Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme for IWMP Hamirpur-II: Bijhari Prepared by: CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)
715

Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Mar 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 2: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

NODAL OFFICER : Dr. K.K.Katoch PROJECT CO-ORDINATOR : Dr. A.K.Goel Watershed Team:

Team Leader : Dr. Anand Singh Members : Dr. Virendra Kumar

Dr. Sanjay Kumar Dr. C.L. Chauhan Dr. Parveen K. Sharma Dr. Rakesh Thakur Dr. Neetu Sharma Dr. Subhash

Total Panchayats : 15 Total Villages : 100

Name of Micro-Watershed Code

Kulehra 1A2A3B1a Dhabriana 1A2A3M2a Bijhari 1A2A3B1d Bhakreri 1A2A3C2a Usnar Kalan 1A2A3L1a

Page 3: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

PREFACE For livelihood security of millions of people of India it is essential that the land which supports the demand of agri-horti-silvi based requirements of the growing population continue to sustain or enhance the productivity through best management of natural resources. The degradation of the lands, particularly on hill slopes is much faster than in the plain areas due to long and steep slopes and intensity of rain. To protect the soil and conserve water many ideas were floated which culminated into the slogans like ,’Catch water where it falls’, ‘Do not let the rain water flow out of the field and if at all it does, then not out of the village’. These all slogans came from the principle of developing lands on the basis of Watershed, as it becomes easier to manage such an enclosed area. The management of such lands earlier use to be in isolation but with the passage of time the human interference came into picture and as such the concept of Watershed Development on holistic basis became prevalent.

In Himachal Pradesh, inspite of the fact that the state receives on an average 1300 mm of rain during the year, most of it drains down the slopes during rainy season without adding anything to the productivity of the crops. At present Himachal Pradesh has irrigation facilities on around 19 per cent of the cultivable area and it is estimated that if all the water resources are exploited or harnessed then also only 40 per cent of the cultivable area can be brought under irrigation. This shows that even after full exploitation of available surface and ground water, 60 per cent of the cultivable area will still remain rainfed and suffer from weather vagaries if proper management of rainwater is not ensured. Thus, the management of soil and water on the principles of active Watershed Unit basis along with all other interacting components have become essential and for which policy planners have become very sensitive from the last three decades. Keeping in view the above facts, Government of Himachal Pradesh has started implementing development on Watershed basis for the well being of the communities living with in the Watersheds. Department of Rural Development, Government of Himachal Pradesh has taken major initiatives in this direction and identified many pockets to be developed on scientific basis for which the assignment of preparation of Detailed Project Reports (DPRs) in respect of nine IWMP Watersheds located in three districts of Himachal Pradesh was given to the CSK Himachal Pradesh Krishi Vishvavidyalaya.

The present DPR is in respect of IWMP Hamirpur-II: Bijhari Watershed, which comprises of 15 Panchayats and 100 villages covering an area of 5000 hectares. The cooperation and moral support provided by the Hon’ble Vice-Chancellor and the Director of Research, CSKHPKV, Palampur is praise worthy. The efforts made by the Watershed DPR preparation Team, Panchayati Raj Institutions of the concerned Watershed, District Level Resource Group and IWMP Project Directorate of Rural Development Department are duly acknowledged in bringing out this DPR in the present implementable form. The initial and final coordination rendered by Dr. V.K. Sharma, Professor (Soil Science) and Dr. A.K.Goel, Senior Research Engineer, respectively is duly acknowledged.

The assistance rendered by Dr. Parveen Kumar Sharma, SMS, KVK Hamirpur at Bara; Mrs. Sunita and Mr. Sartaj in compilation and collation of final DPRs is appreciated.

Dated: November 2, 2011 (Dr. K.K.Katoch)

Nodal Officer (IWMP-DPRs) & Head Department of Soil Science CSKHPKV Palampur-176 062 (H.P.)

Page 4: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

 

Page 5: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Contents

Sr.

No.

Particulars Page No.

Gist

Action Plan for Five Years

1. Introduction 1

2. General Description of Project Area 5

3. SWOT Analysis 18

4. Entry Point Activities 27

5. Water Harvesting 28

6. Agriculture, Horticulture and Animal Husbandry 40

7. Pisciculture 75

8. Drinking Water 76

9. Soil Conservation 79

10. Livelihood Concerns 116

11. Capacity Building 129

12. Project Withdrawal and Consolidation 140

13. Activity and Budget 141

14. Summary 149

Page 6: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

1

GIST IWMP Hamirpur - II (Bijhari)

1 Name of the Project IWMP Hamirpur - II

2 District Hamirpur

3 Block Bijhari

4 Project area 5000 ha

5 Area proposed for treatment 5000 ha

6 Cost Rs. 7,50,00,000

7 Panchayats covered under the project 15

8 Total micro watersheds 5

9 Financial projection in the DPR as

Project fund

Convergence

Rs. 7.5 crores

Rs. 27,94,216/-

10 Whether the year-wise annual action plan prepared or

not.

Yes

11 Whether activity-wise project fund and convergence

funds indicated separately or not.

Yes

12 Whether Khasara No. of civil structure indicated or

not.

GPS located sites

13 Phy. & Fin. Target of the project period mentioned in

the AAP or not.

Yes

14 Micro watershed wise code mentioned or not Yes

15 Proposed activities Water harvesting

structures, crate wires,

hand pump, tube well,

agriculture, horticulture

and animal husbandry

inputs.

16 Provision of funds for water conservation/harvesting

activities

Rs. 4.20 crore

17 Area proposed to be brought under supplemental

irrigation

303 hectare

18 Whether the draft DPR has been approved by:

Page 7: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

2

The gram sabha/ gram Panchayat

The district level resource group

Yes(certificate enclosed)

Yes (certificate enclosed)

19 Expected outcome 20% likely to increase in

the economic status of the

farmers of the project

area.

20 Status Quo Analysis

Total geographical area under the project

Area under cultivation

Fallow land

Forest area

Community land /pasture

Other land

Cropping Pattern

6125 ha

2141 ha

1966 ha

1125 ha

700 ha

193 ha

Maize – Wheat

21 Water harvesting: • Current status of water harvesting activities

• Water harvesting potential in terms of cubic mtrs. • Proposed activities

• Water potential to be created in cubic mtrs.

Irrigation tank, kuhls, bawaris etc. 900000 m3

Polyline tanks, Irrigation tanks, Irrigation kuhls and roof water harvesting, check dams etc. 303000 m3

22 Farm based interventions: • Agriculture based activities in the DPR

• Agriculture allied activities proposed in the DPR

Polyhouse, vermicompositing, collection centres, distribution of seeds and planting materials and trainings to the beneficiaries Dairy, poultry, goatry, bee keeping, piggery, pisciculture etc. & non-farm based activities including training of the people

23 Non-Farm Based Interventions: • Skill development

Trainings on on-farm and

Page 8: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

3

• Proposed micro-enterprises

non-farm activities Carpentry, Pattal making, masonry, basket making, black smith, weavers, rope making and wood crafting

24 Financial Envelop

Watershed Project

Convergence

Rs. 7.5 Crores

Rs. 27,94,216

25 Outcome

The construction of tanks, rain water harvesting structures, wire crated spurs,

renovation of kuhls etc will bring a sizable area under irrigation and will also help in

controlling soil erosion. Provision of micro irrigation systems will ensure efficient

use of water.

The increase in the area under irrigation will lead to diversification. Further use of

good seeds and balance fertilization will lead to 25-30% increase in productivity of

commonly grown crops and increase area under cash crops to improve livelihood

options for farming community.

Reclamation of land and introduction of improved grasses will increase the fodder

availability which will boost the livestock component. Similarly scientific

management practices will lead to improved health which in turn will ensure

increase in milk production.

Introduction of farm based enterprises like beekeeping, backyard poultry, mushroom

units, value addition, tailoring units and poly house are expected to enhance the

income of unemployed youth, farm women etc.

Page 9: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

State: Himachal Pradesh Block: Bijhari Amount: Rs 7,50,00,000/- District: Hamirpur Total area: 5000 ha Work Component Funds

allocated (Rs)

Total proposed

work including

convergence

I Year II Year III Year IV Year V Year TOTALIWMP IWMP IWMP IWMP IWMP

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Phys

ical

(h

a)

Fina

ncia

l (R

s)

A General

1 Administrative (10%) 75,00,000 1500000 1500000 1500000 1500000 1500000 7500000

2 Monitoring (1%) 7,50,000 250000 250000 250000 750000

3 Evaluation (1%) 7,50,000 250000 250000 250000 750000

B Institution & Capacity Building (5%) (37,50,000)

1 Poly house 708700 17 708700

2 Water Conservation 187052 10 187052

3 Diversification 521400 12 521400

4 Poultry 515348 23 515348

5 Mushroom Cultivation 853050 11 85305

6 Value Addition 188250 5 188250

7 Organic Farming 341700 15 341700

8 Microenterprises 434500 10 434500

C Detailed Project Report (1%) 7,50,000 750000 750000

D Consolidation Phase (3%) 22,50,000 2250000 2250000

E Entry Point Activities (4%) 30,00,000 3000000

Page 10: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Work Component Funds allocated

(Rs)

Total proposed

work including

convergence

I Year II Year III Year IV Year V Year

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

F Water Development

Phase (56%)

4,20,00,000

A Construction work has to be done in 1st & 2nd year

1 Pucca tank 570757 55 39 5707570

2 RWHT 1183996 44 17 1183996

3 Open well 1419376 76 70 1419376

4 Bore well* 1594629 09 41.5 1594629

5 Lift

irrigation

8927 01 1.5 8927

6 Kuhl 203820 150m 4.0 193200 10620

B Drinking water

1 Bowri 77412 4 77412

2 Hand pump* 1421574 14 1421574

C Soil conservation

1 Check dam 10x(2+1)/2x2 m

453385 5 37 453385

2 Check dam 8x(2+1)/2x2 m

578264 8 42 578264

3 Check dam 6x(2+1)/2x2 m

759024 14 51 759024

4 Wire crated check dam Check dam 2x1.25x2 m

977500 100 415 977500

5 Wire crated 6993829 543 1214 6993829 967637

Page 11: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Work Component Funds allocated

(Rs)

Total proposed

work including

convergence

I Year II Year III Year IV Year V Year

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

check dam Check dam 3x1.25x2 m

6 Wire crated check dam Check dam 4x1.25x2 m

7439610 406 1225 7439610 497690

7 Wire crated check dam Check dam 6x1.25x2.5 m

5990104 192 897.5 5990104 1048616

8 Wire crated check dam Check dam 8x1.25x2.5 m

2651550 55 125 2651550

9 Wire crated check dam Check dam 10x1.25x2.5

m

2928583 49 494.5 2928583

10 Fencing 1610847 6250m 182 1610847 269653

G Production System and Micro Enterprises 10 % (75,00,000/-)

Agriculture

Provision of

improved

inputs

2560000 64.5 2560000

Diversification 1710500 38.5 1710500

Horticulture

Diversification 1680000 41 1680000

Animal

husbandry

Page 12: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

Work Component Funds allocated

(Rs)

Total proposed

work including

convergence

I Year II Year III Year IV Year V Year

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Con

verg

ence

Phys

ical

(h

a)

Fina

ncia

l (R

s)

Demonstrations

on balanced

feeding and

diseases

management

1168641 591 animal 1168641

Control of endo

and ecto

287897 3832 animal 287897

H LIVELIHOOD ACTIVITIES (9%)

1 Mushroom

bags

1096000 6450 nos 1096000

2 Bee keeping

box

1090000 443 nos 1090000

3 Vermiculture

unit

2118280 426 nos 2118280

4 Back yard

poultry

612240 4050 nos 612240

5 Women

empowerment

1584000 11 nos 1584000

6 Soft toy

making

86900 2 nos 86900

7 Women

empowerment

86900 86900

8 Exposure visit 75000 5 nos 75000

*Excluding farmers’ share i.e. Rs. 9,44,963/-

Page 13: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

1. Introduction The developing countries of the world especially Asian countries which got their

emancipation in the middle of the last century have entered the 21st century with more hopes and expectations and India is no exception to this. To meet the food requirements for the growing population of the country which has crossed 100million mark is one of the most challenging tasks. This will pose an ever-increasing burden on the agriculture sector considering the limited land and water resources. The situation in the rainfed areas will be worse if suitable measures are not planned and implemented. Apart from food, there will be ever enhanced demand for fuel, fodder, fiber etc. In view of this, the agriculture development should take care of all these commodities and this can be achieved only through appropriate watershed development strategy. Conservation of soil and water undoubtedly holds the key to this approach as it not only prevents land degradation but also leads to sustained productivity. Apart, enhancing the livelihood options and uplifting the socio economic status of the inhabitants is the prime objective of integrated watershed development programme in the disadvantaged rainfed areas. Thus watershed development approach should ensure ever increased participations of farmers or other inhabitants in the development and implementation of this endeavor. This will not only ensure restoration of ecological balance through integrated farming system approach but also lead to enhanced profitability and better livelihood options.

With increasing population there is a great pressure on land, consequently the landholdings are becoming marginal and sub marginal. Reduction in vegetative cover due to extensive grazing is leading to faster run-off and decreasing ground water level. About 160 million hectare of land in India has been categorized as degraded land and about 60 million hectare has attained the status of wasteland. To improve the condition of these lands and to get optimum production holds the key to achieve self sufficiency in food and fodder in the future. The Government of India has initiated the steps in this directions through programmes like Drought Prone Area Programme (DPAP), Desert Development Programme (DDP) and Integrated Watershed Development Programme (IWDP) and Hariyali Project , but systematic approach in developing and implementation of these projects holds the key to overcome the problems f drought, desertification and degradation of land respectively.

Conservation and sustainable use of land resources for restoring ecological sustainability will primly start with appropriate water harvesting. In spite of watershed development programmes in operation since last two decades, the appropriate and desired results have not been achieved except in few cases. Hence, the programme has been receiving high priority at Central Govt., State Govt. and multilateral agencies and has been identified as a major route and a promising area for holistic development of agriculture in the country. Integrated Watershed Management Programme (IWMP)

It is widely accepted that watershed development has to be conceived as a broad

strategy for protecting livelihoods of the people inhabiting fragile ecosystems, especially the poor, rather than just the physical resources alone. Thus the overall objective and rationale of watershed development in India is no longer limited to scientifically determined methods of soil and water conservation, but has gone far beyond that, evolving instead into a form of

Page 14: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 2 - 

‘Watershed Plus’, which seeks to ensure not only the availability of drinking water, fuel wood and fodder for the poor, but also raise their income and employment opportunities through improvements in agricultural productivity, better access to markets, extension services etc. Hence, integrated natural resource management and watershed development has become a larger paradigm for achieving sustainable development in the country as whole and hilly states like Himachal in particular.

Concept of water shed A watershed is defined as that geographical area which feeds water to a drainage line

(like a rivulet, stream, river etc). However, a watershed is not only a geographical area, but also the area from where the community living within draws its sustenance. The quality and health of the watershed, therefore, directly affects the quality of life of the people living in that area. Watershed development involves the conservation, regeneration and judicious utilization of natural resources, seeking to bring about an optimum balance between the demand and use of resources. It, therefore, involves complex interactions between various components like Community Development, Soil and land Management, Water Management, Crop Management, Afforestation, Pasture/Fodder Management, Rural Energy Management and related areas. The concept of watershed development seeks to bring equilibrium among these components so that sustainable development of area may become possible.

Objective and Principles of the Programme: There are five major problems in the watershed namely (a) stream bank erosion

and floods and sheet erosion of cultivable land, (b) water scarcity during dry season, (c) large number of scrub animals and (e) Unemployment.

The reason behind stream bank erosion and flood is the lack of vegetative cover in the upper reaches of the micro watershed, thereby increasing peak flow in the stream. This is also reason for reduced percolation of rainwater into the ground, thus affecting the base flow in the stream. Reduced vegetative cover is also responsible for the scarcity of fodder and fuel wood. Thus, all the above five problems are in one-way or other interlinked.

Keeping the above problems in view, the objective for the proposed programme for Hamirpur Watershed- II : Bijhari Block has been decided so as to enhance the base flow and reduce the peak flow in the stream, by harvesting and conserving maximum possible rainwater in the upper reaches of the micro watershed. During five years of implementation phase, the project activities will ensure the accomplishment of the above mentioned micro watershed specific objective, resulting in increased productivity of both the forest land as well as agriculture land. This will ultimately enhance availability of food, fodder and fuel wood in the micro watershed.

Page 15: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 3 - 

Objectives 

• To mitigate the adverse effects of drought on crops and livestock. • To control desertification. • To encourage restoration of ecological balance and • To promote economic development of village community.

