Top Banner
Drainage Services Presentation West Jasper Place/Sherwood Communities Public Information Session September 15 th , 2015
28

Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Aug 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Drainage Services Presentation

West Jasper Place/Sherwood Communities Public Information Session

September 15th, 2015

Page 2: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 2

PROJECT INFORMATION

Page 3: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 3

WEST EDMONTON SANITARY SEWER

W13 (WESS W13)

Page 4: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 4

WESS W13

• 2340mm (1.1 km long and 30 m deep) sanitary trunk designed to: • Reduce risk of basement flooding • Provide capacity for west end growth

Page 5: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 5

WESS W13

N

99 Ave

151

St

100 Ave

93 Ave

156

St

142

St

Existing Structure Existing Sanitary Trunk

WESS W13

Page 6: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 6

151 STREET & 99 AVENUE SANITARY TRUNK SEWER

REHABILITATION

OVERVIEW & PHASE I

Page 7: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 7

Sanitary Trunk Rehab

• Poor condition was identified during connection of WESS W13

• Condition assessment performed on initial portion

• Design & construction work started immediately on initial portion

• Assessment and design continued on remaining trunk sewer

Page 8: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

151 Street & 99 Avenue Sanitary Contributing Area

Win

terb

urn

Rd

23 Avenue NW

Yellowhead Trail

149

Stre

et

Page 9: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

99 Ave

151

St

100 Ave

N

142

St

Sanitary Trunk Rehab 151 St & 99 Ave Area

Stony Plain Rd

Existing Sanitary Trunk WESS W13

Inspected Trunk Rehab Phase I

Page 10: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 10

Sanitary Trunk Rehab Existing Condition

Page 11: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 11

Sanitary Trunk Rehab Channeline Structural Liner

Page 12: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

151 St and 99 Ave Sanitary Trunk Rehab Phase I Overall Plan

Slide 12

151

St

100 Ave

99 Ave New Shaft Sewage Bypass Line

Rehabilitated Infrastructure

Page 13: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 13

Trunk Sewer Rehab Phase I Activities

1. New Shaft Start Oct (100 Avenue & 151 Street)

2. Sewage Bypass Line Nov 2015 (West Side of 151 Street)

3. Liner Installation/Sewer Rehab Nov - Apr

4. Finish Shaft Structures May 2016 & Seal Manholes (100 Ave & 99 Ave)

Page 14: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 14

151 STREET & 99 AVENUE SANITARY TRUNK SEWER

REHABILITATION

FUTURE PHASE(S)

Page 15: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

99 Ave

100 Ave

N

142

St

Sanitary Trunk Rehab 151 St & 99 Ave Area

Stony Plain Rd

Existing Sanitary Trunk WESS W13

Inspected Trunk Rehab Phase I

151

St

Page 16: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 16

Sanitary Trunk Rehab Future Phase(s)

1. Inspection Completed (99 Avenue & 151 Street South)

2. Structural Assessment Oct 2015

3. Design & Final Option Nov to Spring 2016

4. Construction TBD

Page 17: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 17

ODOUR CONTROL SHAFTS

Page 18: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 18

Odour Control Shafts

• Designed to reduce amount of odour escaping from trunk sewers

Page 19: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 19

Odour Control Shafts N

151

St

142

St

95 Ave

100 Ave 99 Ave

97 Ave

102 Ave

Completed Odour Control Shaft Under Construction

Future

Page 20: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 20

Odour Control Shafts

Page 21: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 21

RESIDENT CONCERNS

Page 22: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 22

Resident Concerns

• Odours & Hydrogen Sulfide • Traffic Impacts • Noise

Page 23: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 23

Odour & Hydrogen Sulfide

• Odour in sewers is a primarily a result of hydrogen sulfide (H2S)

• H2S is created by chemical reactions when there is a lack of oxygen

• H2S can be air bourne gas or held within the liquids

• H2S can be released from the liquid by disturbance

Page 24: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 24

Odour & Hydrogen Sulfide (cont)

Odour Reduction Steps: 1. Prevent H2S from being generated (e.g.

oxygen, chemicals) 2. Prevent odours from escaping (e.g. barrier,

odour control structures) 3. Removing H2S from air (e.g. air scrubbers)

Page 25: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 25

Odour & Hydrogen Sulfide (cont)

H2S Monitoring • Installed a H2S monitor at street level beside the

shaft • Monitor runs continuously recording at 5 minute

increments

Page 26: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 26

Other Concerns

• Traffic Impacts • Noise

Page 27: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 27

ALBERTA HEALTH SERVICES

Page 28: Drainage Services Presentation - Edmonton · September 15th, 2015 . Slide 2 PROJECT INFORMATION . Slide 3 . WEST EDMONTON SANITARY SEWER . W13 (WESS W13) Slide 4 ... Slide 16 Sanitary

Slide 28

QUESTIONS