Drainage Task Team

Jan 08, 2016

Download

Documents

Ethan

Drainage Task Team. Judy Grim, P.E. Road and Bridge Director. Volusia County Public Works. What is Stormwater?. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Drainage Task Team

Drainage Task Team

Volusia County Public Works

Judy Grim, P.E.Road and Bridge Director

Page 2: Drainage Task Team

County of Volusia Public Works 2

What is Stormwater?The flow of water during and immediately after a rainfall. As stormwater flows, it picks up particles and pollutants from roads, yards, parking lots and roofs. The result is stormwater runoff. Pollutants found in stormwater include fertilizers, metals, greases, pesticides and animal waste.

Stormwater runoff is the largest single pollutant source affecting the quality of our lakes, canals, rivers and estuaries.

Page 3: Drainage Task Team

County of Volusia Public Works 3

Organizational Structure

53 Employees

Page 4: Drainage Task Team

County of Volusia Public Works 4

Drainage Task Team Stormwater Management Program Goals

• Manage the flow of water during and immediately after a rainfall. • Reduce flooding • Control pollutants• Plan for future development

• Maintained Stormwater Assets:• 160 miles of canals• 323 miles of roadside

ditches• 7256 drainage structures• 155 miles of storm and

sewer pipe• 277 Retention areas

Page 5: Drainage Task Team

County of Volusia Public Works 5

Stormwater Fees

Fees

Single Family Residential

Fixed rate - $72.00

Commercial Properties

Based on the property’s square footage of impervious surface

Page 6: Drainage Task Team

County of Volusia Public Works 6

Stormwater Management5 Year Capital Improvement Projects Plan

Page 7: Drainage Task Team

County of Volusia Public Works 7

Challenges

Increase in Expenses. No increase in RevenuesEmergency EventsIdentifying Areas for Drainage Improvement:

Home FloodingStructure FloodingStreet FloodingYard Flooding

Page 8: Drainage Task Team

County of Volusia Public Works 8

Drainage Task Team Projects

Acquisition and Demolition of Two Existing Homes

Tanglewood Flooding Resolution

Expansion of Original Pond

Page 9: Drainage Task Team

County of Volusia Public Works 9

Flomich Avenue

Airport Road

Drainage Task Team Projects

Page 10: Drainage Task Team

County of Volusia Public Works 10

Tributary “E” Glencoe Road

Ditch Maintenance

Drainage Task Team Projects

Page 11: Drainage Task Team

County of Volusia Public Works 11

Questions?