PROYECTOS DE INVERSIÓN CULMINADOS HASTA ABRIL - 2014 (En Nuevos Soles) Actualizado: 30 de Abril de 2014 ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO PRESUPUESTO PRINCIPAL EJECUCION DEL AÑO INVERSIÓN TOTAL OBSERVACIONES GENERALES 1 54583 DEFENSA RIBEREÑA RIO HUALLAGA - JUANJUI JUANJUI SEDE CENTRAL CULMINADA ENCARGO S/. 1,771,951.04 S/. 0.00 S/. 0.00 0.00% S/. 2,780,888.00 156.94% 2 58103 CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA-HUICUNGO HUICUNGO S. CENTRAL/SRHC-J LIQUIDADA A.D. S/. 1,158,227.96 S/. 0.00 S/. 0.00 0.00% S/. 1,350,326.70 127.49% 3 29306 PACHIZA SEDE CENTRAL LIQUIDADA A.D. S/. 517,655.46 S/. 0.00 S/. 0.00 0.00% S/. 584,760.00 123.23% 4 56319 DEFENSA RIBEREÑA RIO HUALLAGA - CAMPANILLA CAMPANILLA SRHC-J LIQUIDADA A.D. S/. 1,377,991.03 S/. 0.00 S/. 0.00 0.00% S/. 1,478,245.00 97.51% 5 82922 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 279,220.00 S/. 0.00 S/. 0.00 0.00% S/. 171,719.00 61.50% 6 71341 NVA. CAJAMARCA RIOJA CULMINADA S/. 2,542,484.00 S/. 0.00 S/. 0.00 0.00% S/. 1,410,376.00 55.47% 7 151152 SHAPAJA SAN MARTIN PEHCBM LIQUIDADA A.D. S/. 2,057,084.66 S/. 0.00 S/. 0.00 0.00% S/. 780,331.00 37.93% - 9 IRRIGACION 82797 YORONGOS RIOJA PEAM CULMINADA A.D. S/. 84,620.00 S/. 0.00 S/. 0.00 0.00% S/. 78,229.41 92.45% - 10 IRRIGACION 83729 NVA. CAJAMARCA RIOJA PEAM CULMINADA A.D. S/. 466,716.00 S/. 0.00 S/. 0.00 0.00% S/. 242,271.67 51.91% - 11 IRRIGACION 83054 REHABILITACION DE BOCATOMA BAJO TONCHIMA POSIC RIOJA PEAM CULMINADA A.D. S/. 83,351.98 S/. 0.00 S/. 0.00 0.00% S/. 141,735.75 100.00% - 12 IRRIGACION 12469 MORALES SAN MARTIN PEHCBM CERRADO A.D. S/. 1,974,796.00 S/. 0.00 S/. 0.00 0.00% S/. 1,974,796.00 124.84% 13 IRRIGACION 16417 UCHIZA TOCACHE PEHCBM CULMINADA A.D. S/. 4,331,466.80 S/. 0.00 S/. 0.00 0.00% S/. 4,615,541.31 100.00% - 14 IRRIGACION 147477 JUAN GUERRA SAN MARTIN PEHCBM CULMINADA A.D. S/. 640,829.50 S/. 0.00 S/. 0.00 0.00% S/. 655,758.00 77.07% - 15 IRRIGACION 82917 NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 265,686.00 S/. 0.00 S/. 0.00 0.00% S/. 265,685.96 100.00% - 16 IRRIGACION 83791 NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 389,641.00 S/. 0.00 S/. 0.00 0.00% S/. 342,270.21 87.84% - 17 IRRIGACION 95236 SAN RAFAEL BELLAVISTA PEHCBM CULMINADA A.D. S/. 3,629,778.19 S/. 0.00 S/. 0.00 0.00% S/. 3,819,623.00 105.23% - 18 IRRIGACION - MEJORAMIENTO CANALES DE RIEGO – IRRIGACION WINGE PICOTA PICOTA PEHCBM CULMINADA A.D. S/. 2,677,123.75 S/. 0.00 S/. 0.00 0.00% S/. 2,677,123.75 100.00% 2715499.77 19 IRRIGACION 82920 REHABILITACIÓN DE BOCATOMA DE ALTO ALIANZA NVA. CAJAMARCA RIOJA PEAM CULMINADA - S/. 190,518.81 S/. 0.00 S/. 0.00 0.00% S/. 190,518.81 100.00% - 20 IRRIGACION 82821 REHABILITACION DE BOCATOMA TELLO LA UNION NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 120,023.00 S/. 0.00 S/. 0.00 0.00% S/. 140,316.00 100.00% - CODIGO SNIP MODALIDAD EJECUCION PIM DEL AÑO AVAN. % DEL AÑO AVAN % TOTAL BASE/REF. (F-15/Exp. Tec.) DEFENSA RIBEREÑA MARISCAL CACERES Convenio Específico Nº 0035–2008 GRSM-PGR, con MP de Mcal. Cáceres-Juanjui Obra inaugurada 18-12-10 Liquidación observada DEFENSA RIBEREÑA MARISCAL CACERES El proyecto se ejecutó por encargo, a la SRHC- Oficina Zonal Juanjui. La información fue suministrada por SRHC DEFENSA RIBEREÑA CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA- III ETAPA, PROVINCIA MARISCAL CACERES-REGION SAN MARTIN MARISCAL CACERES Primer devengado: setiembre 2009 Ultimo devengado: agosto 2010 Ppto Sede Central, ejecutado OZMC DEFENSA RIBEREÑA MARISCAL CACERES Obra culminada y liquidada, la fuente de financiamiento son R.O. DEFENSA RIBEREÑA REHABILITACION DE DEFENSA RIBEREÑA DEL SECTOR DOMINGO PUESTO Obra culminada, la fuente de financiamiento son R.O. DEFENSA RIBEREÑA CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO YURACYACU EN LOS SECTORES NUEVA CAJAMARCA I Y LOS OLIVOS DIST. NUEVA CAJAMARCA - PROV. RIOJA MD NVA. CAJAMARCA/ S. CENTRAL A.D. CONVENIO Financiamiento por parte de la Sede Central. Convenio N° 016-2008-GRSM/PGR DEFENSA RIBEREÑA CONSTRUCCION DE DEFENSA RIBEREÑA DE LA ZONA URBANA, MARGEN IZQUIERDA RIO HUALLAGA EN LA LOCALIDAD Y DISTRITO DE SHAPAJA, PROVINCIA DE SAN MARTIN - SAN MARTIN REHABILITACION DEL SISTEMA DE RIEGO YORONGOS, LATERALES 17, 18 Y 19 REHABILITACION DE LA BOCATOMA MICHUCO MARGEN DERECHA RIO YURACYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA, SAN MARTIN REHABILITACION Y MEJORAMIENTO IRRIGACION CUMBAZA EN LA PROVINCIA Y REGION SAN MARTIN Al 13-12-12 el monto consignado en el SOSEM, no coincide con el consignado en el Informe de Cierre. Se tomó como valor de la inversión total el del Informe de Cierre CONSTRUCCIÒN DE INFRAESTRUCTURA DE RIEGO EN LA CAPTACIÒN PAMPAYACU, PROVINCIA DE TOCACHE, REGIÒN SAN MARTÌN REHABILITACION DEL CANAL DE RIEGO CUMBAZA, MARGEN DERECHA RIO CUMBAZA TRAMO KM 31+981 AL 32+167, DISTRITO DE JUAN GUERRA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN REHABILITACION BOCATOMA ALTO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA REHABILITACION DE BOCATOMA LUCHADOR - NARANJILLO, DISTRITO NUEVA CAJAMARCA MEJORAMIENTO DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL LATERAL 25, MARGEN DERECHA IRRIGACION SISA,DISTRITO SAN RAFAEL, PROVINCIA BELLAVISTA, REGION SAN MARTIN
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROYECTOS DE INVERSIÓN CULMINADOS HASTA ABRIL - 2014
(En Nuevos Soles)Actualizado: 30 de Abril de 2014
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALES
1 54583 DEFENSA RIBEREÑA RIO HUALLAGA - JUANJUI JUANJUI SEDE CENTRAL CULMINADA ENCARGO S/. 1,771,951.04 S/. 0.00 S/. 0.00 0.00% S/. 2,780,888.00 156.94%
2 58103 HUICUNGO S. CENTRAL/SRHC-J LIQUIDADA A.D. S/. 1,158,227.96 S/. 0.00 S/. 0.00 0.00% S/. 1,350,326.70 127.49%
3 29306 PACHIZA SEDE CENTRAL LIQUIDADA A.D. S/. 517,655.46 S/. 0.00 S/. 0.00 0.00% S/. 584,760.00 123.23%
4 56319 DEFENSA RIBEREÑA RIO HUALLAGA - CAMPANILLA CAMPANILLA SRHC-J LIQUIDADA A.D. S/. 1,377,991.03 S/. 0.00 S/. 0.00 0.00% S/. 1,478,245.00 97.51%
Convenio Específico Nº 0035–2008 GRSM-PGR, con MP de Mcal. Cáceres-JuanjuiObra inaugurada 18-12-10Liquidación observada
DEFENSA RIBEREÑA
CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA-HUICUNGO
MARISCAL CACERES
El proyecto se ejecutó por encargo, a la SRHC-Oficina Zonal Juanjui.La información fue suministrada por SRHC
DEFENSA RIBEREÑA
CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA- III ETAPA, PROVINCIA MARISCAL CACERES-REGION SAN MARTIN
MARISCAL CACERES
Primer devengado: setiembre 2009Ultimo devengado: agosto 2010Ppto Sede Central, ejecutado OZMC
DEFENSA RIBEREÑA
MARISCAL CACERES
Obra culminada y liquidada, la fuente de financiamiento son R.O.
DEFENSA RIBEREÑA
REHABILITACION DE DEFENSA RIBEREÑA DEL SECTOR DOMINGO PUESTO
Obra culminada, la fuente de financiamiento son R.O.
DEFENSA RIBEREÑA
CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO YURACYACU EN LOS SECTORES NUEVA CAJAMARCA I Y LOS OLIVOS DIST. NUEVA CAJAMARCA - PROV. RIOJA
NVA. CAJAMARCA
MD NVA. CAJAMARCA/ S.
CENTRAL
A.D.CONVENIO
Financiamiento por parte de la Sede Central.Convenio N° 016-2008-GRSM/PGR
DEFENSA RIBEREÑA
CONSTRUCCION DE DEFENSA RIBEREÑA DE LA ZONA URBANA, MARGEN IZQUIERDA RIO HUALLAGA EN LA LOCALIDAD Y DISTRITO DE SHAPAJA, PROVINCIA DE SAN MARTIN - SAN MARTIN
REHABILITACION DEL SISTEMA DE RIEGO YORONGOS, LATERALES 17, 18 Y 19
REHABILITACION DE LA BOCATOMA MICHUCO MARGEN DERECHA RIO YURACYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA, SAN MARTIN
NVA. CAJAMARCA
REHABILITACION Y MEJORAMIENTO IRRIGACION CUMBAZA EN LA PROVINCIA Y REGION SAN MARTIN
Al 13-12-12 el monto consignado en el SOSEM, no coincide con el consignado en el Informe de Cierre.Se tomó como valor de la inversión total el del Informe de Cierre
CONSTRUCCIÒN DE INFRAESTRUCTURA DE RIEGO EN LA CAPTACIÒN PAMPAYACU, PROVINCIA DE TOCACHE, REGIÒN SAN MARTÌN
REHABILITACION DEL CANAL DE RIEGO CUMBAZA, MARGEN DERECHA RIO CUMBAZA TRAMO KM 31+981 AL 32+167, DISTRITO DE JUAN GUERRA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN
REHABILITACION BOCATOMA ALTO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA
NVA. CAJAMARCA
REHABILITACION DE BOCATOMA LUCHADOR - NARANJILLO, DISTRITO NUEVA CAJAMARCA
NVA. CAJAMARCA
MEJORAMIENTO DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL LATERAL 25, MARGEN DERECHA IRRIGACION SISA,DISTRITO SAN RAFAEL, PROVINCIA BELLAVISTA, REGION SAN MARTIN
S16
USER: DECIA= 2'730,085.38
M18
jlinares: DECIA: 584,760.00 EL MONTO ACTUAL ES EEGUN SOSEM Y CORRESPONDE AL PERFIL
K19
jlinares: INC. SUPERVISION: 1'346,447.23+50,000.00=1'396,447.23 PPTO.: 09-07-10 OZMC: 1'346,447.23+31,543.80
M19
jlinares: EL MONTO ACTUAL ES EEGUN SOSEM Y CORRESPONDE AL PERFIL
M20
jlinares: DECIA: 171,719.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
M21
jlinares: DECIA: 1'410,376.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
M22
jlinares: DECIA: 780,331.00
S22
USER: MONTO LIQUIDADO
S24
jlinares: SEGÚN LUCHO ROJAS
T24
USER: SEGÚN SOSEM
M27
jlinares: SEGÚN SOSEM: MONTO DEL PERFIL
N27
jlinares: SEGÚN SOSEM: 1'175,415.00 SEGÚN I. CIERRE: 1'974,796.00
K29
jlinares: MONTO SEGÚN SOSEM
M29
jlinares: VIABILIDAD: 850,910.00 INVERSION: 640,830.00 EL SOSEM TOMO EL VALOR DE LA VIABILIDAD
M30
jlinares: DECIA: 176,305.00 MONTO ACTUAL SEGÚN SOSEM
M31
jlinares: DECIA: 96,187.00 MONTO ACTUAL SEGÚN SOSEM
N31
jlinares: SEGÚN SOSEM
T31
USER: SEGÚN SOSEM
K32
jlinares: SNIP 15: 04-11-09
M32
jlinares: DECIA: 3'819,623.00 MONTO ACTUAL, SEGÚN SOSEM
T32
USER: EN EL SOSEM ESTA RESPECTO AL MONTO VIABLE (113%)
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
OBRA DE PREVENCION REVESTIMIENTO CANAL EL AMAZONICO
MEJORAMIENTO DE CAPTACION Y CANAL DE CONDUCCION DEL SISTEMA DE RIEGO EL MILAGRO
MEJORAMIENTO DEL SERVICIO DE PROTECCION Y CONSERVACION DE LA ZONA DE AMORTIGUAMIENTO DEL BOSQUE DE PROTECION DEL ALTO MAYO EN LA PROVINCIA DE
RIOJA - SAN MARTIN
CONSTRUCCION DE LA INFRAESTRUCTURA ADMINISTRATIVA DEL ANP - BPAM
RIOJA, MOYOBAMBA
RIOJA, MOYOBAMBA
CONSTRUCCION DE LA INFRAESTRUCTURA DE CENTROS DE CAPACITACION RURAL, CERCO PERIMETRICO E INSTALACION DE UNIDAD DE TRATAMIENTO PRIMARIO
Obra Liquidada con: RER Nº 433-2010-GRSM/PGR.Convenio Nº 052-2004-GR-SM/PGR - Municipalidad de Soritor.
INDECI EMERGEN
CIA
REHABILITACIÓN DE OBRAS DE ARTE, LATERAL Nº 21 MARGEN DERECHA IRRIGACIÓN SISA
SAN JOSE DE SISA
Obra Liquidada con: RER Nº 434-2010-GRSM/PGRConvenio Nº 062-2004-GR-SM/PGR - Municipalidad de San Rafael.