Hamirpur is situated between 76o 13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the district above mean sea level varies between 400 - 1232 meters. Area wise, it is the smallest district among twelve district of the state and situated at the centre of the State. The area falls under the middle and upper Shivalik ranges and has the most fragile ecosystem. The area falls under the sub-montane low hill zone (Zone-I) of Himachal Pradesh having slopping and undulating topography. Besides having a number of places of scenic beauty, the district has a few places of religious importance. Of these, Baba Balak Nath at Deotsidh is the sacred place, where lakhs of pilgrims from all over India and abroad visit every year. As per revenue, record geographical area of this district is 110070 hectares and according to Survey of India total geographical area is 1,118 sq. kms which support 4, 12,700 human, 2,03,896 livestock population and other flora and fauna species. Of the total population of the district, 3, 82494 inhabit rural areas and 30206 people are urban dwellers. Agro climatically Hamirpur district falls in low hills sub-tropical zone. The winter prevails from November to March, spring in April and May, summer from June to September and transition season from October to November. The minimum temperature in the winter goes up to 4oC and rises to maximum of 34oC in summer. The bijhari watershed which has ben selected for development under the National Watershed Development Project for Rainfed Areas (NWDPRA) falls in the Developmental Block Bijhari, District Hamirpur, comprises of 100 villages of 15 panchayats. The watershed is having arable and non arable lands, grass lands and barren lands, where as there is no area under forest land. The majority of the soils of rainfed hilly tract fall under the antisol and the inceptisol orders. The soils of this tract are shallow and moderately deep with incipient profile development. The texture varies from loamy sand to sandy loam having stony surface. Soils are neutral in reaction (6.5-7.0), available N & P are low and K is medium. Soils have low water holding capacity and susceptible to soil erosion. The soil depth is low to medium with low water holding capacity. With every massive rain, hill transmits huge run off which deepens the gullies & nallahas causing damages to agricultural and grass lnds due to erosion and land slides.

Page 16: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 4 - 

Soil and water conservation including micro scale water resource development is the foundation of any watershed development programme supported by number of other protection, production and livelihood support interventions. This is so because water is the most crucial input and acts as acatalyst to bring in ecological social and economical revolution. Sustainable production depends considerably upon proper development conservation management and use of watershed resource at micro level.watershed management becomes increasingly important as asystem approach to improve livelihood of people while conserving and regenerating their natural resources. The success and sustainability of watershed management will depend upon community participation, which has been widely accepted. The main objective of this project is to develop the natural resource base, sustain its productivity, improve the living standard of farmers and land less labourers and endeavour for restoration of ecological balance.

Page 17: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 5 - 

2. General Description of the Watershed Area Bijhari watershed lies in Bijhari block of district Hamirpur situated between 76o 13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bijhari watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district. Boundaries, Location and Extent The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west, Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 6125 hectares. There are 100 villages under 15 panchayats in the watershed. Physiographic Features

The area is characterised by low hill ranges, intermingled with rivulets and strems. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 18: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 6 - 

Rainfall

District Hamirpur receives sufficient annual rainfall. There are two seasons of rainfall during the year, one from December to March, associated with the passage of western disturbances and the other, which is the main one, extending from middle of June to middle of September, caused by the southwest monsoon. The trend of number of rainy days and the total annual rainfall received in the district w.e.f. 1990-91 to 2006-07 has been presented in Table 1. It can be observed from the table that the pattern of rainfall over the period has been erratic. Highest total rainfall of 2,144 mm was received during 1990-91 and lowest of 1113 mm during 1993-94. The total number of highest rainy days in a year was 110 during 1992-93 followed by 107 during 1994-95. Despite good number of rainy days and total annual rainfall, usually Rabi crops and Kharif crops in some cases face the moisture stress conditions at the critical growth periods, which reduce the yield levels to greater extent. This is mainly due to the uneven distribution to rainfall during the years.Out of the total rainfall 70 percent receive in the month of July August and September only.

Average Annual Rainfall in District Hamirpur, 1990-91 to 2008-09

Year No. of rainy days Total rainfall (mm) 1990-91 99 2144 1991-92 78 1183 1992-93 110 2114 1993-94 97 1113 1994-95 107 1493 1995-96 74 1514 1996-97 81 1304 1997-98 79 1796 1998-99 62 1144 1999-2000 57 1168 2000-01 69 1191 2001-02 57 1187 2002-03 52 1131 2003-04 58 1315 2004-05 60 1392 2005-06 54 1126 2006-07 70 1630 2007-08 - 1448 2008-09 - 1415

Source: Annual Season and Crop Reports, Different Issues, Directorate of Land Records, Government of Himachal Pradesh.

Soils Physiographically, the district can be divided into two tracts i.e rainfed hilly tract and

rainfed and irrigated valley tract. The majority of the soils of rainfed hilly tract fall under the antisol and the inceptisol orders. The soils of this tract are shallow and moderately

Page 19: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 7 - 

deep with incipient profile development. The texture varies from loamy sand to sandy loam having stony surface. Soils are neutral in reaction (6.5-7.0), available N & P are low and K is medium. Soils have low water holding capacity and susceptible to soil erosion. The soils of the rainfed and irrigated valley tract fall under the antisols, inceptisols and alfisos orders. The soils show incipient to moderate profile development. Soil texture varies between loamy sand to clay loam. Soil reaction is neutral and rarely acidic. N and P are low to medium and K is medium. The soil depth is low to medium with low water holding capacity. The soils of some parts of developmental blocks of Sujanpur, Bhoranj, Hamirpur, parts of Bijhari are shallow and have gravels. Forests

The forest area falls under the Hamirpur forest division. For management purpose, the area has been divided into Hamirpur, Aghar, Bijhari, Barsar and Nadaun ranges. In the watershed area, the major tree specie is chil (Pinus roxburghii), which is found as pure as well as chil with scrub forest. These species found in the DPF/UPF as well in the private lands of the people. The major product of chil forest is timber and resin production. Earlier there was provision of TD rights (fuel/timber wood grazing of animals etc) to inhabitants of the villages adjoining to the forest areas. The second economic tree specie found in the watershed area is khair (Acacia catechu). Flora and Fauna

The district has diversified flora in the form of trees, shrubs and grasses. The major trees species found in the district are Acacia catechu (Khair), Grewia optiva, Bauhunia veriegata (Kachnar), Emblica officinalis (Aonla), Bambusa aurandinalis (Bans) Zizyphus zuzuba (Ber), Bombax ceiba (Simbal) Mangifera indica (mango), Ficus carica (Fig), Toona ciliata (Tuni), Syzygium cumini (Jamun) Terminalia chebula (Harar) and Terminalia belerica (Behra). These species found in the forests, private lands and used for providing fuel wood, fodder, timber etc. In addition to these, there are numerous shrubs such as Carissa spinarum, Dodonaea viscosa, Woodfordia fruticosa, Adhatoda, vasica, Murraya koeingi, Zizyphus mauritiana, Vitex negundu, Indigeoferra dosha, Cascutta reflexa and Saccharam sp. The major grass species found in the grassland and pastures of the district are Chrysopogon montanus (Dholoo), Hetropogon contours (Lamloo), Themeda authera (Lunji), Culaliopsis binata (Baggar), Bothriochloa pertusa(Makora. ) Brachiaria multica (Para grass) Aristida sp. and Cynodon dactylon (Doob/Khabbal).The area is also full of wild life centuries ago when the population was sparse and area not so extensively cultivated. With more human interventions in the habitat of wildlife, most of the species are now on decline. Presently, the area has the presence of bagh (leopard), Kakkar (Barking deer), Jackal, Red monkeys, Wild pigs, Seh (Porcupine) and wild rabbit. The wild animal menace especially by monkeys, Kakkar and pigs is becoming alarming problem of the area. Some common birds of the watershed area are Crow, Parrot, Gidh (Vulture), Koel, Neelkant (blue jay), Kala teetar and Peacock.

Page 20: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 8 - 

Demographic Features of Bijhari Watershed Sr. No.

Panchayats No. of House-Holds

Total Population

Male Female Male SC

Female SC

1 Kulehra 335 1679 751 901 157 172 2 Dandwin 241 1168 518 650 98 88 3 Bijhari 660 3140 1488 1652 249 217 4 Balh Bilah 377 1892 866 1026 233 268 5 Sohari 418 1947 876 1071 232 250 6 Barsar 44 234 126 108 27 17 7 Kiara Bagh 331 1706 798 908 279 289 8 Giara Gran 102 469 214 255 57 77 9 Bani 244 1202 561 661 141 154 10 Dhabriana 338 1993 1007 986 179 225 11 Bhakreri 222 1099 539 560 141 124 12 Garli 418 2043 914 1117 134 154 13 Ghangot 253 1164 527 637 169 186 14 Usnar Kalan 319 1762 840 922 133 132 15 Jhanjiani 20 93 46 47 0 0 Total 4322 21591 10071 11501 2229 2353 Land Use

Bijhari watershed extends over an area of 6125 ha. Out of total land in the watershed, cultivated land stood at 2141 ha (24.48%), which was almost totally rainfed. The culturable wasteland accounted for 31.46 per cent of the total area in the watershed. The area under forests on the other land was 23.51 per cent. Area under non-agricultural was 972 ha which comes to around a sixth of the area in the watershed. The area under horticulture is negligible in the watershed area. Panchayat-wise Land Use in Bijhari Watershed (in ha)

Sr. No.

Panchayat

Total Area

Land under Forests

Total Un-irrigated

Culturable Waste

Area under Non Agril. Uses

Area proposed for treatment

1 Kulhera 480 100 149 133 52 380 2 Dandhwin 464 20 147 292 2 444 3 Bijhari 652 164 268 112 111 488 4 Balh-

Bihal 617 179 188 102 259 438

5 Suhari 366 33 259 202 111 333 6 Barsar 119 22 21 11 1 97 7 Kiara 522 129 152 131 56 393

Page 21: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 9 - 

Bagh 8 Giara-

Gran 145 38 0 66 47 107

9 Bani 247 10 71 29 25 237 10 Dhabriana 594 107 114 157 47 487 11 Bhakreri 399 94 48 167 110 305 12 Garli 515 29 207 180 62 486 13 Ghanghot 473 182 82 169 33 291 14 Usnar-

Kalan 514 18 147 215 49 496

15 Jhanjiani 18 0 7 0 7 18 Total 6125 1125 1860 1966 972 5000

Source: Census, 2001

The major proportion (about 95 per cent) of total cropped area in Bijhari block is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. The cropping intensity in the watershed area was estimated to be 184 per cent. Total numbers of agricultural workers are 7518, which amounted to 18.78 per cent of the total population. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area.

Description of total Cultivated Area in Bijhari Watershed Sr.No.

Panchayat

Cultivated Area

Total Cropped Area

Horticulture Area

Total Irrigated Area

Total Agricultural Workers (No.)

1 Kulehra 142 284 0 0 616 2 Dandwin 108 204 0 0 424 3 Bijhari 220 428 1 0 1010 4 Balh Bilah 184 356 0 0 676 5 Sohari 141 275 0 0 954 6 Barsar 193 347 0 0 687 7 Kiara Bagh 153 252 0 0 541 8 Giara Gran 192 343 0 0 492 9 Bani 149 279 0 0 343 10 Dhabriana 103 188 0 0 205 11 Bhakreri 81 144 0 0 396 12 Garli 195 389 0 3 422 13 Ghangot 113 197 0 0 229 14 Usnar Kalan 149 290 0 0 322 15 Jhanjiani 18 18 0 3 201 Total 2141 3994 1 6 7518

Source: Directorate of Economics and Statistics, Govt. of HP

Page 22: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 10 - 

Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects all the 15 panchayats. Of the total households in the area, 65.50 per cent houses have the toilet facilities. As regards the health facilities, there is one community health centre, two primary health centers, two dispensaries, eight health sub-centers and eighteen private clinics available in the area. Resultantly, the infant mortality is very low in the area. There are sufficient educational facilities available in the area. Out of 52 schools in the area, 34 are primary schools, 9 are middle schools, 5 high and 4 senior secondary schools. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 14 tailoring centers and 89 anganwari centers in the catchment area. Panchayat-wise Basic Amenties in Bijhari Watershed

Source: Directorate of Economics and Statistics, Govt. of HP

Sr. No.

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

1 Kulehra 371 1 481 1 1 2 Dandwin 245 1 462 1 1 3 Bijhari 475 1 769 1 1 4 Balh Bilah 290 1 550 1 1 5 Sohari 472 1 525 1 1 6 Barsar 566 1 763 1 1 7 Kiara Bag 196 1 511 1 1 8 Giara Gran 250 1 544 1 1 9 Bani 434 1 543 1 1 10 Dhabriana 211 1 338 1 1 11 Bhakreri 208 1 288 1 1 12 Garli 487 1 595 1 1 13 Ghangot 258 1 418 1 1 14 Usnar Kalan 323 1 462 1 1 15 Jhanjiani 326 1 526 1 1 Total 5112 15 7775 15 15

Page 23: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 11 - 

Description of Health Facilities in Bijhari Watershed

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Bijhari Watershed

Sr

Panchayat

Primary Middle High Sr. Secy

Tailoring Centre

Aganwari Centres

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

1 Kulehra 2 0 0 1 1 5 0 1 1386 2 Dandwin 1 1 0 0 1 4 0 0 1681 3 Bijhari 3 0 1 1 0 5 0 2 2994 4 Balh Bilah 2 2 0 0 1 7 0 0 2358 5 Sohari 2 0 1 0 1 5 0 0 2236 6 Barsar 3 0 1 0 1 9 0 0 2945 7 Kiara Bagh 2 1 0 0 1 8 0 0 1828 8 Giara Gran 3 1 0 1 1 7 0 1 2063 9 Bani 3 1 0 1 1 5 0 0 2321 10 Dhabriana 2 1 0 0 1 5 0 0 1504 11 Bhakreri 1 0 0 0 1 4 0 0 1126 12 Garli 3 0 1 0 1 7 0 0 1995 13 Ghangot 2 0 1 0 1 6 0 0 1417 14 Usnar Kalan 2 1 0 0 1 5 0 0 1837 15 Jhanjiani 3 1 0 0 1 7 5 0 2501 Total 34 9 5 4 14 89 5 4 30192

Source: Directorate of Economics and Statistics, Govt. of HP

Sr. No. Block/Panchayat

*CHC *PHC *Dispensary *Sub Center

*Private Clinic

**Dispensary

1 Kulehra 0 0 1 0 0 0 2 Dandwin 0 0 0 0 1 0 3 Bijhari 0 1 0 0 3 1 4 Balh Bilah 0 0 0 1 2 0 5 Sohari 0 1 0 0 0 0 6 Barsar 1 0 0 0 2 0 7 Kiara Bag 0 0 0 0 0 0 8 Giara Gran 0 0 0 1 3 0 9 Bani 0 0 0 1 1 0 10 Dhabriana 0 0 0 2 0 0 11 Bhakreri 0 0 0 0 1 0 12 Garli 0 0 0 1 2 0 13 Ghangot 0 0 0 1 2 0 14 Usnar Kalan 0 0 0 1 1 0 15 Jhanjiani 0 0 1 0 0 0 Total 1 2 2 8 18 1

Page 24: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 12 - 

Check dam details for Hamirpur DPR Block Bijhari

Panchayats Longitude Latitude Ghangot Kalan 76030’44.64"E 31029’44.64"N

76031’0.48"E 31029’0.48"N 76031’14.16"E 31030’14.16"N

Bal Bihal 76033’16.92"E 31031’16.92"N Dabriana 76029’544.2"E 31032’544.2"N

76029’0.96"E 31018’0.96"N 76029’37.32"E 31032’37.32"N

Bhakreri 76027’44.64"E 31032’44.64"N Garli 76039’46.8"E 31031’46.8"N

76031’3.72"E 31031’3.72"N 76030’7.92"E 31030’7.92"N 76030’2.52"E 31030’2.52"N 76030’10.44"E 31030’10.44"N

Suhari 76030’58.32"E 31032’58.32"N 76031’0.48"E 31032’0.48"N 76030’54.72"E 31032’54.72"N

Bani 76028’4.08"E 31032’4.08"N 76027’57.24"E 31032’57.24"N 76027’43.56"E 31032’43.56"N 76027’29.88"E 31032’29.88"N

Bijahri 76031’59.52"E 31031’59.52"N 76031’47.28"E 31031’47.28"N 76031’32.52"E 31031’32.52"N

Jhanjiani 76038’578.4"E 31028’578.4"N Kulhera 76031’44.76"E 31033’44.76"N

76039’115.2"E 31033’115.2"N 76032’20.04"E 31093’20.04"N

Badsar 76025’57.72"E 31031’57.72"N Kiara Bag 76030’45.72"E 31032’45.72"N Usnar Kalan 76029’22.56"E 31029’22.56"N

76029’9.96"E 31030’9.96"N 76029’594.6"E 31030’594.6"N 76029’56.76"E 31030’56.76"N

Page 25: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 13 - 

Page 26: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 14 - 

Critical Gaps Worked Out in Major Crops

On the basis of PRJA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed

Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed

Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time Mid October- Mid November

Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F

Page 27: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 15 - 

11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed

Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated

Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 28: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 16 - 

Crop: Cauliflower Farming Situation: Irrigated Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed

Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P

Page 29: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 17 - 

Crop: Colocasia Farming Situation: Rain fed Sr. No.

Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap

Page 30: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 18 - 

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. SWOT Analysis for Improving Agriculture and Allied Sectors

Strengths Natural Resources

• Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. • The topography of area is moderately hilly and undulating which makes the soil of

the district well drained • Soil conservation and rainwater harvesting activities have been undertaken by the

Department of Agriculture in some parts. • Climatic conditions of the district are relatively moderate which offer good scope

of rearing wide range of livestock and poultry species. • About 35 per cent of the total geographical area is under pastures/grass lands/waste

land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

• The forest areas, common lands, river beds and neglected pieces of private lands are full of obnoxious weeds which can be utilized for the production of vermi-compost by the farmers.

