Asset Register – Electrical Services North Herts Leisure Centre Z:\3188\MRJS\Asset Register Report\N.H.D.C Asset Register and Conditions Schedule for the Electrical Engineering Services at North Herts Leisure Centre Rev Reason for Issue Date A Preliminary Issue 13/05/2013 Building Services Consultant Engineers David Bedwell & Partners Manor House Yard, Royston, Herts. SG8 7BZ (Tel: 01763 241556) (Fax: 01763 246487) Email – [email protected]
57
Embed
ElecServices Asset Register - Leisure Centre...Asset Register – Electrical Services North Herts Leisure Centre Z:\3188\MRJS\Asset Register Report\N.H.D.C d) It should also be clearly
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Asset Register – Electrical Services North Herts Leisure Centre
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
Electrical Services Specification
Table of Contents
Section Description
1.0 Introduction, Purpose and Format
2.0 Contractor’s Examinations, Checks and Tests
3.0 Exclusions / Clarification
Appendix A Asset Register : Conditions Schedule
Appendix B Summary Asset Register
Appendix C Excerpt from CIBSE Guide Volume M (2008) – Indicative LifeExpectancy for Building Services Plant, Equipment andSystems.
Appendix D Excerpts from B & S E (HVCA) SFG 20 (2012) – the StandardMaintenance Specification for Mechanical and ElectricalServices to Buildings
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
1.0 Introduction, Purpose and Format
1.1.0 Introduction
1.1.1 The maintenance philosophy adopted in this document relate to theexisting / installed electrical equipment and plant and suchmaintenance regimes that shall be adopted in terms of PLANNEDPREVENTATIVE MAINTENANCE (PPM)
1.1.2 As its name implies PPM is a method of maintenance whichnecessitates well-defined maintenance routines for plant andequipment at regular pre-determined intervals. In contrast toRESPONSE MAINTENANCE which is effectively breakdownmaintenance; the philosophy underlying PPM is that plant andequipment is kept operating at or near its peak efficiency.
If PPM is organised and undertaken properly it will produce significantbenefits, the most important of these being the reduction of high repaircosts and energy costs and the elimination of lost revenue resultingfrom forced closure of facilities.
1.1.3 Initially the implementation of PPM is costly but in the long term will besubstantially less expensive than a response maintenance policy.
1.2.0 Purpose
1.2.1 The purpose of this document is identify all items of electrical servicesequipment and plant currently installed at the North Herts LeisureCentre, Letchworth, and subsequently the required PPM regime whichshall be the responsibility of the successful Contractor to perform.
1.2.0 Format
a) The PPM details included in this document are based upon performancerequirements as distinct from detailed schedules of the numerousspecific examinations, tests and checks that will be required of thesuccessful Contractor to achieve the standard of maintenance required.
b) In order to comply with the maintenance standards set out in theschedule the successful Contractor will therefore be required, not only tocomplete the stipulated tests, checks and examinations in accordancewith SFG20 (2012), but also to respond to any works necessary toachieve the standard of maintenance identified in the schedules.
c) The Contractor will be expected to complete all maintenancerequirements in accordance with the frequency intervals as specified inSFG20 (2012) and shall pay all costs relating to such works.
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
d) It should also be clearly understood, with regard to the period withinwhich corrective maintenance or repair is to be achieved, that where, inthe opinion of the Contract Administrator, failure to complete such worksmay give rise to potential injury to staff or users, the minimum statedresponse times will be applied. In certain circumstances it may on theother hand be the case that stated response times may be extended bythe Contract Administrator, when for example the subject building is notin use.
e) Much of the information appertaining to manufacturers, equipment / planttechnical data, current condition, etc as identified in Appendix’s A and Bis self-evident but for the avoidance of misunderstanding the followingadditional explanatory notes are provided:-
Condition Panel:
The intention of this panel is to indicate the condition of the item ofequipment at the date of tender invitation and is based on a scale of 1 to5. The classifications attributed to each point on the scale are asfollows:-
1 = In need of Repalacement2 = Poor Condition for Age, but still serviceable3 = Average Condition for Age4 = Good Condition for Age5 = As New (Excellent Condition)
Reference Appendix A the Asset Register : Conditions Schedule theassessed condition is identified by enlarged figures highlighted in boldtext.
Maintenance Schedule:
The Asset Register : Conditions Schedule includes reference toAppendix D, SFG20 (2012), the Standard Maintenance Specification forMechanical and Electrical Services to Buildings. Each Equipment / Plantdata sheet makes reference to the applicable maintenance clause thusidentifying the extent and frequency at which the required PPM shall beundertaken.
i.e. – Clause 05-23 of SFG20 (2012) refers to “05” Boilers/HeatGenerators and “23” LTHW Boilers.