DEFENSA RIBEREÑA
REHABILITACION DEFENSA RIBEREÑA RIO HUALLAGA PUERTO RICO
Obra Liquidada con: RER Nº 404-2011-GRSM/PGR. Modificada con R.E.R Nº Conv. N° 013-2007-GR-SM/PGR., Munic. Distrital de San Cristobal
DEFENSA RIBEREÑA
AMPLIACION DEFENSA RIBEREÑA RIO HUALLAGA-SAN HILARION
Trabajos paralizados a partir del 08/01/2013. Se reiniciaron los trabajos a partir del 02/05/2013
DEFENSA RIBEREÑA
INDECI EMERGEN
CIA
REHABILITACION DE DEFENSA RIBEREÑA RIO HUALLAGA SAN HILARION
Obra Liquidada con: RGR Nº 047-2011-GRSM/GRI.PIP cerrado con informe de ejecucion de PIP de emergencia por desastres de gran magnitud, con fecha 26-03-12Conv. N° 014-2007-GR-SM/PGR., Munic. Distrital de San Hilarion
DEFENSA RIBEREÑA
Obra Liquidada con : RER Nº 666-2011-GRSM/PGR.Convenio de encargo Nº 006-2007-GRSM-PGR entre GRSM y MPT
MEJORAMIENTO DE 530 ML DEL CANAL SAN JOSE DE PERLA MAYO – SAN FERNANDO, PROVINCIA DE RIOJA, SAN MARTIN
Obra Liquidada con: RGR Nº 068-2011-GRSM/GRINucleo Ejecutor
DEFENSA RIBEREÑA
ENCAUZAMIENTO, LIMPIEZA DE CAUCE, ARMADO DE LA PLATAFORMA MARGEN DERECHA DEL RIO TOCACHE
Culminó el año 2007Convenio de encargo Nº 051-2007-GRSM-PGR
Obra Liquidada con: RER Nº 1353-2010-GRSM/PGRConvenio Nº 049-2004-GR-SM/PGR - Municipalidad de Awajun.
MEJORAMIENTO DEL SISTEMA DE RIEGO ALTO PLANTANOYACU, DISTRITO NUEVA CAJAMARCA, PROVINCIA DE RIOJA - REGION SAN MARTIN
NVA. CAJAMARCA
PROTECCION DE RIBERA RIO YURACYACU - CANAL NARANJAL, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA
NUEVA CAJAMARCA
REHABILITACIÓN DEFENSA RIBEREÑA RIO YURACYACU CANAL CONSTELACIÓN
REHABILITACION TOMA DE CAPTACION BAJO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA
NUEVA CAJAMARCA
M36
jlinares: DECIA: 4,239.00
N36
jlinares: SEGÚN SOSEM
T36
USER: SEGÚN SOSEM
I37
USER: SOSEM NO REGISTRA EJECUCION
N49
jlinares: SOSEM NO REGISTRA INFORMACION. EN PROCESO...
M50
jans Linares: PERFIL, SOSEM
M51
jans Linares: PERFIL, SOSEM
M52
jans Linares: SOSEM, PERFIL
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
CONSTRUCCION PUENTE COLGANTE VEHICULAR DEL DISTRITO DE TINGO DE SAPOSOA, PROVINCIA DE HUALLAGA, DEPARTAMENTO DE SAN MARTIN
TINGO DE SAPOSOA
MEJORAMIENTO DE LA CARRETERA DV. FERNANDO BELAUNDE TERRY (KM 606 DE R05N) LAMAS (R-111)
CONVENIO 008-2007-GRSM/PGR con la Municipalidad de Lamas
CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL TRAMO EMPALME PE - 5N (PUENTE BOLIVIA) - LAMAS - PROVINCIA DE LAMAS – DEPARTAMENTO DE SAN MARTIN
LAMAS Y SHANAO
PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 02-10-09Informe de cierre = 05-09-11
REHABILITACION Y MEJORAMIENTO DE LA CARRETERA VECINAL SAPOSOA - EL DORADO EN LA LOCALIDAD DE EL DORADO, DISTRITO DE SAPOSOA, PROVINCIA DE HUALLAGA
CONSTRUCCION DEL PUENTE VEHICULAR SOBRE EL RIO CUMBAZA, EN LA LOCALIDAD DE SAN ROQUE DE CUMBAZA, DISTRITO DE SAN ROQUE DE CUMBAZA, PROVINCIA DE LAMAS-SAN MARTIN
SAN ROQUE DE CUMBAZA
CONSTRUCCION DE LA CARRETERA VECINAL SAN MARCOS - SELVA ALEGRE, EN EL DISTRITO DE SORITOR, PROVINCIA DE MOYOBAMBA.
S. CENTRAL/ MD SORITOR
REHABILITACION Y MEJORAMIENTO CAMINO VECINAL SORITOR - VILLA HERMOSA (L=19+360 KM.) Y CONSTRUCCION DEL PUENTE COLGANTE CARROZABLE INDOCHE (L=60 M.) EN LA LOCALIDAD DE VILLA HERMOZA-DISTRITO SORITOR-PROVINCIA DE MOYOBAMBA
MEJORAMIENTO CAMINO VECINAL: MARGINAL - PARAISO - SANTA ROSA DE OROMINA - LAS PALMERAS DE OROMINA, DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL JIRON DOS DE MAYO CUADRAS 18, 19, 20 Y CALLE AEROPUERTO DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN
Obra LiquidadaContrato N° 062-2010-GRSM/GGR (19-04-10)
M53
jans Linares: SOSEM, PERFIL
N57
USER: SEDE C. + PEHCBM
N58
USER: SEDE C. + DRT
N59
USER: PEHCBM
N62
USER: SEDE C.
N63
USER: PEHCBM
S63
USER: COINCIDE AL INFORME DE CIERRE
N65
USER: PEHCBM
N66
USER: SEDE C.
N67
USER: PEAM
N68
USER: PEAM
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
53 TRANSPORTES 136413
I I ETAPA
MOYOBAMBA MOYOBAMBA SEDE CENTRAL
CULMINADA A.D.
S/. 2,139,884.64
S/. 1,398,368.71 S/. 0.00 S/. 0.00 0.00% S/. 1,708,548.31 100.00% Obra culminada en proceso de liquidación (80%)
69 TRANSPORTES 45124 TARAPOTO SAN MARTIN CULMINADA ENCARGO S/. 9,963,497.12 S/. 0.00 S/. 0.00 0.00% S/. 9,906,703.00 99.43%
70 TRANSPORTES 45983 CHIPURANA SAN MARTIN PEHCBM CERRADO A.D. S/. 7,934,653.00 S/. 0.00 S/. 0.00 0.00% S/. 7,985,331.00 100.64%
71 TRANSPORTES 7308 MORALES SAN MARTIN CULMINADA A.D. S/. 3,199,421.00 S/. 0.00 S/. 0.00 0.00% S/. 6,676,420.37 100.00% Convenio 002-2005-GSM/PGR
72 TRANSPORTES 80253 SAN MARTIN CULMINADA A.D. S/. 139,678.00 S/. 0.00 S/. 0.00 0.00% S/. 243,951.74 100.00% -
73 TRANSPORTES 25041 JUAN GUERRA SAN MARTIN CULMINADA ENCARGO S/. 618,422.00 S/. 0.00 S/. 0.00 0.00% S/. 588,111.00 100.00% A.D. (Convenio Especifico Nº 05-2009-GRSM/PGR)
74 TRANSPORTES 116252 SAN MARTIN PEHCBM CULMINADA CONTRATA S/. 1,020,574.90 S/. 0.00 S/. 0.00 0.00% S/. 924,615.09 100.00%
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL JIRON DOS DE MAYO CUADRAS 18, 19, 20 Y CALLE AEROPUERTO DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN
CONSTRUCCIÓN CAMINO VECINAL EMPALME CARRETERA F. BELAUNDE TERRY - PUENTE TRIUNFO - NUEVO TACABAMBA, DISTRITOS DE JEPELACIO Y PINTO RECODO, PROVINCIAS DE MOYOBAMBA Y LAMAS
JEPELACIO Y PINTO RECODO
MOYOBAMBA Y LAMAS
REHABILITACION DE LA CARRETERA PICOTA - SHAMBUYACU, TRAMO CRITICO KM 43+880 AL KM 44+000
Obra Liquidada con: RDR Nº 618-2008-GR-TC/DR-SMDRTC-SM
MEJORAMIENTO DE CAMINO VECINAL: NARANJILLO- SHAMPUYACU- PUERTO SANTA ROSA Y ACCESO A PUERTO PRIMAVERA, L = 16.10 KM. Y CONSTRUCCION DE PUENTE TUMBARO
MEJORAMIENTO DE CAMINO VECINAL EN EL TRAMO DE BAJO NARANJILLO - SAN FRANCISCO-PUERTO LA BALSA DEL MAYO, EN EL DISTRITO DE AWAJUN, PROVINCIA DE RIOJA
MEJORAMIENTO DEL CAMINO VECINAL: YURACYACU – UCRANIA, KM. 05+800
CONSTRUCCIÓN CARRETERA NVO. SAN JUAN - CHAMBIRA, KM 06+500 AL KM 15+000
Informe de cierre: 07-12-12El incremento o variación del presupuesto ejecutado respecto al perfil viable, se debe a los adicionales de obra por partidas nuevas ocacionado por factores climaticos
MEJORAMIENTO DE LA PARTE ALTA Y BAJA DE LA AV. SALAVERRY - SECTOR PUENTE BY PASS MORALES, DISTRITO DE MORALES - SAN MARTIN - SAN MARTIN
S. CENTRAL/MD MORALES
CONVENIO POR ENCARGO Nº 005 - 2008 - GRSM - PGR
REHABILITACION DEL CAMINO VECINAL SHAPAJA – RIO HUALLAGA, SANTA LUCIA – CERRO DULCE – RIO HUALLAGA, DISTRITO DE UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN
MP TOCACHE/S. CENTRAL
En reportes anteriores fijura como contratista el CONSORCIO EUREKA
MEJORAMIENTO DE LA AV. CIRCUNVALACION, EN LA CIUDAD Y DISTRITO DE TARAPOTO, EN LA PROVINCIA DE SAN MARTIN - SAN MARTIN
MP SAN MARTIN/ S. CENTRAL
Culminó el año 2009 la I ETAPAConvenio Especifico Nº 038 - 2007 de la I Etapa
CONSTRUCCION CARRETERA CHAMBIRA - PONGO ISLA, UBICADO EN LA LOCALIDAD DE YARINA DISTRITO DE CHIPURANA, PORV. SAN MARTIN
PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 07-07-11Informe de cierre = 05-09-12
CONSTRUCCION PUENTE VEHICULAR ATUMPAMPA SOBRE EL RIO CUMBAZA Y ACCESOS EN LA LOCALIDAD DE MORALES, DISTRITO DE MORALES, PROVINCIA DE SAN MARTIN
S. CENTRAL/ MP SAN MARTIN/
PEHCBM
MEJORAMIENTO DEL ACCESO A LA AA.VV. SATELITE, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN
BANDA DE SHILCAYO
MD BANDA DE SHILCAYO
MEJORAMIENTO DEL CAMINO VECINAL EN EL TRAMO JUAN GUERRA KM 15 - CRUCE A BELLO HORIZONTE, EN EL DISTRITO DE JUAN GUERRA, EN LA PROVINCIA DE SAN MARTIN
MD JUAN GUERRA/S. CENTRAL
CONSTRUCCION DE LA CARRETERA DEPARTAMENTAL SM - 105, TRAMO PELEJO - PAPAPLAYA - PROVINCIA Y DEPARTAMENTO DE SAN MARTIN
MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA – YANTALÓ, PROVINCIA DE MOYOBAMBA, DEPARTAMENTO DE SAN MARTÍN
YANTALO Y MOYOBAMBA
Obra Culminada y LiquidadaDECRETO DE URGENCIA N°041 - 2009
REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-103: EMPALME PE-5N (SACANCHE) - EL ESLABON - PISCOYACU - SAPOSOA, PROVINCIA DEL HUALLAGA, REGION SAN MARTIN
REHABILITACION DE LA CARRETERA PONGO DE CAYNARACHI-BARRANQUITA. TRAMOS Km. 04+000 al Km. 05+500 - Km. 07+000 al Km. 09+500 - Km. 12+000 al Km. 14+000 - Km. 17+000 al kM. 20+000 - Km. 22+000 al Km. 25+000
POR ENCARGO, CONVENIO Nº 012-2007-GRSM-PGR del 27/09/2007
MEJORAMIENTO DEL NIVEL DE SEGURIDAD DEL SERVICIO DE TRANSPORTE FLUVIAL EN EL PUERTO SAUCE DIST. DE SAUCE PROV. Y REGIÓN SAN MARTÍN
PIP Cerrado, con informe de cierre en BP.Informe de cierre = 26-10-12Contrato N° 033 - 2010-GRSM-PEHCBM/PS - AMC (Ejecucion)
MEJORAMIENTO DEL CAMINO VECINAL YANTALO - BOCA DE HUASCAYACU, PROVINCIA DE MOYOBAMBA - SAN MARTIN
96 TRANSPORTES Sin codigo SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,309,934.04 S/. 0.00 S/. 0.00 0.00% S/. 1,320,135.40 100.00%
97 TRANSPORTES Sin codigo ZAPATERO LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 115,646.40 S/. 0.00 S/. 0.00 0.00% S/. 108,019.00 100.00%
98 TRANSPORTES Sin codigo REHABILITACIÓN CARRETERA SHAPAJA CHAZUTA SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 131,252.40 S/. 0.00 S/. 0.00 0.00% S/. 123,361.93 100.00%
99 TRANSPORTES Sin codigo HUALLAGA S. CENTRAL/DRTC LIQUIDADA CONTRATA S/. 0.00 S/. 0.00 S/. 0.00 0.00% S/. 37,413.67 100.00%
100 TRANSPORTES Sin codigo LAMAS SEDE CENTRAL LIQUIDADA S/. 112,935.60 S/. 0.00 S/. 0.00 0.00% S/. 107,802.17 95.45%
101 TRANSPORTES Sin codigo MOYOBAMBA SEDE CENTRAL LIQUIDADA S/. 130,474.80 S/. 0.00 S/. 0.00 0.00% S/. 130,475.00 100.00%
102 TRANSPORTES 73823 SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 296,663.00 S/. 0.00 S/. 0.00 0.00% S/. 241,392.43 100.00% Culminó el año 2008
103 TRANSPORTES - DRTC CULMINADA A.D. S/. 653,000.00 S/. 0.00 S/. 0.00 0.00% S/. 653,000.00 100.00% Culminó el año 2009
104 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 200,000.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2011
105 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 246,464.84 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2010
106 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 300,000.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2011
119 TRANSPORTES 27978 PICOTA SEDE CENTRAL CULMINADA - S/. 1,598,812.00 S/. 0.00 S/. 0.00 0.00% S/. 1,343,659.25 100.00%
REHABILITACION DE LA CARRETERA SACANCHE - SAPOSOA, KM. 0+000 - KM. 21+281.21 (Longitud=21.281 Kms)
SACANCHE Y SAPOSOA
MTC - PVD / S. CENTRAL
Contrato de ejecución de Obra Nº 007-2007-GRSM/PR - CONSORCIO SACANCHE
MANTENIMIENTO PERIÓDICO CARRETERA SAN JOSÉ DE SISA (PTE. SISA 49+ 900) - AGUA BLANCA - SAN PABLO - EMP. PE-5N (BELLAVISTA KM. 121+800).
SAN JOSE DE SISA, AGUA
BLANCA, SAN PABLO Y
BELLAVISTA
EL DORADO Y BELLAVISTA
Obra Liquidada con: RER Nº 011-2010-GRSM/PGR.Contrato de ejecucion de Obra Nº 001-2009-GRSM/PGR - Consorcio Continental.