Agriculture • Land use system of the area indicates ample scope for diversification. • The agro-climatic situations are suitable for the cultivation of cereals, pulses,

oilseeds and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

• More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

• In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

• Farm yard manure is being used in case of maize cultivation. • Scientific weed management practices in maize, paddy and wheat are being

followed by about 40 per cent of the farmers

Page 31: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 19 - 

• Although broadcasting is the major method of seed sowing in case of maize and wheat yet about 30 per cent farmers use kera (broadcasting method).

Horticulture • The mushroom growing activities can be undertaken throughout the year due to

availability of raw material and high demand in the market • Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus

which can be used for the production of variety of value added products. • The medicinal plants such as harad, bahera and amla can also be grown

successfully on marginal and sub-marginal lands. Animal Husbandry • Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. • Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop

residues, weeds and fodder crops supply the dry/green fodder for rest of the year. • Improved sticks of grasses and nursery of fodder trees are available with many

departments like SAUs/KVK/Farmers for improvement of grass lands and pastures. • The climatic conditions are suitable for rearing of cows and buffaloes successfully.

o Veterinary clinical services are available within 10 km distance in the district. o Markets for milk and milk products are available in the local areas. The

procurement of milk from rural areas is also being done by the milk federation.

o Intensive Dairy Development Project is in operation in the district for breed improvement, dissemination of better management practices and commercialization of the activities.

o Credit facilities are available in the district under different departmental and credit institutional schemes.

o Good scope of poultry enterprise especially broiler as the population of small ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

o Good coverage of artificial insemination programme in the district for breed improvement.

Others The availability of vast pasture lands, wide spread reasonable network of veterinary

health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

• The literacy level in the district is higher as compared to other parts of the statehelping in the general awareness and acceptability of the improved technologies responsive.

• Retired military personnel and educated un-employed youth having entrepreneurial ability are available.

Page 32: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 20 - 

Weaknesses Natural Resources

• The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

• The soils are generally shallow with poor water holding capacity. The soils in the development block Bijhari is gravely.

• The sloppy landscape causes quick run-off of rain water due to which ground water recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

• Poor management of natural resources by the beneficiaries. • Scanty/poor vegetative cover on the forest/common lands.

Agriculture • Farmers use higher seed rate as compared to the recommendation of the CSK

HPKV which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

• More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

• Lack of awareness among the farmers about the integrated crop management practices.

• More than 95 per cent of net area sown is rain fed. • The average size of land holding is small (0.6 ha) and scattered. • Erratic rainfall leading to moisture stress during different stages of crop growth in

summer and winter months • Method of preparation and application of FYM is unscientific. The available bio-

mass in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

• Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

• The fields are small which restrict the proper use of mechanized farm implements. • Non-availability of basic farm equipments and tools like spray pumps and

manually operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Horticulture

• Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

• The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Page 33: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 21 - 

• Lack of grafting, training and pruning skills of different fruits plants among the farming community.

• The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

• Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

• Lack of knowledge about the insect, pest and disease management in fruit crops. • Lack of knowledge about the grading and proper packing of fruits.

Animal Husbandry o Non availability of green fodder throughout the year. o Preference of natural service with local bulls in case of buffaloes as success

rate of artificial insemination is low. o A large proportion of cattle and buffaloes in the district are non-descriptive

and low yielders. o Although the maintenance and per unit milk production cost is lower in case of

cattle yet farmers prefer rearing buffaloes over cows. o Farmers use local/indigenous wisdom for cure of diseases rather than seeking

proper clinical diagnosis and treatment. o Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

o Non-adoption of deworming and vaccination schedule.

• Lack of awareness about the scientific storage/preservation methods of green fodder and storage for lean periods.

• Inability/unwillingness of farmers to transport their diseased animals to hospital/dispensary due to hilly tract in some parts of the district.

Others • Migration of rural youth to urban areas and preference to jobs other than agriculture • Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. • Market facility are not adequate

Opportunities Natural Resources • Area is suitable for planting improved grasses, fodder and timber trees • Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. • Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. • Plenty of scope for rain water harvesting during rainy season which can be used as life

saving irrigation for plantation and high value cash crops.

Page 34: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 22 - 

• Broad leaved fodder/timber trees plantation can replace the pine trees to augment fodder supply and reduce fire hazards

Agriculture • Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

• Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

• The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

• Recommendations available for the control of major insect, pest and diseases. • Intensive crop production is possible in lower portions of the district Horticulture • The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied

and upgraded for more productivity. • The climatic conditions of area are congenial for the production of mushroom

throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

• The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Animal Husbandry • Huge demand of milk, meat and eggs in local and distant markets.

o Incentives for establishment of dairy, poultry and fishery units are available.

• The abundant availability of green fodder in kharif/rainy season can be utilized to address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

• Scope for improving pastures through planting of quality grasses and fodder plants. Others • New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

• Scope of organic farming of cereals and pulses. • Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats • Due to the hilly and sloppy topography and high intensity rains and lack of proper soil

and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

• Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

Page 35: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 23 - 

• There are wild animals especially Monkeys, Sambars and Pigs, causes havoc to the cultivated crops.

• Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

• Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

• Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

• Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

• Increasing cases of infertility in cattle causing stray animal menace 3.2 Issues Emerging out of SWOT Analysis • Preference of white collar jobs among educated rural youth. • The productivity of existing crops and livestock need to be improved. • Need for strengthening the soil and water conservation activities at farmers as well as

public level. • Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. • Improvement of local germ-plasm of maize to make it resistant to lodging. • Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. • Improver spacing, pit size, fertilization in fruit plantations. • Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

• Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

• Lack of awareness of the latest agricultural and allied technologies. • Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. • Prevalence of malpractices by traders in marketing of produce. • Preference for rearing of buffaloes over cattle due to taste factor. • Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. • Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. • Preference of natural service by local bull over artificial insemination.

Needs of the People

Enhancement of the Food Production: Enhance the productivity so that the area becomes self sufficient in food grains and

other needs like fuel fodder and timber. Create income-generating opportunities through diversification. Reverse the degradation process to achieve eco balance through sustainable land

and water use.

Page 36: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 24 - 

Sr. No.

Crops Issues Activities

1 Maize Balanced use of fertilizers, IDM, IPM and Plant Population

Field trials to be laid to demonstrate the use of NPK and micronutrients, IDM, IPM and spacing.

2 Wheat Yield reduction due to loose smut and yellow rust

Field trials to be laid out to demonstrate methods of seed treatment and effect of seed treatment with different fungicides on crop yield

3 Toria Improper plant population due to broadcast method of sowing

Field trials to be laid out to demonstrate effect of line sowing on yield of toria crop.

4 Oil seeds & Pulses Popularization of cultivation of Oil seeds & Pulses during rabi and kharif season

Field trials to be laid out to demonstrate for successful cultivation of Oil seeds & Pulses. Mash, Gram, Til, Lentil & Arhar

5 Vegetables Commercial cultivation under polyhouses and open fields.

Field trials to be laid out to demonstrate for successful cultivation of Vegetables and on IDM & IPM under field conditions and Polyhouses.

6 Organic Farming Popularization of Vermicompost

Training and demonstration to the farmers on the methods of preparation of Vermicompost and other organic composts. Integrated disease, pest and nutrient management

7

Control of obnoxious weeds

Eradication of obnoxious weeds from farmers cultivated fields and Grasslands

Field trails through different organic and chemical methods to eradicate the obnoxious weeds

8 Animals husbandry Unbalanced feeding and Disease management

Training and demonstration to the farmers on balanced feeding and disease management to improve milk yield

9 Horticulture, medicinal and aromatic plants

Less area under production of fruit crops and medicinal plants

Field trials to be laid out to demonstrate for successful cultivation of fruit crops and medicinal plants through improved cultivars/varieties

10 Establishment of Nurseries for planting material

Negligible in watershed area Establishment of Nurseries in order to provide different planting material to the farmers of watershed area and to improve pasture lands

Page 37: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 25 - 

Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact Walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

Page 38: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 26 - 

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 39: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 27 - 

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

Page 40: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 28 - 

4. Water Harvesting

Consolidated Village Wise Works of Balh Bihal Micro Watershed

Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Behal Well Open

Sink type of 2.4 m dia and 3 m deep 93380 93380 -

Check Dam 8mx(2m+1m)/ 2mx2m and No.

72283 72283 -

Check dam stone & wire crated (Spur 156400 103137 53263

Total 322063 268800 53263

Aghwin upperly

Check dam stone & wire crated (Spur 163520 100800 62720

Total 163520 100800 62720

Aghwin Buuerly

Well OpenSink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 175944 98924 77020

Total 194620 117600 77020

Balh Patlian Check dam stone & wire crated (Spur 267273 243600 23673

Total 267273 243600 23673

Chaloli

Well Open Sink type of 2.4 m dia and 3 m deep

37352 37352

Check dam stone & wire crated (Spur) 119534 63448 56086

Total 156886 100800 56086

Balh Brahmana

Pacca tankRCC 5mx4mx1m

311322 - -

Well OpenSink type of 2.4 m dia and 3 m deep

56028 - -

Total 367350 310800 56550 Jangal Well OpenSink type of 2.4 m dia and 3

m deep 18676 18676

Check dam stone & wire crated (Spur) 119534 107324 12210 Total 138210 126000 12210 Chat pahl Chahar

Pacca tankRCC 5mx4mx1m

103774 103774 -

Well OpenSink type of 2.4 m dia and 3 m deep

103774 103774 -

Total 122450 122450 - Mathohal

Well Open Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Page 41: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 29 - 

Check dam stone & wire crated (Spur) 236830 197848 38982 Total 274182 235200 38982 Padian

Check dam stone & wire crated (Spur) 169310 151200 18110

Total 169310 151200 18110 Kot Well Open Sink type of 2.4 m dia and

3 m deep 149408 149408 -

Check dam stone & wire crated (Spur) 1037530 908211 129319 Bore well

200mmx150mmat 70m depth 295301 177181 118120*( farmers

share) Total 1482239 1234800 129319 +118120

( farmers share) Pairwin

Check dam stone & wire crated (Spur) 691859 638400 53459

Total 691859 638400 53459 Grand Total 3245600 2818850 308630 +118120

( farmers share) Bani micro watershed

Consolidated village wise works Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Bani Khas Pacca tank 5mx4mx1m

103774 103774

Check Dam RCC with cement plaster

108432 108432

Check dam stone & wire crated (Spur)

200383

132194 68189

Total 412589 344400 68189 Karwin Well Open

Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Babri 19353 19353 - Check dam stone & wire

crated (Spur) 244372

213971 30401

Total 282401 252000 30401 Kuthera Check Dam RCC with

cement plaster 54216 54216 -

Check dam stone & wire crated (Spur)

43986 29784 14202

Total 98202 84000 14202 Mangroli Check dam stone & wire

crated (Spur) 185721 176400 9321

Total 185721 176400 9321 Thana Pacca tank 5mx4mx1m 207548 207548 - Check Dam RCC with

cement plaster 90677 90677 -

928714 835775 92939 Total 1226939 1134000 92939 Grand Total 2205852 1990800 215052

Page 42: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 30 - 

Barsar micro watershed Consolidated village wise works

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Jabbal kheri Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Hand Pump 101541 101541 Tube- Well* 177181** 177181 Check Dam 6m(2m+1m)/

2mx2m and No. 54216 54216

Check dam stone & wire crated (Spur 117306 48090

69216

Total 884016 814800 69216 Bhakreri micro watershed Consolidated village wise works

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Baggi Check dam stone & wire crated (Spur

293244 260400 32844

Total 293244 260400 32844 Rahil Check dam stone & wire

crated (Spur 112410 100800 11610

Total 112410 100800 11610 Bhakreri Check Dam 6m(2m+1m)/

2mx2m and No. 54216 54216 -

Check dam stone & wire crated (Spur

625590 592584 33006

Total 679806 646800 33006 Kowa Check dam stone & wire

crated (Spur 136846 136846 Nil

Total 136846 136846 Nil Makteri

Check dam stone & wire crated (Spur

520756 478800 41956

Total 520756 478800 41956 Jathunda Pacca tank RCC

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

532735 532735 -

Total 655185 655185 - Grand Total 2398247 2278831 119416

Page 43: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 31 - 

Bijhari micro watershed Consolidated village wise works

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Patta Nathu

Check dam stone & wire crated (Spur

112420 75600 36820

Total 112420 75600 36820 Tikkar

Check dam stone & wire crated (Spur

117300 117300 Nil

Total 117300 117300 Nil Ambota

Check dam stone & wire crated (Spur

488750 120000 68750

Total 488750 120000 68750 Bhawanee

Check dam stone & wire crated (Spur

156400 117600 38800

Total 156400 117600 38800 Garari

Check dam stone & wire crated (Spur

215050 201600 13450

Total 215050 201600 13450 Lakho

Check dam stone & wire crated (Spur

454560 403200 51360

Total 454560 403200 51360 Narghol Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

195500

182924 12576

Total 214176 201600 12576 Bijahri

Pacca tankRCC 5mx4mx1m

207548 207548 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Tube well 295301 177181 118120* Check dam stone & wire

crated (Spur 1964525 1941595 225930

Total 2367930 2142000 225930 Baghed Check dam stone & wire

crated (Spur) 183300

Fencing 150440 Total 333740 277200 56540 Grand Total 4460326 3656100 504226

Page 44: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 32 - 

Dhabriana micro watershed Consolidated village wise works Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Ganoh Rajputan

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur 415018 409726 5292 Total 433694 428400 5394 Ganoh Brahmna

Pacca tankRCC 5mx4mx1m

207548 207548

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur 146620 84566 62054 Total 893654 831600 62054 Dhabriana

Pacca tankRCC 5mx4mx1m

207548 207548

Check Dam 6m(2m+1m)/ 2mx2m and No. 54216 54216 -

Check dam stone & wire crated (Spur 755595 645436 110159 Total 1017359 907200 110159 Langheree

Check Dam 10m(2m+1m)/2mx2m 90677 90677

RWHT(2mx2mx1m) 134545 134545 Check dam stone & wire crated (Spur 146620 102378 44242 Total 371842

327600 44242

Neri RWHT(2mx2mx1m) 349817 349817 Check dam stone & wire crated (Spur 117296 78583 38713 Total 467113 428400 38713 Loharda Pacca tankRCC

5mx4mx1m 311322 311322

RWHT(2mx2mx1m) 269090 269090 Tube well of 200mm x 150 mm size at 70 m

depth 295301 354361 236241(

farmers share) Check Dam 10m(2m+1m)/2mx2m 90677 90677 - Check Dam 6m(2m+1m)/2mx2m 54216 54216 - Check dam stone & wire crated (Spur 195500 87934 107566 Total 1275166 1167600 107566 Grand Total 4458828 4090800 368128 Dhandwin micro watershed Consolidated village wise works Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Paplah Hazaru

Pacca tank 5mx4mx1m

311322 311322 -

Check dam stone & wire crated 268820 251478 17342 Total 580142 562800 17342 Sariana Well Open

Sink type of 2.4 m dia and 3 m deep37352 37352 -

Check dam stone & wire crated 711806 634948 76858

Page 45: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 33 - 

Village Particulars Total Cost IWMP Budget

Convergence (MNREGA)

Total 749158 672300 76858 Paploh Brahmana

Check dam stone & wire crated (Spur) and fencing

799400

722400 77000

Total 799400

722400 77000

Baryan Pacca tank 5mx4mx1m

207548 207548 -

Check dam stone & wire crated 39100 19252 19848 Total 246648 226800 19848 Kachwin Pacca Tank

5mx4mx1m 103774 103774

Check dam stone & wire crated 579184

534626 44558

Total 682958 638400 44558 Dadwin Pacca Tank

5mx4mx1m 207548 207548

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check dam stone & wire crated (Spur 310366

284615 25751

Bore well 200mmx150mmat 70m depth

354361 354361

Total 890951 865200 25751 Sugal Check dam stone & wire crated (Spur 58650 42000 16650 Total 58650 42000 16650 Grand Total 4007907 3729900 278007 Garli micro watershed Consolidated village wise works Village Particulars Total Cost IWMP Budget Converge

nce (MNREGA)

Bhanan RWHT(2mx2mx1m) 80727 75600 4627 Total 80727 75600 4627 Manhan Check dam stone & wire crated (Spur 97750 84000 13750 Total 97750 84000 13750 Bahina Check dam stone & wire crated (Spur 224840 201600 23240 Total 224840 201600 23240 Mohlwin Check dam stone & wire crated (Spur 140406 126000 14406 Total 140406 126000 14406 Sarla Check dam stone & wire crated (Spur 466546 436800 24746 Total 466546 436800 24746 Kotlu RWHT(2mx2mx1m) 80727 80727 Pacca tankRCC

5mx4mx1m 207548 207548

Check dam stone & wire crated (Spur 169740

81325 88415

Total 458015 369600 88415 Garli khas RWHT(2mx2mx1m) 53818 53818

Page 46: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 34 - 

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704

Hand pump 203082 203082 Check Dam 8m(2m+1m)/2mx2m 216849 216849 Check dam stone & wire crated (Spur 326140

266320 59820

874593 814800 59820 Total 814827 59793 Dhuma Check dam stone & wire crated (Spur 149080

109200 39880

Total 149080

109200 39880

Mattkar RWHT(2mx2mx1m) 53818 53818 Check dam stone & wire crated (Spur 175950 156182 19768 Total 229768 210000 19768 Khazian Pacca tankRCC

