Eagle P3 Project – Denver, CO Implementing a long term Sustainable Transit Project Jyotsna Vishwakarma, PE, LEED AP RTD, Engineer RTD FasTracks Sustainability Committee Denver, Colorado Jeffrey Cole, PE, PMP DTP, Technical Manager DTP Sustainability Coordinator Denver, Colorado
13

Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

Apr 10, 2018

Download

Documents

voduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

Eagle P3 Project – Denver, COImplementing a long term Sustainable

Transit Project Jyotsna Vishwakarma, PE, LEED AP

RTD, EngineerRTD FasTracks Sustainability Committee

Denver, Colorado

Jeffrey Cole, PE, PMPDTP, Technical Manager

DTP Sustainability CoordinatorDenver, Colorado

Page 2: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

Key Presentation Take-Aways

• Unique Sustainability Benefits a DBFOM Project Offers

• Original Ideas from RTD

• Examples from Eagle P3 in the Social, Economic, and Environmental areas related to Design, Construction, and O&M

Page 3: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

3

FasTracks Plan• $5.04b committed through 2019

• 122 miles of new light rail and commuter rail

• 18 miles of Bus Rapid Transit (BRT) service

• 31 new Park-n-Rides; more than 21,000 new parking spaces

• Enhanced Bus Network & Transit Hubs (FastConnects)

• Redevelopment of Denver Union Station

• 57 new rail and/or BRT stations

• Transit Oriented Communities opportunities

Page 4: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

4

Eagle P3 Project

• Design-Build-Finance-Operate-Maintain (DBFOM) Project• East Rail Line, Gold Line, Northwest Electrified Segment (36

miles of new Commuter Rail; 14 new Stations plus DUS)• New Commuter Rail Maintenance Facility (CRMF)• Procurement of 50 new Rail Vehicles

Page 5: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

5

Sustainability at RTD

Page 6: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

6

Incorporating Public InputVehicle Interior design modified based on public input at 2011 display

• Improve wheelchair maneuverability

• Ceiling handholds added in entry area

• Reconfigure luggage racks

• Bicycle securement

• Hand grips added between headrests

Wheelchair user visiting mock up display

Page 7: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

7

Workforce Initiative Now• Train and hire local residents

• Create a workforce pool for contractors

• $16.56 average starting wage

• 50 local non-profits and organizations assist as resource and training

U.S. Transportation Secretary Ray LaHood speaks about workforce development, backed by Gov. John Hickenlooper, Denver Mayor Michael Hancock and RTD General Manager Phil Washington and FasTracks project workers

Page 8: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

8

Eagle P3 Project (DBFOM)Design-Build-Finance-Operate & MaintainAn Enhancement for Sustainability• Construction and O&M had early and ongoing involvement in

designs• DTP has a full life-cycle approach• Incentivized to propose long term energy savings ideas• Long term commitment to the Region

Bridge over Peña Boulevard

Denver EMU Carbody Shells in Production

Page 9: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

9

DBE/SBE UpdateDBE/SBE GOALS

Design Construction OperationsDBE 19% 20% N/ASBE 19% 18% 17%

• Exceeded design goals• On-target to exceed goals on construction• Goal of over $236 million to DBE/SBE during

Design/Build Period

DBE Contractor performing Bridge Construction Work

Page 10: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

10

CRMF InfoCommuter Rail Maintenance Facility: LEED™ Silver• Sustainability on the Site

• Water Conservation

• Energy Efficiency

• Material Sourcing and Waste Reduction

• Healthy Environments

Rendering of Commuter Rail Maintenance Facility

159,767 sq ft facility under construction

Page 11: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

11

Sustainability – Environmental• Hazardous material and site

remediation• Soil conservation / habitat

preservation• Stormwater and water quality

management• Construction activity pollution

prevention• Reducing energy consumption

and emissions• Waste management and

diversion from landfills

Burrowing owl survey

Relocated Prairie Dog

Hazardous materials removal

Page 12: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

12

Sustainability – Economic• Energy Efficient Trains

o Regenerative Breakingo HVAC

• Materials o Salvaged surplus rails from Other

Projectso Local/regional purchasing (ballast, ties) o Rails from recycled steel o Waste recycled as much as possible

Standardization of construction components

Locally procured rail

Denver EMU Pilot Vehicle Undergoing Testing

Page 13: Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.

13

Sustainability – Social• Social/Socio-Economic

o Support for the WIN programo DBE/SBE developmento Training

• Community Engagemento Community outreach o Volunteer dayso Charitable contributions

• Employee Suggestions: Example o Disposal of 21 pieces of 10’

diameter pipeo Crush and pay to landfill or….o Donate to Wild Animal Sanctuary

Special interest group meetings

Thanksgiving dinners

Used concrete drain pipes

Wild Animal Sanctuary