REHABILITACIÓN CARRETERA CUÑUMBUQUE - SISA, TRAMO NUEVO CELENDÍN - SAN JUAN DE TALLIQUIHUI
Obra Liquidada con: RER Nº 1104-2010-GRSM/PGRConvenio Nº 001-2007-GR-SM/GGR - Dirección Regional de Transportes.
SHAPAJA Y CHAZUTA
Obra Liquidada con: RER Nº 1186-2010-GRSM/PGRConvenio Nº 002-2007-GR-SM/GGR - Dirección Regional de Transportes.
MANTENIMIENTO RUTINARIO DE LA CARRETERA DEPARTAMENTAL SACANCHE - SAPOSOA
SACANCHE Y SAPOSOA
Obra Liquidada con: RER Nº 1487-2010-GRSM/PGRContrato N° 001-2009-GRSM/PGR- Microemp. Asoc. De Conserv. Y Serv. Gener. SAC.
REHABILITACION DE LA CARRETERA PONGO - BARRANQUITA
CAYNARACHI Y BARRANQUITA
ENCARGOPEHCBM
Obra Liquidada con: RER Nº 386-2011-GRSM/PGR.Convenio de Encargo Proyecto Especial Huallaga Central y Bajo Mayo. Esta siendo analizada para solicitar su baja por la SEDE CENTRAL
REHABILITACION DE LA CARRETERA BAÑOS TERMALES – JEPELACIO – ALTO CARRIZALES
MOYOBAMBA Y JEPELACIO
ENCARGOMD JEPELACIO
Obra Liquidada con: RGR Nº 022-2011-GRSM/GRI.Convenio de Encargo Municipalidad Distrital de Jepelacio
REHABILITACIÓN DEL CAMINO DEPARTAMENTAL: NUEVO BELÉN - MONTECRISTO (TRAMO CRITICO KM. 00+000 - KM. 04+000)
MANTENIMIENTO RUTINARIO Y ATENCION DE EMERGENCIAS VIALES DE LOS TRAMOS: JUANJUI - CAMPANILLA Y PIZANA - TOCACHE (RUTA NACIONAL Nº PE 5N) (1)
JUANJUI, CAMPANILLA Y
TOCACHE
MARISCAL CACERES Y TOCACHE
MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL; RUTA SM-110: EMP. PE-5N (DV. YACUSISA) - PUENTE PUSHURUMBO; TRAMO KM. 00+000 AL KM 13+000
MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL EMP. PE-5N PUENTE PUSHURUMBO - SHUNTE; TRAMO KM. 13+000 AL KM 35+000
MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL; RUTA SM-110: TRAMO KM. 35+000 AL KM 47+000
MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL RUTA SM-110, TRAMO KM. 35+000 (SHUNTE) - KM. 43+336
Culminó el año 2010N.E. "RIO METAL RIO GRUESO"A.D. (Convenio Nº 017-2010-GRSM/PGR)
REHABILITACION Y MEJORAMIENTO DEL CAMINO VECINAL VIÑA DEL RIO - ACCESO HUALLAGA - CARRICILLO, DISTRITO DE TOCACHE, PROVINCIA DE TOCACHE - SAN MARTÍN
Culminó el año 2010A.D. (Convenio Nº07-2010-GRSM/PGR)
II ETAPA LIQUIDADA A.D. S/. 1,073,065.50 S/. 0.00 S/. 0.00 0.00% Obra Liquidada con el 18-01-11
145 7903 SORITOR MOYOBAMBA CULMINADA A.D. S/. 239,190.00 S/. 0.00 S/. 0.00 0.00% S/. 252,914.98 100.00% Convenio 055-2007-GRSM/PGR con la MD Soritor
CONSTRUCCION DEL CAMINO PEDESTRE DESDE EL CACERIO ALTO PACHIZA - MOTELILLO - AL CASERIO LA CANAAN - DISTRITO DE SAPOSOA, PROVINCIA DE HUALLAGA - SAN MARTIN
MP HUALLAGA/S. CENTRAL
CONSTRUCCIÓN DEL CAMINO VECINAL PISCOYACU-NUEVO SACANCHE-EL DORADO EN LA PROVINCIA DE HUALLAGA, REGIÓN SAN MARTÍN
PISCOYACU, SAPOSOA
MEJORAMIENTO DEL PUENTE VEHICULAR CHAMBIRA DE LA LOCALIDAD DE JUANJUI, DISTRITO DE JUANJUI, PROVINCIA DE MARISCAL CACERES - SAN MARTIN
MARISCAL CACERES
CONSTRUCCION DEL PUENTE VEHICULAR SAN MARTIN DE ALAO Y ACCESOS, DISTRITO DE SAN MARTIN - EL DORADO - SAN MARTIN
SAN MARTIN DE ALAO
*Adicionales de Obra = S/. 865,982.99*Deductivos de Obra = S/. 187,376.51* Adicional de Supervisión = S/. 179,227.65
MEJORAMIENTO DEL CAMINO VECINAL SM-502, TRAMO:EMP. PE-5N (DV. RIOJA) - POSIC , PROVINCIA DE RIOJA - SAN MARTIN
POSICRIOJA
Contrato Nº 033-2012Decreto de Urgencia Nº 016-2012
REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL PUERTO HUICTE - UNIÓN CADENA (EMP. SANTA LUCÍA), DISTRITO DE UCHIZA - TOCACHE - SAN MARTÍN
CONVENIO Nº 01-2012-
GRSM/PGR
Financiado por el GRSM Y FONIPRELDECRETO DE URGENCIA N°054-2011LP N° 003-2012-MDUContrato de Consultoria de obra y ejecución de obra
CONSTRUCCION DEL PUENTE CONGANTE PEATONAL MARIPOSA, DISTRITO DE SHUNTE - TOCACHE - SAN MARTIN
CONVENIO Nº 05-2012-
GRSM/PGR
Se asignó presupuesto para la culminación de la obra
CONSTRUCCION ALCANTARILLA EN JR. DOMINGO CANAL BARRIO LA PLAZA, PROVINCIA DE LAMAS - SAN MARTIN
MP LAMAS/S. CENTRAL
R.G.G.R. N°090-2007-GRSM/GGR43203.88
CONSTRUCCION ALCANTARILLA EN LA PROLONGACION 02 DE MAYO BARRIO MUNICHIS, PROVINCIA DE LAMAS - SAN MARTIN
Resolución Gerencial General Regional N°099-2007-GRSM/GGR, DEL 17/12/2007 QUE APRUEBA EL EXPEDIENTE TECNICO
EDUCACION Y CULTURA
RECUPERACION DE AULAS, SERVICIOS HIGIENICOS E IMPLEMENTACION CON MOBILIARIO ESCOLAR Y AMPLIACION DE TALLERES DE LA I.E. N° 0050 - ABRAHAM CARDENAS RUIZ
A.D.R.E.R. Nº 986-2007-GRSM/P
GR
Obra liquidadaSegún informacion de la OZMCR.E.R. Nº 986-2007-GRSM/PGR
EDUCACION Y CULTURA
RECUPERACION DE 06 AULAS E IMPLEMENTACION CON MOBILARIO + SS.HH EN LA ESCUELA PRIMARIA DE MENORES N° 0049 CRISTINO GARCIA CARHUAPOMA
S. CENTRAL/MD SAN RAFAEL
Convenio Nº 001-2008-GRSM/PGR - Municipalidad Distrital de San Rafael.
EDUCACION Y CULTURA
MEJORAMIENTO Y AMPLIACION DEL I.E. Nº 0208 SANTIAGO ANTUNEZ DE MAYOLO BARRIO SAN JUAN BELLAVISTA
Obra liquidada.Según informacion de la OZMC
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO EL DORADO
SAN JOSE DE SISA
EDUCACION Y CULTURA
RECONSTRUCCION, MEJORAMIENTO DEL I.E. Nº 0025 - MIGUEL A. PINEDO VASQUEZ - PISCOYACU, PROVINCIA DE HUALLAGA - SAN MARTIN
PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 14-02-12Informe de cierre = 04-06-12
EDUCACION Y CULTURA
CONSTRUCCIÓN Y SUSTITUCIÓN DE LA INFRAESTRUCTURA JOSE HERÁCLIDES VELA Nº 0752 DEL DISTRITO DE SACANCHE PROV. DE HUALLAGA
EDUCACION Y CULTURA
MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA I.E. Nº 0020 ERNESTO CHAVEZ TAMARIZ - SAPOSOA - SAN MARTIN
S. CENTRAL/MP HUALLAGA
EDUCACION Y CULTURA
RECOSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA EN LA I.E. 0763 CABO EJERCITO PERUANO SANTIAGO TAPULLIMA PASHANASE DIST. DE CUÑUMBUQUE, PROVINCIA DE LAMAS - SAN MARTIN (TRANSF. OZBM)
EDUCACION Y CULTURA
SUSTITUCION Y MEJORAMIENTO DE LA I.E. SECUNDARIA CAHUIDE - HUICUNGO
MARISCAL CACERES
Obra Liquidada el 31-03-09Mediante R.E.R. N° 376 - 2008-GRSM/PGR, se encarga la ejecución a la OZMC-J
EDUCACION Y CULTURA
RECUPERACION DE AULAS DE LA EPM Nº 00898 EL LUCERO - SORITOR
S. CENTRAL/ MD SORITOR
F153
USER: 2008
K155
jlinares: DECIA: 1'989,053.00 MONTO ACTUAL SEGÚN SRHC
M155
jlinares: DECIA: 2'110,036.00
N155
jlinares: SEGÚN SOSEM
S156
jans Linares: LUCHO: 403,918.48
M157
jlinares: DECIA: 804,243.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
D163
jlinares: FUENTE: SRMC (Ing. Simon Zarpan)
S163
USER: SEGÚN SOSEM
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
146 29186 MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL CULMINADA A.D. S/. 857,134.00 S/. 0.00 S/. 0.00 0.00% S/. 943,789.14 110.11% Ejecutado mediante convenio
147 51528 MOYOBAMBA MOYOBAMBA SEDE CENTRAL CULMINADA CONTRATA S/. 92,844.00 S/. 0.00 S/. 0.00 0.00% S/. 92,844.00 100.00%
148 102513
I ETAPA
JEPELACIO MOYOBAMBA
SEDE CENTRAL LIQUIDADA CONTRATA
S/. 3,921,155.63
S/. 507,803.90
S/. 0.00 S/. 638,426.18 #DIV/0! S/. 3,833,688.90 97.72%II ETAPA SEDE CENTRAL LIQUIDADA CONTRATA S/. 992,159.85
III ETAPA SEDE CENTRAL CULMINADA CONTRATA S/. 2,512,245.30
149 37830 JEPELACIO MOYOBAMBA SEDE CENTRAL TRANSFERIDA S/. 2,084,960.86 S/. 0.00 S/. 0.00 0.00% S/. 2,191,303.46 100.00%
150 30157
- RIOJA RIOJA DRE CULMINADA CONTRATA
S/. 1,467,330.32
S/. 0.00 S/. 0.00 0.00%
S/. 1,241,293.83 84.60%
-
III ETAPA. RIOJA RIOJA SEDE CENTRAL LIQUIDADA CONTRATA S/. 0.00 S/. 0.00 0.00%
151 9931 MORALES SAN MARTIN LIQUIDADA A.D. S/. 1,262,584.00 S/. 0.00 S/. 0.00 0.00% S/. 1,060,956.00 84.03% Culminó el año 2010
152 47543 CHAZUTA SAN MARTIN SRBM-T LIQUIDADA A.D. S/. 2,647,714.22 S/. 0.00 S/. 0.00 0.00% S/. 2,340,257.00 88.39%
153 49387 MORALES SAN MARTIN LIQUIDADA A.D. S/. 310,351.00 S/. 0.00 S/. 0.00 0.00% S/. 389,836.00 125.61% Culminó el año 2011
154 18368 TARAPOTO SAN MARTIN CULMINADA A.D. S/. 543,791.00 S/. 0.00 S/. 0.00 0.00% S/. 543,791.00 100.00% Culminó el año 2007
155 31469 MOYOBAMBA MOYOBAMBA SEDE CENTRAL TRANSFERIDA CONTRATA S/. 1,557,416.00 S/. 0.00 S/. 0.00 0.00% S/. 1,155,557.89 74.20%
156 162225 JEPELACIO MOYOBAMBA SEDE CENTRAL CULMINADA A.D. S/. 357,875.45 S/. 0.00 S/. 0.00 0.00% S/. 455,280.00 100.00%
EDUCACION Y CULTURA
SUSTITUCION DE INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA N 00496 SUGLLAQUIRO - DEL DISTRITO DE MOYOBAMBA
EDUCACION Y CULTURA
FORTALECIMIENTO DE LAS AREAS ADMINISTRATIVAS DE LA SEDE DE LA UNIDAD DE GESTION EDUCATIVA LOCAL DE MOYOBAMBA
AMC-La casita de la computadora SRLtda por 48,834.00
EDUCACION Y CULTURA
MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.N.A. JENARO ERNESTO HERRERA TORRES - JERILLO - DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, SAN MARTIN
Contrato N° 072-2011-GRSM-GGR adquisición de mobiliarioContrato de ejecucion de Obra Nº 054-2011-GRSM/GGR - Bricks y Concret Contratistas Generales S.A.C.Proyectista: Ing. Alfonso Vasquez Tello-Decreto de Urgencia N° 078-2009 (ADS N° 019-2009-GRSM)
AMPLIACION Y MEJORAMIENTO DEL COLEGIO MILITAR MARISCAL ANDRES AVELINO CACERES EN LA LOCALIDAD DE MORALES
S. CENTRAL/ SRBM-T
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BÁSICAS DE LA INSTITUCION EDUCATIVA DE MENORES Nº 015 - SAN PEDRO DEL DISTRITO DE CHAZUTA – PROVINCIA DE SAN MARTIN
Obra Liquidada con: RSR Nº 071 -2012-GRSM/SRBM-TCon R.E.R. Nº 496 - 2009 - GRSM/PGRse delega como Unidad Ejecutora a la Oficina Zonal Bajo Mayo - Tarapoto
EDUCACION Y CULTURA
CONSTRUCCION DEL CERCO PERIMETRICO DE LA ALDEA INFANTIL VIRGEN DEL PILAR - MORALES-DE LA PROVINCIA DE SAN MARTIN.
S. CENTRAL/ SRBM-T
EDUCACION Y CULTURA
SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA EN LA ESCUELA ESTATAL Nº 0655 JOSE ENRIQUE CELIS BARDALES
S. CENTRAL/ SRBM-T
EDUCACION Y CULTURA
RECUPERACION DE INFRAESTRUCTURA EDUCATIVA DE LA IE N° 00021 RICARDO PALMA - PUEBLO LIBRE - MOYOBAMBA - SAN MARTIN
Obra Liquidada con:R.G.G.R. Nº 348-2008-GR-SM/GGRTrámite con informe N° 035-2012-SGSyLO/SAMVA Administración: Informe N° 040-2012-SGSyLO/SAMVContrato Nº 012-2007-GRSM/PGRCONSORCIO OROMINAObra Transferida a la Dirección Reginal de Educación - Moyobamba U:E N° 300-096
EDUCACION Y CULTURA
MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E Nº 00512 - JERILLO - JEPELACIO - MOYOBAMBA - SAN MARTÍN
La obra está culminada bajo la modalidad de administración directa, inaugurada el 16-12-11 en proceso de liquidación
K168
Aprobado Mediante RGR N°015-2011-GRSM/GRI, del 06/07//2011
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS, AMPLIACION Y REHABILITACION DE LA INFRAESTRUCTURA DE LA I.E.I N° 134-JESUS DE NAZARETH - SEGUNDA JERUSALEN, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN
ELIAS SOPLIN VARGAS
PROY. LIQUIDADO
PROYECTO LIQUIDADO CON RGGR N°035-2014-GRSM/GGR, del 05/03/2014, con un monto total de Inversión de 596,635.00 Nuevos Soles
EDUCACION Y CULTURA
MEJORAMIENTO Y SUSTITUCION DEL SERVICIO EDUCATIVO DE LA I.E. - ARTURO BARTRA GARCIA - PAJARILLO, DISTRITO DE PAJARILLO - MARISCAL CACERES - SAN MARTIN
Según cuadro "Avance noviembre 2012" la Obra está Liquidada.Según el cuadro "Avance noviembre 2012", el costo de la obra es: 435,675.80Según informacion alcanzada por la OZMC: Obra LiquidadaSegún el cuadro "Avance noviembre 2012", el costo de la obra es: 1'369,847.69
EDUCACION Y CULTURA
MARISCAL CACERES
Aprobación del Exp. Tec.: R.G.G.R. N° 018-2005-GRSM/GGRContrato de ejecucion de Obra Nº 008-2005-GRSM/GGR - Q & L Contratistas Gener. SAC.
