doc.: IEEE 802.11-11/0471r1 Report March 2011 Adrian Stephens, Intel Corp Slide 1 802.11 March 2011 Closing Plenary Reports Date: 2011-03-17 N am e C om pany A ddress Phone em ail A drian Stephens Intel Corporation +44 792 008 4900 (m obile) [email protected]A lex A shley N D S Ltd +44 792 021 1351 [email protected]Authors:
87
Embed
Doc.: IEEE 802.11-11/0471r1 Report March 2011 Adrian Stephens, Intel CorporationSlide 1 802.11 March 2011 Closing Plenary Reports Date: 2011-03-17 Authors:
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
doc.: IEEE 802.11-11/0471r1
Report
March 2011
Adrian Stephens, Intel CorporationSlide 1
802.11 March 2011 Closing Plenary Reports
Date: 2011-03-17
Name Company Address Phone email Adrian Stephens Intel
Adrian Stephens, Intel Corporationfrom slide 2/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
March2011
doc.: IEEE 802.11-11/0471r1
Report Slide 7
ANA Announcements• Current ANA announced to group is 802.11-11-0270r0. (2011 Feb 25)
– See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-00-0000-ana-database.xls
– All new requests received by end of meeting will be uploaded and announced via 802.11 WG reflector
• Procedure for ANA is contained in 07/0827r0.– See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt
• Editorial Guidance– ANA assignments should be done before the time of moving from WG LB to
Sponsor ballot.
– If a resource number is not in the ANA Database, please use <ANA> in drafts!
– Editors to replace any ANA controlled resources numbers with <ANA> upon incorporation of material into drafts.
– Editors need to check the ANA database to determine which resources are controlled and ensure that values are requested from the ANA.
Adrian Stephens, Intel Corporationfrom slide 3/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
March 2011
doc.: IEEE 802.11-11/0471r1
Report
ANA Report
• Recent allocations to TGad (1 item) and TGs (9 items)
• Two Behavior Limits released (reserved) by TGmb
• Two “temporary” values used by TGmb replaced by allocated values
• Reallocation of two values used by TGmb to avoid collision with published .11v
Adrian Stephens, Intel CorporationSlide 8from slide 4/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
March 2011
doc.: IEEE 802.11-11/0471r1
Reportfrom slide 5/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
Numbering Alignment Process
• Update from all published standards. Posted as 11-08/644r20 (2011 Feb 17) By Kazuyuki Sakoda
• TGz-2010 started a new update cycle. 11v-2011, 11u-2011, REVmb D7.03 numbering needs to be completed. 11ae is the next, then 11af, 11aa, 11ad, 11ac, 11ah, 11ai
• Create a working group MEC that includes numbering and ANA before going to Sponsor Ballot
• We use more columns for the two baselines.
Slide 9 Adrian Stephens, Intel Corporation
March 2011
doc.: IEEE 802.11-11/0471r1
Report
802.11 Style Guide
• See 11-09-1034-01-0000-wg11-style-guide.doc
• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.
• Call for interest to update this guide to match REVmb conventions
Slide 10 Adrian Stephens, Intel Corporationfrom slide 6/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
March 2011
doc.: IEEE 802.11-11/0471r1
Report
Most current doc shaded green.
TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Published
s mb ae af aa ad aa ad ac ah
s Y 9.0 Frame 8.0 Yes 2009 Kazuyuki Sakoda 15-Mar
mb Y 7.03 Frame 9.0 Yes 2009 Adrian Stephens 15-Mar
ae 6.0 2.0 OpenOffice 3.2
No 2009 Henry Ptasinski 19-Jan
af 6.02 1.0 Frame 9.0 No 2009 Peter Ecclesine 15-Mar
aa 7.0 7.0 1.0 0.06 3.01
Word No 2009 Alex Ashley 16-Mar
ad 2.0 Word 2007
No 2009 Carlos Cordero 15-Mar
ac 7.0 0.2 Frame 9.0 No 2009 Robert Stacey 15-Mar
ah Wongyu Song
ai Tom Siep
Changes from last report shown in red.
Mar 2011 Draft Development Snapshot
Slide 11 Adrian Stephens, Intel Corporationfrom slide 7/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)
March 2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 12
Closing ReportDate: 2011-03-18
Name Company Address Phone email
Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134
– Second Recirculation SB (20 day) to start shortly
• Scheduled Teleconference calls on – April 29, May 6
– 10am Eastern (7am Pacific)
• Timeline Analysis– No change from plan that 11mb will incorporate 11s
– Revisit in May
from slide 3/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 18
Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion• Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval
from slide 4/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)
from slide 1/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 33
Abstract
This document is the closing report for the TGac for the March 2011 session.
from slide 2/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report
Work Completed
• Resolutions were approved for 232 (28.5%) technical comments.• Resolutions were discussed for many other comments and approvals were deferred for further review• New revision of the draft (D0.3) will include approved resolutions.• Comments spreadsheet is available in 11-11-0276r6• Meeting Minutes are available in 11-11-461r0.• Agenda is available in 11-11-290r4.
Adrian Stephens, Intel CorporationSlide 34
Comment Type Received Approved Resolutions
Editorial 1000 Assigned to the Editor
Technical 814 232
from slide 3/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 35
March 2011 Goals
• Continue with Draft D0.1 comments resolution.• Prepare TG draft D1.0• Start WG Letter Ballot
from slide 4/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report
TG Ad Hoc Meeting in May
• Request the WG to approve an ad hoc meeting of TGac in the Bay Area, California on May 3-5, 2011 to advance the TGac draft prior to the May IEEE 802 Wireless Interim.
