Top Banner
Image Durable Post-Tensioned Concrete Structures TR72 Concrete Bridge Development Group July 2011 Gordon Clark Gordon Clark Director Ramboll, Former Chairman Gifford
67

Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Jan 31, 2018

Download

Documents

LêAnh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Image

Durable Post-Tensioned Concrete StructuresTR72

Concrete Bridge Development Group July 2011 Gordon ClarkGordon Clark

Director Ramboll, Former Chairman Gifford

Page 2: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

CBDG 26 June 2002CBDG 26 June 2002

• Last update to CBDG conference 9 years ago• A long journey started in 1991, 20 years ago

Page 3: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Durable Post-Tensioned Concrete Bridges

An update and background to Concrete Society Report TR47 Second Edition

26 June 2002

Gordon Clark

Page 4: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Publication July 2002July 2002

Page 5: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

NNow

Revision 3 of CS ReportRevision 3 of CS Report now including Buildings –2010

renamed TR72b f i ifi tbecause of significant revisions

Page 6: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

A resume of the backgroundA resume of the background

• What was the fuss about ?

• New developments

• Where are we now and what next

Page 7: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

An early UK problem Braidley Road Bridge built 1968All prestressing replaced late 1970’sAll prestressing replaced late 1970 sIncompatible materials in corrosion protection ?

Page 8: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

1977 UK ban on external post-tensioning in bridges

• This and other problem bridges led to a major rethink about corrosion protection and replaceability

Page 9: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

M25 New Haw Viaduct 1980 – internal prestressingM25 New Haw Viaduct 1980 internal prestressing

Page 10: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

1985 Collapse Ynys-y-Gwas

Page 11: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

UK CBDG/Concrete Society CommitteeUK CBDG/Concrete Society Committee

• First convened 1991First convened 1991• George Somerville (BCA – and CBDG being founded)• Gordon Clark (Gifford)Gordon Clark (Gifford)• Mark Raiss (Benaim)• Mike Walker (Concrete Society)• Mike Walker (Concrete Society)

Page 12: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

1992 Collapse in Belgium

1992 UK ban on internal prestressing for bridges

Page 13: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Design relied on uninspectable buried tie-downDesign relied on uninspectable buried tie down

Tendon tie-down

Tendon tie-down

Page 14: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition
Page 15: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Taf Fawr Bridge 1964. Major corrosionR b il 199Rebuilt 1995

Page 16: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Major concern about corrosionMajor concern about corrosion

• Poor design detailsg• Poor grouting• Salt attack• Unable to inspect internal tendons

Page 17: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Sudden collapse often possible in bonded tendons

Page 18: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Major Investigations - Filling the DuctsImproving grout – not at this stage

Page 19: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Full Scale Trials – still some problemsFull Scale Trials still some problems

Page 20: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Camel Viaduct – externally prestressed 1993Camel Viaduct externally prestressed 1993• Replaceable, restressable tendons

N d i l f d d• New design rules for redundancy

Page 21: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Camel Viaduct – externally prestressed 1993Prototype for some details

Page 22: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

TR47 publishedTR47 published 1996

Page 23: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Key aspects requiredKey aspects required

• Must fill the duct• Non-bleed grout• Non-shrink grout• Multi-layer protectionMulti layer protection

– Waterproofing– Cover

Plastic Duct– Plastic Duct– Anchorage caps– Vents properly sealed

• Detail to avoid water penetration

Page 24: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

UK was out on a limb stillUK was out on a limb still

• HA lifted the ban on internal post-tensioning except precast segmentalp g p p g• Problem not yet acknowledged in other countries• More UK research and development especially on grouts• Fib work started in 1997Fib work started in 1997

Page 25: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Swiss survey 1998107 bridges – 13% had grouting deficiencies

Page 26: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Anglo – French study 19991999

163 bridges – 12% not163 bridges – 12% not grouted

Page 27: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

New Inclined Tube Stability Test (French)New Inclined Tube Stability Test (French)

Page 28: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Inclined Tube Test - Results:

Poor performance Poor performance

Good performanceGood performance

Photograph courtesy VSL

Page 28

Page 29: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Standard Bleed Tests - Results:

Grout with good performance Grout with good performance

in Inclined Tube Testin Inclined Tube Test

Grout with poor performance Grout with poor performance

in Inclined Tube Testin Inclined Tube Test

Page 29

Page 30: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Wick-Induced Bleeding of GroutWick Induced Bleeding of Grout

Grout with poor performance in Inclined Tube Test

Grout with good performance in Inclined Tube TestTube Test

Photograph courtesy VSL

Page 30

Page 31: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

US Experience – Mid Bay BridgeUS Experience Mid Bay Bridge

Page 32: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Mid Bay Bridge Florida

• Built 1992• 138 spans

V id i A h• Voids in Anchorages• Corrosion in Tendons• Powdery GroutPowdery Grout• Broken Tendons• Cause – POOR GROUTING – more than 700 voids• Repair cost over $1m in 2001

ONLY 9 Years• ONLY 9 Years

Page 33: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition
Page 34: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

TestingTesting

Page 35: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

1997 Virginia failure1997 Virginia failure

Page 36: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Vertical prestressingprestressing inside Sunshine Skyway PiersSkyway Piers

Page 37: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Anchors inAnchors in pockets

Page 38: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Leaking epoxy joints in segmental deckLeaking epoxy joints in segmental deck

