doc.: IEEE 802.15-01/109r0 Submiss ion Slide 1 John Barr, Motorola March 2001March 2001 Project: IEEE 802.15 Working Group for Wireless Personal Area Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Networks (WPANs) Submission Title: [TG3 Opening Report 12Mar01] Date Submitted: [11Mar01] Source: [John Barr] Company [Motorola] Address [1750 E. Golf Road, Schuamburg, IL 60173] Voice:[+1 847 576-8706], FAX: [+1 847 538-4253], E-Mail: [[email protected]] Re: [01098r2P802-15_TG3-Mar01-Meeting-Objective-and-Agenda.xls] Abstract: [TG3 Chair Report to 802.15 WG] Purpose: [TG3 chair report to WG to update them from the last session on all work items.] Notice: This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.
14
Embed
Doc.: IEEE 802.15-01/109r0 Submission March 2001March 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
doc.: IEEE 802.15-01/109r0
Submission
Slide 1 John Barr, Motorola
March 2001March 2001
Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TG3 Opening Report 12Mar01]
Date Submitted: [11Mar01]
Source: [John Barr] Company [Motorola]Address [1750 E. Golf Road, Schuamburg, IL 60173]Voice:[+1 847 576-8706], FAX: [+1 847 538-4253], E-Mail:[[email protected]]
Purpose: [TG3 chair report to WG to update them from the last session on all work items.]
Notice: This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.
March 2001March 2001
John Barr, MotorolaSlide 2
doc.: IEEE 802.15-01/109r0
Submission
IEEE 802.15 Working Group for Wireless Personal Area Networks
TG3 Status ReportMarch 2001, Hilton Head, SC
USA
802.15
March 2001March 2001
John Barr, MotorolaSlide 3
doc.: IEEE 802.15-01/109r0
Submission
Agenda
• Goals of March Meeting
• IEEE 802.15.3 PAR
• Status and plans for TG3
• March Document List
March 2001March 2001
John Barr, MotorolaSlide 4
doc.: IEEE 802.15-01/109r0
Submission
Goals of the January Meeting
• Conference call status, including approval of any ad hoc business.
• Vote on acceptance of baseline draft.
• Resolve outstanding issues.
• Identify issues requiring resolution.
• Review project plan.
• Establish work plan for March-May.
March 2001March 2001
John Barr, MotorolaSlide 5
doc.: IEEE 802.15-01/109r0
Submission
IEEE 802.15.3 PAR• Wireless Medium Access Control (MAC) and Physical
Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN)– … wireless connectivity with fixed, portable and moving devices
within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person)
– … interoperability or coexistence with other 802.15 TG
– … coexistence with other wireless devices in conjunction with Coexistence Task Groups such as 802.15.2
– … low complexity, low cost, low power
– … >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications.
March 2001March 2001
John Barr, MotorolaSlide 6
doc.: IEEE 802.15-01/109r0
Submission
Status and Plans for TG3
• Construction of Initial DraftGoal: MAC/PHY standard of high rate WPAN
• ScheduleGoal: Produce a Standard by the end of 2001 or
early 2002
• Next StepsGoal: Establish base line draft, March, 2001.
Working Group draft, May, 2001. Sponsor ballot, November, 2001.
March 2001March 2001
John Barr, MotorolaSlide 7
doc.: IEEE 802.15-01/109r0
Submission
Teleconference Calls• Goal: Finalize clauses for base line draft. Identify key
issues and create proposed resolution for vote to approve base line draft during Hilton Head meeting.
• 802.15.3 General: Held every Tuesday between F2F meetings.
• PHY Committee: Every Thursday.• MAC Committee: Every Tuesday following general
802.15.3 call.• System Committee: No calls scheduled. Email work.
March 2001March 2001
John Barr, MotorolaSlide 8
doc.: IEEE 802.15-01/109r0
Submission
MAC Summary• Monday: Overview of MAC clauses in base line draft
– Overview of MAC– Synchronization– Contention access period– Contention free period– MAC management SAP– Authentication & Privacy (Ref 802.11e work)
• Tuesday: MAC Issue Resolution:– Detailed MAC review and issue resolution– Summarize proposed MAC baseline ammendments– Joint MAC/PHY session to resolve issues
• Wednesday: MAC Planning and Issue Resolution– Vote to approve MAC ammendments (8:06 AM)– Planning session at 4:00 PM
March 2001March 2001
John Barr, MotorolaSlide 9
doc.: IEEE 802.15-01/109r0
Submission
Systems Summary
• Monday: Systems committee report
• Tuesday: Systems Issue Resolution (1:00PM)– Summary of proposed amendments (5:21PM)