Note: it is assumed that as competent M&E Maintenance Contractorsthat those tendering for this particular project will have access to theirown in house version of SFG20 (2012) and subsequently a copy of thisparticular document is not attached.
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
Economic Life:
As Appendix C, this the economic life expectancy obtained from CIBSEGuide Volume M (2008) – Indicative Life Expectancy for BuildingServices Plant, Equipment and Systems; and/or that which one wouldnormally expect to be achieved.
Predicted Future Life:
The predicted life is deemed to be the economic life less the number ofyears the item has been in operation or, where this is not known, thefuture anticipated life based upon its present condition, maintenancehistory and general state of repair.
It is acknowledged that although it is possible to keep many items ofelectrical equipment operational for periods substantially in excess oftheir anticipated life, the repair and maintenance costs of so doing may,after a certain time, dictate that replacement is a more viable and costeffective option.
2.0 Contractors Examinations, Checks and Tests
It will be the responsibility of the successful Contractor to formulatedetailed inspection schedules and rotas to comply with the generalintention of the examinations, tests and checks stipulated within thisdocument and SFG 20 (2012).
3.0 Exclusions / Clarification
The Contractor’s attention is drawn to the fact that repair, maintenanceand inspection of the following items are expressly excluded from thiscontract:-
PA Systems Intruder Alarms Fire alarms
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
APPENDIX A
- Asset Register: Conditions Schedule
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 01
Equipment / Plant Ref: P A System Model Type:
No Off: 1
Manufacturer: Baldwin Boxall Installed Applied Systems Biggleswade
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N A R P M: N A
Running Current: N A Starting Current: N A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 10 years
Predicted Future Life: 5 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 11-01 Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 02
Equipment / Plant Ref: Chlorine Alarm Model Type: Gas Master 1
No Off: 1
Manufacturer: Crowcon Instruments Ltd Agent Proton Water Services
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N A R P M: N A
Running Current: N A Starting Current: N A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 0 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 03
Equipment / Plant Ref: Emergency Lighting Model Type: Flood
No Off: 8
Manufacturer: Uknown
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N A R P M: N A
Running Current: N A Starting Current: N A
Serial Number:
Date of Manufacture:
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 04
Equipment / Plant Ref: Emergency Lighting Model Type: EXIT
No Off: 24
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 5 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 – (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 05
Equipment / Plant Ref: Emergency Lighting – Various Locations Model Type: SOL/NM3
No Off: Refer to Lighting Schedule
Manufacturer: Channel Safety Systems
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture:
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 8 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 - (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 06
Equipment / Plant Ref: Emergency Lighting – Various Locations Model Type: MAXI3/NM3TD 3 Headed Time Delay
No Off: Refer to Lighting Schedule
Manufacturer: Channel Safety Systems
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: 2004
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 25 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 - (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 07
Equipment / Plant Ref: Emergency Lighting – Various Locations Model Type: MAXI 3/NM3/TD/WP
No Off: Refer to Lighting Schedule
Manufacturer: Channel Safety Systems
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 8 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 – (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 08
Equipment / Plant Ref: Emergency Lighting – Various Locations Model Type: ECO/NM3/TD
No Off: Refer to Lighting Schedule
Manufacturer: Channel Safety Systems
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 8 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 – (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 8 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 – (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 10
Equipment / Plant Ref: Emergency Lighting – Various Locations Model Type: LX/M3F
No Off: Refer to Lighting Schedule
Manufacturer: Channel Safety Systems