Adrian Stephens, Intel CorporationSlide 36from slide 5/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 37
Conference Call Times
• March 31 , April 14 , April 28 , – 20:00 – 22:00 ET
• April 7 , April 21 – 10:00 – 12:00 ET
from slide 6/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 38
TGad March 2011 Closing ReportDate: 2011-03-17
Name Company Address Phone email Eldad Perahia Intel
from slide 1/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 73
Abstract
Closing report for JTC1 ad hocfor March 2011, Singapore
from slide 2/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 74
JTC1 ad hoc generated a number of liaisons in Mar 2011
• Progress in Singapore (March 2011)– Review extended goals
• The ad hoc is now responsible for 802 matters
– Review status of liaisons previously sent to SC6• No comments on any Sponsor Ballot drafts
– Discuss identifier conflict liaison previously sent to SC6• Considered responses from Chinese and Swiss NBs
• Developed liaison offering a new IE and two new status codes
– Update on status of ISO/IEC 8802-11:2005• Likely to be reconfirmed based on ballot
– Update on status of ISO/IEC 8802-3:2000• Likely to withdrawn based on liaison from IEEE 802.3
from slide 3/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 75
JTC1 ad hoc generated a number of liaisons in Mar 2011
• Progress in Singapore (March 2011)– Update on WAPI progress
• Late breaking news: IEEE 802 comments objecting to claims that IEEE 802.11i is insecure have been rejected as irrelevant in proposed comment disposition submission. Similar comments from US NB also rejected.
– Discuss a proposed 802.1X/AE related liaison• Developed liaison inviting SC6 members to attend 802.1 WG in July,
and included analysis on proposed NP for replacement of .1X/AE
• Was discussed in 802.1 closing plenary
– Approve delegation for next SC6 meeting• Recommended Bruce Kraemer be appointed head of delegation
• Bruce authorised to select other candidates
from slide 4/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report
JTC1 ad hoc will prepare for more liaisons out of Singapore meeting
• Plans for Palm Springs (May 2011)– Prepare ppt versions of recent liaisons to SC6
– Develop liaison on proposed .11 replacement NP
– Possibly develop liaison on proposed .16 security replacement NP
– Review latest response to liaison related to security of IEEE 802.11i
– Confirm delegation to SC6• Likely to include 802.11, 802.1 and maybe 802.16 members
Adrian Stephens, Intel CorporationSlide 76from slide 5/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report
Motion to appoint HoD to SC6 meeting
• The JTC1 ad hoc unanimously approved a motion to appoint HoD to SC6 meeting– The IEEE 802 JTC1 ad hoc recommends to IEEE 802 ExCom that
Bruce Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The ad hoc also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation
• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG recommends to IEEE 802 ExCom that Bruce
Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The WG also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation
Adrian Stephens, Intel CorporationSlide 77from slide 6/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report
Motion to allocate an IE identifier and two status codes
• The JTC1 ad hoc unanimously approved a motion to allocate an IE identifier and two status codes– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 ANA
that two status codes and an IE identifier be allocated for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard
• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG approves the IEEE 802.11 ANA allocating
two status codes and an IE identifier for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard
Adrian Stephens, Intel CorporationSlide 78from slide 7/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report
Motion for identifier conflict liaison to SC6 • The JTC1 ad hoc unanimously approved a motion for a liaison to
SC6 in relation to the identifier conflict issue– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE 802
ExCom and IEEE International ad hoc that:• The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover
letter
• Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values
• IEEE 802.11 WG should consider an equivalent motion– IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE International ad
hoc that:• The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover
letter
• Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values
Adrian Stephens, Intel CorporationSlide 79from slide 8/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report
Motion for 1X/1AE liaison to SC6
• The JTC1 ad hoc unanimously approved a motion for a liaison to SC6 in relation to 1X/1AE– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE
802 ExCom and IEEE International ad hoc that:• The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an
appropriate cover letter• Paul Nikolich be given authority to make editorial changes
• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE
International ad hoc that:• The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an
appropriate cover letter• Paul Nikolich be given authority to make editorial changes
Adrian Stephens, Intel CorporationSlide 80from slide 9/9 of 11/0467r0 by Andrew Myles, Cisco
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 81
IEEE 802.11Regulatory Ad Hoc Committee
Closing ReportDate: 2011-03-18
Name Affiliations Address Phone email Rich Kennedy Research In
from slide 1/3 of 11/0469r0 by Bruce Kraemer, Marvell
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 86
Smart Grid – March 2011
Tuesday & Thursday topics
• UK Consultation
• Update of activities in P2030
• IEEE Smart Grid
• FERC
• Australian Smart Metering RFI
• Revision NIST Smart Grid PAP#2 Report plan
• Open SG
• ITU-R paper - WP1A document
from slide 2/3 of 11/0469r0 by Bruce Kraemer, Marvell
March2011
doc.: IEEE 802.11-11/0471r1
Report Adrian Stephens, Intel CorporationSlide 87
DeliverablesPaper & Matrix1. Identify and fully define all necessary terminology (mesh, etc.)2. Come up with sane metric definitions for Section 43. Come up with guidelines for filling out the wireless technologies matrix
to make sure entries are comparable across technologies– This includes a selection of high priority, fully described “operating
points” representing deployment scenarios4. Come up with dates for submissions for column entries for the matrix
and appoint coordinators for each technology represented in the matrix5. Submit results to the PAP2 reflector and announce a comment period6. Directly solicit SDO participation and schedule SDO calls to discuss
submissions and comments on all of the above – Bluetooth, 7. Discuss & adjust the deliverables content using OpenSG as the venue and
a proxy for the utility industry8. Completion target: July? December?9. Assessment of industry practices in deployment
from slide 3/3 of 11/0469r0 by Bruce Kraemer, Marvell