Top Banner
Ecological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser Knöpfel treeze Ltd., Uster DF 54, 5.12.2013
36

Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Mar 21, 2018

Download

Documents

doanlien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Ecological scarcity 2013:Overview and main elements of the

update and its implications

Rolf Frischknecht, Sybille Büsser Knöpfel

treeze Ltd., Uster

DF 54, 5.12.2013

Page 2: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

4601

Eco-factor Carbon dioxide (CO2):

UBP/kg

Page 3: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Contents

Project outline

Methodology and main elements of the update

Focus: greenhouse gases, nuclear wastes

Eco-factor time series

Synthesis

2

Page 4: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Project goal

Update of Swiss eco-factors 2006

Track

Swiss environmental legislation

Swiss emission situation

Expand to new/emerging environmental impacts

Provide

ready to use eco-factors Switzerland 2013

method applicable in other countries/regions

3

Page 5: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Project organisation

4

Commissioner- FOEN, P. Gerber

Steering group- P. Gerber (Lead), FOEN- N. Egli, FOEN- G. Hildesheimer, Öbu- A. Braunschweig, E2

Advisory group- G. Hildesheimer (Lead)- various companies- P. Gerber- A. Braunschweig- R. Frischknecht

Contractors- R. Frischknecht, treeze,

Main contractor, (Lead)- staff at treeze- ideja communication- ETHZ, ICB

Discussion group Methodology- R. Frischknecht (Lead)- A. Braunschweig, E2- P. Gerber, FOEN- E. Egli, FOEN- E. Franov, carbotech- M. Scheringer, ETHZ

Page 6: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Advisory group

Christian Brütsch, RePower AG

Patrik Burri, Credit Suisse

Roland Högger, Geberit International AG

Elisabeth Huber, Geberit International AG (until 12. 2012)

Martin Kilga, Sinum AG

Peter Müller, Knecht und Müller AG

Paul Schnabl, Die Schweizerische Post

Jörg Schwille, Schweizer Metallbau AG

Marcel Sutter, BWK-FMB AG

Patrik Walser, Migros Genossenschaft

Anne Wolf, Die Schweizerisch Post5

Page 7: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Project phases

6

Additional ecofactors and adaptation of methodology

ackground investigations for Ecoand determination factors 2013

Background investigations for Eco-factors 2013and determination of draft Eco-factors 2013

1st test phase

Revision of draft Eco-factors Switzerland 2013

2nd test phase

Final set of Eco-factors Switzerland 2013

Topics discussed:

- normalisation- multiple impact assessment- rounding- POPs and bioaccumulating

substances- land use in different biomes- abiotic resources

10.10

06.11

04.12

05.12

09.12

11.12

09.13

Feedback on proposed new elements

07.11

ContractorsDiscussion group methodologyAdvisory group

Page 8: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

The ecological scarcity formula

K = Characterization factor of a pollutant or a resource

Flow = Load of a pollutant, quantity of a resource consumed or level of a characterized environmental pressure

Fn = Normalization flow: Current annual flow with Switzerland as the system boundary

F = Current flow: Current annual flow in the reference area

Fk = Critical flow: Critical annual flow in the reference area

c = Constant (1012/a)

UBP = Eco-point: the unit of the assessed result

7

{ {constant

Weighting

2

ionNormalizat)applicable (if

zationCharacteri

UBP1factor -Eco c

F

F

FK

kn

⋅=

32143421

Page 9: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

The regionalisedecological scarcity formula

K = Characterization factor of a pollutant or a resource

Flow = Load of a pollutant, quantity of a resource consumed or level of a characterized environmental pressure

FnCH = Normalization flow: current annual flow with Switzerland as the system

boundary

F Region 1 = Current flow: current annual flow within Region 1

FkRegion 1 = Critical flow: critical annual flow within Region 1

c = Constant (1012/a)

UBP = Eco-point: the unit of the assessed result

8

cF

F

F

UBP1KfactorEco

2

Region 1

k

Region 1

CH

n

1 Region⋅

⋅=−

Page 10: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Basic scheme Swiss ecofactors ‘13