5mx4mx1m 207548 207548

RWHT(2mx2mx1m) 26909 26909 Hand pump 101541 101541 Check Dam 8m(2m+1m)/2mx2m 73283 73283 Check dam stone & wire crated (Spur 1396644 1245519 151125 Total 1805925 1654800 151125 Grand total 1468284 1293600 169184 Ghangotkalan micro watershed Consolidated village wise works Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Ghangot Kalan Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check Dam 6m(2m+1m)/2mx2m 54216 54216 Check Dam

8m(2m+1m)/2mx2m 72283 72283

Check dam stone & wire crated (Spur 527880 456129 71751 Total 1088151 1016400 71751 Dhakyana Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676

Check Dam 6m(2m+1m)/2mx2m 54216 54216 Check dam stone & wire crated (Spur 109980 86708 23272 Total 182872 159600 23272 Badhu Check dam stone & wire crated (Spur 73320 67200 6120

Page 47: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 35 - 

Total 73320 67200 6120 Gutiana Fencing 375830 376100 270 Total 375830 376100 270 Ghangot Khurd Fencing 300880 300880 Check dam stone & wire crated (Spur)

6mX1.25mX2.5m 73320 73320

Total 374200 374200 Nil Grand Total 2094373 1993500 101413 Giaragran micro watershed Consolidated village wise works Villages Structure/work Activities to be undertaken Check Dam

8mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Masalan kalan

1 Dub Khad (Dadol) 72283 72283 - Irrigation of 30 kanal area

Total 72283 72283 -

Villages Structure/work No. Activities to be undertaken

Maslan kalan

Check dam stone & wire crated (Spur)

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

6mx1.25mx2.5mm 2 Community based Barla nalah

-

6mx1.25mx2.5mm 12 Karnala Nalh -

Total 14 513240

Jhanjiani micro watershed Consolidated village wise works Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Gandak Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur)

83086

73724 9362

Total 101762 92400 9362 Kohlari Well Open

Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Check dam stone & wire crated (Spur)

29324 21448 7876

Total 66676 58800 7876 Grand Total 168438 151200 17238

Page 48: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 36 - 

Kiara bag micro watershed Consolidated village wise works Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Kohdra Pacca tank 5mx4mx1m

207548 162783 44765

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Handpump 101541 101541 - Check dam stone & wire crated (Spur 78200 78200 - Total 405965 361200 44765 Badloi Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

56028 56028

Check dam stone & wire crated (Spur 183300 134198 49102 Total 343102 294000 49102 Baghed Pacca tank

5mx4mx1m 103774 103774 -

Check dam stone & wire crated (Spur 192854 148226 44628 Total 296628 252000 44628 Pelehra Pacca tank 5mx4mx1m 103774 103774 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Check dam stone & wire crated (Spur 200386 196750 3636 Total 322836 319200 3636 Kharota Pacca tank 5mx4mx1m 103774 103774 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676

Handpump 203082 203082 - Check dam stone & wire crated (Spur 205290 186868 18422 Total 530822 512400 18422 Desen Well Open

Sink type of 2.4 m dia and 3 m deep 74704 74704 -

Handpump 101541 101541 - Check dam stone & wire crated (Spur 233950 176555 57395 Total 410195 352800 57395 Kheri Well Open

Sink type of 2.4 m dia and 3 m deep 74704 74704 -

Check dam stone & wire crated (Spur 466126 420896 45230 Total 540830 495600 45230 Sunwin Rajputtan

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check dam stone & wire crated (Spur 183300 143696 39604 Total 258004 218400 39604 Sunwin Brahmana

Kuhal 203820 193200 10620

Total 203820 193200 10620 Kohlwin Check dam stone & wire crated (Spur 183200 176400 6800 Total 183200 176400 6800

Page 49: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 37 - 

Village Particulars Total Cost IWMP Budget

Convergence (MNREGA)

Kiara Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 78200 48524 29676 Total 96876 67200 29676 Bagg Check dam stone & wire crated (Spur 59767 58800 967 Total 59767 58800 967 Grand Total 3652045 3301200 350845 Kulehra micro watershed Consolidated village wise works Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Karha, Lahri Ghumara & Lahri Tarkhana

Check dam stone & wire crated (Spur

532328 428400 103928

Total 532328 428400 103928 Dagwar Check dam stone & wire

crated (Spur 884764 882000 2764

Total 884764 882000 2764 Changar Check dam stone & wire

crated (Spur 918591 865200 53391

Total 918591 865200 53391 Sulhari

Check dam stone & wire crated (Spur

488742 369600 119142

Total 488742 369600 119142 Sunhani Check dam stone & wire

crated (Spur 219960 193200 26760

Total 219960 193200 26760 Tangar

Check dam stone & wire crated (Spur 337232

262123 75109

Check Dam 10m(2m+1m)/ 2mx2m

90677 90677

Total 427909 352800 75109 Grand Total 3472294 3091200 381094 Sohari micro watershed

Consolidated village wise works Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Duggyar Pacca tank 5mx4mx1m 26909 26909 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Babri 19353 19353 - Check dam stone & wire crated (Spur 464305 439062 25243 Total 529243 504000 25243 Barla Well Open

Sink type of 2.4 m dia. and 3 m deep 37352 37352 - RWHT(2mx2mx1m) 26909 26909 -

Page 50: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 38 - 

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Babri ( 2mx1.2mx0.9m) 38706 38706 Check dam stone & wire crated (Spur 430096 350633 79463 Total 533063 453600 79463 Sohari RWHT(2mx2mx1m) 26909 26909 - Check Dam 8mx(2m+1m)/

2mx2m and No. 72283 72283 - Check Dam 6m(2m+1m)/

2mx2m and No. 54216 54216 - Check dam stone & wire crated (Spur 615804 468192 147612 Total 769212 621600 147612 Magnoti Pacca tank 5mx4mx1m 26909 26909 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Bore well 200mmx150mmat 70m depth 354360 354360

Check Dam 6m(2m+1m)/ 2mx2m and No. 108432 108432 -

Check dam stone & wire crated (Spur 471656 289623 182033 Total 980033 798000 182033 Ghulera Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Fencing 451320 401324 49996 Total 469996 420000 49996 Grand Total 3281547 2797200 484347 Usnar kalan micro watershed Consolidated village wise works Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Jajal Check dam stone & wire crated (Spur 268806 243600 25206 Total 268806 243600 25206 Ghatta Panga Check dam stone & wire crated (Spur 227347 210000 17347 Total 227347 210000 17347 Narkar Pacca tank 5mx4mx1m 207548 207548 Check dam stone & wire crated (Spur) 219934 170452 49482 Total 427482 378000 49482 Usnar Khurd Pacca tank 5mx4mx1m 207548 207548 Well Open Sink type of 2.4 m dia and 3 m deep 18676 18676 Check dam stone & wire crated (Spur) 29244 8776 20468 Total 255468 235000 20468 Usnar Kalan Pacca tank 5mx4mx1m 311322 311322 Well Open Sink type of 2.4 m dia and 3 m deep 74704 74704 - Check Dam 10mx(2m+1m)/2mx2m and No. 90677 90677 Check Dam 6m(2m+1m)/

2mx2m and No. 54210 54210 Check dam stone & wire crated (Spur) 68424 23484 44940 Total 599337 554397 44940 Chukhiniar Handpump 101541 101541

Page 51: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 39 - 

Village Particulars Total Cost IWMP Budget Convergence (MNREGA)

Check dam stone & wire crated (Spur) 205268 167259 38009 Total 306809 268800 38009 Gurya Khurd Handpump 101541 101541 Check dam stone & wire crated (Spur) 117296 100059 17237 Total 218837 201600 17237 Gurya Kalan Pacca tank 5mx4mx1m 311322 311322 - Well Open Sink type of 2.4 m dia and 3 m deep 18676 18676 Handpump 203082 203082 Check dam stone & wire crated (Spur) 439870 416120 23750 Total 972950 949200 23750 Nara Handpump 101541 101541 Well Open Sink type of 2.4 m dia and 3 m deep 74704 74704 Check Dam 6m(2m+1m)/ 2mx2m and No. 54216 54216 Check dam stone & wire crated (Spur) 1063911 835139 168772 Total 1294372 1125600 168772 Grand Total 4571408 4166197 405211

Page 52: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 40 - 

6. Agriculture, Horticulture and Animal Husbandry Bal-bihal

Village Intervention Area Cost involved (Rs.)

I II III IV V

Agwin upper & bulhy, balh patian and chaloli

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ rs. 40000/ha

20000 - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ rs.45000/ha

- 22500 - -

Total 45500 20000 22500 - -Balh brahmana, jangal and chatpahl

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ rs. 40000/ha

40000 - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ rs.45000/ha

- 45000 - -

Total 62500 40000 22500 Behal , mathohal and padian

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ rs. 40000/ha

40000 - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ rs.45000/ha

- 22500 - -

Total 62500 40000 22500 - -Kot Provision of improved

inputs (viz., seeds, fertilizers, pesticides andtools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ rs. 40000/ha

40000 40000 - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

2 ha 90000/- @ rs.45000/ha

- 45000 45000 -

Total 170000 40000 85000 45000 Pairwin Provision of improved

inputs (viz., seeds, fertilizers, pesticides and

1 ha 40000 @ rs. 40000/ha

40000 - -

Page 53: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 41 - 

Village Intervention Area Cost involved (Rs.)

I II III IV V

tools ) for demonstration in cereals, pulses and oilseeds

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ rs.45000/ha

- 22500 - -

Total 62500 40000 22500 - -Grand Total 403000 180000 175000 450000

Horticulture Village Intervention Area Cost involved

(rs) I II III IV V

Agwin upper & bulhy, balh patian and chaloli

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 - - 20000 - - Balh brahmana, jangal and chatpahl

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Behal , mathohal and padian

Diversification towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Kot Diversification

towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 -

Total 1ha 40000 40000 Pairwin Diversification

towards drought/frost tolerant fruit plants

1 ha 40000 40000

Total 1ha 40000 40000 Grand Total 160000 160000

Animal husbandry

Village Intervention Animal Cost involved (rs)

I II III IV V

Agwin upper & bulhy, balh patian and chaloli

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 - - - Balh brahmana, jangal and chatpahl

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 - - - Behal , Demonstration to the 5 10000 - 10000

Page 54: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 42 - 

Village Intervention Animal Cost involved (rs)

I II III IV V

mathohal and padian

farmers on balanced feeding and disease management to improve milk yield

Total 10000 - 10000 - Kot Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

100 7400 - 7400

Total 37400 37400 Pairwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Control of endo and ecto parasites

85 6600 - 6600

Total 26600 - 26600 Grand total 94000 94000

Total budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 403000 2. Horticulture 160000 3. Animal husbandry 94000 Grand total 657000

Bani

Village Intervention Area Cost involved (rs)

I II III IV V

Bani khas Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ rs. 40000/ha

20000 - - -

Total 20000 20000 - - -Karwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ rs. 40000/ha

20000 -

Total 20000 20000 - - -Kuthera and mangroli

Provision of improved inputs (viz., seeds, fertilizers,

0.5 ha 20000 @ rs. 40000/ha

20000 - - -

Page 55: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 43 - 

Village Intervention Area Cost involved (rs)

I II III IV V

pesticides and tools ) for demonstration in cereals, pulses and oilseeds

Total 20000 20000 - - -Thana Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1.5 ha 69800 @ rs. 40000/ha

40000 29800 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ rs.45000/ha

- 22500 22500 - -

Total 114800 40000 22500 22500 - -Grand Total

174800 100000 52300

22500 - -

Horticulture

Village Intervention Area/no. Cost

involved (rs)I Ii Iii Iv V

Bani khas

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Karwin Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kuthera and mangroli

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Thana Diversification

towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand total

2.5 100000

- - 100000 - -

Page 56: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 44 - 

Animal husbandry:

Village Intervention Animals Cost involved

(rs) I II III IV V

Bani khas

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Karwin Control of endo

and ecto parasites

100 7400 - 7400

Total 7400 - 7400 Kuthera and mangroli

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

3 5900 - 5900

Total 5900 - 5900 Thana Demonstration

to the farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 47400 - 47400 Grand Total 80700 80700

Activity Total budget Agriculture 174800 Horticulture 100000

Animal husbandry 80700 Grand total 355500

Barsar

Village Intervention Area Cost involved (Rs)

I II III IV V

Jabbal Kheri

Provision of improved inputs (viz., seeds, fertilizers, pesticides and

1 ha 40000 @ Rs. 40000/ha

- 40000 - -

Page 57: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 45 - 

Village Intervention Area Cost involved (Rs)

I II III IV V

tools ) for demonstration in cereals, pulses and oilseeds

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 22500 62500 - - -

Horticulture Village Intervention Area Cost involved

(Rs) I II III IV V

Jabbal Kheri

Diversification towards drought/frost tolerant fruit plants

1.0 ha 40000 - - 40000 - -

Total 0.5ha 40000 40000

Animal Husbandry Village Intervention Area Cost involved

(Rs)I II III IV V

Jabbal Kheri

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20500 - - 10000 10500 -

Total 10 20500 - - 10000 10500

Activity Total budgetAgriculture 85000 Horticulture 40000

Animal husbandry 20500 Grand Total 145500

Bhakreri Village Intervention Area Cost involved

(Rs)I II III IV V

Baggi Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Page 58: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 46 - 

Village Intervention Area Cost involved (Rs)

I II III IV V

cereals, pulses and oilseeds

Total 20000 20000 - - - Bhakreri Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 62500 - - - Kowa Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 0.5 20000 20000 - - - Makteri Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 62500 - - - Jathunda Provision of

improved inputs (viz., seeds, fertilizers, pesticides and

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Page 59: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 47 - 

Village Intervention Area Cost involved (Rs)

I II III IV V

tools ) for demonstration in cereals, pulses and oilseeds

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45500/- @ Rs.45500/ha

- 45500 - - -

Total 85500 85500 Grand Total 250500 Horticulture Village Intervention Area Cost

involved (Rs)

I II III IV V

Bhakreri Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Makteri Diversification

towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Jathunda Diversification

towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand Total 100000 100000 Animal Husbandry Village Intervention Animals Cost involved

(Rs)I II III IV V

Baggi Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Kahil Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 3700 - 3700

Total 13700 - 13700 Bhakreri Demonstration to the

farmers on balanced feeding and disease

10 20000 - 10000 10000

Page 60: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 48 - 

Village Intervention Animals Cost involved (Rs)

I II III IV V

management to improve milk yield

Total 20000 - 10000 10000 Kowa Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Makteri Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 25000 - 25000 -

Total 25000 25000 Jhatunda Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 8800 - 8800 -

Total 8800 8800 Grand Total 107000 107000

Sr. No. Activity Total budget1. Agriculture 250500 2. Horticulture 1000003. Animal husbandry 107500 Grand Total 457500Bijhari

Village Intervention Area Cost involved (Rs)

I II III IV V

Patta Nathu and Tikkar

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 20000 20000 - - - Ambota Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 Bhawanee and Garari

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Page 61: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 49 - 

oilseeds Total 20000 20000 - - - Lakho Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 - - -Narghol and Baghed

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 1.0 42500 20000 22500 Bijhari Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

3 ha 120000 @ Rs. 40000/ha

40000 40000 40000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

4 ha 180000/- @ Rs.45000/ha

45000 45000 45000 45000

Total 3,40,000 85000 85000 85000 45000Grand total 422500 185000 107500 85000 45000

Horticulture Village Intervention Area Cost

involved (Rs)

I II III IV V

Ambota Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Bhawanee and Garari

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Lakho Diversification towards

drought/frost tolerant fruit 0.5ha 20000 - - 20000 - -

Page 62: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 50 - 

plants Total 0.5ha 20000 20000 Narghol and Baghed

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 - - Bijhari Diversification towards

drought/frost tolerant fruit plants

2ha 80000 - - 40000 40000 -

Total 1ha 80000 40000 40000 Grand Total 160000 12000

0 40000

Animal Husbandry: Village Intervention Animals Cost

involved (Rs)

I II III IV

Patta Nathu and Tikkar

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

4880 - 4880 Total 24880 24880 Ambota Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

8 16100 - 16100

Total 16100 - 16100 Bhawanee and Garari

Control of endo and ecto parasites

50 4090 4090

Total 4090 4090 Lakho Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

05 10000 10000

Control of endo and ecto parasites

50 3856 3856

Total 13856 13856 Bijhari Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

40 80000 20000 20000 20000 20000

Control of endo and ecto parasites

150 10574 - 10574

Total 90574 - 30574 Grand Total 149500 20000 89500 20000 20000Dhabriana

Village Intervention Area Cost involved (Rs)

I II III IV V

Ganoh Rajputtan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Page 63: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 51 - 

tools ) for demonstration in cereals, pulses and oilseeds Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 - - - Ganoh Brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 Dhabriana Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500

Total 85000 40000 22500 22500 Langheree and Neri

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Page 64: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 52 - 

cereals, pulses and oilseeds

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 60000 22500 - - - Loharda Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - - Grand Total 400000 200000 152500 67500 Horticulture Village Intervention Area Cost

involved (Rs)

I II III IV V

Ganoh Rajputtan

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ganoh Brahmana

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Dhabriana Diversification

towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Langheree and Neri

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Page 65: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 53 - 

1ha 40000 40000 Loharda Diversification

towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand Total 180000 180000

Animal Husbandry Village Intervention Animals Cost

involved (Rs)

I II III IV V

Ganoh Rajputtan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Ganoh Brahmana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

60 4800 - 4800

Total 44800 44800 Dhabriana Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Total 30000 - 30000 Langheree and Neri

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

20000 - 20000 Loharda Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

70 5700 - 5700

Total 45700 45700 Grand Total 150500 150500

Sr. No. Activity Total budget

1. Agriculture 4000002. Horticulture 180000 3. Animal husbandry 150500

Grand Total 730500

Page 66: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 54 - 

Dadwin Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Sugal and Paplohal Hazaru

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

- 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 - 62500 Paplohal brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - - Sariana Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - - Baryan Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Diversification towards cash crops like tomato, capsicum,

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Page 67: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 55 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cauliflower, cabbage, brinjal, ginger, turmeric etc.