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 8 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 37 – (01-02) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 11
Equipment / Plant Ref: Recessed Down Light – Twin Lamp PL - Various Locations Model Type:
No Off: 125
Manufacturer: Illuma
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 15 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 12
Equipment / Plant Ref: Fluorescent Model Type: 1800 single IP65
No Off: 6
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 13
Equipment / Plant Ref: Fluorescent – Various Locations Model Type: 1800 single prismatic
No Off: 3
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/a R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 14
Equipment / Plant Ref: Fluorescent – Various Locations Model Type: 1800 Twin IP65
No Off: 9
Manufacturer: Various
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 15
Equipment / Plant Ref: Down Lighter Model Type: 50W / LED
No Off: 48
Manufacturer: Various
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 17
Equipment / Plant Ref: Showcase - Bar Model Type: 50W (Diachroic) Recessed Downlight
No Off: 9
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 18
Equipment / Plant Ref: Fluorescent Model Type: Wall Mounted 1-Lamp
No Off: 8
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 19
Equipment / Plant Ref: Fluorescent Model Type: 1500 Twin IP65
No Off: 31
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture:
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 20
Equipment / Plant Ref: Fluorescent Model Type: 1500 Single IP65
No Off: 2
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 21
Equipment / Plant Ref: Fluorescent Model Type: 1800 Twin Caged
No Off: 24
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 22
Equipment / Plant Ref: Fluorescent – Various Locations Model Type: 1500 Twin Prismatic
No Off: 10
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 5 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 23
Equipment / Plant Ref: Fluorescent – Various Locations Model Type: 1800 Twin Prismatic
No Off: 20
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 24
Equipment / Plant Ref: Fluorescent Model Type: 600 Twin Opal
No Off: 1
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 25
Equipment / Plant Ref: Fluorescent Model Type: Drum Prismatic 2D
No Off: 18
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 26
Equipment / Plant Ref: Pool Hall Flood Model Type: 400W 5ON-T
No Off: 32
Manufacturer: Dakell Northampton
Load/Duty: N/A Gas input: N/A
Voltage: V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 5 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 27
Equipment / Plant Ref: Hi-Hay Model Type: 400W 5ON
No Off: 25
Manufacturer: Thorn Lighting
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 28
Equipment / Plant Ref: Fluorescent Model Type: Lay-In 600 x 600 – 4 Lamp
No Off: 92
Manufacturer: Various
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 29
Equipment / Plant Ref: Fluorescent Model Type: Lay-In 600 x 600 2 Lamp (PL)
No Off: 71
Manufacturer: Various
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 3 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 31
Equipment / Plant Ref: Neon + Miniatures Model Type: Unknown
No Off: 40
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 32
Equipment / Plant Ref: Pendants – Café Model Type: Unknown
No Off: 3
Manufacturer: Unknown
Load/Duty: N/A Gas input: N/A
Voltage: 230V Phase: 1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 36 – (01-04) Item No: Job No:
Comments and Other Relevant Details:
Asset Register: Electrical Services Project: North Herts Leisure Centre
Date: April 2013
Ref: A R 33
Equipment / Plant Ref: Electrical Distribution Boards & Control Panels Model Type: Various
No Off: 19 (see attached schedule)
Manufacturer: Various
Load/Duty: N/A Gas input: N/A
Voltage: 230/400V Phase: 3/1
Hz / (CPS): 50 Hz HP / KW: N/A R P M: N/A
Running Current: N/A Starting Current: N/A
Serial Number:
Date of Manufacture: Unknown
Condition: 1 2 3 4 5
Comments: Note: Enlarged Bold figure denotes assessed condition: 5 = As new (Excellent Condition) 4 = Good Condition for age 3 = Average Condition for age 2 = Poor Condition for age, but still serviceable 1 = In need of renewal.
Economic Life: 20 years
Predicted Future Life: 10 years
B & S E (HVCA) SFG 20 (2012) Maintenance Schedule Reference: 44-07 Item No: Job No:
Comments and Other Relevant Details:
Distribution Points Summary - for A R 33
Test Ref
Location Manufacturer Site Ref
NB of Ways
NB of Ways in
Use
CP01 Pool Plant Room
CP02 Pool Plant Room
CP03 Pool Plant Room
CP04 Pool Plant Room
CP05 Room 77 Void
CP06 Wave Control Room
DB01 Main Switch Room
Merlin Gerin DB6 36 34
DB02 Pool Plant Room
MK N/A 10 4
DB03 External Metal Box Hypochlorite Room
MEM EX LGT
6 4
DB04 Hypochlorite Room External
Hager N/A 4 1
