educad PROJECT: SCHOOL FOR THE FUTURE
Aug 15, 2015
educad PROJECT: SCHOOL FOR THE FUTURE
ART ROOMOUTDOORS
49200
31224
Sickroom
Restaurant
Class 1Class 2Class 3
Kitchen
Reception
Principle
Girls
Boys
Art Class
Storage
Staff room
Library
Class 5
Class 4
Open Hall
Sport Area
RECEPTION & STAFF ROOM
Material: Mystic Brown LaminateUse: Classrooms, Staff room Storage room & LibraryThickness: 6mmFixing: The whole assembly is glued together at the edges and floats in a thin closed-cell polyethylene foam pad
Materials used:25,4mm thick Bamboo polesFinish: Varnish to protect against rotting
Fixing method: Dowels.
The exterior of the space within the school is warming but still relaxing. The materials that was chosen to build the school with is all as eco-friendly as possible. The Bricks that is used to build with, is woolbricks. Glass solar tiles is used for the roof over the corridor. Recycled plastic is used is use for the deck in the open hall.
Material: Mystic Brown LaminateUsage: Classrooms, Staff room, Storage room & LibraryThickness: 6mmFixing: The whole assembly is glued together at the edges and floats on a thin, closed-cell polyethylene foam pad
Material: Gypsum Plaster boardUsage: CeilingThickness: 12mmFinish: Layer of Plascon One Coat ceiling white paint
to do list:-hand in design-study for the test : 20 Oct
Material: Steel Square tubeUsage: TrussesThickness: 10mm
FROM THE ART CLASS:
FROM THE RECEPTION:
FROM THE CORRIDOR:
ART ROOM
:
Bamboo structure:
ISO VIEWS
5350mm
2600m
m2600m
m
2500m
m
ISO VIEWS:
2000mm
Materials:Top: Material: Safety glassThickness: 10mmFinish: Polished
Cover: Material: Supawood Panel Thickness: 48mmFinish: White High Gloss White Duco panel
Desk:Material: SupawoodThickness: 48mmFinish: Layer of wood laminate
1
2 3
600mm 800mm 600mm
100m
m950m
m
1
2
3
Reception desk:
Materials:
25,4mm thick Bamboo polesFinish: Varnish to protect against rotting
Fixing method: Dowels.
CUSTOM MADE PIECES