Generation Nkangala District Municipality Date: 2020/05/21 P O Box 437 Middleburg Enquiries: Duvha Environmental Management 1050 +27 13 690 0445 +27 66 212 2105 Attention: Mr V Mahlangu Enquiries: Ms Simthandile Nhlapo +27 13 690 0445 AND +27 66 212 2105 Directorate: Air Quality Management Services The Chief Director: Mr S S Maluleka Department of Environmental Services Total number of pages: 14 Private Bag X447 PRETORIA 0001 Tel: (012) 310 3263 Total number of annexes:1 Fax: (012) 320 0488 DUVHA POWER STATION Atmospheric Emission License 17/4/AEL/MP312/11/07 GENERAL MANAGER DATE 2020-06-08
14
Embed
DUVHA POWER STATION - Eskom · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Generation
Nkangala District Municipality
Date: 2020/05/21
P O Box 437
Middleburg
Enquiries: Duvha Environmental Management
1050
+27 13 690 0445
+27 66 212 2105
Attention:
Mr V Mahlangu
Enquiries: Ms Simthandile Nhlapo
+27 13 690 0445
AND
+27 66 212 2105
Directorate: Air Quality Management Services
The Chief Director:
Mr S S Maluleka
Department of Environmental Services
Total number of pages: 14
Private Bag X447
PRETORIA
0001
Tel: (012) 310 3263
Total number of annexes:1
Fax: (012) 320 0488
DUVHA POWER STATION
Atmospheric Emission License 17/4/AEL/MP312/11/07
GENERAL MANAGER DATE
2020-06-08
AUGUST 2019
DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07
1 RAW MATERIALS AND PRODUCTS
Raw Materials and Products
Raw Material Type
Units Maximum Permitted Consumption Rate
Consumption Rate Aug-2019
Coal Tons 1 400 000 521 891
Fuel Oil Tons 5 000 3910.4
Production Rates
Product / By-Product Name
Units Maximum Production Capacity Permitted
Production Rate Aug-2019
Energy GWh 3600 833.20
Ash Tons not specified 143 989.8
2 ENERGY SOURCE CHARACTERISTICS
Coal Characteristic Units Stipulated
Range Monthly Average Content
Sulphur Content % 0.6 TO >1.2 0.860
Ash Content % 27 TO 30 27.590
3 EMISSION LIMITS (mg/Nm³)
Associated Unit/Stack
PM SOx NOx
Unit 1 100 3500 1100
Unit 2 100 3500 1100
Unit 3 100 3500 1100
Unit 4 100 3500 1100
Unit 5 100 3500 1100
Unit 6 100 3500 1100
4 ABATEMET TECHNOLOGY (%) Associated Unit/Stack
Technology Type Efficiency Aug-
2019
Unit 1 Fabric Filter Plant (FFP) Unit Off-line
Unit 2 Fabric Filter Plant (FFP) 99.83%
Unit 3 Fabric Filter Plant (FFP) Unit Off-line
Unit 4 Electro Static Precipiator (ESP)
99.75%
Unit 5 Electro Static Precipiator (ESP)
99.76%
Unit 6 Electro Static Precipiator (ESP)
99.36%
5 MONITOR RELIABILITY (%)
Associated Unit/Stack
PM SO₂ NO
Unit 2 94.9 94.7 94.7
Unit 4 92.8 99.2 99.2
Unit 5 100.0 99.9 99.9
Unit 6 91.2 98.8 98.8
6 EMISSION PERFORMANCE
Table 6.1: Monthly tonnages for the month of August 2019
Associated Unit/Stack
PM (tons) SO2 (tons) NOx (tons)
Unit 2 76.7 4 268 1 995
Unit 4 51.1 1 439 764
Unit 5 97.0 3 846 1 415
Unit 6 152.2 1 718 830
SUM 377.0 11 270 5 003
Table 6.2: Operating days in compliance to PM AEL Limit - August 2019
Associated Unit/Stack
Normal Grace Section
30 Contravention
Total Exceedance
Average PM
(mg/Nmᶟ)
Unit 2 26 0 0 0 0 37.1
Unit 4 12 4 0 0 4 88.3
Unit 5 31 0 0 0 0 46.8
Unit 6 4 8 2 0 10 217.6
SUM 73 12 2 0 14
Table 6.3: Operating days in compliance to SOx AEL Limit - August 2019
Associated Unit/Stack
Normal Grace Section
30 Contravention
Total Exceedance
Average SOx
(mg/Nmᶟ)
Unit 2 27 0 0 0 0 2 034.5
Unit 4 20 0 0 0 0 1 619.1
Unit 5 31 0 0 0 0 1 856.4
Unit 6 19 0 0 0 0 1 673.2
SUM 97 0 0 0 0
Table 6.4: Operating days in compliance to NOx AEL Limit - August 2019
The rest of the information demonstrating compliance with the emission license conditions is supplied in the annual emission report which will be sent to your office.
Boiler Plant Engineering Manager Date
Environmental Manager Date
Engineering Manager Date
Compiled by: Environmental Officer
For: Nkangala District Municipality Air Quality Officer
Copies: Eskom Environmental Management D Herbst
B Mccourt
Group Technology Engineering R Rampiar
E Patel
Duvha Power Station: Engineering Manager
Operating Manager
Maintenance Manager
Production Manager
Boiler Engineering Manager
System Engineer
Environmental Manager
2020/05/2227 May 2020
27 May 2020
ADDENDUM TO MONTHLY EMISSIONS REPORT
9 COMPLAINTS REGISTER
Table 9. Complaints for the month of August 2019
Source Code / Name
Root Cause Analysis
Calculation of Impacts / emissions associated with the incident
Dispersion modeling of pollutants where applicable
Measures implemented to prevent reoccurrence
Date measure will be implemented
No complaints were received during the month of August 2019.
10 S30 INCIDENT OR LEGAL CONTRAVENTION REGISTER
To be completed in the case of a S30 incident or a legal contravention:
Unit no Incident
Start Date Incident End Date
Incident Cause
Remedial action
S30 initial notification
sent
Date S30 investigatio
n report sent
Date DEA Acknowledgm
ent
Date DEA Acceptabl
e
Comments / Reference No.
Unit 6 07/08/2019 07/08/2019
Lack of management support to Outage Department in failure to manage risks during the starting up of the unit.
General Manager to implement corrective action to address poor outage management.