Top Banner
Endless investment opportunities in public infrastructure and services 2014 -2015 Carlos Herrera Investors Servicing Director
32

Endless investment opportunities in public infrastructure ...

Jan 12, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Endless investment opportunities in public infrastructure ...

Endless investment opportunities in publicinfrastructure and services

2014 -2015

Carlos Herrera Investors Servicing Director

Page 2: Endless investment opportunities in public infrastructure ...

The State agency for the private investment promotion.

Promotes PPPs projects in infrastructure and public services.

Offers guidance services for the investors.

PROINVERSION

Page 3: Endless investment opportunities in public infrastructure ...

ATTRACTIVE SECTORS TO INVEST

MINNIG ELECTRICAL ENERGY

FISHERYAGRO-

INDUSTRY

FORESTTEXTILE-

CLO-THING

HYDRO-CARBONS

Services

Natural

Resources

TOURISM

Page 4: Endless investment opportunities in public infrastructure ...

PROMOTING INVESTMENT THROUGH PPP

Promotion plan

Call and Bidding documents

Contractdevelopment

sectors and entities

Opinions

AwardBid

closureSupervising

contract

INICIAT

Bidders Comments

Sector assignment Incorporation

Submission, evaluation and selection technical &

economic proposals

PROINVERSION

M a r k e t

Page 5: Endless investment opportunities in public infrastructure ...
Page 6: Endless investment opportunities in public infrastructure ...

TRANSPORT INFRASTRUCTURE

Transport infrastructure has beenprioritized in order to increasecompetitiveness and set up a SouthAmerican Pacific Business Hub.

Commitments for investment inconcessions of the sector, around US$ 7.4billion as of September 2013

The developed infrastructure will becomplemented by new investmentsplanned towards 2016, by the MTC,having planned projects over US$ 20.5billion (Public Works and PPA)

Page 7: Endless investment opportunities in public infrastructure ...

Chinchero International Airport - Cusco 658

Line 2 and Branch Line of Av. Faucett - Av. Gambetta of the Metro of Lima and Callao 5,701

General San Martín Port Terminal 102

Amazon waterways 65

PROJECTS TO BE AWARD JAN - APR 2014

US$ MM

US$ 6,526 million

in transport infrastructure

PPP projects

Page 8: Endless investment opportunities in public infrastructure ...

LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO

Concession to design, finance, build, provision ofelectromechanical equipment, purchase of rollingstock, operation and maintenance of Line 3 and Line 4.

Estimated investment: Under evaluation

Type of concession : Co-financed

Concession Period: 35 years

Line 3 Line 4

32 Km 30 Km

2015 2015Estimated award date

Approximate length

TO BE CALLED

Lima and Callao

Page 9: Endless investment opportunities in public infrastructure ...

Execution of the following works along the 128 Km of theexisting railway (passengers and cargo train):

Railway upgrade Changes to the tracks in critical sectors Purchase of rolling stock Reinforcement of 15 railway bridges Extension of 38 tunnels for standard gauge rolling stock

(1,435 mm) Upgrades to the signaling and telecommunication systems Draining works

The project includes the interoperability with Ferrocarril Central(railway service with standard gauge of 25 ton per axle) for theconnection of high Andes regions with the port of Callao and theSanta Anita market.

Estimated investment: Under evaluationType of concession : Co-financedConcession Period: 30 years

Estimated award date: I QT 2015

HUANCAYO - HUANCAVELICA RAILWAY

TO BE CALLED

Junin

Ferrocarril Central railwayFerrocarril Huancayo – Huancavelica railwayFerrocarril Sur railway

Huancavelica

Page 10: Endless investment opportunities in public infrastructure ...

FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA

A private proposal for the design,

construction, electromagnetic equipment,

systems, rolling stock, financing, operation

and maintenance of a 14 Km fast mass

transportation system on an elevated track.

• Estimated Investment: Studies in progress

• Type of concession : Co-financed

Estimated award date: 2015

UNDER EVALUATION

Arequipa

Page 11: Endless investment opportunities in public infrastructure ...

CONCESSIONS IN URBAN AREAS PERIPHERAL RING ROAD

Private proposal for the construction, financing,

operation and maintenance of a highway from

Av. Elmer Faucett to Av. Circunvalación (approx.

33 Km), according to the technical parameters

and service levels established.

• Estimated Investment: Studies in progress

• Type of concession : Co-financed

Estimated award date: IV QT 2014Ring road

UNDER EVALUATION

Lima and Callao

Page 12: Endless investment opportunities in public infrastructure ...