Total 42500 20000 22500 - - - Kachwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

- 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 - 62500 - - - Dandhwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - -Grand Total 422500 140000 215000 67500 0 0 Horticulture

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Sugal and Paplohal Hazaru

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 20000 Paplohal brahmana

Diversification towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 40000 - - 40000 - -Sariana Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 - - 20000 - - Kachwin Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 - - 20000 - - Dandhwin Diversification

towards drought/frost 0.5ha 20000 - - 20000 - -

Page 68: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 56 - 

tolerant fruit plants Total 20000 - - 20000 - - Grand Total 120000 0 0 120000 0 0 Animal Husbandry

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Sugal and Paplohal Hazaru

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Total 20000 - 20000 - - - Paplohal brahmana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

100 animals 7400 - 7400

Total 27400 27400 Sariana Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000 - - -

Total 5 10000 - 10000 - - - Baryan Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

4 9500 - 9500 - - -

Total 9500 - 9500 - - - Kachwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

100 animals 7400 - 7400

Total 27400 27400 Dandhwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

125animals 9200 - 9200

Total 29200 0 29200 Grand Total 123500 - 123500 - - - S. No. Activity Total budget 1. Agriculture 422500 2. Horticulture 1200003. Animal husbandry 123500 4. Grand Total 666000

Page 69: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 57 - 

Garli Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Banan, Manhan, Bahna and Molhwin

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 10000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - -Sarla Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 Kotlu Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500

Total 42500 20000 22500 Garli and Dhuma

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - -

Page 70: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 58 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Matkar and Khajian

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

2 ha 90000/- @ Rs.45000/ha

- 45000 45000 - -

Total 170000 40000 62500 45000 - - Grand Total

442500 160000 215000

Horticulture Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Banan, Manhan, Bahna and Molhwin

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Sarla Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kotlu Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Garli and Dhuma

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Matkar and Khajian

Diversification towards drought/frost tolerant fruit plants

2 ha 80000 - - 40000 40000 -

Total 2ha 80000 40000 40000 Grand Total 180000 140000 40000 Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Banan, Manhan, Bahna and Molhwin

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 animals

3700 - 3700

Total 13700 13700 Sarla Demonstration to the

farmers on balanced feeding and disease

5 10000 - 10000

Page 71: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 59 - 

management to improve milk yield

Control of endo and ecto parasites

50 animals

3700 - 3700

Total 13700 13700 Kotlu Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Garli and Dhuma

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Matkar and Khajian

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

120 animals

9100 - 9100

Total 49100 49100 Grand Total

106500 106500

S. No. Activity Total budget 1. Agriculture 442500 2. Horticulture 180000 3. Animal husbandry 106500 Grand Total 729000 Ghankhot Kalan Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Dhakriana and Batyana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 - - - Badhu and Gutiana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Page 72: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 60 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cereals, pulses and oilseeds

Total 20000 20000 - - - Ghanghot Khurd

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Ghanghot Kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - - Grand Total 207500 100000 85000 22500 Horticulture

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Dhakriana and Batyana

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Badhu and Gutiana

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghanghot Khurd

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghanghot Kalan

Diversification towards drought/frost tolerant fruit plants

2 ha 80000 - - 80000 - -

Total 2ha 80000 80000 Grand Total

140000

Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Dhakriana and Batyana

Demonstration to the farmers on balanced

5 10000 - 10000

Page 73: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 61 - 

feeding and disease management to improve milk yield

Control of endo and ecto parasites

80 animals

6878 - 6878

Total 16878 - 17400 Badhu and Gutiana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 21841 - 21841

Total 21841 21841 Ghanghot Khurd

Control of endo and ecto parasites

100 animals

7073 - 7073

Total 7073 - 7073 Ghanghot Kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

170 animals

13208 - 13208

Total 43208 - 43208 Grand Total 89000 89000 Sr. No. Activity Total budget 1. Agriculture 207500 2. Horticulture 140000 3. Animal husbandry 89000 Grand Total 436500 Giaragran Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Maslana kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ Rs.45000/ha

- 45000 - - -

Total 85000 40000 45000 - - - Horticulture Village Intervention Area Cost involved

(Rs) I II III IV V

Maslana kalan

Diversification towards drought/frost tolerant fruit plants

1.0 ha 40000 - - 40000 - -

Total 40000 40000 Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Maslana kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Page 74: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 62 - 

Control of endo and ecto parasites 205 animals

15500 - 15500

Total 35500 35500 Grand Total

160500 40000 80500 40000 - -

Sr. No. Activity Total budget (Rs.) 1. Agriculture 85000 2. Horticulture 40000 3. Animal husbandry 35500 4. Grand Total 160500 Jhanjiani Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Gandhak and Kohlri

Provision of improved inputs (viz., seeds, fertilizers, pesticides) and tools for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 - 20000 - - - Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Gandhak and Kohlri

Control of endo and ecto parasites

100 animals

7000 - 7000

Total 7000 7000 Grand Total 27000 27000 - - S. No. Activity Total budget 1. Agriculture 20000 2. Horticulture 0 3. Animal husbandry 7000 4. Grand Total 27000 Kiara-Bagh Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Bagg and Desen

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ Rs.45000/ha

- 45000 - - -

Total 85000 40000 45000 - - - Kohdera Provision of improved 0.5 ha 20000 @ Rs. 20000 - - -

Page 75: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 63 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

40000/ha

Total 20000 20000 - - - - Badloi Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - - Baghed Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 - - - Pelehra Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 Sunwin Brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 Kiara and Kharota

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - -

Page 76: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 64 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Kheri Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Sunwin Rajputtan and Kohlwin

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Total 40000 40000 Grand Total

372500 260000 112500

Horticulture Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Bagg and Desen

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 - - 20000 - - Kohdera Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Badloi Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kiara and Kharota

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kheri Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

100000 100000

Page 77: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 65 - 

Animal Husbandry Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Bagg and Desen

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

4 8000 - 8000

Control of endo and ecto parasites

190 animals

13448 - 13448

Total 21448 - 21448 - - -Kohdera Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

4 8500 - 8500

Total 8500 - 8500 Badloi Control of endo and ecto

parasites 80

animals 6300 - 6300

Total 6300 - 6300 Baghed Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 animals

3900 - 3900

Total 13900 - 13900 Pelehra Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Sunwin Brahmana

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 7400 - 7400 Kiara and Kharota

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Kheri Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Sunwin Rajputtan and Kohlwin

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

125 animals

9290 - 9290

Total 19290 - 19290 Grand Total

116838 - 116838

Page 78: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 66 - 

Sr. No. Activity Total budget 1. Agriculture 372500 2. Horticulture 100000 3. Animal husbandry 116838 4. Grand Total 589338 Kulehra Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Karah Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

- -

Total 40000 40000 - - - Lahri ghumara and Lahari Tarkhana and Mindwin

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 Changar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Dagwar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Sunhani Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in

0.5 ha 40000 @ Rs. 20000/ha

20000 - - - -

Page 79: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 67 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cereals, pulses and oilseeds

Total 0.5 ha 20000 20000 - - - - Tangar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Total 1 ha 40000 40000 - - - - Suhlari Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 Grand Total 352500 285000 67500 Horticulture Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Karah Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Lahri ghumara and Lahari Tarkhana and Mindwin

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Changar Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Dagwar Diversification towards

drought/frost tolerant fruit plants

1.0 ha 40000 - 20000 20000 - -

Total 1.0 ha 40000 - 20000 20000 - - Suhlari Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

120000 20000 100000

Animal Husbandry

Page 80: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 68 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Kulehra Control of endo and ecto parasites

100 animals

7400 - 7400

Total 7400 - 7400 Lahri ghumara and Lahari Tarkhana and Mindwin

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

4 8000 - 8000

Total 8000 - 8000 Changar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Control of endo and ecto parasites

80 animals

6000 6000

Total 26000 - 16000 10000 Dagwar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 10000 10000

Control of endo and ecto parasites

50animals 3700 3700

Total 23700 10000 13700 Sunhani Control of endo and

ecto parasites 100 animals

7400 - 7400

Total 7400 - 7400 Tangar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

60 animals

4500 - 4500

Total 14500 - 14500 Suhlari Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 5 10000 - 10000 Grand Total

97000 10000 77000 10000

Sr. No. Activity Total budget 1. Agriculture 352500 2. Horticulture 120000 3. Animal husbandry 97000 4. Grand Total 569500

Page 81: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 69 - 

Sohari Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Sohari Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Magnoti Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Ghulera Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Barla Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Dugyar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Page 82: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 70 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

demonstration in cereals, pulses and oilseeds Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - -Grand Total

312500 20000 112500 - - -

Horticulture Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Sohari Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Magnoti Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghulera Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Barla Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Dugyar Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

2.5 ha 100000 - - 100000 - -

Animal Husbandry Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Sohari Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Magnoti Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Ghulera Demonstration to the

farmers on balanced 5 10000 - 10000

Page 83: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 71 - 

feeding and disease management to improve milk yield

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Barla Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Dugyar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Grand Total 87000 87000 S. No. Activity Total budget 1. Agriculture 312500 2. Horticulture 100000 3. Animal husbandry 87000 Grand Total 499500 Usnar Kalan Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Jajal Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 20000 20000 - - -Narkar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 Gatta panga

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 - - - Usnad khurd

Provision of improved inputs (viz., seeds,

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Page 84: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 72 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

Total 20000 20000 - - - Usnad kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Chukiniar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Total 40000 40000 - - - - Kuryh Khurd

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 Kuryah kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Nara Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato,

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Page 85: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 73 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

Total 125000 62500 62500 - - - Grand Total

412500 305000 107500 0 0 0

Horticulture Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Narkar Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Usnarkalan Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kuryah kalan

Diversification towards drought/frost tolerant fruit plants

1.0ha 40000 - - 40000 - -

Total 40000 - - 40000 - - Chukiniar Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Nara Diversification towards

drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 40000 - - 40000 - -Grand Total

140000 0 0 140000 0 0

Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Jajal Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

160 animals

11960 - 11963

Total 21963 21963 Narkar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Control of endo and ecto parasites

70 animals

5115 5115

Total 25115 25115 15115 10000 Gatapanga Demonstration to the 5 10000 - 10000

Page 86: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 74 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

farmers on balanced feeding and disease management to improve milk yield

Control of endo and ecto parasites

85 animals

6200 6200

Total 16200 - 16200 Usnad khurd

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

140 animals

10544 - 10544

Total 20544 20544 Usnarkalan Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

40 animals

3002 - 3002

Total 13002 - 13002 Chukhiniar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

90animals 6562 - 6562

Total 16560 - 16562 - - - Kuryh Khurd

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Kuryah kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

120 animals

9218 - 9218

Total 39218 39218 - - - Nara Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Control of endo and ecto parasites

120 animals

8898 - 8898

Total 28898 - 28898 Grand Total

191500 25115 181502 10000 0 0

Page 87: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 75 - 

7. Pisciculture No activity has been proposed in the panchayats due to lack of interest, however the

fishery department should organize some awareness camps in the panchayat as there is

scope for pisciculture in some areas under watershed.

Page 88: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 76 - 

8. Drinking Water

Bal Bihal

Particulars Location Numbers Size (Meters)

Remarks Cost

Village Bihal- Ravinder- Bhutto Well Sink type of 2.4 m dia and 3 m deep In Harijan Basti 01

For Drinking

18676

Balh Brahmana Well Sink type of 2.4 m dia and 3 m deep In Harijan Basti 01

For Drinking

18676

Total 37352 Bani

Particulars Village Location Numbers Size Remarks Cost Open Well Karwin In the field

of Sh. Sita Ram

01 Open sink type 2.4m dia & 3m deep

For Drinking water

18676

Babri Under the Peepal tree

01 1.2mx1.2mx0.9m For Drinking water

19353

Total 38029Barsar Villages Particulars Location No. Total

Cost (Rs) Budget from IWMP

Farmer share

Remarks

Jabbal Kheri

Hand Pump Harijan Basti Kheriqan on land of Sh. Ranjit Singh

01 101541

101541 - For drinking

Tube- Well Sh. Jagat Ram Khereian

01 295301 177181 118120 For Drinking of 15 families and irrigation of 50 kanal area

Total 02 396842 278722 118120 Bhakreri Water bodies

Baggi Kahil Bhakreri Kowa Makteri Jathunda Total No.

Unit cost

Total cost

Open Well

- - - - - 1 1 18676 18676

Total 18676 Garli Water bodies

Kotlu Garli Khas

Mohlwin Khajian Total No.

Unit cost Total Cost

Hand Pump

- 2 - - 2 101541 203082

Water structures

Village Location Expected outcomes

Hand Pump Garli On the land of Sh. Charan Dass Harijan Basti For drinking of 20 families On the land of Sh. Dev Raj For drinking of 15 families

Page 89: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 77 - 

Ganghot Kalan Water bodies

Dhakriana Batyana Badhu Gutiana Ghanghot Khurd

Ghanghot Kalan

Total No.

Unit cost

Total cost

Well 1 1 2 18676 37352 Total 37352

Water structures

Village Location

Well Dhakriana In the land of Sh. Baldev Singh For Drinking beneficiaries 12 families

Ghanghot Kalan

In the land of Sh. Jeet Ram at Matoli

For Drinking beneficiaries 20 families

Giaragram Village structures Numbers Size

(m) Location Remarks

Maslana Kalan

Hand Pump 1 90mm dia HDPE pipeline with 63 mm dia outlet

On the land of Sh Desh Raj Sharma

For Drinking water for families

Hand Pump 1 On Community place

For Drinking water for 10 OBC families

Kiarabagh Particulars Location Numbers Size

(Meters) Remarks Cost (Rs.)

Village Desan Ward No. 1 Member:- Sh. Parshotum Chand 88941-54805 Hand Pump In the land of

Sh. Prakash Chand

01 - For Drinking beneficiaries 15 families

101541

Village: Kharota Hand Pump

In the land of Sh. Prakash Chand

01 2 no. For Drinking beneficiaries 07 families

203082

In the land of Smt. Giano Devi

01 For Drinking beneficiaries 05 families

Village: Khodra Pattian Hand Pump In the land of

Sh. Gian Chand

01 - For Drinking beneficiaries 10 families

101541

Total Hand Pump (4 No.) 406164 Sohari Village Location Numbers Size (m) Remarks Dugyar Under the Peepal

tree 01 1.2m x1.2m

x 0.9m For Drinking water for 65 families

Barla Near Samshan Ghat 01 1.2m x1.2mx 0.9m

For Drinking water for 50 families In the Land of Jhidu

and Banta Ram Khasra No.

01

Page 90: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 78 - 

Usnar Kalan Village Structure Location Numbers Size (m) Total

Cost/village IWMP Budget

Convergence Beneficiaries

Nara Handpump In the Land of Sh. Kashmir Singh

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 7 families

Kurya Kalan

Handpump In the land of Sh. Punnu Ram and Smt Bishambri Devi.

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 15 families

In the land of Sh. Mansha Ram and Prabhu Ram.

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 10 families

Kurya Khurad

Handpump In the Land of Sh. Polo Ram

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 15 families

Chukhniar Handpump In the Land of Smt Bishambri devi/ punnu Ram

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 15 families

Total 507705 507705 - -

Page 91: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 79 - 

9. Soil Conservation Bal Bihal

Village Location Particulars Cost Bihal

on the land of Sh, Birbal/Jagat Ram on Kodhri Khad

Check Dam RCC with cement plaster 8mx1m, 2mx2m

72283

Total 72283

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Behal Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Rapar cho (Jagdish land to Kodari land)

4 39100

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Dim cho (Kartar Singh land to Mihinder Singh Surinder Singh land)

6 117300

Total 10 156400 102837 53263 Aghwin upperly

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Bhidya wala cho

3 43986

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Gian chand Roshan lal Balhi

2 119534

Total 5 163520 100800 62720 Aghwin Buuerly

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Baeya da cho 2 29324

Goniya da cho

2 29324

Pange da cho 4 58648 Verna da cho

(Shop to lindi khadd)

4 58648

Total 12 175944 117600 58344 Balh Patlian Check dam stone &

wire crated (Spur) 3mx1.25x2.5m

Paani ka cho (Main road to lindi khadd)

2 29324

Pangula ka cho (Main road to lindi khadd)

2 29324

Jagan Nath Amar Nath land (Jandyale Amb)

2 29324

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Kodari khadd (balh Brahmana to Pairwin)

3 179301

Total 267273 243600 23673 Chaloli

Check dam stone & wire crated (Spur)

Jangal to Mathohal ke

2 119534 63448 56086

Page 92: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 80 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

10mx1.25x2.5m boundry tak Total 119534 63448 56086 Jangal Check dam stone &

wire crated (Spur) 10mx1.25x2.5m

Govind, Baldev & others ki zameen ke pass

2 119534

Total 119534 107324 12210 Mathohal

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Kut cho (Jagbir Singh land to Lakha Ram land)

2 29324

Ambia de cho (Jangel to Balhi tak)

3 43986

Balh wale cho (Jangal to Balhi)

3 43986

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Jangal Nallah 2 119534

Total 10 236830 197848 38982 Padian

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Sarola da cho (Gallu ghatta to Taleran tak)

6 87972

Purana guard khana to well

3 43986

Total 169310 151200 18110 Kot Check dam stone &

wire crated (Spur) 10mx1.25x2.5m

Lindi khadd Jangal se Phanchi Ram Kot se jabali tak

10 597670

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Jamani de cho (Tota Ram house to Lindi khadd tak)

3 43986

Harua de cho (Sunder ram house to lindi khadd tak )

2 29324

Gharana da cho (Kisori ram house to lindi khadd )

3 43986

Balakrupi cho (Balakrupi to lindi khadd)

3 43986

Chanaute cho (Sada ram house to lindi khadd)

3 43986

Bang wala cho (Capt. Mohinder to lindi khadd)

5 73310

Page 93: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 81 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Some house to Shamshaan ghaat

4 58648

Chatpahal wala cho to lindi khadd

4 58648

Khala wala cho

3 43986

Total 40 1037530 908211 129319 Pairwin

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Kodari khadd Balh brahmna to kallar

9 537903

Check dam stone & wire crated (Spur) 6mx1.25x2.5m

Khole wala nallah (Gian chand /Sukh Dev ke makaan ke saath)

1 36660

Check dam stone & wire crated (Spur) 4mx1.25x2.5m

Paidla cho-Balle (Peharwin)

2 29324

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Peharwin cho rajkumar land to well

2 29324

Tank wala nallah (Hari Ram house to Paras Ram land)

2 29324

Kallar-khadd cho (Suresh house ke pass jangal gaon)

2 29324

Total 18 691859 638400 53459 Grand Total 3137734 2631268 506166 Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence(MNREGA)

Behal Well Open Sink type of 2.4 m dia and 3 m deep

93380 93380 -

Check Dam 8mx(2m+1m)/ 2mx2m and No.

