VMT GmbH | Stegwiesenstraße 24 | 76646 Bruchsal | Germany t +49 7251 9699 0 | www.vmt-gmbh.de Production line for the segments Visualization of the crane navigation Storage place of the jobsite Koralmtunnel Project Start Contractor August 2012 ARGE KAT 2 ( Strabag / Jäger Bau) Navigation System Crane Navigation - works in connection with the SDS. Responsible to show the crane driver the position of the ordered segment Information Systems - Segment Documentation System SDS - IRIS.tunnel Service - Commissioning jobsite In Austria, VMT installed the Segment Documentation System SDS to control the reinforcement production, segment production, storage, logistic, segment installation at TBM and the WLAN infrastructure. Deutschlandsberg, Austria Koralmtunnel KAT 2 Manage Information Navigate Tunnelling Service Precision VMT | Reference Project | Koralmtunnel KAT 2
1

Deutschlandsberg, Austria Koralmtunnel KAT 2 · Deutschlandsberg, Austria Koralmtunnel KAT 2 Manage Information Navigate Tunnelling Service Precision VMT | Reference Project | Koralmtunnel

Sep 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Deutschlandsberg, Austria Koralmtunnel KAT 2 · Deutschlandsberg, Austria Koralmtunnel KAT 2 Manage Information Navigate Tunnelling Service Precision VMT | Reference Project | Koralmtunnel

VMT GmbH | Stegwiesenstraße 24 | 76646 Bruchsal | Germany

t +49 7251 9699 0 | www.vmt-gmbh.de

Product i on l i ne fo r t he

segment s

V i sua l i z a t i on o f t he c r ane

nav i g a t i on

Sto ra ge p l a ce o f t he job s i t e

Ko ra lm tunne l Project Star t

Cont ractor

August 2012

ARGE KAT 2 ( Strabag / Jäger Bau)

Nav igat ion System

Crane Nav igat ion

- works in connect ion w i th the SDS. Responsib le to

show the crane dr ive r the posi t ion o f the ordered

segment

In format ion Systems - Segment Documentat ion System SDS

- IR IS .tunne l

Serv ice

- Commiss ion ing jobs i te

In Austria, VMT installed the Segment Documentation System SDS to control the reinforcement production, segment production, storage, logistic, segment installation at TBM and the WLAN infrastructure.

Deutschlandsberg, Austria Koralmtunnel KAT 2

Manage Information

Navigate Tunnelling

Service Precision

VMT | Reference Project | Koralmtunnel KAT 2