Execution of upgrade and rehabilitation works (117km), initial periodic maintenance (160 km); andsubsequent maintenance and operation of 651 Km, inorder to reach and maintain the levels servicesestablished on the railway route.

Estimated investment: The sector is conducting thefinal engineering studies.

Type of concession : Co-financedConcession period: 25 years

Estimated date of award: I QT 2015

LONGITUDINAL DE LA SIERRA HIGHWAY SECTION 4

TO BE CALLED

APURÍMAC

Page 13: Endless investment opportunities in public infrastructure ...

Regular initial maintenance, and operation and maintenance

of all the Section (422 km), in order to obtain the required

level of service.

Estimated Investment: The sector is updating theupgrading and improvement costs

Type of concession: Co-financed

Concession period: 25 years

Estimated award date : II QT 2015

TO BE CALLED

LONGITUDINAL DE LA SIERRA HIGHWAY SECTION 5

Cusco

Page 14: Endless investment opportunities in public infrastructure ...

Private proposal for the concession to build,

operate and maintain 30 km in the southern

part of the country.

Estimated investment: Under evaluation.

Type of concession: Self sustaining

Estimated award date: 2015

PANAMERICANA SUR HIGHWAY: SECTION ICA- DV. QUILCA

UNDER EVALUATION

Ica

Arequipa

Page 15: Endless investment opportunities in public infrastructure ...
Page 16: Endless investment opportunities in public infrastructure ...

ENERGY SECURITY AND SOUTHERN GAS PIPELINE

Concession to design, finance, build, operate, maintainand transfer of a natural gas distribution system. Theproject includes 2 sections:

a)Construction of natural gas pipelines and liquid gaspipelines from Malvinas plant to the Connection point(CP) and then to the Chinquintirca plant.

b)Natural gas pipeline from (CP) runs through Cusco andArequipa and reach of the south coast of the country.This comprises the following works:

Route 1: natural gas pipeline from the CP to Cusco

Route 2: Continuance of the gas pipeline to Ilo andMollendo.

Estimated Investment: US$ 3,722 million

Type of concession: Self - sustained

Estimated award date: II QT 2014

CALLED

Malvinas

Chiquintirca

Camisea

CUSCO

PUNO

AREQUIPA

Mollendo MOQUEGUA

TACNAIlo

Quillabamba

PC

Page 17: Endless investment opportunities in public infrastructure ...

SUPPLY SYSTEM OF LNG FOR DOMESTIC MARKET

Concession to design, finance, build, operate and maintain a

supply system of liquid natural gas with a capacity of 130,000

M3 in emergency situations for up to 7 days.

Estimated Investment : US$ 250 million.

Type of concession: Self-sustaining.

Concession term: 20 years plus the build period (30 months)

Estimated award date: IV QT 2014

CALLED

Lima

Page 18: Endless investment opportunities in public infrastructure ...

Concession to design, finance, build, operate, and maintain

an LPG transport system from the producer facilities (Pisco)

to Lurin. The transport capacity will be 50,000 TM/day

Estimated investment: US$ 250 millones

Type of concession: Self- sustained

Concession term: 20 years plus the build period (36months)

Estimated award date: III QT 2014

Planta de

almacenamiento y

despacho de GLP

Ica

Lima

CALLED

LPG TRANSPORT SYSTEM FOR LIMA

Page 19: Endless investment opportunities in public infrastructure ...
Page 20: Endless investment opportunities in public infrastructure ...

ELECTRIC ENERGY PRODUCTION

The exploitation of the Camisea field has lead in the expansion of thermal generation, which has grown by an average annual rate of 22% for the last ten years.

Electric Energy Production by source (%)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

National Electric Energy Production (GWh)

Hydraulic Thermal Others

Hydraulic53%

Thermal46%

Others1%

2013

Hydraulic86%

Thermal14%

2003

Source: Committee of Economic Operation of SEIN Source: Committee of Economic Operation of SEIN

Page 21: Endless investment opportunities in public infrastructure ...

220 kV Moyobamba - Iquitos Transmission Line and associated substations

434

US$ MM

US$ 434 million

in electrical energy PPP project

PACIFIC OCEAN

PROJECTS TO BE AWARD JAN - APR 2014

Page 22: Endless investment opportunities in public infrastructure ...

Location: Nationwide.

Supply of power and energy to the National Interconnected

Power System (SEIN) through new hydroelectric power

stations to meet the demand of 400/400/300 MW from

2018 on. The energy sale will be guarantee by contracts.

