DEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM Royce Hammitt, Des Moines Wastewater Reclamation Authority (WRA)
49

DEVELOPMENT OF AN INTEGRATED HAULED WASTE · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Mar 05, 2018

Download

Documents

lamkhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

DEVELOPMENT OF AN

INTEGRATED HAULED

WASTE PROGRAM

Royce Hammitt, Des Moines Wastewater Reclamation Authority (WRA)

Page 2: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Des Moines Wastewater

Reclamation AuthorityAltoona - Ankeny - Bondurant - Clive - Cumming - Des Moines -

Greenfield Plaza/Hills of Coventry - Johnston - Norwalk - Pleasant Hill –

Polk City - Waukee - West Des Moines - Polk and Warren Counties -

Urbandale/Windsor Heights and Urbandale Sanitary District

Working together to protect

public health and enhance the

environment by recycling

wastewater and being the

preferred treatment facilities

for hauled liquid wastes

Operating Contractor - City of Des Moines

8/19/14 Midwest Governor's Association Tour 2

Page 3: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

• The Des Moines WRF serves a population of 500,000

• Treated nearly 26 billion gallons of wastewater or about

72 million gallons per day in 2009

• Actively seeks to improve efficiency in use of resources

8/19/14 Midwest Governor's Association Tour 3

Page 4: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Water19%

Aviation10%

Building Services

7%

Civic Center3%

Library1%

Misc1%

Parks3%

Street Lights30%

Traffic3%

Wastewater23%

8/19/14 Midwest Governor's Association Tour 4

Water and Wastewater Demands Energy

Source: Texas Comptroller of Public Accounts

Typical Large City Electrical Usage

Page 5: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Wastewater Plants Can Produce Enough Electricity to

Meet Demands

8/19/14 Midwest Governor's Association Tour 5

Aeration and

other liquid

processes

Solids processes

Pumping

Lighting

Anaerobic

digestion of

wastewater solids

Additional energy from

biosolids and other

renewable sources

Electric Demand Potential Electric Supply

Other organic waste

including FOG (fats, oils,

and grease)

Source: David L. Parry, CSWEA, Oct. 2010

Page 6: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

A Wastewater and Organic Waste Treatment

Center

8/19/14 Midwest Governor's Association Tour 6

Hauled organic wastes account for 42% of the feed to the

anaerobic digesters

Des Moines Wastewater Treatment Plant, Des Moines, IA

Page 7: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

2010 WERF Interim Report – Waste

Characterization

8/19/14 Midwest Governor's Association Tour 7

Page 8: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

8/19/14 Midwest Governor's Association Tour 8

Page 9: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

8/19/14 Midwest Governor's Association Tour 10

Page 10: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Hauled Wastes• Sources

• Sludges from regional

WWTP’s

• Industrial and food

processing wastes

• Issues• Spikes in biogas

• Foaming

• Received 24/7!

8/19/14 Midwest Governor's Association Tour 11

Page 11: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Original Trucked Liquid

Waste (TLW)

• Little storage

• Loads transferred to

digester as they arrive

and unload

New TLW Facility

• Storage

• 160,000 gallons

• Carry over of wastes

through weekend

• Costs less to store feed

stock than to store gas

8/19/14 Midwest Governor's Association Tour 12

Page 12: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

COMBINED HAULED WASTE

PROJECT

8/19/14 Midwest Governor's Association Tour 13

NEW UNLOADING

FACILITY

Page 13: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Trucked Liquid Waste Storage

8/19/14 Midwest Governor's Association Tour 14

Page 14: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

COMBINED HAULED WASTE

PROJECT RESULTS

• Tanker unloading time

reduced by 50%

• Areas of congestion

eliminated

• Customers (haulers)

give positive comments

8/19/14 Midwest Governor's Association Tour 15

Page 15: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

WRF Hauled Waste -- Regional8/19/14 Midwest Governor's Association Tour 16

Page 16: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

8/19/14 Midwest Governor's Association Tour 17

“If you build it – they’ll come”