72283 72283 -

Check dam stone & wire crated (Spur 156400

103137 53263

Total 322063 268800 53263 Aghwin upperly

Check dam stone & wire crated (Spur 163520

100800 62720

Total 163520 100800 62720 Aghwin Buuerly

Well OpenSink type of 2.4 m dia and 3 m deep

18676 18676 - Check dam stone &

wire crated (Spur 175944 98924 77020

Total 194620 117600 77020

Page 94: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 82 - 

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Balh Patlian Check dam stone & wire crated (Spur

267273 243600 23673

Total 267273 243600 23673 Chaloli

Well OpenSink type of 2.4 m dia and 3 m deep

37352 37352 Check dam stone &

wire crated (Spur) 119534 63448 56086

Total 156886 100800 56086 Balh Brahmana

Pacca tankRCC 5mx4mx1m 311322 - -

Well OpenSink type of 2.4 m dia and 3 m deep

56028 - - Total 367350 310800 56550 Jangal Well OpenSink type of 2.4

m dia and 3 m deep 18676 18676

Check dam stone & wire crated (Spur)

119534 107324 12210

Total 138210 126000 12210 Chat pahl Chahar

Pacca tankRCC 5mx4mx1m

103774 103774 - Well OpenSink type of 2.4

m dia and 3 m deep 103774 103774 -

Total 122450 122450 - Mathohal

Well Open Sink type of 2.4 m dia and 3 m deep 37352 37352 -

Check dam stone & wire crated (Spur) 236830

197848 38982

Total 274182 235200 38982 Padian

Check dam stone & wire crated (Spur)

169310 151200 18110

Total 169310 151200 18110 Kot Well Open Sink type of

2.4 m dia and 3 m deep 149408 149408 -

Check dam stone & wire crated (Spur) 1037530

908211 129319

Bore well 200mmx150mmat 70m depth 295301 177181 118120*( farmers share)

Total 1482239 1234800

129319 +118120 ( farmers share)

Pairwin

Check dam stone & wire crated (Spur) 691859

638400 53459

Total 691859 638400 53459 Grand Total

3245600 2818850 308630 +118120 ( farmers share)

Consolidated Works In Panchayat Bani Particulars Bani Khas Kuthera Thana Size Numbers Cost

Check Dam RCC with cement

1 10mX1, 2mX2m 01 90677

Page 95: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 83 - 

plaster Check Dam RCC with cement plaster

2 1 6mx1m, 2mx2m 03 162648

Total 253325 Structures Village Location Actual

budget Budget from IWMP

Expected outcomes

Check Dam RCC with cement plaster 10mX1, 2mX2m

Thana In Paniali near the land of Sh. Sada Ram

90677 90677 For irrigation of 200 kanal area

Total 90677 90677 6mx1m, 2mx2m

Bani Khas On Jarlu Main Chau near the land of Sh. Bakil Singh

54216 54216 For irrigation of 200 kanal area

On Churna wala Chau near the land of Sh. Ajit/Sant Ram

54216 54216 For irrigation of 600 kanal area

Total 108432 108432Kuthera With the land of

Sh. Balbir Singh 54216 54216 For irrigation of 50 kanal

area Total 54216 54216 Grand Total 253325 253325

Village Structures Location No. Actual Budget IWMP

Budget Convergence (MNREGA)

Bani Khas Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Lunda Cho (Parkash Chand/Balbir chand land to Gian Chand land)

3 29325

Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Balia da Cho (Road to Khwaja Khadd)

3 43986

Jaralu wala Cho (Om Parkash land to Lunda cho)

3 43986

Lunda Cho/Harijan Basti (Gian singh & Ranjit Singh land)

3 43986

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Lunda Cho (Rattan Chand land to Mohinder Sant Ram land)

2 39100

Total 200383 132194 68189

Karwin Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Nallah Bani Bande to Chharda Tak (Bakil singh Land)

3 43986

Radha Soami Nias to Balia (Kuthere) tak

3 43986

Page 96: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 84 - 

Village Structures Location No. Actual Budget IWMP Budget

Convergence (MNREGA)

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Public Science School Bani to Water bodi tak

3 58650

Nalua wala cho (Nulu bain to Churne wala cho)

5 97750

Total 244372 213971 30401

Kuthera Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Nalu to Lunde da gharaat

3 43986

29784

14202

Total 43986 29784

14202

Mangroli Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Rakkar Cho (near Jagdish, Ravinder Land)

2 19550

Kara Khara –

Nikku Ram, Ranbir Singh ki jameen ke sath

2 19550

Kara Khara, near

Raghubirs land 3 29325

Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Pankal nala Burda (Road) to Khwaja khadd

4 58648

Kawalia – Balloo

wala cho Janj ghar 4 58648

Total 185721 176400 9321

Thana Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Roshan lal house to water bodi

2 29324

Kiari cho (Sade Ram land to ajit singh ke phat)

4 58648

Vinod Kumar land to water bodi

4 58648

Virendar land gohar to water bodi

6 87972

Sambhu house to Lunda cho tak

6 87972

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Pathia da cho (Mandir to Ranbir house)

5 97750

Gada wala cho (Road to Khwaja khadd tak)

2 39200

Jandral cho (Purshotam singh house to Khwaja khadd)

4 78200

Kankar Aato

Panga (Brij lal, Kartar singh to

4 78200

Page 97: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 85 - 

Village Structures Location No. Actual Budget IWMP Budget

Convergence (MNREGA)

Girdhari land)

Aato Panga (Rajinder singh land to Nand ram/Ramesh land)

4 78200

Bhindia da panga-

Nallah de panga (Nand ram land to Khadd)

4 78200

Khalyan de panga (Jashbir to water bodi)

2 39100

Sita ram ki road se

khadd tak 4 78200

Khil thana

/Harijan Basti 2 39100

Total 928714 835775

92939Village Wise Budget Allocation Under Soil Conservation Village Particulars Total Cost IWMP

Budget Convergence(MNREGA)

Bani Khas Pacca tank 5mx4mx1m

103774 103774

Check Dam RCC with cement plaster

108432 108432

Check dam stone & wire crated (Spur)

200383

132194 68189

Total 412589 344400 68189 Karwin Well Open

Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Babri 19353 19353 - Check dam stone & wire

crated (Spur) 244372

213971 30401

Total 282401 252000 30401 Kuthera Check Dam RCC with

cement plaster 54216 54216 -

Check dam stone & wire crated (Spur)

43986 29784 14202

Total 98202 84000 14202 Mangroli Check dam stone & wire

crated (Spur) 185721 176400 9321

Total 185721 176400 9321 Thana Pacca tank

5mx4mx1m 207548 207548 -

Check Dam RCC with cement plaster

90677 90677 -

Page 98: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 86 - 

928714

835775 92939

Total 1226939 1134000 92939 Grand Total 2205852 1990800 215052 Barsar Villages Structure/work Activities to be undertaken Check Dam

6mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/ identification

Actual budget Budget from IWMP

Proposed Convergence

Expected outcomes

Jabbal kheri 1 Ananti khad cho

54216 54216 - Irrigation of 150 kanal area

Total 54216 54216 -

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Jabbal kheri Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Cheli wala Cho (Koot to Baag)

3 43986 -

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Mahila Mandal ghar to Jabbal water body

2 73320 -

Total 117306 48090 69216 Bhakreri Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/ identification

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 On the land of Sh

54216 54216 - Irrigation of 50 kanal area

Village Structures Location No. Actual

BudgetIWMP

BudgetConvergence

(MNREGA)Baggi

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Bikram jeet Singh (Cheedh)/Prithi Singh/Gian Chand/Kashmir Singh/Sukh Ram land to khwaja khadd tak0

4 78200

Pritam Singh-Balbir Singh

2 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Pritam Singh/Diwan Chand

2 29324

PWD Rest House to Kahwa Body tak

5 73310

Balbir singh- Yash pal-Kuldeep land

2 29324

Yashpal –Kuldeep land

3 43986

Total 293244 260400 32844 Rahil Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Baldev-Anant Ram land

5 73310

Check dam stone & Opposite of 2 39100

Page 99: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 87 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 4mX1.25mX2.0m

Yashpal land-Baldev Anant ram

Total 112410 100800 11610 Bhakreri Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Shyah de panga (Sher Singh land to Kashmir Singh land)

6 117300

Kashmir singh land

( Both tributaries)

4 78200

Roshan and Kashmir land

3 39100

Handia da cho (Prem Singh & other s land)

5 97750

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Kashmir singh Rattan Chand

2 29324

Jaisi land to Rattan land

10 146620

Sita Ram (Bamboo) to water body

8 117296

Total 38 625590 592584 33006 Kowa Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Bakhtaura Singh land to Kuldeep Singh house

8 117296

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Gurbachan singh land

2 19550

Total 136846 136846 Nil Makteri

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Vishal land to Makandi land

4 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Ramesh Chand land to Rattan chand land

5 71110

Puran singh land to Banku Ram land

8 117296

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Rajinder Singh (Gahrian )to Khokhli (Rattan Chand land)

15 293250

Total 520756 478800 41956 Jathunda Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Chamel Singh/ Shiv Raj to capt. Ramesh land

7 68425

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Chamel Singh/ Shiv Raj to capt. Ramesh land

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mohindra Agency to water body

20 391000

Total 32 532735 532735 - Grand Total 2221581 2102165 119416

Village wise budget allocation under soil conservation Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Baggi Check dam stone & wire crated (Spur 293244 260400 32844

Page 100: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 88 - 

Village Particulars Total Cost IWMP Budget

Convergence (MNREGA)

Total 293244 260400 32844 Rahil Check dam stone & wire crated (Spur 112410 100800 11610 Total 112410 100800 11610 Bhakreri Check Dam 6m(2m+1m)/2mx2m and No. 54216 54216 - Check dam stone & wire crated (Spur 625590 592584 33006 Total 679806 646800 33006 Kowa Check dam stone & wire crated (Spur 136846 136846 Nil Total 136846 136846 Nil Makteri

Check dam stone & wire crated (Spur 520756 478800 41956

Total 520756 478800 41956 Jathunda Pacca tank RCC

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 532735 532735 - Total 655185 655185 - Grand Total 2398247 2278831 119416 Village wise budget allocation under soil conservation Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Jabbal kheri Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Hand Pump 101541 101541 Tube- Well* 177181** 177181 Check Dam 6m(2m+1m)/

2mx2m and No. 54216 54216

Check dam stone & wire crated (Spur)

117306 48090 69216

Total 884016 814800 69216 Farmer share =*854216 ** Excluding Farmer share.

Bijhari Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Patta Nathu

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Julfi Ram ki zameen se Siaru ke naalu tak

2 39100

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Vinod land to Joginder land

2 73320

Total 112420 75600 36820 Tikkar

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chhimbe ke ghar se kotle tak

6 117300

Total 117300 117300 Nil Ambota

Check dam stone & wire crated (Spur)

Ambota school to Hambotu ke end tak

10 195500

Page 101: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 89 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

4mX1.25mX2.0m Khill se Jabrali tak 15 293250 Total 488750 120000 68750 Bhawanee Check dam stone

& wire crated (Spur) 4mX1.25mX2.0m

Bhawani machine se ambota village

4 78200

Banani machine se chalrai Gaon ke dor

4 78200

Total 156400 117600 38800 Garari

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kumhar babri se Syaru da nallah

8 156400

Vidya sagar land se Matoli sudesh master ke khet tak

3 58650

Total 215050 201600 13450 Lakho

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chauthe Vars (Dharam chand land to Ramesh land)

6 117300

Jol wala cho 6 117300 Check dam stone

& wire crated (Spur) 6mX1.25mX2.5m

Maggar wala cho se shamshaan ghaat tak

6 219960

Total 454560 403200 51360 Narghol Check dam stone

& wire crated (Spur) 4mX1.25mX2.0m

Bhag Singh ke ghar se kotlu nallah ke saath

4 78200

Bhag chand ki zameen se julfi ram ke ghar tak

3 58650

Jindu ram ke ghar se gardi ke nallu tak

3 58650

Total 195500

182924 12576

Bijahri

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Bazaar well se nallu tak

6 219960

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

‐ Do- 4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Chanderuhi ke ghar se Pattharian wale soo tak

3 109980

Anant ram ke ghar se baudi tak

2 73320

Madan ke ghar se Mehar Singh ke

2 73320

Page 102: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 90 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

khet tak Check dam stone

& wire crated (Spur) 10mx1.25mx2.5m

Devi Singh ke ghar se Hari Ram ke khet jaad tak

3 179301

Khurpari se Narghol ki baudi tak

4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Khurpari se Narghol ki baudi tak

4 146640

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

Balbir Singh ke khet se Shamsher ghar tak

4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

3 109980

Badu ka cho se Jagan nath ki balli tak

5 183300

Check dam stone & wire crated (Spur) 4mx1.25mx2.5m

Vijay Singh ke khet se Bijhri gardi sadak tak

4 78200

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Balh Nallah 2 73320

Total 46 1964525 1941595 225930 Baghed Check dam stone

& wire crated (Spur) 6mx1.25mx2.5m

Nallah 5 183300

Fencing 500m 150440 Total 333740 277200 56540 Grand Total 4038245 3437019 504226 Village wise budget allocation under soil conservation Village Particulars Total Cost IWMP

Budget Convergence (MNREGA)

Patta Nathu

Check dam stone & wire crated (Spur 112420 75600 36820

Total 112420 75600 36820 Tikkar

Check dam stone & wire crated (Spur 117300 117300 Nil

Total 117300 117300 Nil Ambota

Check dam stone & wire crated (Spur 488750 120000 68750

Total 488750 120000 68750 Bhawanee

Check dam stone & wire crated (Spur 156400 117600 38800

Total 156400 117600 38800 Garari

Check dam stone & wire crated (Spur 215050 201600 13450

Page 103: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 91 - 

Village Particulars Total Cost IWMP Budget

Convergence (MNREGA)

Total 215050 201600 13450 Lakho

Check dam stone & wire crated (Spur 454560 403200 51360

Total 454560 403200 51360 Narghol Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 195500 182924 12576

Total 214176 201600 12576 Bijahri Pacca tankRCC 5mx4mx1m 207548 207548 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Tube well 295301 177181 118120* Check dam stone & wire crated (Spur 1964525 1941595 225930 Total 2367930 2142000 225930 Baghed Check dam stone & wire crated (Spur) 183300 Fencing 150440 Total 333740 277200 56540 Grand Total 4460326 3656100 504226 Dhabriana

Structures Check Dam 10m(2m+1m)/2mx2m Check Dam 6m(2m+1m)/2mx2m

Loharda 1 1 Langhere 1 Dhabriana - 1 Unit cost 90677 54216 Total cost 181354 108432 Grand Total 289786

List of sites for proposed activities and expected outcomes Sructures village Location Total

Cost IWMP Budget

Convergence Expected outcome

Check Dam 10m(2m+1m)/2mx2m

Langhere On the land of Sh. Shankar Dass

90677 90677 For the Irrigation of 500 kanal land

Loharda On the land of Sh. Subhash Chand

90677 90677 For the Irrigation of 1000 kanal land

Check Dam 6m(2m+1m)/2mx2m

Loharda On the land of Sh. Madan Lal

54216 54216 For the Irrigation of 800 kanal land

Dhabriana In Bain di Balh

54216 54216 For the Irrigation of 60 kanal land

Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Ganoh Rajputan

Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Shobhe di bali Cho (Jagan Nath land to Babu Ram ke banne

4 239068

Page 104: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 92 - 

Tak Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Gaala de cho (Hari Chand land to Shobe di Bali)

3 58650

Shobhe di bali Cho (Jagan Nath land to Babu Ram ke banne Tak

6 117300

Total 13 415018 409726 5292 Ganoh Brahmna

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Malti wala cho (Road to Khabran)