EDUCACION Y CULTURA
CONSTRUCCION DEL COLISEO CERRADO - TARAPOTO (LIQUIDACIÓN FINANCIERA)
Obra Liquidada con Resolución Ejecutiva Regional Nº 230-2008-GR-SM/GGR
EDUCACION Y CULTURA
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA CLEOFE DEL AGUILA AREVALO DEL DISTRITO DE LA BANDA DE SHILCAYO
BANDA DE SHILCAYO
Obra Liquidada con Resolución Gerencial General Regional Nº 205-2008-GR-SM/GGR Contrato N° 021-2007-GRSM/GGR
EDUCACION Y CULTURA
RECONSTRUCCIÓN DE 07 CENTROS EDUCATIVOS, UBICADOS EN LA PROVINCIA DE LAMAS.
Obra Liquidada con Resolución Ejecutiva Nº -2008-GR-SM/GGR.Contrato N° 017-2007-GRSM/GGR
EDUCACION Y CULTURA
1.- CONSTRUCCIÓN DE LA INFRAESTRUCTURA DEL COLEGIO NACIONAL JOSE FAUSTINO SANCHEZ CARRIÓN-PACAYZAPA-ALONSO DE ALVARADO-LAMAS-SAN MARTÍN I Etapa
ALONSO DE ALVARADO
Contrato liquidado, en tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
2.- MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN LA IE Nº 0307-ROQUE - I ETAPA
ALONSO DE ALVARADO
Contrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
3.- RECUPERACION Y MEJORAMIENTO DE INFRAESTRUCTURA EDUCATIVA DE LA IE N° 0358 DANIEL A. CARRION GARCIA - ESTANCIA TABALOSOS - I ETAPA
Contrato Nº 017-2007-GRSM/GGRContrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
4.- AMPLIACIÓN DE LA INFRAESTRUCTURA DEL CENTRO EDUCATIVO N° 0292 DE TABALOSOS - I ETAPA
Contrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
5.- SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA E.I. N 0773 ANEXO SANGAMAYOC-DISTRITO DE BARRANQUITA-PROVINCIA DE LAMAS - I ETAPA
Contrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
6.- SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA I.E N 0590 -BARRANQUITA - I ETAPA
Contrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
7.- SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. Nº 0591 - SANTIAGO DE BORJA - I ETAPA
CONTRATO Nº 017-2007-GRSM/GGRContrato liquidadoen tramite para su transferencia durante el presente año 2014
EDUCACION Y CULTURA
RECUPERACION DE 05 AULAS Y MOBLIARIO EN EL C.E.I. Nº 00740 DE SAN JUAN DE TALLIQUIHUI - II ETAPA
Obra Liquidada con R.E. Nº 361-2008-GR-SM/GGR.Contrato de ejecucion de Obra Nº 004-2007-GRSM/GGR
EDUCACION Y CULTURA
RECUPERACIÓN DE LA INFRAESTRUCTURA EDUCATIVA E IMPLEMENTACIÓN CON MOBILIARIO EN EL COLEGIO ESTATAL INTEGRADO AGROPECUARIO N° 0771-SHAMBUYACU - I y II ETAPA
Obra Liquidada con:R.G.G.R. Nº 142-2008-GR-SM/GGR (I ETAPA).PENDIENTE DE LIQUIDACION (Según SAMV).Contrato N° 007-2007-GRSM/GGR- NATIVAS MAQUINARIAS E.I.R.L
EDUCACION Y CULTURA
AMPLIACION DE LA NUEVA INFRAESTRUCTURA EN LA INSTITUCION EDUCATIVA INTEGRADA Nº 0094 -SHILCAYO- DEL DISTRITO DE LA BANDA DE SHILCAYO
BANDA DE SHILCAYO
CONTRATO LIQUIDADO
Obra Liquidada con Resolución Ejecutiva Regional Nº 272-2009-GR-SM/PGRContrato N° 015-2008-GRSM/GGI
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS DE LA OFERTA EDUCATIVA DE LA IE N° 0326-INTEGRADO NIVEL PRIMARIA Y SECUNDARIA,-CENTRO POBLADO SANTA MARTA-SAN JOSE DE SISA
SAN JOSE DE SISA
Obra Liquidada con Resolución Gerencial General Regional Nº 054-2009-GR-SM/GGRContrato N° 018-2007-GRSM/GGR
EDUCACION Y CULTURA
SUSTITUCIÓN DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CESAR RUIZ REATEGUI DE PUCACACA
Obra Liquidada con: R.G.G.R. Nº 005-2009-GR-SM/GGRContrato de ejecución de Obra Nº 010-2007-GRSM/PGR - CONSTRUCTORA REGIONAL AMAZONICA S.R.L
EDUCACION Y CULTURA
SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA DEL C.N. JUAN VELASCO ALVARADO, PACAYPITE-NUEVO SAN MIGUEL JEPELACIO
Obra culminada, operativa y con contrato liquidadaContrato N° 011-2007-GRSM/PGRConstructora y Negociaciones Milagro de Jesús E.I.R.L.
M180
jlinares: 503,541.22
K181
jlinares: DECIA: 2'314,252.00 SNIP 15 Y SOSEM: 2'201,193.00
M181
jlinares: DECIA: 435,873.01 MONTO ACTUAL SEGÚN CUADRO "AVANCE NOV. 2012"
S181
jlinares: SEGÚN SOSEM
V182
jlinares: Según el cuadro "Avance noviembre 2012", el avance al mes de agosto 2012 es: 143,518.37. Además, la obra está en proceso de liquidación.
N187
jlinares: SOSEM NO REGISTRA NANCI
N188
jlinares: SOSEM NO REGISTRA NANCI
N190
jlinares: SOSEM NO REGISTRA NANCI
N191
jlinares: SOSEM NO REGISTRA NANCI
N192
jlinares: SOSEM NO REGISTRA NANCI
N195
jlinares: SEGÚN SOSEM al 12-12-12 AL PARECER SOLAMENTE CORRESPONDE A LA II ETAPA
S195
jlinares: SEGÚN SOSEM= 256,546.00 12-12-12
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
182 75435
I ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA
S/. 4,205,806.00
-
S/. 0.00 S/. 0.00 0.00% S/. 3,614,540.56 89.00%
II ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA -
III ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA S/. 404,763.29
183 172815 TARAPOTO SAN MARTIN SRBM LIQUIDADA A.D. S/. 299,093.54 S/. 0.00 S/. 0.00 0.00% S/. 299,092.00 100.00%
MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO ALTO MAYO - MOYOBAMBA
Obra Liquidada con: RER Nº 268-2011-GRSM/PGR.Contrato Nº 023 - 2010 - GRSM/PGRCASAS CONTRATISTAS INGENIEROS S.A.C.En tramite para su transferencia en el presente año 2014
Resolución de Liquidacióntrámite con:Informe N° 032-2012-SGSyLO/SAMVAadministración: Informe N° 039-2012-SGSyLO/SAMVObra Concluida en Proceso de LiquidaciónEn tramite para su transferencia en el presente año 2014Obra culminada y operativa con contrato liquidado En tramite para su transferencia en el presente año 2014
EDUCACION Y CULTURA
CONSTRUCCION DE LA TRIBUNA NORTE Y TANQUE-CISTERNA Y MEJORAMIENTO DE LOS SEVICIOS HIGIENICOS Y CAMERINOS DEL ESTADIO MUNICIPAL, EN EL DISTRITO DE TARAPOTO, PROV. DE SAN MARTIN - SAN MARTIN
Obra Liquidada con: RSR Nº 072 -2012-GRSM/SRBM-TMediante Memorando Nº 077 - 2011 - GRSM/GRI, la GRI - GRSM, delega como Unidad Ejecutora a la Oficina Zonal Bajo Mayo - Tarapoto
EDUCACION Y CULTURA
AMPLIACIÓN, MEJORAMIENTO, IMPLEMENTACION EN EL CENTRO EDUCATIVO N° 0463 - SAN JUAN DE PORONGO, DISTRITO DE UCHIZA, PROVINCIA DE TOCACHE
MP TOCACHE/S. CENTRAL
ENCARGOConvenio Nº 013-2007-GRSM/PGR
Monto actual según SOSEMInversión total según informacion de la GRI: 258,969.19Culminó el año 2007Convenio Específico Nº 013-2007-GRSM-PGR
EDUCACION Y CULTURA
AMPLIACION DE INFRAESTRUCTURA E IMPLEMENTACION I.E. NICANOR REATEGUI DEL AGUILA, PROVINCIA DE TOCACHE
NUEVO PROGRESO
MD NVO. PROGRESO
Culminó el año 2007Convenio Especifico Nº 011-2007-GRSM-PGR
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS DE LA OFERTA EDUCATIVA DEL INSTITUTO SUPERIOR TECNOLOGICO ALTO HUALLAGA
NUEVO PROGRESO
Culminó el año 2007A.D. (R. E. R Nº985-2007-GRSM/PGR)
NUEVO PROGRESO
EDUCACION Y CULTURA
AMPLIACION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E. CIRO ALEGRIA BAZAN INTEGRADO CENTRO POBLADO RAMAL DE ASPUZANA, PROVINCIA DE TOCACHE - SAN MARTIN
NUEVO PROGRESO
MD NVO. PROGRESO
Culminó el año 2007Convenio Especifico Nº 012-2007-GRSM-PGR
EDUCACION Y CULTURA
AMPLIACION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA E IMPLEMENTACION CON MOBILIARIO EN LA I.E. Nº 0031 "MARIA ULISES DAVILA PINEDO" DISTRITO DE MORALES
Convenio RESOL. EJECUT. REG. Nº 554 -2008-GRSM/PGR. Sub Region Bajo Mayo
EDUCACION Y CULTURA
AMPLIACION DE INFRAESTRUCTURA EDUCATIVA, 04 AULAS,EN LA I.E. Nº 0096 - LAS PALMAS, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN
BANDA DE SHILCAYO
Culminó el año 2010 N.E. "LOS PALMEAÑITOS DE LA IE N° 0096"A.D. (Convenio Nº 001-2010-GRSM/PGR)
ADMINISTRACION Y
PLANEAMIENTO
REHABILITACION Y AMPLIACION DE LAS DEPENDENCIAS TECNICO ADMINISTRATIVAS DEL PEAM
EDUCACION Y CULTURA
MEJORAMIENTO INTEGRAL DEL SERVICIO EDUCATIVO OFRECIDO EN LA I.E. Nº 0401 ARTURO CHUMBE VARGAS – HUAYABAMBA, DISTRITO DE JUANJUI, PROVINCIA DE MARISCAL CÁCERES, DEPARTAMENTO DE SAN MARTÍN
MARISCAL CECERES
EDUCACION Y CULTURA
CONSTRUCCION DE 03 AULAS, DIRECCION, SSHH E IMPLEMENTACION CON MOBILIARIO ESCOLAR EN LA INSTITUCION EDUCATIVA INICIAL Nº 256-CUÑUMBUQUE
CONVENIO X ENCARGO
Conv Esp. Interint. Nº 002-2008-GRSM/PGRLiquidación en la GRI, se reviso la Liq.Financiera con Informe Nº 005-2010-GRSM/SGSyLO/MRS
EDUCACION Y CULTURA
RECUPERACIÓN DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA N° 0769 DE CASPIZAPA
CONVENIO X ENCARGO
Pago al residente: Contrato N° 1009 por 9,000.00 (AMC)Encargo con RESOL. EJECUT. REG. Nº -2008-GRSM/PGR. Sub Region Bajo Mayo
EDUCACION Y CULTURA
CONSTRUCCIÓN DE AULAS E IMPLEMENTACIÓN DE MOBILIARIOS DE LA I.E. MANUEL GONZALES PRADA LOCALIDAD DE NARANJOS, DISTRITO DE PARDO MIGUEL - RIOJA - SAN MARTIN
MD PARDO MIGUEL/S. CENTRAL
EDUCACION Y CULTURA
RECONSTRUCCION DE TRIBUNAS Y REMODELACION DE INSTALACIONES DEL ESTADIO MOYOBAMBA
CONVENIOLIQUIDACION EN LA GRI PROCESO DE REVISION
S206
jlinares: DECIA= 3'614,541.00 SOSEM= 3'618,541.00
I207
jlinares: LIQUIDACION EN TRAMITE
N211
jlinares: DECIA= 775,637.79
M214
jlinares: DECIA= 773,632.54
M215
USER: DECIA: 302,465.00 MONTO ACTUAL SEGÚN SOSEM
K216
USER: DEL REGISTRO EN LA FASE DE INVERSION
S216
USER: SOSEM NO REGISTRA EJECUCION
K218
jlinares: SEGÚN SNIP 15 Y SOSEM (19-04-12), E.T. INTEGRAL
L218
jlinares: I ETAPA SEGÚN OZMC
N218
jlinares: SRHC MONTO CONTRATADO SEGÚN SOSEM
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
La obra fisica está concluida, el ispector solicitó la recepción. La comisión de recepción está programando su visita de campo, a fin de constatar la culminación.Ampliaciones de plazo: 1, 2, 3, 4, 5 = 08, 12, 09, 09, 45
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. Nº 00804 - VALLE DE LA CONQUISTA - MOYOBAMBA - SAN MARTIN
Val.N°08 del Cont. Principal:Acumulado Ejec. Fis.=94.64%, Progr. Fis. =100%Ejec. Finan= 3,208,610.61 Progr. Finan.= 3,320,000.00Mensual (Mes de Marzo)Ejec. Fis.=3.36%, Ejec. Finan= 82,281.91 El contrato de ejecución de Obra se encuentra liquidado, se aplico una penalidad de S/. 13,940.70 por demora en termino de obra.Mediante Contrato N°002-213-GRSM/GGR con la empresa L&N DISTRIBUIDORA SAC, por un monto de S/. 28,720.00 se realiza la adquisición de mobiliario para esta etapa del proyecto
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BÁSICAS DEL SERVICIO EDUCATIVO DE LA INSTITUCIÓN EDUCATIVA PRIMARIA N 00956 - ALTO RIOJA - DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA - SAN MARTIN
Con maxima penalidad, esta ejecutando a cuenta del contratista.Paralización de obra = 61 dc Ampliaciones de plazo: 93 dcADS, Contrato N° 037-2010-GRSM/GGR (Supervisión)Contrato N° 001-2012-GRSM/GGR (Ejecución)ADP N° 006-2011-GRSM (suma alzada)
EDUCACION Y CULTURA
SUSTITUCION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. N 00123 SEGUNDA JERUSALEN-ELIAS SOPLIN VARGAS- RIOJA
ELIAS SOPLIN VARGAS
LP, CONTRATO N° 054-2012-GRSMCONTRATO DE OBRA LIQUIDADO, POR LIQUIDAR PROYECTO
EDUCACION Y CULTURA
AMPLIACION SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA DE LA IE LUIS HERNAN RAMIREZ MENDOZA - LA HUARPIA - JEPELACIO - MOYOBAMBA - SAN MARTIN
EDUCACION Y CULTURA
MEJORAMIENTO INTEGRAL DEL SERVICIO EDUCATIVO EN LA I.E. N 0412 - TOCACHE, DISTRITO Y PROVINCIA DE TOCACHE - DEPARTAMENTO DE SAN MARTÍN
AMP PLAZO 1: 6 dc RGGR 125-2012-GRSM/GGRADP, CONTRATO N° 043-2012-GRSMLP, CONTRATO N° 044-2012-GRSMAMC, CONTRATO N° 024-2011-GRSM-GGR (Elaboración de Exp. Téc.)OBRA RECEPCIONADA EN PROCESO DE LIQUIDACION (Con Plazo al 01/04/2014)
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN LA I.E. N 0418 VICTOR MANUEL PEREZ MORALES - HUICUNGO - MARISCAL CACERES - SAN MARTIN
MARISCAL CACERES
ADP N° 003-2012-GRSMOBRA LIQUIDADA , COORDINAR PARA LIQUIDAR EL PROYECTO
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. 0352, PACAYZAPA - ALONSO DE ALVARADO - LAMAS - SAN MARTIN
ALONSO DE ALVARADO
LP, Contrato N° 080-2012-GRSM/GGRD.U. N°016-2012OBRA CULMINADA Y LIQUIDADA
EDUCACION Y CULTURA
MEJORAMIENTO EN LA CALIDAD DEL SERVICIO EDUCATIVO EN LA I.E. N 00179 - SAN JOSÉ DEL ALTO MAYO, MOYOBAMBA - SAN MARTÍN
LP - Contrato N° 076-2012-GRSM/GGRD.U. N°016-2012
EDUCACION Y CULTURA
CONSTRUCCION DE COLISEO Y MEJORAMIENTO DEL AUDITORIO DE LA I.E. IGNACIA VELASQUEZ DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN
EDUCACION Y CULTURA
AMPLIACION SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA ALBERTO LEVEAU GARCIA LOCALIDAD DE PICOTA, PROVINCIA DE PICOTA - SAN MARTIN
LP - Contrato Nº 002 - 2013-GRSM-PEHCBM/PS (Ejecucion)D.U. N°016-2012'EL 22/01/2014 SE RESOLVIO CONTRATO. EL SALDO DE OBRA SE EJECUTA POR ADMINISTRACION DIRECTA
EDUCACION Y CULTURA
CONSTRUCCION DEL COLISEO DE LA CIUDAD DE RIOJA, DISTRITO Y PROVINCIA DE RIOJA - SAN MARTIN
213 108569 BAJO BIAVO BELLAVISTA S. CENTRAL/SRBM CULMINADA S/. 1,074,967.24 S/. 38,855.00 S/. 3,600.00 9.27% S/. 1,675,881.28 100.00% Obra culminada y recepcionada, falta liquidación
I ETAPA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,685,971.73
215 15963 II ETAPA EL DORADO SEDE CENTRAL CULMINADA CONTRATA S/. 637,369.00 S/. 0.00 S/. 0.00 0.00% S/. 196,427.00 100.00% La II Etapa está culminada.