9

Page 11: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Final report: Structure and new elements

Part I: Life cycle assessment in short

Basic information for decision makers

Questions and answers concerning Life Cycle Assessment (FAQ)

Part II: Method fundamentals

The ecological scarcity method

Derivation principles

Application principles

Characterisation and grouping by environmental issues

Part III: Eco-factors for Switzerland

10

Page 12: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

New grouping

11

Environmental topic 1 tier grouping 2 tier grouping

Water resources Water resources Water resources

Energy resources Energy resourcesAbiotic resources

Mineral primary resources Mineral resources

Land use Land use

SoilNon radioactive waste to deposit Non radioactive waste

Radioactive waste to deposit Radioactive waste

Climate change Climate change Climate change

Ozone layer depletion Ozone depletion Ozone depletion

Main pollutants and PM

Air quality Air qualityCarcinogenic substances into air

Heavy metals into air

Radioactive substances into air

Water pollutants

Water quality Water qualityHeavy metals into water

POP into water

Radioactive substances into water

Pesticides into soilSoil quality Soil quality

Heavy metals into soil

Noise Noise Noise

Page 13: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Climate change: Target andcharacterisation

Two targets

Act on the reduction of CO2-Emissions (CO2-Gesetz):minus 20 % (relative to 1990) by 2020

Sustainable Development Strategy 2012-2015:minus 50 to 85 % reduction by 2050

Target (agreed by FOEN): minus 80 %

Characterisation:

GWP of 4th IPCC assessment report 2007

no adjustments for emissions of greenhouse gases in lower stratosphere (by airplanes)

12

Page 14: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

greenhouse gases, ecofactors

13

2013 2006 remarks

normalisation flow 53’040 1’000 t CO2-eq 53’034 emissions 2009

actual flow 53’040 1’000 t CO2-eq 45’436

critical flow 10’766 1’000 t CO2-eq 11’183 80 % reduction relative to 1990

weighting factor 24.3 16.5

ecofactor 460 UBP/kg CO2-eq 310

Increase of CO2 ecofactor by 50 % compared to 2006

Page 15: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Radioactive wastes, new concept

damage potential instead of «(political) acceptance»

Radiotoxicity Index (RTI), dependent on

activity of radionuclide

dose factor of radionuclide

limit value of dose

international measure used by NAGRA (National Cooperative for the Disposal of Radioactive Waste)

14

Page 16: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

radioactive wastes, actual and critical flow

actual flow (Data source: NAGRA):Maximum value RTI inventory Switzerland

critical flow (Data source: NAGRA):RTI at time of final closure of deposit: presumably 2115

Ordinance of Closedown and Waste disposal funds for nuclearinstallations (Stilllegungs- und Entsorgungsfondsverordnung)

Nuclear Energy Act (Kernenergiegesetz (KEG)), §39, cypher 2:«... the Federal Council shall order the closure of the repository, if the permanent protection of humans and the environment is

ensured.”

15

Page 17: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Radiotoxicity inventory -2050 ofradioactive wastes in Switzerland

16

1.00E+07

1.00E+08

1.00E+09

1.00E+10

1.00E+11

1.00E+12

1.00E+13

1.00E+14

1.00E+15

1.00E+16

1970 1980 1990 2000 2010 2020 2030 2040 2050

Rad

ioto

xiz

itäts

ind

ex (

RT

I)

Zeit ab Produktion [Jahre]

ALLTOX 1

RTI SMA

RTI ATA

RTI HAA/BE

RTI Gesamt

Calender years

Page 18: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Radiotoxicity inventory 2050+ ofradioactive wastes in Switzerland

17

1.00E+07

1.00E+08

1.00E+09

1.00E+10

1.00E+11

1.00E+12

1.00E+13

1.00E+14

1.00E+15

1.00E+16

1.00E+00 1.00E+01 1.00E+02 1.00E+03 1.00E+04 1.00E+05 1.00E+06 1.00E+07

Rad

ioto

xiz

itä

tsin

dex

(R

TI)