10 146620

Darya de cho 5 73310 Ladian wala cho

(Mandir to Varun Balli)

5 73310

Balha wala cho (Shamsher Ghat to Varun Balli)

5 73310

Fencing Mandir to Gahari-Piploo tak

1000m 300880

Total 10 146620 84566 62054 Dhabriana

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Bayan da Balh Wale cho Dev Raj Land to water bodi se niche tak

4 58648

Kwali (Ramesh land to Nalu wala cho)

2 29324

Pattian Gaon(Khwaru walacho to school wala cho)

3 43986

Khwaru wale cho to jabali tak

4 58648

Ambia de cho (Jodha Ram land to Ramesh Land)

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jalana de cho se Jaryat &cho kachhi

5 73310

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

Jalana de cho se Jaryat &cho kachhi

5 298835

Kharota ke saath (Dina Nath/Bhagat Ram?Bali Ram/Anant Ram land)

5 119534

Total 33 755595 645436 110159 Langheree Check dam stone & Nayal dug cho 10 146620 102378 44242

Page 105: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 93 - 

wire crated (Spur) 3mX1.25mX2.0m

(Ranjit land to Shankar Das land

Total 146620 102378 44242 Neri Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Paniali to Neri Kiara tak

8 117296 78583 38713

Total 117296 78583 38713 Loharda Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Chaun kwali/ Bain wala cho (Prakash Chand land to Balyat tak)

10 195500 87934 44242

Total 195500 87934 44242 Grand Total 1776649 1408623 304702 Village Wise Budget Allocation Under Soil Conservation Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Ganoh Rajputan

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur

415018 409726 5292

Total 433694 428400 5394 Ganoh Brahmna

Pacca tankRCC 5mx4mx1m

207548 207548

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur

146620 84566 62054

Total 893654

831600 62054

Dhabriana

Pacca tankRCC 5mx4mx1m

207548 207548

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216 -

Check dam stone & wire crated (Spur

755595 645436 110159

Total 1017359 907200 110159 Langheree

Check Dam 10m(2m+1m)/2mx2m

90677 90677

RWHT(2mx2mx1m) 134545 134545 Check dam stone & wire

crated (Spur 146620 102378 44242

Total 371842

327600 44242

Neri RWHT(2mx2mx1m) 349817 349817 Check dam stone & wire

crated (Spur 117296 78583 38713

Total 467113 428400 38713 Loharda Pacca tankRCC

5mx4mx1m 311322 311322

RWHT(2mx2mx1m) 269090 269090 Tube well of 200mm x 150

mm size at 70 m depth 295301 354361 236241( farmers share)

Check Dam 10m(2m+1m)/2mx2m

90677 90677 -

Page 106: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 94 - 

Check Dam 6m(2m+1m)/2mx2m

54216 54216 -

Check dam stone & wire crated (Spur

195500 87934 107566

Total 1275166 1167600 107566 Grand Total 4458828 4090800 368128

Dadwin

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Paplah Hazaru

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Beri cho(Rajinder land to Baldev land)

2 39100

Balia wala cho( Roshan house to Jagdish Chand)

6 117300

Bane da cho ( Hari Ram land to Raghubir Land)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Galue da cho (Joginder Singh land0

2 73320

Total 268820 251478 17342 Sariana Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Bain wala cho ( Amar Singh land to Main road)

4 58648

Gaare da cho ( Sarwan singh land to Janj ghar)

4 58648

Jolkhi cho ( Main road to Duni Chand/Hari singh land)

3 43986

Bagae da cho ( Main road to Amar singh/ Sukh Ram land)

2 29324

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Kaillu da cho( Amar Singh land to Ramesh Ballha land)

2 39100

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Dadhwin khud ( Mandiara to Paploh Brahmana)

10 482100

Total 711806

634948 76858

Paploh Brahmana

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mohra da cho( Jagan Nath/Amin Chand land)

4 78200

Chhale da cho 10 195500

Page 107: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 95 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Khaite da cho ( Kamal dev land to Dev Das bamboo)

2 39100

Daya Ram land to rattan chand land

2 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Khoo wala cho ( Rajinder land to Rattan chand land)

8 117296

Moran da choi 2 29324 Fencing ( parkash

chand land to rajinder kr land

1000m 300880

Total 799400

722400 77000

Baryan Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gaare da cho ( Sarwan singh land to Janj ghar)

2 39100

Total 39100 19252 19848 Kachwin Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Lohar ke ghar wala nallah( Sarwan singh land to Satish land)

7 102634

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kuan wala nala( Ramesh house to Lekh Ram land)

5 97750

Tukari wala cho( Duni Ram land to Sarwan singh/Deep Singh land

4 78200

Kaghar wala cho( Satya devi land to Dhani Ram land)

6 117300

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Khatte butte wale nallah( Raghubir land to Daya Ram land.

3 109980

Pud wala nallah(Dhani Ram land to Parkash chand land)

2 73320

Total 579184

534626 44558

Dhandwin Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans raj ke god se mukhtiar singh land

3 43986

Check dam stone & wire crated (Spur)

Mehar Singh land to Rupan

4 78200

Page 108: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 96 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

4mX1.25mX2.0m Devi land) Chamel singh

land to Amin Chand land

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Karyali ka cho ( road to balwant land

3 109980

Total 310366 284615 25751 Village Wise Budget Allocation Under Soil Conservation

Village Particulars Total Cost

IWMP Budget

Convergence (MNREGA)

Paplah Hazaru

Pacca tank 5mx4mx1m

311322 311322 -

Check dam stone & wire crated (Spur

268820 251478 17342

Total 580142 562800 17342 Sariana Well Open

Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Check dam stone & wire crated (Spur

711806 634948

76858

Total 749158 672300 76858 Paploh Brahmana

Check dam stone & wire crated (Spur) and fencing

799400 722400 77000

Total 799400 722400 77000

Baryan Pacca tank 5mx4mx1m 207548 207548 -

Check dam stone & wire crated (Spur 39100 19252 19848

Total 246648 226800 19848 Kachwin Pacca Tank

5mx4mx1m 103774 103774 Check dam stone & wire

crated (Spur 579184

534626 44558 Total 682958 638400 44558 Dhandwin Pacca Tank

5mx4mx1m 207548 207548 Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676

Check dam stone & wire crated (Spur

310366 284615 25751

Bore well 200mmx150mmat 70m depth

354361 354361

Total 890951 865200 25751 Sugal Check dam stone & wire

crated (Spur 58650 42000 16650 Total 58650 42000 16650 Grand Total

4007907 3729900 278007

Page 109: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 97 - 

Garli

Structures Garli Khas

Khajian Total No.

Unit cost

Total Cost

Budget from IWMP

Proposed Convergence

Check Dam 8m(2m+1m)/2mx2m

3 1 4 72283 289132 289132 -

Khajian On the land of Sh. Bhagat Ram For irrigation of 100 kanal area Garli On the land of Sh. Pawan

Kumar/Lekh Raj at Matoli Nallah For irrigation of 250 kanal area

On the land of Sh. Dev Raj/Sarwan Singh at Nihar Dugh

For irrigation of 100 kanal area

On the land of Mangat Ram/Dev Raj at Matoli Nallah

For irrigation of 150kanal area

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Manhan Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Nika Ram land to main nallah9khazian0

5 97750 84000 13750

Total 97750 84000 13750 Bahina Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Tile se khazian nale tak

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.0m

Munshi Ram well to molwi ram land

4 146640

Total 224840 201600 23240 Mohlwin Check dam stone &

wire crated (Spur) 8mX1.25mX2.5m

Barbi Ram / hans raj land to main khazian nallah

2 96420

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Roshan lal land tp Banahan

3 43986

Total 140406 126000 14406 Sarla Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Jagdish chand land to Bimla devi land

3 43986

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Balakrupi to main khudd

3 58650

Jagdish chand land to garli bridge

3 58650

Shakti chand land to Sita ram land

2 39100

Check dam stone &

wire crated (Spur) 6mX1.25mX2.0m

Balakrupi to main khudd

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Balakrupi to main khudd

4 192840

Total 466546 436800 24746 Kotlu Check dam stone &

wire crated (Spur) 8mX1.25mX2.5m

Lunda wala nallah( Sri ram land to Dhani ram land0

2 96420

Check dam stone & wire crated (Spur)

Kutta wala nallah( Desh raj land to

2 73320

Page 110: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 98 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

6mX1.25mX2.5m Subhash land) Total 169740

81325 88415

Garli khas Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jol wala nallah( Milkhi ram to Matoli Nallah

4 78200

Dular singh house to Kangari nallah to Matoli Nallah

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Srwan ( Kabir panthi ) house nallah

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Khoba rada nallah( Charan dass land to Ghumar khud)

2 96420

Total 326140

266320 59820

Dhuma Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mandir nallah to khill( Parkash chand)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Mandir nallah to khill( Parkash chand)

3 109980

Total 149080 109200 39880

Mattkar Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kud nallah bodi harijan basti (Dev raj land to Matoli nallah

5 97750

Kuta da cho( Piar chand house to road side

4 78200

Total 175950 156182 19768 Khazian Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Garib dass house to water bodi

3 109980

Check dam stone & wire crated (Spur) 4mX1.25mX2.0

Inder house to pritam land tp main nallah

4 78200

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Mata mandir to main nallah khazian

4 58648

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jol wala nallaha ( jai ram land to rattan chand land)

3 58650

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Doag wala nallah: main road to khawaja

4 78200

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Hans raj land to rattan chand land

2 38100

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gujjar ram house to main nallah khazian

6 117300

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Gujjar ram house to main nallah khazian

2 96420

Page 111: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 99 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jagan nath land to main nallah khazian

5 97750

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Sukh ram house to main nallah khazian

6 87972

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Sukh ram house to main nallah khazian

4 78200

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Sukh ram house to main nallah khazian

2 96420

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Poultry farm nallah 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Pogar panga( kamal kishor land to Pogar panga

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Dukhral ( Sambhu ram ) to Khawaja( Chaman lal)

4 146640

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Janj ghar to Khawaja khud

4 146640

Total 59 1396644 1245519 151125 Grand Total

3147096 2706946 435150

Village Wise Budget Allocation under Soil Conservtion Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Bhanan RWHT(2mx2mx1m) 80727 75600 4627 Total 80727 75600 4627 Manhan Check dam stone &

wire crated (Spur 97750 84000 13750

Total 97750 84000 13750 Bahina Check dam stone &

wire crated (Spur 224840 201600 23240

Total 224840 201600 23240 Mohlwin Check dam stone &

wire crated (Spur 140406 126000 14406

Total 140406 126000 14406 Sarla Check dam stone &

wire crated (Spur 466546 436800 24746

Total 466546 436800 24746 Kotlu RWHT(2mx2mx1m) 80727 80727 Pacca tankRCC

5mx4mx1m 207548 207548

Check dam stone & wire crated (Spur

169740

81325 88415

Total 458015 369600 88415 Garli khas RWHT(2mx2mx1m) 53818 53818 Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704

Hand pump 203082 203082 Check Dam 216849 216849

Page 112: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 100 - 

Village Particulars Total Cost

IWMP Budget

Convergence (MNREGA)

8m(2m+1m)/2mx2m Check dam stone & wire

crated (Spur 326140

266320 59820

874593 814800 59820 Total 814827 59793 Dhuma Check dam stone & wire

crated (Spur 149080

109200 39880

Total 149080

109200 39880

Mattkar RWHT(2mx2mx1m) 53818 53818 Check dam stone & wire

crated (Spur 175950 156182 19768

Total 229768 210000 19768 Khazian Pacca tankRCC

5mx4mx1m 207548 207548

RWHT(2mx2mx1m) 26909 26909 Hand pump 101541 101541 Check Dam

8m(2m+1m)/2mx2m 73283 73283

Check dam stone & wire crated (Spur

1396644 1245519 151125

Total 1805925 1654800 151125 Grand total 1468284 1293600 169184 Ganghot Kalan Sructures Check Dam

6m(2m+1m)/2mx2mCheck Dam 8m(2m+1m)/2mx2m

Total No.

Unit cost

Total cost

Dhakriana 1 2 54216 108432 Ghanghot Kalan

1 1 1 72283 72283

Total 180715 List of proposed sites Sructures Check Dam

6m(2m+1m)/2mx2m Dhakriana In the land of Sh. Jagat Ram

Ghanghot Kalan

In the land of Sh. Sarwan Singh

Check Dam 8m(2m+1m)/2mx2m

Ghanghot Kalan

In the land of Sh. Jharu Ram /Bhagat Ram at Matoli Nallah

List of Check dam stone & wire crated (Spur) Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Ghangot Kalan

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Khobla: (jai Singh land to Udho Ram)

3 109980

Tulsi Ram House to Ranjit Singh land

3 109980

Taurya Di Bael (Pratap Singh land to Sarwan /Ranjit land)

2 73320

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Phale wala cho (Sarwan Land to Sukhan devi land)

5 97750

Jeet ram land to 3 58650

Page 113: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 101 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Baggu Ram land Kasal nallah

(Karam Chand land to Hukam chand land)

4 78200

Total 20 527880 456129 71751 Dhakyana Check dam stone

& wire crated (Spur) 6mX1.25mX2.5m

Dhakyana nallah (Gian Singh house to saryali khadd)

3 109980 86708 23272

Total 3 109980 86708 23272 Badhu

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Satish kumar land to bridge

2 73320

Total 73320 67200 6120 Gutiana Fencing Tauri de bad

(Pratap Singh land)

400m 120352

Fencing Tauri de bad (Yashpal Singh land)

250m 75220

Dib-Rahgubir Singh/Shamsher Singh

600 m 180258

Total 375830

376100 270

Ghangot Khurd

Fencing Jolhki- Rulia Ram Land

1000m 300880 300880

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Than cho (Yashpal land to Ranjit land)

2 73320 73320

Total 374200

374200 Nil

Grand Total 1461210 1360337 101413 Village wise budget allocation under soil conservation Mangroli Mangroli Mangroli Mangroli Mangroli Ghangot Kalan

Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check Dam 6m(2m+1m)/2mx2m

54216 54216

Check Dam 8m(2m+1m)/2mx2m

72283 72283

Check dam stone & wire crated (Spur

527880 456129 71751

Total 1088151 1016400 71751 Dhakyana Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676

Check Dam 6m(2m+1m)/2mx2m

54216 54216

Page 114: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 102 - 

Check dam stone & wire crated (Spur

109980 86708 23272

Total 182872 159600 23272 Badhu Check dam stone & wire

crated (Spur 73320 67200 6120

Total 73320 67200 6120 Gutiana Fencing 375830

376100 270

Total 375830

376100 270

Ghangot Khurd

Fencing 300880 300880

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

73320 73320

Total 374200

374200 Nil

Grand Total 2094373 1993500 101413 Giaragram Villages Structure/work Activities to be undertaken Check Dam

8mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Masalan kalan

1 Dub Khad (Dadol) 72283 72283 - Irrigation of 30 kanal area

Total 72283 72283 - Villages Structure/work No. Activities to be undertaken Maslana kalan

Check dam stone & wire crated (Spur)

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

6mx1.25mx2.5mm 2 Community based Barla nalah

-

6mx1.25mx2.5mm 12 Karnala Nalh - Total 14 513240 Janjiani Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Gandak Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dugahla wala cho (Janj ghar to Kohlri)

3 43986

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Bain da nallah (Jagdish Chand land to Water bodi)

2 39100

Total 83086

73724 9362

Kohlari Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Bhagat Ram to Udho Ram Land

2 29324

Total 29324 21448 7876 Grand Total 112410 95172 17238

Village wise budget allocation under soil conservation Village Particulars Total IWMP Convergence

Page 115: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 103 - 

Cost Budget (MNREGA) Gandak Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur)

83086

73724 9362

Total 101762 92400 9362 Kohlari Well Open

Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Check dam stone & wire crated (Spur)

29324 21448 7876

Total 66676 58800 7876 Grand Total 168438 151200 17238 Kiara Bagh Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Desen Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Dhamde da cho( Sunka ram land to Prem Chand land)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Dhamde da cho( Sunka ram land to Prem Chand land)

2 73320

Pilyde da cho( Kashmir singh to Relu Ram land)

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Pilyde da cho( Kashmir singh to Relu Ram land)

1 48210

Total 233950 176555 57395 Kohdra Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Sant Ram to Parkash Chand Land

4 78200 - -

Total 78200 - - Badloi Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Sarol cho( Sant Ram to Pritam Singh land)

3 109980

Bali wala cho

2 73320

Total 183300 134198 49102 Bhaged Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Lahya da cho( Onkar land to Subhash chand land)

2 73320

Check dam stone & wire crated (Spur)

Sarwan Kumar land

2 119534

Page 116: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 104 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

10mX1.25mX2.5m to Barbi land

Total 192854 148226 44628 Palehra Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Relu ram land to Pritam Singh land

4 78200 - -

Nalu da cho to Naun di Bali

4 78200 - -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Mitan wala cho ( Kishor kumar land to bhagan devi land)

43986 - -

Total 200386 196750s 3636 Kiara Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Balu ka Nala( Dhani Ram land to Dev datt land)

2 39100 - -

Water body wala nala( Brahmi devi land to Dhani Ram land)

2 39100 - -

Total 78200 48524 29676 Kharota Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Jalanu nala( Krishna Dayal land to Kuldeep chand land)

2 73320

Chalauli cho( Ram Rakha land house to Subhash chand Land)