216 146557 RIOJA SEDE CENTRAL CULMINADA S/. 2,950,815.00 S/. 41,679.00 S/. 17,862.00 42.86% S/. 35,724.00 1.21%
217 131507 EL DORADO CULMINADA A.D. S/. 106,352.00 S/. 0.00 S/. 0.00 0.00% S/. 106,352.00 100.00%
219 SALUD 16471 II ETAPA BELLAVISTA BELLAVISTA S. CENTRAL/SRHC CULMINADA A.D. S/. 1,993,173.00 S/. 433,413.26 S/. 0.00 S/. 0.00 0.00% S/. 1,724,914.23 86.54%
229 SALUD 26829 SAN PABLO BELLAVISTA LIQUIDADA A.D. S/. 767,525.21 S/. 0.00 S/. 0.00 0.00% S/. 1,353,335.48 105.51%
230 SALUD 9101 SAN PABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 447,092.18 S/. 0.00 S/. 0.00 0.00% S/. 328,388.97 100.00%
231 SALUD 9100 SAN PABLO BELLAVISTA SEDE CENTRAL TRANSFERIDA CONTRATA S/. 437,426.54 S/. 0.00 S/. 0.00 0.00% S/. 316,708.85 72.40%
232 SALUD 130041 EL PORVENIR SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 755,279.24 S/. 0.00 S/. 0.00 0.00% S/. 598,657.88 100.00%
EDUCACION Y CULTURA
AMPLIACIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIÓN EDUCATIVA INTEGRADO RICARDO PALMA SORIANO, EL PORVENIR, DISTRITO DE UCHIZA - TOCACHE - SAN MARTÍN
CONVENIO Nº 01-2012-
GRSM/PGR
Contrato S/N supervision (ADS)Contrato N° 002-2012-MDU - D.U. N° 054-2011 (LP)-ejecucionFinanciado por el GRSM y FONIPREL
EDUCACION Y CULTURA
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E 0755-HORACIO ZEVALLOS GAMES DE LA LOCALIDAD DE CAMPANILLA,DISTRITO DE CAMPANILLA, PROVINCIA DE MARISCAL CACERES - SAN MARTIN
MARISCAL CACERES
CONVENIO Nº 02-2012-
GRSM/PGR
EDUCACION Y CULTURA
MEJORAMIENTO SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA N° 0084 ANDRES AVELINO CACERES DORREGARAY NUEVO LIMA, DISTRITO DE BAJO BIAVO-BELLAVISTA-SAN MARTIN
CONVENIO X ENCARGO
EDUCACION Y CULTURA
MEJORAMIENTO DE LA OFERTA EDUCATIVA EN LA I.E. JOSE CARLOS
MARIATEGUI LACHIRA - SAN CRISTOBAL DE SISA - SAN HILARION
- PICOTA - SAN MARTIN
OBRA CULMINADA RECEPCIONADA Y EN PROCESO DE LIQUIDACIÓN, El Adicional N°01 y Deductivo Vinculante fueron denegados.
OBRA LIQUIDADA, • Con fecha 29 de Enero del 2013, se firma el CONTRATO N° 006-2013-GRSM/GGR con la Empresa PROYECTOS Y DESARROLLOS MALKY SOCIEDAD COMERCIAL DE RESPONSABILIDAD LIMITADA, para la adquisición de mobiliario de la Primera Etapa del Proyecto por un monto de S/. 67,835.00; teniendo un plazo de entrega de 30 días Calendarios.
EDUCACION Y CULTURA
SUSTITUCION DE LA INFRAESTRUCTURA EN LA INSTITUCION EDUCATIVA INTEGRADA Nº 0274 LUISA SANCHEZ RAMIREZ DE LA BANDA DE PISHUAYA EN EL DISTRITO DE SAN JOSE DE SISA
SAN JOSE DE SISA
EDUCACION Y CULTURA
MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. JOSE CARLOS MARIATEGUI - NARANJILLO - NUEVA CAJAMARCA - RIOJA - SAN MARTIN
NUEVA CAJAMARCA
Contrato N° 063-2012-GRSM (Elaboracion de exp. tec.)-AMC-Arboleda Gil Wiliams Salomon
EDUCACION Y CULTURA
CONSTRUCCION DE LOSA DEPORTIVA Y GRADERIAS DE LA I.E. N 0277 SANTA CRUZ, EN EL CENTRO POBLADO DE SANTA CRUZ, EN EL DISTRITO DE SAN JOSE DE SISA, PROVINCIA DE EL DORADO - SAN MARTIN
SAN JOSE DE SISA
S. CENTRAL/NUCLEO
EJECUTOR
AMPLIACION, REHABILITACION Y EQUIPAMIENTO DEL HOSPITAL RURAL DE BELLAVISTA
La obra está culminada bajo la modalidad de administración directa.
REPOSICION Y EQUIPAMIENTO DEL CENTRO DE SALUD CONSUELO, DISTRITO DE SAN PABLO, PROVINCIA DE BELLAVISTA, DEPARTAMENTO DE SAN MARTIN
DRS/SRHC/S. CENTRAL
Mediante R.E.R.Nº 376-2008-GRSM/PGR se designa a entidad ejecutora
RECUPERACION, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD FAUSA SAPINA
Contrato N° 020-2010-GRSM/PGRObra Transferia a Región San Martin Salud Huallaga Central U.E N° 402-1059,mediante RGGR N° 199-2013-GRSM/GGR del 21/10/2013, el acta de transferencia fue suscrita el 28/10/2013
RECUPERACION, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD DOS DE MAYO
Obra Liquidada con: RGGR N° 123-2012-GRSM/GGRObra Transferia a Región San Martin Salud Huallaga Central U.E N° 402-1059,mediante RGGR N° 144-2013-GRSM/GGR del 08/08/2013, el acta de transferencia fue suscrita el 28/10/2013
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD PELEJO, MICRORED BARRANQUITA, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD SAN MARTIN
Obra Liquidada con:R.G.G.R. N° 110-2012-GRSM/GGRR.G.R. Nº 035-2011-GRSM/GRIObra Transferia a Región San Martin Salud U.E N° 400-0930,mediante RGGR N° 159-2013-GRSM/GGR del 03/09/2013, el acta de transferencia fue suscrita el 26/12/2013
K244
Aprobado mediante RGR N° 063-2011-GRSM/GRI, del 29/11/2011
K260
jlinares: DECIA: 1'282,690.00 MONTO ACTUAL SEGÚN SRHC
235 SALUD 13346 SORITOR MOYOBAMBA S. CENTRAL/PEAM CULMINADA A.D. S/. 635,456.00 S/. 0.00 S/. 0.00 0.00% S/. 270,558.00 42.58% -
236 SALUD 9114 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 362,660.60 S/. 0.00 S/. 0.00 0.00% S/. 230,453.00 100.00%
237 SALUD 65010 SAN MARTIN CULMINADA A.D. S/. 3,890,578.00 S/. 0.00 S/. 0.00 0.00% S/. 5,091,751.00 130.87% Culminó el año 2008
238 SALUD 80501 VARIOS DRS CULMINADA CONTRATA S/. 4,982,949.00 S/. 0.00 S/. 0.00 0.00% S/. 4,754,374.00 95.41% Culminó el año 2009
239 41351 VARIOS SEDE CENTRAL CULMINADA CONTRATA S/. 1,929,451.00 S/. 0.00 S/. 0.00 0.00% S/. 1,858,068.00 96.30% -
240 SALUD 9118 SAN PABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 429,640.47 S/. 0.00 S/. 0.00 0.00% S/. 314,939.68 73.30%
241 SALUD 130301 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 682,086.02 S/. 0.00 S/. 0.00 0.00% S/. 529,440.00 77.62%
242 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AGUA BLANCA AGUA BLANCA EL DORADO SEDE CENTRAL LIQUIDADA ENCARGO S/. 22,950.00 S/. 0.00 S/. 0.00 0.00% S/. 20,907.10 100.00%
243 SALUD Sin codigo REHABILITACIÓN DEL HOSPITAL RURAL DE PAPAPLAYA PAPAPLAYA SAN MARTIN DRS LIQUIDADA ENCARGO S/. 21,469.00 S/. 0.00 S/. 0.00 0.00% - -
244 SALUD Sin codigo SAPOSOA HUALLAGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,225.00 S/. 0.00 S/. 0.00 0.00% S/. 6,627.50 115.71%
245 SALUD Sin codigo LAMAS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 8,973.00 S/. 0.00 S/. 0.00 0.00% S/. 8,210.70 112.31%
246 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ALIANZA CAYNARACHI LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 12,590.00 S/. 0.00 S/. 0.00 0.00% S/. 11,486.00 109.54%
247 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AMINIO SHATOJA EL DORADO SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,155.00 S/. 0.00 S/. 0.00 0.00% S/. 6,544.50 111.98%
248 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPAMPA MORALES SAN MARTIN DRS LIQUIDADA ENCARGO S/. 12,573.00 S/. 0.00 S/. 0.00 0.00% - -
MEJORAMIENTO DE LOS SERVICIOS DEL HOSPITAL DE APOYO I - JUANJUI, PROVINCIA DE MARISCAL CACERES,
REGION SAN MARTIN
MARISCAL CACERES
Para reclasificación con Informe N° 040-2012-SGSyLO/SAMVEl tiempo de Ejecucion fue de 180 dias pero hubo 254 dias de ampliacion.Contrato de ejecucion de Obra Nº 037-2009-GRSM/GGR - Consorcio JuanjuiCONTRATO N° 040-2011-GRSM/GGRen tramite para su transferencia durante el presente año 2014
MARISCAL CACERES
Obra culminada, en operación y liquidadaen tramite para su transferencia durante el presente año 2014
EQUIPAMIENTO DEL SERVICIO DE EMERGENCIA DEL HOSPITAL DE MOYOBAMBA.
ADMINISTRACION CENTRAL - MINSA
AMPLIACION, REHABILITACION Y EQUIPAMIENTO DEL CENTRO DE SALUD SORITOR
RECUPERACIÓN, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD PONGO ISLA
Obra Liquidada con R.E.R. Nº 069-2011-GRSM/PGRContrato de ejecucion de Obra Nº 017-2010-GRSM/ GGR
MEJORAMIENTO DEL ACCESO AL HOSPITAL DE APOYO I, EN LA LOCALIDAD DE LA BANDA DE SHILCAYO, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN
BANDA DE SHILCAYO
MD BANDA DE SHILCAYO/S.
CENTRAL
IMPLEMENTACION DE LA RED DE SERVICIO DE SANGRE EN LA REGION SAN MARTIN
MOYOBAMBA, SAN MARTIN,
RIOJA, MARISCAL CACERES,
HUALLAGA, TOCACHE
PREVISION SOCIAL
FORTALECIMIENTO AL PROGRAMA DE NUTRICION Y SEGURIDAD ALIMENTARIA EN LOS DISTRITOS DE TARAPOTO, MOYOBAMBA, CALZADA, RIOJA Y NUEVA CAJAMARCA EN EL DEPARTAMENTO DE SAN MARTIN
MOYOBAMBA, SAN MARTIN,
RIOJA
RECUPERACIÓN, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD RAMON CASTILLA
Obra liquidada.Contrato de Ejecución de Obra N° 006-2012-GRSM/GGR en tramite para su transferencia durante el presente año 2014
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD LECHE, MICRORED DE SALUD HUIMBAYOC, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD SAN MARTIN
Obra culminada, en operación y liquidadaCulminó el año 2011Contrato Nº 008-2011-GRSM/GGR en tramite para su transferencia durante el presente año 2014
Convenio Nº 021-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con R.E.R. Nº 1190-2010-GRSM/PGRConvenio Nº 020-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD 7 DE JULIO (AHUIHUA)
Obra Liquidada con: R.E.R. Nº 1191-2010-GRSM/PGRConvenio Nº 038-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD ALFONSO UGARTE
Obra Liquidada con: R.E.R. Nº 1192-2010-GRSM/PGRConvenio Nº 025-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1193-2010-GRSM/PGRConvenio Nº 035-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1194-2010-GRSM/PGRConvenio Nº 022-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1195-2010-GRSM/PGRConvenio Nº 026-2007-GR-SM/GGR - Dirección Regional de Salud.