Page 17: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

8/19/14 Midwest Governor's Association Tour 18

0

100

200

300

400

500

600

700

800

900

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

x 1

00

0 g

all

on

s

Restaurant Grease Hauled to WRF

FY13

FY12

FY11

FY10

FY09

FY08

FY07

FY06

Page 18: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Existing Facilities8/19/14 Midwest Governor's Association Tour 19

Page 19: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Tasks & Objective of the BioEnergy

Master Plan

8/19/14 Midwest Governor's Association Tour 20

Enhance biogas

production

Maximize use of

biogas

Develop Economic Model

Improve digester

facilities

Reliable,

Flexible System

for the Future

EvaluationProcess

Page 20: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

WRA’s Existing Program

8/19/14 Midwest Governor's Association Tour 21

AnaerobicDigestion

BiogasStorage

50 MGD

0.14 MGD

Sludges

Hauled Wastes

Biosolids to Land Application

Process Heating

Building Heating

Power Generation

Industrial User

Primary and Secondary Treatment

> 30 loads/day

Page 21: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

0

250,000

500,000

750,000

1,000,000

1,250,000

1,500,000

1,750,000

2,000,000

2,250,000

1/8/07 2/27/07 4/18/07 6/7/07 7/27/07 9/15/07 11/4/07 12/24/07 2/12/08 4/2/08 5/22/08 7/11/08 8/30/08 10/19/08

Cu

.Ft

/ D

ay

Date

Total Production

Total UsageObjective < 5% loss

Daily Biogas Production and Usage

8/19/14 Midwest Governor's Association Tour 22

Page 22: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Evaluation Process

• 11 economic and noneconomic criteria

• WRA staff developed weighting

8/19/14 Midwest Governor's Association Tour 23

0 25 50 75 100

Weight

Ease of O&M

Proven and Reliable

Lifecycle Costs

Page 23: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Task 1

8/19/14 Midwest Governor's Association Tour 24

Improve digester

facilities

Reliable,

Flexible System

for the Future

EvaluationProcess

Page 24: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Required Digester Improvements• Covers Evaluated

8/19/14 Midwest Governor's Association Tour 25

Fixed Steel Floating Gas Membrane

Submerged Fixed

Concrete

Page 25: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Submerged Fixed Cover Gas Dome

8/19/14 Midwest Governor's Association Tour 26

Gas Withdrawal

Gas Dome

Spray Nozzles

EmergencyLiquid Level

Overflow toStandpipe

NormalOperatingLevel

Normal Overflow to Standpipe(Embedded in Cover) Emergency Overflow

Pipe to U-Tube Gas Seal

3" Gas Pipeto Standpipe

Recirculation fromTank Bottom

Transflow3-Way Valve

Pressure VacuumRelief

Page 26: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Digester Covers Selected• Primaries – Submerged Fixed Covers

• Ease of O&M

• Foam control

• Increased capacity (~8%)

8/19/14 Midwest Governor's Association Tour 27

• Secondary – Gas Membrane– Biogas storage

– Biosolids storage

– Dewatering operations flexibility

Page 27: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Examples of Covers

8/19/14 Midwest Governor's Association Tour 28

Page 28: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Task 2

8/19/14 Midwest Governor's Association Tour 29

Enhance biogas

production

Improve digester

facilities

Reliable,

Flexible System

for the Future

EvaluationProcess

Page 29: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Methods Evaluated for Increasing Biogas

Production

• WAS pretreatment

– MicroSludge®

– OpenCEL

• Advanced digestion– Extended thermophilic

– Temperature phased (TPAD)

8/19/14 Midwest Governor's Association Tour 30

Page 30: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Conclusions for Enhancement Evaluation

• WAS Pretreatment• Limited benefit due to small fraction of TWAS

• Potential increase in biogas production ~ 7%

• Payback > 20 years

• Advanced Digestion• Increased capacity & Class A product

• Potential increase in gas production ~ 10-15%

• Payback >15 years

• Best Option• Increase hauled waste volume

8/19/14 Midwest Governor's Association Tour 31

Page 31: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Task 3

8/19/14 Midwest Governor's Association Tour 32

Enhance biogas

production

Maximize use of

biogas

Improve digester

facilities

Reliable,

Flexible System

for the Future

EvaluationProcess

Page 32: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Model Biogas Storage and Use

8/19/14 Midwest Governor's Association Tour 33

Page 33: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Biogas Storage Evaluation

8/19/14 Midwest Governor's Association Tour 34

Capacity

(cf)% of Biogas Flared

Current Future

475,000 6.1 13.8

805,000 5.8 13.6

Increased

storage is

important, but

not the key!