• Estimated investment: Under evaluation

• Type of concession : Self-sustained

Estimated date of award: III QT 2014

1100 Mw ELECTRICITY SUPPLY

TO BE CALLED

Page 23: Endless investment opportunities in public infrastructure ...

220 KV LA PLANICIE INDUSTRIALES TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS

Concession to design, finance, build, operate, and maintain

the transmission line with a length of 16.6 km and two

circuits with 400 MVA capacity each. The last 5 km of the

line will be underground.

Estimated investment: US$ 56.6 million

Type of concession : Self-sustaining

Concession period: 30 years plus the construction period(22 months approximately).

Estimated award date: II QT 2014

CALLED

Lima

Page 24: Endless investment opportunities in public infrastructure ...

220 KV FRIASPATA - MOLLEPATA TRANSMISSION LINE AND 220/60 KV ORCOTUNA SUBSTATION

CALLED

Concession to design, finance, build, operate andmaintain the following projects:

a)Mollepata – Friaspata transmission line of 90.5 k.m.and 192 MVA capacity and associated sub stations.

b)220/60 kV new Orcotuna substation with 50 MVAcapacity.

Both projects will allow to meet the energy demand inthe regions involved.

Estimated investment: US$ 43.5 million

Type of concession : Self-sustained.

Concession period: 30 years plus the constructionperiod (25 months approximately)

Estimated award date: II QT 2014

Mollepata

Friaspata

SE Orcotuna

Junin

Ayacucho Huancavelica

Page 25: Endless investment opportunities in public infrastructure ...

220 kV AZANGARO – JULIACA – PUNO TRANSMISSION LINE

Concession of the design, financing, construction,operation and maintenance of the line of more than110 Km and capacity of 120 MVA; in order toeliminate the congestion of current links in 138 kVwithin the area of the project and reinforce theSouth Interconnected System with a reliablenetwork of 220 kVa) Azángaro-Juliaca Line : 83 Km

b) Juliaca-Puno Line: 31 Km

Estimated investment : US$ 81.3 million

Modality: Self-sustainable

Concession term: 30 years plus the constructionperiod (24 months approximately)

Estimated award date : III QT 2014

Puno

TO BE CALLED

Page 26: Endless investment opportunities in public infrastructure ...
Page 27: Endless investment opportunities in public infrastructure ...

54 Sanitation Companies(EPS)

504 Organisms from civil society

Rural area 29%

EPS 62%

490 Local

government 9%

Urban area 71%

WATER & SANITATION SUPPLIERS

Page 28: Endless investment opportunities in public infrastructure ...

Concession to design, finance, build, operate andmaintain of the following infrastructure works:

Extension capacity of Pomacocha and HuallacochaBajo dams (approx. 100 MM cubic meters ).

Diversion works of Pomacocha – River Blanco (approx.10 km of trans Andean tunnel).

Water purification plant (5 m3/s), and

Southern conduction line Ramal Sur (approx. 25,6 km)from Huachipa to Villa del Triunfo districts, threetunnels of 4.2 k.m., 4.5 k.m., and 2.5 k.m.; and 6support reservoirs of 24,000 cubic meters.

Estimated Investment: US$ 400 million

Type of concession: Self -sustained

Concession term: 20 to 30 years

Estimated award date: IV QT 2014

POR CONVOCAR

P

H

Water Purificatio

n Plant

Southern conduction line

Blanco RiverRimac River

Trans Andean tunnel

MAIN WORKS AND CONDUCTION OF DRINKABLE WATER SUPPLY FOR LIMA

CALLED

Page 29: Endless investment opportunities in public infrastructure ...

CHILLÓN RIVER WATER SUPPLY WORKS

Concession to design, finance, build, operate andmaintain of dam works (approximately 40 MM cubicmeters) of Chillón river basin.

Estimated investment :US$ 45 million

Type of concession: Self- sustaining

Concession term: 20 to 30 years

Estimated award date: IV QT 2014

POR CONVOCAR

TO BE CALLED

Canta

Matucana

Ancón

Lima

Page 30: Endless investment opportunities in public infrastructure ...

Peru is a country that grows and builds its future

Peru, towards a world class infrastructure

Page 31: Endless investment opportunities in public infrastructure ...

Over

US$ 12,000 million

in PPP projects

PROINVERSION´S PORTFOLIO 2014-2015

Airport

Electrical energy

Railways

Hydrocarbons

Penal Facilities

Port

Sanitation

Health

Tourism

Land transport

Waterways

Page 32: Endless investment opportunities in public infrastructure ...