M264
jlinares: DECIA= 5'540,279.00
S264
jans Linares: COSTO DE OBRA SEGÚN L.R.D.C: 434,689.77
S265
jans Linares: COSTO DE OBRA SEGÚN L.R.D.C: 434,689.77
M266
jlinares: DECIA= 464,475.00
S269
jans Linares: LUCHO: 4'562,895.02
N270
jlinares: DECIA= 4'631,124.20
M271
jlinares: DECIA= 1'858,068.00
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
249 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPLAYA MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA ENCARGO S/. 11,930.00 S/. 0.00 S/. 0.00 0.00% S/. 10,887.00 110.11%
250 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPAMPA MORALES SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 12,573.00 S/. 0.00 S/. 0.00 0.00% S/. 11,455.70 109.56%
251 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AUCALOMA SAN ANTONIO SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,445.00 S/. 0.00 S/. 0.00 0.00% - -
252 SALUD Sin codigo SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,073.00 S/. 0.00 S/. 0.00 0.00% - -
253 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD CAJATAMBO UCHIZA TOCACHE SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,796.00 S/. 0.00 S/. 0.00 0.00% S/. 7,796.00 100.00%
254 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD CAYENA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,139.00 S/. 0.00 S/. 0.00 0.00% S/. 8,355.10 112.07%
255 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD HUAYABAMBA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 14,478.00 S/. 0.00 S/. 0.00 0.00% S/. 13,195.20 110.00%
256 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD HUINGUILLO JUANJUI DIRES LIQUIDADA ENCARGO S/. 8,492.00 S/. 0.00 S/. 0.00 0.00% S/. 7,762.80 91.41%
257 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD LA VICTORIA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 6,512.00 S/. 0.00 S/. 0.00 0.00% S/. 5,980.80 116.57%
258 SALUD Sin codigo PISCOYACU HUALLAGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 11,263.00 S/. 0.00 S/. 0.00 0.00% S/. 10,286.70 110.77%
259 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD PACASMAYO AGUA BLANCA EL DORADO DIRES LIQUIDADA ENCARGO S/. 6,870.00 S/. 0.00 S/. 0.00 0.00% S/. 6,303.00 100.00%
260 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD PANJUY TABALOSOS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,042.00 S/. 0.00 S/. 0.00 0.00% S/. 13,042.00 S/. 100.00
261 SALUD Sin codigo CUÑUMBUQUE LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 10,727.00 S/. 0.00 S/. 0.00 0.00% S/. 9,789.30 110.12%
262 SALUD Sin codigo TABALOSOS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,015.00 S/. 0.00 S/. 0.00 0.00% S/. 13,015.00 100.00%
263 SALUD Sin codigo SAN MARTIN DRS LIQUIDADA ENCARGO S/. 10,207.00 S/. 0.00 S/. 0.00 0.00% S/. 10,207.00 100.00%
264 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD SAN REGIS SAPOSOA HUALLGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,969.00 S/. 0.00 S/. 0.00 0.00% S/. 12,787.10 113.29%
265 SALUD Sin codigo TOCACHE TOCACHE SEDE CENTRAL LIQUIDADA ENCARGO S/. 8,648.00 S/. 0.00 S/. 0.00 0.00% S/. 8,648.00 100.00%
266 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD SHAPAJA SHAPAJA SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 10,475.00 S/. 0.00 S/. 0.00 0.00% S/. 19,619.50 187.30%
267 SALUD Sin codigo MOYOBAMBA MOYOBA,BA SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,045.00 S/. 0.00 S/. 0.00 0.00% S/. 8,280.50 113.74%
268 SALUD 130135 BARRANQUITA LAMAS SEDE CENTRAL TRANSFERIDA CONTRATA S/. 548,705.16 S/. 0.00 S/. 0.00 0.00% S/. 464,654.10 100.00%
269 SALUD 130298 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 847,010.15 S/. 0.00 S/. 0.00 0.00% S/. 658,479.00 100.00%
Obra Liquidada con: R.E.R. Nº 1196-2010-GRSM/PGRConvenio Nº 032-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1196-2010-GRSM/PGRConvenio Nº 032-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1197-2010-GRSM/PGRConvenio Nº 027-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD CABO ALBERTO LEVEAU - MACHUNGO
CABO ALBERTO LEVEAU
Obra Liquidada con: R.E.R. Nº 1198-2010-GRSM/PGRCulminó el año 2007Convenio Nº 050-2007-GR-SM/GGR - Dirección Regional de Salud.
Convenio Nº 046-2007-GR-SM/GGR - Dirección Regional de Salud.
MARISCAL CACERES
Obra Liquidada con: R.E.R. Nº 1200-2010-GRSM/PGRConvenio Nº 042-2007-GR-SM/GGR - Dirección Regional de Salud.
MARISCAL CACERES
Obra Liquidada con: R.E.R. Nº 1201-2010-GRSM/PGRConvenio Nº 043-2007-GR-SM/GGR - Dirección Regional de Salud.
MARISCAL CACERES
Obra Liquidada con: R.E.R. Nº 1202-2010-GRSM/PGRConvenio Nº 044-2007-GR-SM/GGR - Dirección Regional de Salud.
MARISCAL CACERES
Obra Liquidada con: R.E.R. Nº 1203-2010-GRSM/PGRConvenio Nº 045-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD NUEVO SACANCHE
Obra Liquidada con: R.E.R. Nº 1204-2010-GRSM/PGRConvenio Nº 039-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1205-2010-GRSM/PGRConvenio Nº 034-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1206-2010-GRSM/PGRConvenio Nº 029-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD SAN FRANCISCO DEL RIO MAYO
Obra Liquidada con: R.E.R. Nº 1207-2010-GRSM/PGRConvenio Nº 030-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD SAN MIGUEL DEL RIO MAYO
Obra Liquidada con: R.E.R. Nº 1208-2010-GRSM/PGRConvenio Nº 018-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD SAN PABLO DE TIPISHCA
CHIPURANA Y NAVARRO
Obra Liquidada con: R.E.R. Nº 1209-2010-GRSM/PGRCulminó el año 2007Convenio Nº 036-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con. R.E.R. Nº 1210-2010-GRSM/PGRConvenio Nº 040-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD SAN ROSA DE SHAPAJA
Obra Liquidada con: R.E.R. Nº 1211-2010-GRSM/PGRConvenio Nº 047-2007-GR-SM/GGR - Dirección Regional de Salud.
Obra Liquidada con: R.E.R. Nº 1212-2010-GRSM/PGRCulminó el año 2007Convenio Nº 037-2007-GR-SM/GGR - Dirección Regional de Salud.
REHABILITACIÓN DEL PUESTO DE SALUD VALLE LA CONQUISTA
Obra Liquidada con: R.E.R. Nº 1213-2010-GRSM/PGRConvenio Nº 033-2007-GR-SM/GGR - Dirección Regional de Salud.
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD SANTIAGO DE BORJA, MICRO RED BARRANQUITA, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD
Obra Liquidada con: RGGR N° 106-2012-GRSM/GGRContrato Nº 001-2010-GRSM-ORAObra Transferia a Región San Martin Salud U.E N° 400-0930,mediante RGGR N° 164-2013-GRSM/GGR del 03/09/2013, el acta de transferencia fue suscrita el 26/12/2013
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD YARINA, MICRO RED HUIMBAYOC, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD
Obra Liquidada con R.G.G.R. Nº 070-2011-GRSM/GRIContrato (R.E.R Nº 1185-2010-GRSM/PGR)Contrato Nº 066-2010-GRSM/GGR
V300
jlinares: DECIA: R.G.R. Nº 036-2011-GRSM/GRI
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
272 SANEAMIENTO 10519 SAN PABLO BELLAVISTA S. CENTRAL/SRBM-T CULMINADA A.D. S/. 2,176,389.08 S/. 0.00 S/. 0.00 0.00% S/. 2,336,744.00 100.00%
273 SANEAMIENTO 10503 SAN RAFAEL BELLAVISTA CERRADO A.D. - S/. 0.00 S/. 0.00 0.00% S/. 4,745,243.00 123.30%
274 SANEAMIENTO 78793 EL PORVENIR SAN MARTIN MD PORVENIR CULMINADA S/. 2,644,690.00 S/. 0.00 S/. 0.00 0.00% S/. 1,814,917.00 100.00% -
275 SANEAMIENTO 7331 BELLAVISTA BELLAVISTA LIQUIDADA A.D. S/. 631,977.92 S/. 0.00 S/. 0.00 0.00% S/. 2,320,453.00 181.37% Ejecución por convenio de encargo a la SRBM-T
276 SANEAMIENTO 10292 SAN RAFAEL BELLAVISTA MD SAN RAFAEL CULMINADA ENCARGO S/. 1,824,311.00 S/. 0.00 S/. 0.00 0.00% S/. 1,966,008.00 107.77% Convenio Específico N° 003-2010-GRSM/PGR
288 SANEAMIENTO 23736 BARRANQUITA LAMAS S. CENTRAL/SRBM-T LIQUIDADA A.D. S/. 3,909,701.00 S/. 0.00 S/. 0.00 0.00% S/. 3,927,214.00 100.45%
MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE BETANIA EN EL, DISTRITO DE PINTO RECODO - LAMAS - SAN MARTIN
Comisión de recepción RGGR N° 068-2012-GRSM/GGR 26/07/12Acta de recepción de obra 21-08-12La obra paralizó desde 21-06-11Adenda N° 01 al Convenio N° 003 (16-11-10)Conenio N° 003-2010-GRSM/PGR, firmado (19-03-10)
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CONSUELO
Mediante R.E.R. Nº 609-2008-GRSM-PGR se delegó a la U.E. SRBM-T, para administrar, ejecutar y liquidar la obra.Obra culminada.
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAN RAFAEL Y LA LIBERTAD
S. CENTRAL/PEHCBM
PIP cerrado, con informe de cierre. Entransferencia física de obra= 29-12-10Informe de cierre= 04-09-12
CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE EL PORVENIR - PELEJO, DISTRITO DE EL PORVENIR - SAN MARTIN - SAN MARTIN
CONVENIO Nº06-2012-GRSM/PGR
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA CIUDAD DE BELLAVISTA
AGUA P' TODOS/S. CENTRAL/SRBM-T
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CRISTINO GARCIA CARHUAPOMA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN MARTIN DE ALAO
SAN MARTIN DE ALAO
S. CENTRAL/ MD SAN MARTIN DE
ALAO
Convenio Nº 003-2006-GRSM/PGR Munic. Distr. San Martin de Alao
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE AGUA BLANCA
Convenio R.G.G.R. Nº 095-2006-GRSM/GGRRESOL. EJECUT. REG. Nº 445 -2010-GRSM/PGR. Oficina Zonal Bajo Mayo - Tarapoto.
Mantenimiento
REHABILITACIÓN DEL SISTEMA DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE AGUA BLANCA - PROVINCIA DE EL DORADO - SAN MARTIN
INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SHATOJA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE EL ESLABÓN
Contrato de ejecución de Obra Nº 026-2007-GRSM/GGRProcedimiento especial de seleccion - DS 24-2006-VIVIENDA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SACANCHE - II ETAPA
CONVENIO X ENCARGO
La obra se ejecutó bajo la modalidad de admnistracion directa. Actualmente está culminada.Ejecución por convenio de encargo a la SRHC-MC-J
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PISCOYACU
CONVENIO CON R.G.G.R. Nº 106-2006-GRSM/GGR, LIQUIDADO
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PISCOYACU - II ETAPA.
Obra Liquidada con: RGGR N 2009-GR-SM/GGRContrato de ejecución de Obra Nº 002-2008-GRSM/PGR - CONSORCIO EUREKA
INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE RUMISAPA
Contrapartida de la Sede del GRSM y ejecutó SRBM- T
SALDO INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE RUMISAPA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PINTO RECODO
Liquidación de contrato con R.E.R. N° 889-2009-GRSM/PGR: 1'407,530.93
AMPLIACION DEL SISTEMA DE CAPTACION Y CONDUCCION DEL SISTEMA DE AGUA POTABLE, LAMAS, PROVINCIA DE LAMAS - SAN MARTIN
Informe de cierre: 07-09-12.La entidad encargada de la operación y mantenimiento es la UE, por lo que no corresponde la transferencia (EMAPA SM)
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE EN EL DISTRITO DE SHANAO - LAMAS - SAN MARTIN
MD SHANAO/S. CENTRAL
INSTALACION DEL SISTEMA DE AGUA POTABLE DE LAS LOCALIDADES DE SANTA ROSA, LA UNION, SAN MARTIN, JUAN SANTOS ATAHUALPA, NUEVA ALEGRIA, BARRANQUITA Y OTRAS
Ficha SNIP con PIP viable, falta realizar informe para pasar a la FASE DE INVERSIÖN
K302
jlinares: PROYECTO INICIAL: 90 DC INFRAESTRUCTURA: 284,709.35 EQUIPAMIENTO : 60,030.50 ESTUDIOS : 14,950.00 ------------------------------------------- TOTAL : 359,689.85
L302
jlinares: SALDO DE OBRA: 30 DC INFRAESTRUCTURA: 86,523.24 EQUIPAMIENTO : 54,009.03 DEUDAS : 16,775.91 MAT. EN ALMACEN : -19,000.00 ------------------------------------------ TOTAL : 138,308.18
N302
jlinares: DECIA= 49,438.00
S302
USER: DECIA= 112,468.00
M304
jlinares: DECIA= 2'336,744.00
M305
jlinares: DECIA= 4'724,743.00 REPRESENTA MONTO EJECUTADO REAL
S305
USER: SOSEM: 4'724,743.00 INFORME DE CIERRE: 4'745,243.00
303 SANEAMIENTO 26015 SAN FERNANDO RIOJA SEDE CENTRAL CONTRATA S/. 2,417,418.00 S/. 0.00 S/. 0.00 0.00% S/. 1,969,486.00 81.47% CONTRATO Nº -2007-GRSM/PGR
304 SANEAMIENTO 76000 CHIPURANA SAN MARTIN SRBM CULMINADA A.D. S/. 394,427.76 S/. 0.00 S/. 0.00 0.00% S/. 726,928.00 100.00% -
305 SANEAMIENTO 11282
- SAUCE SAN MARTIN SEDE CENTRAL CONTRATA
S/. 8,316,800.00
S/. 8,316,800.00
S/. 0.00 S/. 0.00
0.00%
S/. 7,344,932.20 100.00%
- SAUCE SAN MARTIN LIQUIDADA ENCARGO S/. 366,559.41 0.00% Obra liquidada
306 SANEAMIENTO 15727 CACATACHI SAN MARTIN MDC CERRADO ENCARGO S/. 720,338.00 S/. 0.00 S/. 0.00 0.00% S/. 487,054.00 67.61%
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CALZADA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE HABANA
CONVENIO Nº 012-2006-GRSM/PGR; Municipalidad Distrital de Habana
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE JEPELACIO
INSTALACION DEL SISTEMA DE AGUA POTABLE DEL CENTRO POBLADO MENOR SAN JOSE DEL ALTO MAYO Y ANEXOS, DISTRITO MOYOBAMBA
AMPLIACION DE LA RED DE DESAGUE EN EL SECTOR BELLA AURORA CUADRAS 1, 2 Y 3 - MOYOBAMBA
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PUERTO RICO
Obra Liquidada con: RER Nº 1781-2010-GRSM/PGRTransferencia: 16-12-10 (A la fecha no existe documento de la transferencia)Informe de cierre: 10-12-10Contrato N° 002-2007-GRSM/PGR- Consorcio Oro Verde
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN HILARION
Obra Liquidada con: RGR Nº 074-2011-GRSM/GRIObra en operación
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE BUENOS AIRES
CULMINADA/EN ARBITRAJE
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE EN LA LOCALIDAD DE SAN HILARION
No se encuentra operativo por que el proyecto no se ejecuto en su totalidad (Según informe de cierre).Transferencia: 05-10-10 (MDSH)INFORME DE CIERRE: 29-09-10
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CASPIZAPA
Primera Etapa de la Obra ejecutado por encargo a la SRBM mediante R.G.G.R. Nº 039-2006-GRSM/GGR lo cual se encuantra liquidado por un monto de S/. 570,000.00
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE TRES UNIDOS
Obra liquidada.Obra ejecutada, culminada y liquidada por AD por la OZBM
Mantenimiento
REHABILITACIÓN DEL SISTEMA DE AGUA POTABLE DE LA OBRA: "MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE TRES UNIDOS"
La Obra se encuentra recepcionada y en proceso de liquidación
CONSTRUCCION DEL SISTEMA DE DRENAGE PLUVIAL EN LA LOCALIDAD DE PILLUANA
Obra entregada y recepcionada por la MD PilluanaObra liquidada por la entidad encargada de la ejecucion (OZBM)
MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE EN EL C.P.M SAN JUAN DE RIO SORITOR, DISTRITO DE NUEVA CAJAMARCA - RIOJA - SAN MARTIN
NVA. CAJAMARCA
MD NVA. CAJAMARCA
INSTALACION DEL SISTEMA DE ALCANTARILLADO EN AL LOCALIDAD DE SAN FERNANDO
CULMINADA/EN ARBITRAJE
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DEL ALCANTARILLADO DE LA LOCALIDAD DE NAVARRO-CHIPURANA (COMPONENTE I - AGUA POTABLE)
MEJORAMIENTO DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAUCE Y 8 DE JULIO
CULMINADA/EN ARBITRAJE
Obra en ArbitrajeProyecto culminado y operativo. Etapa en arbitraje del GRSM con el CONSORCIO SAUCE.
