Electrical consumers list & power balance
Continuous
(C)
Intermittent
(I)
Spare
(S)
kW kW kW kW
LP003-1 Fire Fighting pump Bldg Light&Small Pwr C 20 20
HSV-0011 Valve for gas metering station I 2 2
HSV-0012 Valve for gas metering station I 2 2
PM-032A Fire Fighting Jockey Pump C 10 10
PM-032B Fire Fighting Jockey Pump S 10 10
TOTAL 30 4 10
(1) Duty Type: "C" Continuous; "I" Intermittent; "S" Spare
Peak Load ( 1*C + 0.6*I + 0.1*S ) kW
CONSUMED
LOAD
33.4
CONSUMED LOAD
Equipment
No.Description
Du
ty T
yp
e (
1)
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical consumers list & power balance
Continuous
(C)
Intermittent
(I)
Spare
(S)
kW kW kW kW
LP003-1 Fire Fighting pump Bldg Light&Small Pwr C 20 20
HSV-0011 Valve for gas metering station I 2 2
HSV-0012 Valve for gas metering station I 2 2
PM-032A Fire Fighting Jockey Pump C 10 10
PM-032B Fire Fighting Jockey Pump S 10 10
TOTAL 30 4 10
(1) Duty Type: "C" Continuous; "I" Intermittent; "S" Spare
Peak Load ( 1*C + 0.6*I + 0.1*S ) kW
CONSUMED
LOAD
33.4
CONSUMED LOAD
Equipment
No.Description
Du
ty T
yp
e (
1)
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical power balance
1 2 3 4 5 6
4 + 2 Compressors = 4 running + 1 spare + 1 in long term maintenance
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical power balance
1 2 3 4 5 6
Plant power consumption: 4MW 3* 4MW Power Generator = 2@50% + 1 spare
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
General one line diagram
LV
MV
MV/LV
40 kW= 400 V * 100 Amps = 10 kV * 4 Amps
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical distribution
LV
MV
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
MV Switchgear
Transformers
Electrical One Line Diagram
LV switchgears = Motor Control Centers (MCC)
Power generators
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical calculations
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Equipment data sheet
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Switchboard single line diagram
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Switchboard typical diagrams
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Normal/Essential power consumers
Continuous
(C)
Intermittent
(I)
Spare
(S)
kW kW kW kW
LP003-1 Fire Fighting pump Bldg Light&Small Pwr C 20 20
HSV-0011 Valve for gas metering station I 2 2
HSV-0012 Valve for gas metering station I 2 2
PM-032A Fire Fighting Jockey Pump C 10 10
PM-032B Fire Fighting Jockey Pump S 10 10
TOTAL 30 4 10
CONSUMED LOAD
Equipment
No.Description
Du
ty T
yp
e (
1)
CONSUMED
LOAD
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Normal/Essential consumers
Continuous
(C)
Intermittent
(I)
Spare
(S)
kW kW kW kW
LP003-1 Fire Fighting pump Bldg Light&Small Pwr X C 20 20
HSV-0011 Valve for gas metering station X I 2 2
HSV-0012 Valve for gas metering station X I 2 2
PM-032A Fire Fighting Jockey Pump X C 10 10
PM-032B Fire Fighting Jockey Pump X S 10 10
TOTAL 30 4 10
CONSUMED LOAD
Equipment
No.Description
Essen
tial
No
rmal
Du
ty T
yp
e (
1)
CONSUMED
LOAD
Continuous
(C)
Intermittent
(I)
Spare
(S)
kW kW kW kW
LP003-1 Fire Fighting pump Bldg Light&Small Pwr C 20 20
HSV-0011 Valve for gas metering station I 2 2
HSV-0012 Valve for gas metering station I 2 2
PM-032A Fire Fighting Jockey Pump C 10 10
PM-032B Fire Fighting Jockey Pump S 10 10
TOTAL 30 4 10
CONSUMED LOAD
Equipment
No.Description
Du
ty T
yp
e (
1)
CONSUMED
LOAD
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical Control System
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical Equipment layout drawing
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical Main Cable routing
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Cable schedule & routing drawings
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Typical installation drawings
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Trouble shooting diagrams
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical Calculations
Main calculations done on a project are : • Load flow analysis • Short circuit analysis • Cable sections • Motor starting impact • Transient phenomena (Loss of a generator for example) • Protection coordination • Harmonic analysis
8 8 0 0
8 9 0 0
9 0 0 0
9 1 0 0
9 2 0 0
9 3 0 0
9 4 0 0
9 5 0 0
9 6 0 0
9 7 0 0
9 8 0 0
9 9 0 0
1 0 0 0 0
0 . 0 2 . 5 5 . 0 7 . 5 1 0 . 0 1 2 . 5 1 5 . 0 1 7 . 5 2 0 . 0
V O L T A G E O F M S - 0 0 1 ( S T U D Y 1 )
Bu
s V
olt
ag
e (
Vo
lts
)
T im e ( S e c o n d s )
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Selectivity
© 2
01
5 – H
ervé
Baro
n
HERVE
BARON
Electrical Engineering in a nutshell
List & preliminary calcs • Electrical consumers list • Power balance
Installation drawings • Cable routing & schedule • Typical wiring diagrams • Standard drawings: power,
grounding, lighting etc. • Substation layouts • Trouble shooting diagrams
Calculations • Protection settings
EQUIPMENT SPECIFICATIONS
Diagrams • Single line diagram Calculations • Load flow analysis • Short circuit Specifications & data sheets • Generators, Transformers,