DB05 Back Office Server Room
MEM DB1/1 10 10
DB06 Back Office Server Room
Merin Gerin N/A
DB07 Managers Office Wylex DB1/1/1
7 4
DB08 Room 77 Void
Merlin Gerin DB3 36 35
DB09 First Floor Kitchen Office
Merlin Gerin DB4 48 20
DB10 First Floor Kitchen
Merlin Gerin N/A 24 17
DB11 First Floor Fitness Office
MEM N/A 48 39
DB12 First Floor Fitness Office
MEM N/A 48 43
DB13 Sports Hall Store
Merlin Gerin DB2 48 37
NORTH HERTFORDSHIRE LEISURE CENTRE – LIGHTING SCHEDULE
A R 24 Fluorescent 600 Twin Opal 1 Unknown N/A 230V Unknown 3 20 3 36-(01-04)
A R 25 Fluorescent Drum Prismatic 2D 18 Unknown N/A V Unknown 3 20 3 36-(01-04)
A R 26 Pool Hall Flood 400W 5ON-T 32 Dakell N/A V Unknown 4 20 5 36-(01-04)
A R 27 Hi-Hay 400W 5ON 25 Thorn Lighting N/A 230V Unknown 3 20 3 36-(01-04)
A R 28 Fluorescent Lay-In 600x600 - 4 Lamp 92 Various N/A 230V Unknown 3 20 3 36-(01-04)
A R 29 Fluorescent Lay-In 600x600 - 2 Lamp 71 Various N/A 230V Unknown 3 20 3 36-(01-04)
A R 30 Wall Lights Café Unknown 11 Unknown N/A 230V Unknown 3 20 10 36-(01-04)
A R 31 Neon + Miniatures Unknown 40 Unknown N/A 230V Unknown 5 20 10 36-(01-04)
A R 32 Pendants Café Unknown 3 Unknown N/A 230V Unknown 3 20 10 36-(01-04)
A R 33 Electrical Distribution Boards &Control Panels
Various Locations 19 (see attachedschedule)
Unknown N/A 230/400V Unknown 3 20 10 36-(01-04)
* Condition Legend:
5 = As New (Excellent Condition) / 4 = Good Condition for Age / 3 = Average Condition for Age / 2 = Poor Condition for Age, but still servicable / 1 = In Need of Replacement
Asset Register – Electrical Services North Herts Leisure Centre
Z:\3188\MRJS\Asset Register Report\N.H.D.C
APPENDIX C
- Excerpt from CIBSE Guide Volume M (2008)
Indicative Life Expectancy for Building Services Plant, Equipment and Systems
Ref: CIBSE Guide Volume M (2008)
Indicative Life Expectancy for Building Services Plant, Equipment and Systems – excerpt from CIBSE Guide Volume M (2008)
Equipment Item Indicative
Life (Years)
Remarks
Boiler Plant
Shell and tube boilers (steam and HTHW)
20 Water treatment is very important
Water tube boilers (steam and HTHW) 25 Water treatment is very important
Electrode/electric boilers (steam and HTHW)
25 Water treatment is very important
Shell and tube boilers (MTHW/LTHW) 20
Water tube boilers (MTHW/LTHW) 25
Electrode/electric boilers (MTHW/LTHW)
25
Cast iron sectional boilers (MTHW/LTHW)
25
Steel boilers (MTHW/LTHW) 15
Condensing boilers (MTHW/LTHW) 15
Refrigeration Plant - medium to large capacity
Centrifugal chiller 15 See note 1
Reciprocating chiller 20 See note 1
Screw chiller 20 See note 1
Absorption chiller 20
Refrigeration Plant - open type cooling towers
Plastic coated metal cooling tower of plastic coating
25 Consider thickness, bonding and quality
Galvanised metal cooling tower 12 Consider thickness and quality of galvanising
Timber constructed cooling tower which can extend life
10 Consider quality of timber preservation
Ceramic cooling tower 35
Plastic constructed cooling tower 20 Consider thickness and quality of plastic
Epoxy treated metal cooling tower 15
Stainless steel cooling tower 30 Consider quality and thickness of stainless steel
Refrigeration Plant - external heat rejection
Air cooled condensers 20
Evaporative condensers 20
Air blast dry air coolers - plastic coated metal of plastic coating
25 Consider thickness, bonding and quality
Air blast dry air coolers - galvanised metal 20 Consider thickness and quality of galvanising
Air blast dry air coolers — epoxy treated metal
20
Ref: CIBSE Guide Volume M (2008)
Equipment Item Indicative
Life (Years)
Remarks
Boiler Plant Auxiliaries
Oil storage tanks — external protection 20 Depends on thickness of metal and corrosion protection
Oil storage tanks — underground 15 Depends on thickness of metal and corrosion protection
Combustion controls 12
Boiler electrodes 8
Feed pumps 15
Water treatment 15
Atmospheric gas burners 15
Forced air gas burners 12
Oil burners 12
Solid fuel handling plant 15 Conveyor system up to 20 years
High temperature fans 15
Instrumentation 10
Oil distribution system for boiler plant 15
Gas distribution system for boiler plant 20
Mild steel flue 15 Depends on thickness of metal and corrosion protection
Stainless steel flue 20 Check quality of stainless steel
Brick or concrete chimney — external 40
Brick or concrete chimney — internal 50
Steel chimney — external 30 Depends on thickness of metal and corrosion protection
Water Tanks
Cast iron water cisterns 35
Mild steel (treated) water cisterns 15 Not for domestic or drinking water purposes
Plastic water cisterns 35 High quality structural support is necessary
Galvanised metal water cisterns 12
Ductwork - systems and components
Ductwork (galvanised) 30
Ductwork (plastic) need to be considered 20 Mechanical damage and expansion
Ductwork (flexible circular) 20 Mechanical damage needs to be considered also cleaning difficulties