Zeit ab 2050 [Jahre]

ALLTOX 2

RTI SMA [Bq]

RTI ATA [Bq]

RTI HAA/BE [Bq]

gesamt

Time of final closure = permanent protection of humans and the environment is ensured

ca. 2115 Years since 2050 (logarithmic)

Page 19: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

radioactive wastes, characterisation

Basis: Radiotoxicity index (RTI)

Reference«substance»:high active waste (HAA)

Characterisation factors cm3 HAA-eq/cm3

low and medium active wastes 0.000045

alpha toxic wastes 0.0015

high active wastes (incl. spent fuel) 1

High active wastes are important

Low active wastes from hospitals etc. are marginal

18

Page 20: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

radioactive wastes, ecofactors

19

2013 2006

low and medium active wastes 2.1 UBP/cm3 3’300

Spent fuels, high active wastes, alpha toxic wastes 35’000 UBP/cm3 18’000

High active wastes (including spent fuel) 46’000 UBP/cm3

Alphatoxic wastes 69 UBP/cm3

EF low and medium active wastes much lower

EF high active waste approx. doubled

In total, very similar assessment like in 2006

Page 21: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Evolution of ecofactors ofselected pollutants/resources

20

Page 22: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Evolution of the shares of Swiss environmental impacts (UBP)

21

1. gen

2. gen

3. gen

4. gen

Page 23: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Evolution of Switzerland’secopoints (UBP)

22

Page 24: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Actual impacts Switzerland:Relative importance and change

23

Importance

Ch

an

ge

higher

lower

highlow

Climate change

Ozone depletion

Air quality

Water quality

Soil quality

Non radioactive waste

Radioactive waste

Land use

Abiotic resources

Energy resources

Water use

Noise

Page 25: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Actual situation andenvironmental target (in UBP’13)

24

Page 26: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Synthesis: «UBP-view» on Swiss environmental situation

Climate change: more and more important

Air and water quality: slightly less important

Ozone depletion and non radioactive wastessignificantly less important

Overall reduction of environmental impacts (in UBP) by about 50% to reach Swiss environmental targets

25

Page 27: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

4th generation ecofactorsSwitzerland brings you

up to date Swiss ecofactors

approach ready to be implemented in other countries/regions

ecofactors covering new impacts such as resource dispersion, noise and persistent organic pollutants

broadened regionalised ecofactors for land use andwater use

no revolution but evolution

26

Page 28: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Thank you very much for your attention!

Contact:[email protected]:www.treeze.ch

Acknowledgement:Funding: Swiss Federal Office for the Environment FOEN, ÖbuCo-operation (until 10.2012): Karin Flury, Matthias StuckiSuggestions, preparatory work and practical tests:

Peter Gerber, Arthur Braunschweig, Gabi Hildesheimer, Norbert EgliMembers of the advisory group, andHans Bögli, Laura de Baan, Fredy Dinkel, Emil Franov, Paul Filliger, Ernst Furrer, Daniel Hartmann, Bettina Hitzfeld, Blaise Horisberger, Michael Hügi, Harald Jenk, Sybille Kilchmann, Martin Kilga, Thomas Köllner, Nina Mahler, Sandy Ruiz Mendoza, Reto Muralt, Beat Müller, Carla Ng, Christian Pillonel, Robin Quartier, Monika Schaffner, Kaarina Schenk, Martin Scheringer, Ulrich Sieber, Peter Straehl, Josef Tremp, Roland von Arx

Page 29: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Appendix

Page 30: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Electricity supply systems

29

Page 31: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Electricity supply systems

30

Page 32: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Transport services

31

Page 33: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Transport services

32

Page 34: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

construction materials

33

Page 35: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

construction materials

34

Page 36: Ecological scarcity 2013: Overview and main … Frischknecht.pdfEcological scarcity 2013: Overview and main elements of the update and its implications Rolf Frischknecht, Sybille Büsser

Environmental impacts in Switzerland (UBP’13)

35Frischknecht et al.

forthcoming