Eagle P3 Project – Denver, CO Implementing a long term Sustainable Transit Project Jyotsna Vishwakarma, PE, LEED AP RTD, Engineer RTD FasTracks Sustainability Committee Denver, Colorado Jeffrey Cole, PE, PMP DTP, Technical Manager DTP Sustainability Coordinator Denver, Colorado
13
Embed
Eagle P3 Project – Denver, CO: Implementing a long term ... · Eagle P3 Project – Denver, CO. Implementing a long term Sustainable Transit Project . Jyotsna Vishwakarma, ... U.S.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Eagle P3 Project – Denver, COImplementing a long term Sustainable
miles of new Commuter Rail; 14 new Stations plus DUS)• New Commuter Rail Maintenance Facility (CRMF)• Procurement of 50 new Rail Vehicles
5
Sustainability at RTD
6
Incorporating Public InputVehicle Interior design modified based on public input at 2011 display
• Improve wheelchair maneuverability
• Ceiling handholds added in entry area
• Reconfigure luggage racks
• Bicycle securement
• Hand grips added between headrests
Wheelchair user visiting mock up display
7
Workforce Initiative Now• Train and hire local residents
• Create a workforce pool for contractors
• $16.56 average starting wage
• 50 local non-profits and organizations assist as resource and training
U.S. Transportation Secretary Ray LaHood speaks about workforce development, backed by Gov. John Hickenlooper, Denver Mayor Michael Hancock and RTD General Manager Phil Washington and FasTracks project workers
8
Eagle P3 Project (DBFOM)Design-Build-Finance-Operate & MaintainAn Enhancement for Sustainability• Construction and O&M had early and ongoing involvement in
designs• DTP has a full life-cycle approach• Incentivized to propose long term energy savings ideas• Long term commitment to the Region
Bridge over Peña Boulevard
Denver EMU Carbody Shells in Production
9
DBE/SBE UpdateDBE/SBE GOALS
Design Construction OperationsDBE 19% 20% N/ASBE 19% 18% 17%
• Exceeded design goals• On-target to exceed goals on construction• Goal of over $236 million to DBE/SBE during
Design/Build Period
DBE Contractor performing Bridge Construction Work
10
CRMF InfoCommuter Rail Maintenance Facility: LEED™ Silver• Sustainability on the Site
• Water Conservation
• Energy Efficiency
• Material Sourcing and Waste Reduction
• Healthy Environments
Rendering of Commuter Rail Maintenance Facility
159,767 sq ft facility under construction
11
Sustainability – Environmental• Hazardous material and site