --- 30 1.20 36.8
--- --- 30 1.20 41.6
--- --- 30 1.20 43.4
--- --- 30 1.20 46.8
Note :
SO2 - Sulphur dioxide
NO2 - Nitrogen dioxide
PM - Particulate matter
Analyzed By Authorised signatory Environmental Engineer Technical Manager
G.Aarathi K.Ramakrishna Reddy
applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
t be used as evidence in the Court of law & should not used any advertising media withoutTotal liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdiction only.
Protocol
1985 (reaffirmed 2009)
11255 (Part 2) : 1985 (reaffirmed 2014)
11255 (Part 7) : 2005 (reaffirmed 2005)
ENVIRONMENT & MINING SERVICES
Annexure – 2/B (2nd Fort Night)
Date of Validity 06.08.2017
LY - 2016 Results Standards
PM
(mg/ Nm 3)
SO2
mg/Nm3
NO 2
mg/Nm3
50
66.72 30.64 100
54.84 24.82 100
Due to Rain 100
Due to Rain 50
Due to Rain 150
Due to Rain 150
50
50
50
50
50
---- ---- 50
---- ---- 50
---- ----- 50
---- ---- 50
---- ---- 50
Authorised signatory
K.Ramakrishna Reddy
without special permission in writing.
STACK MONITORING RESULTS
1. Name of the Industry : BMM Ispat
2. Sample collected by : GLOBAL Environment & Mining Services
3. Particulars of sample collected : Vayubodhan Stack sampler
4. Month : JULY -
Sl.
No Stack Attached to
Date of
Monitoring
Chimneys attached to Bag Filter (De dusting Units)
2X500 TPD Sponge Iron Kiln 3&4
12 Coal Primary Screen
13 Coal Stock House -1 & coal stock house-2
14 Cooler Discharge -1 04.07.2016
15 Cooler Discharge -2 & PSB transfer tower 04.07.2016
16 Production Bunker & Intermediate bin
17 Production Separation bin 04.07.2016
18 Pellet Stock house
19 Dolochar Stock House 1 & 2
20 CPU Building
Analyzed By Environmental Engineer
G.Aarathi
Note:
1. The result listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. 2. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.3. This report is not to be reproduced wholly or in part & cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdic
Sample collected by : GLOBAL Environment & Mining Services NABL Certificate No.T- 3553 Date of Validity 06.08.2017Particulars of sample collected : Vayubodhan Stack sampler VSS 1 Sl.No. 304 DTB 07
2016 (2nd Fort Night)
Monitoring
Fuel
Used
Ta OC
TS OC
V
m/Sec
HEIGHT
(m)
Diameter
(m) PM
mg/Nm3
--- --- 30 1.20 Not in Operation
--- --- 30 1.20
.2016 --- --- 30 1.20 41.2
.2016 --- --- 30 1.20 36.4
--- --- 30 1.20 Not in
.2016 --- --- 30 1.20 42.8
--- --- 30 1.20
Not in Operation--- --- 30 1.20
--- --- 30 1.20
Note :
SO2 - Sulphur dioxide
NO2 - Nitrogen dioxide
PM - Particulate matter
Authorised signatory Technical Manager
K.Ramakrishna Reddy
applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdiction only.
Protocol
1985 (reaffirmed 2009)
IS 11255 (Part 2) : 1985 (reaffirmed 2014)
IS 11255 (Part 7) : 2005 (reaffirmed 2005)
ENVIRONMENT & MINING SERVICES
Annexure – 2/B
Date of Validity 06.08.2017
Results Standards
PM
(mg/ Nm3) SO2
mg/Nm3
NO 2
mg/Nm3
Not in Operation 50
50
---- ---- 50
---- ---- 50
Not in Operation 50
---- --- 50
Not in Operation
50
50
50
Sulphur dioxide
Nitrogen dioxide
Authorised signatory
cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.
STACK MONITORING RESULTS
1. Name of the Industry : BMM Ispat Ltd.,
2. Sample collected by : GLOBAL Environment & Mining Services
3. Particulars of sample collected : Vayubodhan Stack sampler
Si.