SALDO DE OBRA DEL PROYECTO MEJORAMIENTO DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAUCE Y 8 DE JULIO.
S. CENTRAL/PEHCBM
REHABILITACION, MEJORAMIENTO Y/O AMPLIACION DEL SISTEMA DE AGUA Y SANEAMIENTO DE LA LOCALIDAD DE CACATACHI EN EL DISTRITO DE CACATACHI, PROVINCIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN
La UE es la encargada de la operación y mantenimiento, por lo que no existe transferencia.Informe de cierre: 06-08-10
K326
jlinares: SEGÚN FORMATO 1 Y 2 PEAM: 7'893,538.24 SNIP 15: 13'658,899.30
M326
jlinares: DECIA=11'481,889.00 MONTO ACTUAL SEGÚN SOSEM
N326
jlinares: SEGÚN SOSEM: SEDE C.: 36,223.00 PEAM: 11'504,550.00
S326
USER: DECIA= 11'481,889.00
M327
jlinares: DECIA= 937,.609.00
S329
USER: EN INFORME DE CIERRE INDICA: Monto de Inversión Ejecutado: 2'221,005.95 liquidacion: 2'221,005.95 MONTO ACTUAL SEGÚN SOSEM
M330
jlinares: SEGÚN SOSEM
N330
jlinares: SEGÚN SOSEM
S332
USER: SOSEM: 1'218,883.00 INFORME DE CIERRE: 1'185,381.07
K336
jlinares: OZBM ejecutó la obra con un VR del 23-02-10 de: 1'639,013.31, bajo la modalidad de AD, en 223 dc. 1'550,133.30, AD, 150 dc.
O341
jans Linares: VERIFICAR
S343
USER: EL INFORME DE CIERRE NO MUESTRA NINGUN MONTO
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
307 SANEAMIENTO 12190 HUIMBAYOC SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 4,072,124.00 S/. 0.00 S/. 0.00 0.00% S/. 4,169,240.00 102.38%
308 SANEAMIENTO 60336
CHAZUTA SAN MARTIN PEHCBM CULMINADA A.D.
S/. 5,993,729.00
- S/. 0.00 S/. 0.00 0.00%
S/. 8,037,367.00 134.10%
Culminó el año 2008
CHAZUTA SAN MARTIN PEHCBM CULMINADA A.D. - S/. 0.00 S/. 0.00 0.00% Culminó el año 2010
309 SANEAMIENTO 103370 SAN MARTIN EMAPA SM LIQUIDADA ENCARGO S/. 1,141,167.27 S/. 0.00 S/. 0.00 0.00% S/. 1,088,111.00 100.00%
313 SANEAMIENTO 3783 PROTECCIÓN DE LA LINEA DE CONDUCCIÓN CACHIYACU SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 133,540.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%
314 SANEAMIENTO 5744 LAMAS LAMAS SEDE CENTRAL LIQUIDADA - S/. 808,132.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%
315 SANEAMIENTO Sin codigo LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 84,560.00 S/. 0.00 S/. 0.00 0.00% S/. 84,544.00 99.98%
316 SANEAMIENTO CHIPURANA SAN MARTIN MD CHIPURANA LIQUIDADA ENCARGO S/. 73,892.00 S/. 0.00 S/. 0.00 0.00% S/. 71,892.00 100.00%
317 SANEAMIENTO 29184 BELLAVISTA BELLAVISTA SEDE CENTRAL CONTRATA S/. 2,017,449.99 S/. 0.00 S/. 0.00 0.00% S/. 2,346,798.08 100.00%
318 SANEAMIENTO 67150 MORALES SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 194,771.00 S/. 0.00 S/. 0.00 0.00% S/. 189,821.86 100.00%
319 SANEAMIENTO 62245 TARAPOTO SAN MARTIN EMAPA SM CERRADO A.D. S/. 681,408.00 S/. 0.00 S/. 0.00 0.00% S/. 680,245.00 100.00% -
320 SANEAMIENTO 77554 SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 272,115.00 S/. 0.00 S/. 0.00 0.00% S/. 268,185.47 100.00% Conv Esp. Interint. Nº 008-2008-GRSM/PGR
321 SANEAMIENTO 57994 TARAPOTO SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 273,365.00 S/. 0.00 S/. 0.00 0.00% S/. 330,075.02 S/. 100.00 Culminó el año 2008
322 SANEAMIENTO 67208 TARAPOTO SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 162,421.00 S/. 0.00 S/. 0.00 0.00% S/. 147,126.84 100.00% -
INSTALACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE HUIMBAYOC
Obra liquidada con: R.G.G.R. N° 131-2012-GRSM/GGRContrato N° 004-2007-GRSM/PGRCONSORCIO VIRGEN DEL CARMENMediante Acuerdo Regional de autorización de Transferencia Ac. Reg. N°032-2013-GRSM/CR del 10/07/2013, se realiza la Transferencia de Obra a la Municipalidad Distrital de Huimbayoc con R.E.R N° 866-2013-GRSM/PGR del 17/10/2013 con acta de transferencia del 09/12/2013
INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE CHAZUTA
OPERACIÓN Y MANTENIMIENTO -INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE CHAZUTA
AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE JR. RECREO - BANDA DE SHILCAYO
BANDA DE SHILCAYO
Culminó el año 2009A.D. Convenio Especifico Nº 012-GRSM/PGR
INSTALACION DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DE LETRINAS SANITARIAS PARA LOS CASERIOS DE BOLAYNA, CUNYAG, NUEVA AREQUIPA, CAHUIDE, NUEVA UNION, SAN JUAN DE PORONGO, BAJO HUAYNABE Y ALTO HUAYNABE EN EL DISTRITO DE UCHIZA, PROV. DE TOCACHE
Transferencia: 10-04-12 (MD UCHIZA)-Mediante Acta de entrega de obra.Informe de cierre: 26-10-12
MEJORAMIENTO DE LA PRESTACION DEL SERVICIO DE AGUA POTABLE EN LA LOCALIDAD DE SAN HILARION, DISTRITO DE SAN HILARION, PROVINCIA DE PICOTA, REGION SAN MARTIN
CONSTRUCCION DE SISTEMA DE DRENAJE DE AGUAS DE INUNDACIÓN QUEBRADA CAÑO HONDO
TARAPOTO, MORALES,
BANDA DE SH.
Obra Liquidada con: R.E.R. Nº 251-2003 -GR-SM/PGRContrato de Ejec. De Obra Nº 110-2002-CTAR-SM/PEMediante Acuerdo Regional de autorización de Transferencia Ac. Reg. N°038-2013-GRSM/CR del 10/07/2013, se realiza la Transferencia de Obra a la Municipalidad Provincial de San Martin con R.E.R N° 876-2013-grsm/pgr del 17/10/2013 con acta de transferencia del 20/12/2013
MEJORAMIENTO DE LA COBERTURA DEL SISTEMA DE DESAGUE LAMAS
Obra Liquidada con: R.G.G.R. Nº 017-2005 -GR-SM/GGRADP Nº 001-2004-GRSM/PE.
REHABILITACIÓN DE LA CAPTACIÓN DEL SISTEMA DE AGUA POR GRAVEDAD ROQUE
ALONSO DE ALVARADO
Obra Liquidada con: R.E.R. Nº 431-2010-GRSM/PGRConvenio Nº 060-2004-GR-SM/PGR - Municipalidad de Alonso de Alvarado.
INDECI EMERGEN
CIA
REHABILITACION DE CAPTACION DE SISTEMA DE AGUA POTABLE LOCALIDAD DE NAVARRO
Obra Liquidada con: R.G.R. Nº 003-2011-GRSM/GRIConvenio Nº 009-2007-GRSM/PGR - Municipalidad Distrital de Chipurana
INSTALACION DE UN SISTEMA DE ALCANTARILLADO PARA LAS LOCALIDADES DE EL PORVENIR Y LIMON
MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. ALFONSO UGARTE C-1 A LA C-8 MORALES
CULMINO EL AÑO 2008Conv Esp. Interint. Nº 006-2008-GRSM/PGR
AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE JR. JOSE OLAYA C-4 A 15 - TARAPOTO
AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE LA CARRETERA A YURIMAGUAS KM 0+000.00 A 1+000.00 - BANDA DE SHILCAYO
BANDA DE SHILCAYO
AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO DE JR. CUSCO C-1 A 6 - TARAPOTO
AMPLIACION DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. ESPAÑA C-4 A LA C-6 - TARAPOTO
V344
jlinares: DECIA: R.E. N° 014-2009-GR-SM/GGR DECIA: CULMINO EL AÑO 2007
340 ENERGIA 29779 BAJO BIAVO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,875,752.00 S/. 0.00 S/. 0.00 0.00% S/. 2,112,825.76 100.00%
341 ENERGIA 27994 ELECTRIFICACION DEL VALLE DE PONACILLO ALTO BIAVO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 2,024,637.00 S/. 0.00 S/. 0.00 0.00% S/. 1,949,538.16 96.29% ###
MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. TUPAC AMARU C-1 A 5, PP.JJ. NUVE DE ABRIL-TARAPOTO
MEJORAMIENTO DEL SISTEMA DE AGUA DE LAS LOCALIDADES DE CUZCO BARRANCA ABANCAY
INSTALACION DE AGUA POTABLE CASERIO ALTO PROGRESO DE ALMENDRILLO, DISTRITO DE TABALOSOS - LAMAS - SAN MARTIN
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO JR. TEOBALDO LOPEZ - RIOJA
MP RIOJA/S. CENTRAL
AMPLIACION DEL SISTEMA DE AGUA POTABLE PUERTO NUEVO, SANTA ELENA Y LA UNION, DISTRITO DE BAJO BIAVO - BELLAVISTA - SAN MARTIN
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SANGAMAYOC DEL DISTRITO DE BARRANQUITA, PROVINCIA DE LAMAS - SAN MARTIN
MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE JUANJUI
MARISCAL CACERES
Contrato Nº 068 - 2011-GRSM-PEHCBM/PS (Supervision) - CPContrato Nº 076 - 2011-GRSM-PEHCBM/PS (Ejecución) - LP* Adicionales de Obra = S/. 17'748,778.10* Deductivos de Obra = S/. 11'706,218.71* Adicional de Supervision = S/. 686,078.08* Adicional de Interv. Social = S/. 82,900.00* Adicional de Mitig. Amb. = S/. 109,800.00
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DE LETRINAS SANITARIAS DE LA LOCALIDAD DE ACHINAMIZA , DISTRITO DE CHAZUTA - SAN MARTIN - SAN MARTIN
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
CP-Contrato N° 18 (Supervision)ADP-Contrato N° 028-2012-GRSM-PEAM-01.00 (Ejecucion)LP-Contrato N° 9 (Ejecución de obra)AMC-Contrato 15 (compra de terreno para laguna de oxidacion)
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN EL CPM DE NARANJILLO, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA - SAN MARTIN
NVA. CAJAMARCA
CP-Contrao 8LP-Contrato 01
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE POR GRAVEDAD, LOCALIDADES SEGUNDA JERUSALEN- SANTA FE, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN
ELIAS SOPLIN VARGAS
ELECTRIFICACION DE 06 LOCALIDADES DEL DISTRITO DE BAJO BIAVO
Contrato de ejecución de Obra Nº 008-2007-GRSM -- LP
Adicional - RER N° 362-2011-GRSM/PGRSe ejecuto con Contrato N° 017-2009-GRSM/GGRProyecto en proceso de Recepción 212 días de paralización Contrato N° 017-2009-GRSM/GGR (31-08-09) - AMC
L364
jlinares: II ETAPA
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
342 ENERGIA 23522 SAPOSOA HUALLAGA SEDE CENTRAL CONTRATA S/. 2,490,960.00 S/. 0.00 S/. 0.00 0.00% S/. 1,661,068.79 66.68% Contrato Nº 009-2007-GRSM/PGR -- LP
352 ENERGIA 27940 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 722,651.00 S/. 0.00 S/. 0.00 0.00% S/. 878,053.00 121.50% -
353 ENERGIA 45282 MOYOBAMBA MOYOBAMBA PEAM LIQUIDADA A.D. S/. 706,278.00 S/. 0.00 S/. 0.00 0.00% S/. 726,724.00 102.89%
354 ENERGIA 40831 MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 292,992.28 S/. 0.00 S/. 0.00 0.00% S/. 319,459.00 101.50%
355 ENERGIA 15789 BELLAVISTA SEDE CENTRAL CONTRATA S/. 2,006,631.00 S/. 0.00 S/. 0.00 0.00% S/. 1,914,574.00 95.41%
ELECTRIFICACION RURAL DE LAS LOCALIDADES CIRCUNDANTES EN EL TRAMO SAPOSOA - NUEVA VIDA
CULMINADA/EN ARBITRAJE
ELECTRIFICACION RURAL DE LAS LOCALIDADES DE CARANAYACU, NUEVO MUNDO, BAGAZAN, VISTOSO GRANDE, VISTOSO CHICO, POLOPONTA, NUEVO CELENDIN Y SAN JUAN DE TALLIQUIHUI, PERTENECIENTE AL DISTRITO DE ZAPATERO, PROVINCIA DE LAMAS, REGION SAN MARTIN.