Page 34: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Natural Gas Use

Alternatives for Increasing Use

• Replace natural gas use at plant

– Supply additional boilers

– Produce biomethane for plant-wide use

• Produce additional power• More operating time

• Additional engine generators

• Sell to gas utility

• Increase volume sold to industry

8/19/14 Midwest Governor's Association Tour 35

Boilers

Misc.

Other

Page 35: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Natural Gas Usage in Plant Boilers

8/19/14 Midwest Governor's Association Tour 36

Page 36: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

8/19/14 Midwest Governor's Association Tour 37

Additional Generation

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

Jun'13

Jul '13 Aug'13

Sep'13

Oct'13

Nov'13

Dec'13

Jan'14

Feb'14

Mar'14

Apr'14

May'14

KW's Purchased vs Generated

Purchased 19,424,008 Generated 12,758,651

Generated:Average: 39.6%Last Month: 44.7%

Page 37: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Current Engines

8/19/14 Midwest Governor's Association Tour 38

• 3 engine

generator sets,

each ~600 kW

• In 2010, used

over 190 million

cubic feet of

digester gas to

generate

almost 10

million kWh of

electricity

Page 38: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

New Engines – (4) 1.4 MW Jenbacher

8/19/14 Midwest Governor's Association Tour 39

Page 39: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Compressed Biogas (CBG) Production

Options

• Pressure Swing Absorption (PSA)– Low energy (~60KW)

– Experience with biogas

– Operational flexibility

• CO2 Wash– High energy (~300KW)

8/19/14 Midwest Governor's Association Tour 40

Page 40: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Use of Biogas by Local Industry

• Averaging 700,000 cfd

• Capacity of 1,200,000 cfd

• Conveyance system limits

• Potential for 1,700,000 cfd in future

8/19/14 Midwest Governor's Association Tour 41

Page 41: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Use of Biogas by Local Industry

8/19/14 Midwest Governor's Association Tour 42

Page 42: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Staged Approach to Expanding Biogas Use

• Increase industry use preferred• Proven, reliable

• Minimal affect on O&M

• Backup power generation associated with High

Rate Treatment Facility (separate project)• Add 4 new 1.4 MW engine generators (2 CHP biogas, 2

Emergency)

• Use in boilers possible in future• Proven, reliable system

• Reduces natural gas dependence

• Payback ~ 12 years

8/19/14 Midwest Governor's Association Tour 43

Page 43: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Task 4

8/19/14 Midwest Governor's Association Tour 44

Enhance biogas

production

Maximize use of

biogas

Develop Economic Model

Improve digester

facilities

Reliable,

Flexible System

for the Future

EvaluationProcess

Page 44: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Process & Economic Model

8/19/14 Midwest Governor's Association Tour 45

Model

Primary& WAS

4 Different

Wastes

Digestion process

parameters

PowerNatural Gas

Tip FeesTreatment CostsLand Application

DewateringBiogas Options

Monthly Biogas Balance

Present Worth

OutputInput Parameters

Page 45: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Natural Gas Storage Range

8/19/14 Midwest Governor's Association Tour 46

Page 46: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Natural Gas Price Volatility

8/19/14 Midwest Governor's Association Tour 47

Page 47: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

Example of Economic Model Output

8/19/14 Midwest Governor's Association Tour 48

Page 48: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW

•Reliable systems to

provide valuable

public services

•Increased revenue

potential

•Flexibility for multiple

uses of biogas will be

critical

8/19/14 Midwest Governor's Association Tour 49

Digestion / Biogas System Improvements will

Enhance WRA’s Overall Sustainability

Page 49: DEVELOPMENT OF AN INTEGRATED HAULED WASTE  · PDF fileDEVELOPMENT OF AN INTEGRATED HAULED WASTE PROGRAM ... stock than to store gas ... generator sets, each ~600 kW