No Stack Attached to
Date of
Monitoring
1 Pellet Plant-2 ESP
2 2X500TPD Sponge iron kiln1&2 ESP 25.07.2016
3 2X500TPD Sponge iron kiln3&4 ESP 27.07.2016
4 1 X 70MW-CFBC Boiler ESP 28.07.2016
5 2X70MW -CFBC Boiler ESP 28.07.2016
6 SMS 29.07.2016
7 Bar mill 29.07.2016
Chimneys attached to Bag Filter (De dusting Units)
Beneficiation Plant-2
1 Iron Ore Cone Crusher
2 Iron Ore Screening
Pellet Plant-2
3 Additive grinding mill
4 Mixer building
5 Pellet discharge point
2 X 500 TPD Sponge Iron Kiln 1 & 2
6 Cooler Discharge -1 & 2 26.07.2016
7 Coal stock house 26.07.2016
8 Production Separation bin-1 & 2 26.07.2016
9 Production Separation bin-3&4 26.07.2016
10 Transfer HouseE 26.07.2016
Analyzed By Environmental Engineer
G.Aarathi Note:
1. The results listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. 2. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.3. This report is not to be reproduced wholly or in part & cannot be used as 4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdic
Sample collected by : GLOBAL Environment & Mining Services NABL Certificate No.T- 3553 Date of Validity 06.08.2017Particulars of sample collected : Vayubodhan Stack sampler VSS 1 Sl.No. 304 DTB 07 Month : JU
Fuel
Used
Ta OC
TS OC
V
m/Sec
HEIGHT
(m)
Diameter
(m) PM
mg/Nm3
Coal SHUTDOWN
Coal 31 148 5.61 70 3.00 92.4
Coal 29 146 5.78 70 3.00 86.8
Coal 31 144 5.90 70 3.00 27.6
Coal 30 159 6.18 110 8.00 46.6
Coal 30 109 13.22 86 2.40 42.0
- 27 261 8.34 87 3.00 30.6
NOT IN OPERATION
SHUTDOWN
--- --- 30 1.20 49.2
--- --- 30 1.20 32.7
--- --- 30 1.20 46.1
--- --- 30 1.20 42.5
--- --- 30 1.20 48.9
Note :
SO2 - Sulphur dioxide
NO2 - Nitrogen dioxide
PM - Particulate matter
Analyzed By Authorised signatory Environmental Engineer Technical Manager
G.Aarathi K.Ramakrishna Reddy
applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
t be used as evidence in the Court of law & should not used any advertising media withoutTotal liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdiction only.
Protocol
1985 (reaffirmed 2009)
11255 (Part 2) : 1985 (reaffirmed 2014)
11255 (Part 7) : 2005 (reaffirmed 2005)
ENVIRONMENT & MINING SERVICES
2nd Fort Night)
Date of Validity 06.08.2017
JULY- 2016 Results Standards
PM
(mg/ Nm 3)
SO2
mg/Nm3
NO 2
mg/Nm3
50
62.84 26.48 100
52.68 18.24 100
76.82 31.84 100
64.28 22.46 50
- - 150
- - 150
50
50
50
50
50
---- ---- 50
---- ----
---- ---- 50
---- ----- 50
---- ---- 50
Authorised signatory
K.Ramakrishna Reddy
without special permission in writing.
STACK MONITORING RESULTS
1. Name of the Industry : BMM Ispat
2. Sample collected by : GLOBAL Environment & Mining Services
3. Particulars of sample collected : Vayubodhan Stack sampler
4. Month : JULY -
Sl.
No Stack Attached to
Date of
Monitoring
Chimneys attached to Bag Filter (De dusting Units)
2X500 TPD Sponge Iron Kiln 3&4
12 Coal Primary Screen
13 Coal Stock House -1 & coal stock house-2
14 Cooler Discharge -1 27.07.2016
15 Cooler Discharge -2 & PSB transfer tower 27.07.2016
16 Production Bunker & Intermediate bin
17 Production Separation bin 27.07.2016
18 Pellet Stock house
19 Dolochar Stock House 1 & 2
20 CPU Building
Analyzed By Environmental Engineer
G.Aarathi
Note:
1. The result listed refer only to the tested samples & applicable parameters. Endorsement of products is neither inferred nor implied. 2. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.3. This report is not to be reproduced wholly or in part & cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.4. Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdic
Sample collected by : GLOBAL Environment & Mining Services NABL Certificate No.T- 3553 Date of Validity 06.08.2017Particulars of sample collected : Vayubodhan Stack sampler VSS 1 Sl.No. 304 DTB 07
- 2016 (2nd Fort Night)
Monitoring
Fuel
Used
Ta OC
TS OC
V
m/Sec
HEIGHT
(m)
Diameter
(m) PM
mg/Nm3
--- --- 30 1.20 Not in Operation
--- --- 30 1.20
27.07.2016 --- --- 30 1.20 48.4
27.07.2016 --- --- 30 1.20 47.9
--- --- 30 1.20 Not in Operation
27.07.2016 --- --- 30 1.20 48.2
--- --- 30 1.20
Not in Operation--- --- 30 1.20
--- --- 30 1.20
Note :
SO2 - Sulphur dioxide
NO2 - Nitrogen dioxide
PM - Particulate matter
Authorised signatory Technical Manager
K.Ramakrishna Reddy
applicable parameters. Endorsement of products is neither inferred nor implied. Samples will be destroyed after one month from the date of issue of test certificate unless otherwise specified.
cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.Total liability of our laboratory is limited amount. Any dispute arising out of this report is subject to Bangalore jurisdiction only.
Protocol
1985 (reaffirmed 2009)
IS 11255 (Part 2) : 1985 (reaffirmed 2014)
IS 11255 (Part 7) : 2005 (reaffirmed 2005)
ENVIRONMENT & MINING SERVICES
Annexure – 2/B
Date of Validity 06.08.2017
Results Standards
PM
(mg/ Nm3) SO2
mg/Nm3
NO 2
mg/Nm3
Not in Operation 50
50
---- ---- 50
---- ---- 50
Not in Operation 50
---- --- 50
Not in Operation
50
50
50
Sulphur dioxide
Nitrogen dioxide
Authorised signatory
cannot be used as evidence in the Court of law & should not used any advertising media without special permission in writing.