ELECTRIFICACION RURAL DE LOS CACERIOS SOMOS LIBRES Y PUEBLO NUEVO
TABALOSOS Y ALONSO DE ALVARADO
CONTRATO LIQUIDADO
Obra Liquidada con: RER Nº 040-2009-GRSM/PGRContrato de ejecución de Obra Nº 019-2007-GRSM/ GGR
ELECTRIFICACION RURAL DE LA COMUNIDAD DE ALTO SHAMBOYACU
Obra Liquidada con: RGGR Nº 046-2009-GR-SM/GGRContrato de ejecucion de Obra Nº 024-2008-GRSM/GGR
ELECTRIFICACION RURAL DEL TRAMO JUANJUI-PACHIZA CAMPANILLA,DISTRITOS DE PACHIZA, HUICUNGO, CAMPANILLA, PROVINCIA DE MARISCAL CACERES, REGION SAN MARTIN
PACHIZA, HUICUNGO, CAMPANILLA
MARISCAL CACERES
Obra Liquidada con: RGGR Nº 055-2009-GR-SM/GGRContrato de ejecución de Obra Nº 012-2007-GRSM/PGR
ELECTRIFICACIÓN DE DIEZ (10) CASERÍOS UBICADOS EN LOS MÁRGENES DE LOS RÍOS HUAYABAMBA Y JELACHE - JURISDICCIÓN DE LOS DISTRITOS DE HUICUNGO Y PACHIZA, PROVINCIA DE MARISCAL CÁCERES, DEPARTAMENTO DE SAN MARTÍN
PACHIZA, HUICUNGO
MARISCAL CACERES
Primer devengado NOVIEMBRE-2009Ultimo devengado DICIEMBRE-2009
ELECTRIFICACION RURAL DE LOS CASERIOS DE CARRIZAL Y NUEVO CUTERVO, JURISDICCION DEL DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN
Obra Liquidada con: RGGR Nº 346-2008-GR-SM/GGRContrato Nº 027-2007-GRSM/GGR
ELECTRIFICACION RURAL EN CINCO (05) LOCALIDADES DE LA PROVINCIA DE MOYOBAMBA DEL DEPARTAMENTO DE SAN MARTIN: DOMINGO PUESTO, VALLE LA CONQUISTA, PUEBLO LIBRE, LA LIBERTAD DE HUASCAYACU, BUENOS AIRES
ELECTRIFICACION RURAL DE LA UNIDAD AGROPECUARIA ALTO JERILLO, COMPRENSION DEL DISTRITO DE JEPELACIO
41603
ELECTRIFICACION RURAL DE LOS CASERIOS POTRERILLO, ALTO RIOJA Y 7 DE JUNIO, JURISDICCION DEL DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN
S. CENTRAL/GARCAM
Obra Liquidada con: RGGR Nº 056-2009-GR-SM/GGRContrato. Nº 025-2008-GRSM/GGR
ELECTRIFICACION RURAL DE CUATRO CENTROS POBLADOS SAN JOSE DE HABANA, SANTA ROSA DE OROMINA, PARAISO
ELECTRIFICACION RURAL DE LAS LOCALIDADES DE SAN JOSE DEL MORRO, CAMPO ALEGRE, PEDRO PASCASIO NORIEGA Y HUAÑIUNA; DEL DISTRITO Y PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN
Obra Liquidada con Resolución Gerencial Nº 114-2010-GRSM-PEAM.01.00Contrato N° 028-2010-GRSM/GGR- Engineering Build SAC.
ELECTRIFICACION RURAL DE LA LOCALIDAD DE FLOR DEL MAYO, JURISDICCION DEL DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN.ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO DE SAN MARTIN 2008-I, ITEM 2: ELECTRIFICACIÓN RURAL DE LA LOCALIDAD DE FLOR DE MAYO
Contrato Liquidado con: RER Nº 990-2010-GRSM/PGRContrato N° 002-2009-GRSM/PGR - Consorcio El Morro.Se realizo mediante: LP, llave en mano-c.u., estudios (60 dc) + ejecucion (60 dc)Aprobación del exp. tec. de contratación: RGGR Nº 275-2008-GRSM/GGR
ELECTRIFICACION DEL VALLE ASHCUYACU TRAMO PERUATE-NUEVA FLORIDA-SHAMBOYACU
BELLAVISTA Y SAN PABLO
CULMINADA/EN ARBITRAJE
Ejecutado por la SRHC Oficina Zonal Mariscal Caceres - Juanjui; bajo R.G.G.R. Nº 099-2006-GRSM/GGR
365 ENERGIA 190857 MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 93,976.00 S/. 73,021.78 S/. 73,021.78 100.00% S/. 73,021.78 100.00%
366 ENERGIA 41881 UCHIZA TOCACHE SEDE CENTRAL CULMINADA - S/. 1,726,108.00 S/. 0.00 S/. 0.00 0.00% S/. 1,733,653.00 100.44% -
367 ENERGIA 79885
TARAPOTO SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA
S/. 917,493.68
- S/. 0.00 S/. 0.00 0.00% S/. 675,178.00 73.59%
TARAPOTO SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 505,067.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%
368 ENERGIA 136464 MOYOBAMBA MOYOBAMBA SEDE CENTRAL CULMINADA CONTRATA S/. 509,973.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%
369 ENERGIA 46163 RIOJA RIOJA SEDE CENTRAL LIQUIDADA CONTRATA S/. 344,821.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%
CONSTRUCCION DEL SISTEMA DE ELECTRIFICACION DEL SECTOR AMPLIACION EN LA LOCALIDAD DE PUERTO RICO PROVINCIA DE PICOTA - SAN MARTIN
ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO SAN MARTIN - SECTOR 1 - ITEM 04: ELECTRIFICACION DE LAS LOCALIDADES DEL TRAMO BUENOS AIRES-SAN ANTONIO DE PAUJILZAPA
Obra Liquidada con Res. Ejecutiva Regional Nº 369-2010-GRSM/PGRContrato N° 010-2007-GRSM/PGR
AMPLIACION DEL SISTEMA DE ELECTRIFICACION RURAL DE LOS BARRIOS LA UNION, SAN JUAN Y SANTA TRINIDAD PROVINCIA DE PICOTA - SAN MARTIN
MD SHAMBOYACU/S. CENTRAL
AD-ENCARGO-CONVENIO
Obra culminada y puesta en operación.Ejecutado por la MD Shamboyacu, mediante CONVENIO Nº 030-2008-GRSM/PGR
INSTALACION DE REDES SECUNDARIAS EN EL CENTRO POBLADO CHINCHA ALTA, DISTRITO PUCACACA, PROVINCIA PICOTA, REGION DE SAN MARTIN
P.S.E. (PEQ. SIST. ELECT.) AWAJUN PROV. RIOJA: CC. NN. ALTO Y BAJO NARANJILLO, SHAMPUYACU, CC. PP. SAN FRANCISCO Y SAN CARLOS; Y ANGAIZA, VISTA ALEGRE, RICARDO PALMA, BUENOS AIRES NVA. STA. CRUZ DE NVA. CAJAMARCA
NVA. CAJAMARCA
CULMINADA/EN ARBITRAJE
Contrato Nº 007-2007-GRSM/PGRLP Nº 007-2007-GRSM/PGRContrato en ArbitrajeLos gastos se realizaron por:DIREC. EJECUT. DE PROY.-DEP ENER. Y MINAS - M. DE ENERGIA Y MINAS : 44,411.74MEM - DIRECCION GENERAL DE ELECTRIFICACION RURAL: 78,801.83REGION SAN MARTIN-SEDE CENTRAL: 1,583,051.75
ELECTRIFICACIÓN DEL VALLE DEL ALTO MAYO, SECTOR NOR OESTE – DISTRITOS DE RIOJA, NUEVA CAJAMARCA, AWAJUN Y PARDO MIGUEL; JURISDICCIÓN DE LA PROVINCIA DE RIOJA, DEPARTAMENTO DE SAN MARTÍN
MOYOBAMBA, AWAJUN, NVA. CAJAMARCA, RIOJA, PARDO
MIGUEL
MOYOBAMBA Y RIOJA
4'424,072.794'125,809.04
ELECTRIFICACION DE LAS LOCALIDADES RIBEREÑAS DEL RIO HUALLAGA COMPRENDIDAS EN EL TRAMO CHAZUTA-SAN PABLO DE TIPISHCA
HUIMBAYOC Y CHIPURANA
LIQUIDADA/EN ARBITRAJE
Obra Culminada con Contrato N° 007-2010-GRSM/GGR-LiquidadoCulminó el año 2010
SALDO DE OBRA, ELECTRIFICACIÓN DE LAS LOCALIDADES RIBEREÑAS DEL RIO HUALLAGA, COMPRENDIDAS EN EL TRAMO CHAZUTA - SAN PABLO DE TIPISHCA
HUIMBAYOC Y CHIPURANA
Obra Liquidada con: RGGR Nº 018-2012-GRSM/GGRContrato de ejecucion de Obra Nº 007-2010-GRSM/GGR - Consorcio Huallaga
IMPLEMENTACION DEL SUBSISTEMA DE REDES SECUNDARIAS DE LA LOCALIDAD DE TANANTA, DISTRITO DE TOCACHE
MP TOCACHE/S. CENTRAL
ELECTRIFICACION DEL PEQUEÑO SISTEMA ELECTRICO TOCACHE II ETAPA / RAMAL UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN
Culminó el año 2008CONVENIO Nº 228-2008-GRSM-PGR
INSTALACION DEL SERVICIO DE NERGIA ELECTRICA MEDIANTE SISTEMA CONVENCIONAL PARA LA ELECTRIFICACION RURAL DEL SECTOR FLOR DE MAYO, DISTRITO Y PROVINCIA DE MOYOBAMBA, DEPARTAMENTO DE SAN MARTIN
Contrato de Ejecución de Obra Nº 038-2013-GRSM/GGR Servicios y Construcciones S.A.C.
AMPLIACION SISTEMA ELECTRICO TOCACHE II ETAPA RAMAL UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN
IMPLEMENTACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL - COER - DE LA REGION DE SAN MARTIN
El componente sistema de utilización esta culminada,liquidada y operativa, por lo que, lo correspondiente a infraestructura se encuentra ejecutada al 100%. El resto corresponde a otra área
SISTEMA DE UTILIZACION A TENSION DE DISTRIBUCION PRIMARIA EN 22,9-10KV, PARA EL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL SAN MARTIN
Obra Liquidada con: RGR Nº 028-2011-GRSM/GRIAdicional: RER N° 310-2011-GRSM/PGRAmpliación de P.: RER N° 176-2011-GRSM/PGRContrato Nº 061-2011-GRSM/GGR -- 443,130.99ADS N° 037-2010-GRSM
ELECTRIFICACIÓN RURAL DEL SECTOR SAN LORENZO, PERTENECIENTE AL DISTRITO Y PROVINCIA DE MOYOBAMBA, REGIÓN DE SAN MARTÍN
Liquidación pendiente.Obra Culminada en proceso de Liquidación
ELECTRIFICACION RURAL DEL CASERIO RAMIRO PRIALE, JURISDICCION DEL DISTRITO DE RIOJA, PROVINCIA DE RIOJA, REGION SAN MARTIN ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO SAN MARTIN - ITEM 02: ELECTRIFICACIÓN RURAL DE CACERIO RAMIRO PRIALÉ.
Contrato N° 009-2007-GRSM/PGR- Consorcio Luz Para Todos.
F398
jlinares: PICOTA
H398
jlinares: FICHA SNIP= MP PICOTA
M398
jlinares: DECIA= 206,945.00
K399
jlinares: SIMILAR AL MONTO DEL PERFIL
M399
jlinares: DECIA= 511,929.00
N399
jlinares: SEDE C.
O399
jlinares: DEP+DGER(MEN)
K400
jlinares: DECIA: 452,962.00
M400
jlinares: DECIA= 361,111.00 MONTO ACTUAL SEGÚN SOSEM
N400
jlinares: SOSEM
M401
jlinares: DECIA= 237,316.00 SEGÚN SOSEM
K404
jlinares: DECIA: 3'154,729.10 SNIP 15 y SOSEM: 3'589,673.44
K406
jlinares: MONTO DEL PERFIL:SOSEM
M406
jlinares: DECIA= 119,453.00
M409
jlinares: DECIA= 1'733,653.00 MONTO ACTUAL SEGÚN SOSEM:MONTO DEL PERFIL
S410
jlinares: SEGÚN SOSEM
S412
USER: DECIA: 466,524.50 SOSEM: 475,196.00
ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO
PRESUPUESTO PRINCIPAL
INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO
SNIPMODALIDAD EJECUCION
PIM DEL AÑO
EJECUCION DEL AÑO
AVAN. % DEL AÑO
AVAN % TOTAL
BASE/REF. (F-15/Exp. Tec.)
370 ENERGIA 105360 SAN APABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,010,392.94 S/. 0.00 S/. 0.00 0.00% S/. 1,022,805.00 100.00%
371 ENERGIA 6762 SEDE CENTRAL CERRADO CONTRATA S/. 63,336,161.00 S/. 0.00 S/. 0.00 0.00% S/. 65,130,358.00 102.83%
382 VIVIENDA - VARIOS VARIOS SEDE CENTRAL CULMINADA CONTRATA S/. 214,925.53 S/. 0.00 S/. 0.00 0.00% S/. 214,925.53 -
AMPLIACIÓN DE LA FRONTERA ELÉCTRICA RURAL DEL VALLE YSHANGAYACU, DISTRITO DE SAN PABLO, BELLAVISTA - SAN MARTIN
Obra Liquidada con: RGGR Nº 019-2012-GRSM/GGRContrato de ejecucion de Obra Nº 075-2010-GRSM/GGR
INTERCONEXION DEL SISTEMA ELECTRICO SAN MARTIN AL SEIN
TOCACHE, POLVORA,
BELLAVISTA, HUALLAGA
TOCACHE, BELLAVISTA
ELECTRO ORIENTE SA es la entidad encargada de la operación y mantenimiento.La tranferencia se llevó a cabo el 14-09-09 mediente CONVENIO GRSM-FONAFE.El expediente técnico de CONSEC
INSTALACION DEL SISTEMA DE ELECTRIFICACION RURAL DE LOS CASERIOS LA VICTORIA, PUERTO BAGAZAN, SANTA FE Y NACIENTE RIO NEGRO, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN
ELIAS SOPLIN VARGAS
MD ELIAS SOPLIN VARGAS
ELECTRFICACION RURAL DE LAS LOCALIDADES DEL BAJO HUALLAGA, DISTRITOS DE CHIPURANA, HUIMBAYOC Y CHAZUTA, PROVINCIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN
CRIPURANA, HUIMBAYOC Y
CHAZUTA
Ejecución de obra: CONTRATO Nº 037-2012-GRSM/GGR, Supervisión de obra: CONSORCIO SAN MARTINOBRA EN PROCESO DE RECEPCIÓN Y LIQUIDACIÓNMediante Resolución Gerencial General Regional N°003-2014-GRSM/GGR, del 21 de Enero del 2014, se designa el COMITÉ DE RECEPCIÓN DE OBRA
MEJORAMIENTO DE LA INFRAESTRUCTURA ELECTRICA DEL SISTEMA DE UTILIZACIÓN A DISTRIBUCION PRIMARIA EN 22.9 KV PARA EL SUMINISTRO ELECTRICO DEL PREDIO: INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN HILARION
CULMINADA/EN ARBITRAJE
La obra, fisicamente se culminó, sin embargo aun falta cancelar al contratista pagos relacionados con adicionales, por lo que se continua considerando como "en ejecución".Paralizado por falta de disponibilidad de terreno y errores en el expediente técnico.OBRA EN PROCESO DE LIQUIDACIÓN
ELECTRIFICACION RURAL DE LA LOCALIDAD DE RAMON CASTILLA - DISTRITO DE CHAZUTA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN
AMPLIACION Y MEJORAMIENTO DE ELECTRIFICACION RURAL EN BAJA TENSION EN LA LOCALIDAD DE HUIMBAYOC, DISTRITO DE HUIMBAYOC, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN
INSTALACION .DE LA ELECTRIFICACION RURAL DE LA LOCALIDAD DEL MIRADOR, DISTRITO DE SHAMBOYACU - PICOTA - SAN MARTIN
IMPLEMENTACION DE LAS REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA EN LA LOCALIDAD DE SANTA ROSILLO, DISTRITO HUIMBAYOC, PROVINCIA Y DEPARTAMENTO SAN MARTIN