20 January 2003 1 DSS Advisory Board Current Status for DSS Good progress on software Database interface is advancing Installation Schedules Review of DSS project could be made in May Installation of first prototype DSS in 3 rd Quarter Experimental requirements? Necessary services for DSS operation Status for electricity, networking, etc? Sensors for DSS Who provides which sensors?
3

DSS Advisory Board

Feb 01, 2016

Download

Documents

Sauda

DSS Advisory Board. Current Status for DSS Good progress on software Database interface is advancing Installation Schedules Review of DSS project could be made in May Installation of first prototype DSS in 3 rd Quarter Experimental requirements? Necessary services for DSS operation - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DSS Advisory Board

20 January 2003 1

DSS Advisory Board

• Current Status for DSS– Good progress on software– Database interface is advancing

• Installation Schedules– Review of DSS project could be made in May– Installation of first prototype DSS in 3rd Quarter– Experimental requirements?

• Necessary services for DSS operation– Status for electricity, networking, etc?

• Sensors for DSS– Who provides which sensors?

Page 2: DSS Advisory Board

AEVAlarmEvaluation

DINDigitalInputs

AINAnalogInputs

VAINVirtual AINs

ALMAlarms

A2AAlarm toAction

relations

ACTActions

History(only DIN,VAIN,ALM,ACT)

Receive

Boundary violationAccess Error

DSS Status PLC Status

Warm/ColdstartsPS

ModulesI/O Access

RedundancyCPU MemoryCPU TimingDSS Code

CPU StatusModule StatusCom. StatusPLC Status

Page 3: DSS Advisory Board

• Standard LEP rack 56U (52U used)

56U

(25

6cm

)

• 4U: UPS (APC.com ?)• 1U: OPC Server PC• 2U: Local Display

• 7U: CPU (left, only in CPU racks ;-)• 7U: PS (right)• 12U: External crates (max. 2)• 1U: Sliding table

• 25U: patch panelWAGO modules (some including

relais / optocoupler)

• maybe OPC Server PC behind patch panel Racks accessible from behind ?