Page 39: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Typical precast segmentTypical precast segment

Page 40: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

US Research & Development

Page 41: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition
Page 42: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition
Page 43: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

New requirementsNew requirements

• Improved groutsp g• Non-bleed• Non-shrink

• New tests• Inclined tube

Wick test for bleed• Wick test for bleed• Density

Page 44: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Second Edition 2002Major changes to testingMajor changes to testing

Followed emerging fibFollowed emerging fib guidance

Page 45: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Footbridge Concord North Carolina 2004Footbridge Concord, North Carolina 2004

Page 46: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

International guidance fib 2000 - 2005International guidance fib 2000 2005

Page 47: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

2004 FHAUS Guidance

Page 48: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Further US researchFurther US research

Page 49: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Further product Development - systemsFurther product Development systems

Page 50: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Further development – precast duct couplersFurther development precast duct couplers

Page 51: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Further Development - groutsFurther Development grouts

Page 52: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

European and other StandardsEuropean and other Standards

• EN4455• EN446• EN447• EN13670• ETAG013• CWA 14646• CWA 14646• CARES Model Specification• NSCS• ISO’s being developed

Page 53: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition
Page 54: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Further UK problems since TR47 v2Grouting ducts in Buildings• Realisation that not just bridges affectedj g• Post-tensioned car park slabs – problems found• Study indicated quite widespread problems

– Empty or partially filled ducts– Bursting of cover

• Commonly still used cement/water mix• Commonly still used cement/water mix• Mainly steel ducts and exposed anchors with low cover• Needed a careful review and improvement to practicep p

Page 55: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Leaky waterproofingLeaky waterproofingWater in grout vents(UK discovered 2011)(UK discovered 2011)New rules would prevent

Page 56: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Post-tensioned floors 1990’s• Careful design is critical• Some resistance to use

M j i b fit ( t ti d th) i t ll b ildi• Major economic benefits (construction depth) in tall buildings• Minimise slab thickness on multi-storey – extra floors in same height building• Vibration has to be considered

Page 57: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Survey - Types of ProblemsSurvey Types of Problems

• Ungrouted ductsU g• Partially grouted ducts• Cover bursting due to excess grouting pressure or freezing of

t i d twater in duct• Poor design detailing of anchorages• Lack of care in positioning and detailing tendonsLack of care in positioning and detailing tendons• Late changes to Holes in slabs causing repositioning

Page 58: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

National Structural Concrete Specification to pEN13670

P bli h d 2010Published 2010

Updated to latest UKUpdated to latest UK practice

Page 59: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

TR72

Main changes from gTR47 2nd edition….

Page 60: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Main changes from TR47 2nd Edition 2002Main changes from TR47 2 Edition 2002

• Updated to align with ENs for grouting • Some slight departures (more stringent incorporating UK ideas since

EN’s published)EN’s published)• Specification removed – refer to ENs where possible• Test methods removed – refer to ENsTest methods removed refer to ENs• Include recommendations for buildings based on further experience• Update on Quality Scheme requirements• CARES Scheme improved in parallel

Page 61: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

What next?What next?

• ISO Draft International StandardsSO S• Launched at ISO TC71 meeting 17 June in Hong Kong• Implementation in UK of stricter surveillance by CARES• Further Development of technology to monitor new structures• Lots of older UK post-tensioned structures still under investigation

especially Network Rail– especially Network Rail• European Standard for Plastic ducts to be developed• Adapting Specifications for new Nuclear Use for HSEp g p• Grouting standards relatively mature – for a while

Page 62: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

FinallyFinally

May I encourage you or your organisation toMay I encourage you or your organisation to consider joining the fib UK group and support the UK Concrete Industry internationallyUK Concrete Industry internationally

www fib international orgwww.fib-international.org

Page 63: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Objectives of fib

… to develop at an international level the study of scientific and practical matters capable of advancing thescientific and practical matters capable of advancing the technical, economic, aesthetic and environmental performance of concrete construction.performance of concrete construction.

Page 64: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Wh j i UK fib G ?Why join UK fib Group?• Enables member to:Enables member to:

– join with other participating UK companies to collectively participate in and influence the work of y p pfib commissions and task groups

– network with other leading UK organisations – receive regular free cutting edge international

publications, including back issues of bulletins– sustain UK national membership of fib

Page 65: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Members of UK fib Group

• Arup • Gifford/RambollArup • Atkins • British Precast Concrete

Gifford/Ramboll • Parsons Brinckerhoff • The Concrete CentreBritish Precast Concrete

Federation • BRE Ltd

The Concrete Centre • The Concrete Society • UK CARES

• Celsa Manufacturing UK CARES

• Joining• Associate IStructE

• Joining – University of Bath

Page 66: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Network of contactsNetwork of contacts

• Fib is THE international concrete network• Fib organisation – National Delegates from 43 countries• Commission Members• Academics, Professors, Contractors, Consultants, Suppliers• Links to JCI Japan, ACI US and Concrete Institutes, Bodies and

Universities across the worldUniversities across the world• Symposia and Conferences• State-of-the-art reports and guidance

Page 67: Durable Post-Tensioned Concrete Structures TR72 Concrete · PDF fileDurable Post-Tensioned Concrete Bridges An update and background to Concrete Society Report TR47 Second Edition

Thank you for your attentionThank you for your attention