2 73320

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chalauli cho( Ram Rakha land house to Subhash chand Land)

3 58650

Total 205290 186868 18422 Kheri Check dam stone &

wire crated (Spur) 10mX1.25mX2.5m

Saryali khud( Shambu Ram/Dev Raj land to Ram Nath land)

6 358602 358602 -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Brahm Dass to Bansi Ram Land

2 29324

Check dam stone & Sita Ram 2 39100

Page 117: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 105 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 4mX1.25mX2.0m

house to Duni Chand

Shambhu Ram land to Baljit

2 39100

Total 466126 420896 45230 Sunwin Rajputtan

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Baggu di bali to Shakra Ram land

3 109980

Naun nala (Shankar dass land to Keasr dass land0

2 73320

Total 183300 143696 39604 Kohlwin Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Khildu di khad ( Rattan chand to Ranjit land )

3 109980 - -

Bali wala cho ( Sant Ram to Parkash Chand land)

2 73220 -

Total 183200 176400 6800 Bagh Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

School( dharm chand land to Ram Nath land

1 59767 58800 967

Total 59767 58800 967 Grand Total 2064573 1494163 295460 Village wise budget allocation under soil conservation Village Particulars Total

CostIWMP Budget

Convergence(MNREGA)

Kohdra Pacca tank 5mx4mx1m

207548 162783 44765

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Handpump 101541 101541 - Check dam stone & wire crated

(Spur 78200 78200 -

Total 405965 361200 44765 Badloi Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

56028 56028

Check dam stone & wire crated (Spur

183300 134198 49102

Total 343102 294000 49102 Baghed Pacca tank 103774 103774 -

Page 118: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 106 - 

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

5mx4mx1m Check dam stone & wire crated

(Spur 192854 148226 44628

Total 296628 252000 44628 Pelehra Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

200386 196750 3636

Total 322836 319200 3636 Kharota Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Handpump 203082 203082 - Check dam stone & wire crated

(Spur 205290 186868 18422

Total 530822 512400 18422 Desen Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Handpump 101541 101541 - Check dam stone & wire crated

(Spur 233950 176555 57395

Total 410195 352800 57395 Kheri Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check dam stone & wire crated (Spur

466126 420896 45230

Total 540830 495600 45230 Sunwin Rajputtan

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check dam stone & wire crated (Spur

183300 143696 39604

Total 258004 218400 39604 Sunwin Brahmana

Kuhal 203820 193200 10620

Total 203820 193200 10620 Kohlwin Check dam stone & wire crated

(Spur 183200 176400 6800

Total 183200 176400 6800 Kiara Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

78200 48524 29676

Total 96876 67200 29676

Page 119: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 107 - 

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Bagg Check dam stone & wire crated (Spur

59767 58800 967

Total 59767 58800 967 Grand Total 3652045 3301200 350845 Kulehra Villages Structure/

work Activities to be undertaken

Check Dam 10m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Tangar 1 Tota Chau 90677 90677 Irrigation of 80 kanal area

Total 1 90677 90677 List of Check dam stone & wire crated (Spur) Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Karha, Lahri Ghumara & Lahri Tarkhana

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Bainja da phat 4 146640

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Well to Sunhani tak

10 146620

Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Dhaula cho to Sunhani brahmna

4 239068

Total 532328 428400 103928 Dagwar Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Bakshi Ram residence to Malkit singh

6 219960

Golu wala cho 10 366660 Harijan Basti 2 73320 Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Gujran di gaari 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gaari wala cho 10 195500

Total 884764 882000 2764 Changar Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Kuan se niche cho Pakka tak

2 73320

Check dam stone & wire crated (Spur) 10x1.25x2.5 m

Banku ram to birbal shop

4 239068

Ghali wali khadd

4 146640

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Matriana changar kwali ke Madhya wala nalah

4 78200

Page 120: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 108 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Gabale Baas (Kuan cho)

4 58648

Changar-dagwar naala

4 58648

Chhinja da garu

5 73310

Total 918591 865200 53391 Sulhari

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dinanath land to Transformer sulhari

10 14662

Gahre de choi 3 43986 Dhoa da cho 3 43986 Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Nalah/Rakha da cho

10 195500

Roshan lal land to Daljeet house

3 58650

Total 488742 369600 119142 Sunhani Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

School to Chhajju Dalip singh ke Maveshi khana tak

6 219960

Total 219960 193200 26760 Tangar

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Ballian, Roop lal to Roshan lal land

5 73310

Ropa tela 4 58648 Khoblu Cho to

Peer Mandir 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Balua da cho to Uperla tanger da Kuan

4 78200

Gallue da cho 5 97750 Total 20 337232 262123 75109 Grand Total 3381617 3000523 381094 Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Karha, Lahri Ghumara & Lahri Tarkhana

Check dam stone & wire crated (Spur

532328 428400 103928

Total 532328 428400 103928 Dagwar Check dam stone &

wire crated (Spur 884764 882000 2764

Total 884764 882000 2764 Changar Check dam stone &

wire crated (Spur 918591 865200 53391

Total 918591 865200 53391 Sulhari

Check dam stone & wire crated (Spur

488742 369600 119142

Total 488742 369600 119142 Sunhani Check dam stone &

wire crated (Spur 219960 193200 26760

Page 121: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 109 - 

Total 219960 193200 26760 Tangar

Check dam stone & wire crated (Spur

337232 262123 75109

Check Dam 10m(2m+1m)/2mx2m

90677 90677

Total 427909 352800 75109 Grand Total 3472294 3091200 381094

Sohari Villages Structure/work Activities to be undertaken Check Dam

8mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 Khasra no 683 72283 72283 0 Irrigation of 150 kanal area

Total 1 - 72283 72283 0

Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 On the land of Sh Bhagat Ram and Prem singh( Khasra no 607)

54216 54216 0 Irrigation of 50 kanal area

Magnoti 1 On the land of Sh Bhagi Rath

54216 54216 0 Irrigation of 100 kanal area

1 On the land of Smt Bagwanti devi and Annat Ram

54216 54216 0 Irrigation of 50 kanal area

Total 3 162648 162648 0

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Duggyar Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Parun to primary school

10 97750

primary school to Ghori da nala( harijan basti)

5 48875

Chhor to bred ki or 10 97750 Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Guggu nala to danger tak

15 219930

Total 464305 439062 25243 Barla Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Bag wala cho 8 78200 -

Baien wala cho 8 78200 - Garane wale pange

babri tak 8 78200 -

Baroti wala nala 8 78200 - Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Pange se bain nala tak

8 117296 -

Total 430096 350633 79463 Sohari Check dam stone &

wire crated (Spur) Kiliwal cho to Kachwin

8 117296 -

Page 122: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 110 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

3mX1.25mX2.0m Thau te shiv mandir 8 117296 - Harijan basti to

kachwin 10 146620

Tetar to Lahdi ki aur 6 87972 - Gaurav keg hare to

Tangar side 10 146620 -

Total 615804 468192 147612 Magnoti Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Pandiri se jamun ke ped tak

5 48875 - -

Boru wala cho- jamun-mandir tak

5 48875 - -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Gare wali khadi palehra ke pass se bori tak

8 117296 - -

Naya kuan magnoti se bhaged se kiara tak

5 73310 - -

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Daguyar se Brahman bhaged se kuan tak

5 183300 - -

Total 471656 289623 182033 Ghulera Fencing Khasra no. 679-82-

83,63-65 Jondu Ram ,Banta Ram ,Lekh Ram ,Jeet Ram, Pritam Chand and Others

1500m 451320 401324 49996

Total 451320 401324 49996 Grand Total

2433181 1948834 484347

Village Wise Budget Allocation Under Soil Conservation

Village Particulars Total

Cost IWMP Budget

Convergence(MNREGA)

Duggyar Pacca tank 5mx4mx1m 26909 26909 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Babri 19353 19353 - Check dam stone & wire

crated (Spur 464305 439062 25243

Total 529243 504000 25243 Barla Well Open

Sink type of 2.4 m dia. and 3 m deep

37352 37352 -

RWHT(2mx2mx1m) 26909 26909 - Babri ( 2mx1.2mx0.9m) 38706 38706 Check dam stone & wire

crated (Spur 430096 350633 79463

Total 533063 453600 79463 Sohari RWHT(2mx2mx1m) 26909 26909 -

Page 123: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 111 - 

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Check Dam 8mx(2m+1m)/ 2mx2m and No.

72283 72283 -

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216 -

Check dam stone & wire crated (Spur

615804 468192 147612

Total 769212 621600 147612 Magnoti Pacca tank

5mx4mx1m 26909 26909 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Bore well 200mmx150mmat 70m depth

354360 354360

Check Dam 6m(2m+1m)/ 2mx2m and No.

108432 108432 -

Check dam stone & wire crated (Spur

471656 289623 182033

Total 980033 798000 182033 Ghulera Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Fencing 451320 401324 49996 Total 469996 420000 49996 Grand Total

3281547 2797200 484347

Usnar Kalan Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Usnar Kalan

1 In the land of Sh Rattan Chand /Sanjay Kumar

54216 For Irrigation of 30 kanal area

Nara 1 In the land of Sh Madan Lal and Lachman Dass

54216 For Irrigation of 100 kanal area

Villages Structure/work Activities to be undertaken Check Dam

10m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Usnar Kalan

1 In the land of Sh Puran Chand

90676 For Irrigation of 50 kanal area

Page 124: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 112 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Jajal Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dhian Singh Land to Sarwan Land

2 29324

Ram Singh to Madal Lal/Tara Chand Land

2 29324

Dewan Phatt Amar Nath- Balwant Rai

2 29324

Garne di Kwali 2 29324 Balwant Rai

Land 3 43986

Tara Chand Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Amar Nath Land

2 39100

Dhian Chand Land

2 39100

Total 17 268806 243600 25206 Ghatta Panga Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Ajudhya devi house to Madan Lal Land

3 43986

Balwant Rai to Subash Chand

4 58648

Babu Ram – Jeet Ram Land to Khadd

3 43986

Total 10 227347 210000 17347 Narkar

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Panchayat Ghar to Harnam Dass Land

4 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans Raj house to Hari Ram Land

2 29324

Hari Ram land to Lihar

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Baina to Dug (Harnam Dass to Udo ram land)

4 78200

Total 15 219934

170452 49482

Usnar Khurd Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Anant Ram Land to Saryali Khadd

2 29244

Total 2 29244 8776 20468 Usnar Kalan Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Dina Nath Suresh Kumar Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Puran Chand to Saryali Khadd

2 39100

Total 4 68424 23484 44940

Page 125: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 113 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Chukhiniar Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Hans Raj Land to Khadd

2 29324

Raj Kumar Land to Saryali Khadd

4 58648

Suhru Ram house to Rikhi Ram land

2 29324

Raju/ Bishambari Land to Khadd

2 29324

Vyasan Devi Land

2 29324

Manbhari Land

2 29324

Total 205268

167259 38009

Gurya Khurd Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Prabhu ram/ chotu ram land

2 29324

Bhandari Ram parkash Chand

2 29324

Gian Chand Land

2 29324

Chotu ram land

2 29324

Total 8 117296 100059 17237 Gurya Kalan Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Dhannu Ram/Shyam lal Land

2 19550

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans Raj (Road) to Bishambhari Devi

3 43986

Hari Kishan to Beli Ram Land

5 73310

Thanedar Kotha to Bhandari Ram Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Desh Raj/Beli ram land to main khadd

4 78200

Hem Raj land to Saryali Khadd

4 78200

Punnu ram land to Saryali Khadd

4 78200

Dhannu Ram land to Saryali Khadd

2 39100

Total 439870

416120 23750

Nara Check dam stone & Vasu Dev 3 179301

Page 126: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 114 - 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 10mX1.25mX2.5m

Land

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Banku Ram/Sukh Ram House to Basudev Tank

2 43986

Main Road to Basu Dev Tank

2 29324

Hans Raj land to Lachman Dass Land

2 29324

Primary School (Nara) to Jyoti House to Khill

6 87972

Dharam Dei Land to Saryali Khadd

4 58648

Madan Lal Land

4 58648

Road (Jubbali) to Darjian di balli

5 73310

Parkash Chand Kartar Chand Land

3 43986

Garib Dass land to Khadd

2 29324

Bhagg singh Land

4 58648

Gugga (Jol) to Chaproh boundary

4 58648

Baroli (Shakti chand land) to Khadd

6 87972

Sandesh / Bhag Singh Land to Khadd

10 146620

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Leela Devi land to Saryali Devi

4 78200

Total 61 1063911 855139 168772 Village Wise Budget Allocation under Soil Conservtion

Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Jajal Check dam stone & wire crated (Spur

268806 243600 25206

Total 268806 243600 25206 Ghatta Panga Check dam stone & wire crated

(Spur 227347 210000 17347

Total 227347 210000 17347 Narkar Pacca tank

5mx4mx1m 207548 207548

Page 127: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 115 - 

Village Particulars Total Cost

IWMP Budget

Convergence (MNREGA)

Check dam stone & wire crated (Spur)

219934

170452 49482

Total 427482 378000 49482 Usnar Khurd Pacca tank

5mx4mx1m 207548 207548

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check dam stone & wire crated (Spur)

29244 8776 20468

Total 255468 235000 20468 Usnar Kalan Pacca tank

5mx4mx1m 311322 311322

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check Dam 10mx(2m+1m)/ 2mx2m and No.

90677 90677

Check Dam 6m(2m+1m)/ 2mx2m and No.

54210 54210

Check dam stone & wire crated (Spur)

68424

23484 44940

Total 599337 554397 44940 Chukhiniar Handpump 101541 101541 Check dam stone & wire crated

(Spur) 205268

167259 38009

Total 306809 268800 38009 Gurya Khurd Handpump 101541 101541 Check dam stone & wire crated

(Spur) 117296 100059 17237

Total 218837 201600 17237 Gurya Kalan Pacca tank

5mx4mx1m 311322 311322 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Handpump 203082 203082 Check dam stone & wire crated

(Spur) 439870

416120 23750

Total 972950 949200 23750 Nara Handpump 101541 101541 Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216

Check dam stone & wire crated (Spur)

1063911 835139 168772

Total 1294372 1125600 168772 Grand Total 4571408 4166197 405211

Page 128: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 116 - 

10. Livelihood Concerns

Bal Bihal Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Agwin Upper & Bulhy, Balh patian and Chaloli Total

Mushroom Cultivation

3 (50 bags) 30000 10000 20000 -

Vermiculture Unit 3mx1m( Low cost)

5 no. 25000 - 25000 10000 20000 -

Total 55000 - 25000 10000 20000 - Balh Brahmana, Jangal and Chatpahl

Mushroom Cultivation

2(50 bags) 20000 20000 -

Vermiculture Unit 3mx1m( Low cost)

7no. 35000 35000 - - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Total 75000 35000 - 20000 20000 - Behal , Mathohal and Padian

Mushroom Cultivation

2 (50 bags) 20000 10000 10000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Total 90000 50000 - 10000 30000 - Kot Mushroom

Cultivation 3 (50 bags) 30000 - - 30000 - -

Tailoring Unit 1 144000 144000 Vermiculture

Unit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Bee-keeping 2 no.(10Boxesper unit)

40000 - - 20000 20000 -

Backyard poultry 100 chicks 20000 - - 20000 - Total 259000 25000 144000 70000 20000 Parwin Mushroom

Cultivation 2(50 bags) 20000 20000 - -

Vermiculture Unit 3mx1m( Low

8 no. 40000 40000 - - - -

Page 129: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 117 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cost) Backyard poultry 200 chicks 32300 - - 32300 - Bee-keeping 1

no.(10Boxesper unit)

20000 - - - 20000 -

Total 112300 40000 52300 20000 Total 85500 25000 - 40500 20000 - Kheri Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Sunwin Rajputtan and Kohlwin

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 50000 50000 - - - - Grand Total

591300 150000 169000 162300 110000 -

Bani

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Bani Khas Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 120 chicks 18000 - - 18000 -

Total 53000 25000 28000 Karwin Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

2 no. 10000 10000 - - - -

Total 40000 10000 10000 20000 - Kuthera and Mangroli

Mushroom Cultivation

1 (50 bags) 10000 10000

Backyard poultry 120 chicks 5000 - - 5000 - VermicultureUnit

3mx1m( Low cost) 5 no. 25000 25000 - - - -

Page 130: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 118 - 

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Total 40000 25000 - 15000 - Thana Income generation I no.

(Tailoring Unit)

144000 144000

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

3 no. 12950 12950 - - -

Total 186950 156950 10000 20000 Barsar

Village Intervention Area/no. Cost involved

(Rs)

I II III Iv v

Jabbal Kheri

Mushroom Cultivation

3(50 bags) 30000 - - 30000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 2 (100) chicks 30950 - - 30950 - - Total 130950 25000 25000 60950 20000

Bhakreri

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Baggi Vermiculture Unit 3mx1m( Low cost)

7 no. 35000 35000 - - - -

Total 35000 35000 - - - -

Kahil Vermiculture Unit 3mx1m( Low cost)

3 no. 15000 15000 - - - -

Total - 15000 15000 - - - -Bhakreri Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 80000 50000 - 10000 20000 -Kowa Vermiculture

Unit 3mx1m( Low cost)

7no. 35000 35000 - - - -

Total 35000 35000 - - - Makteri Mushroom 2(50 bags) 20000 - - 20000 - -

Page 131: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 119 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Cultivation Bee-keeping 1 no.(10Boxes

per unit) 20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Backyard poultry

150 chicks 23000 - - 23000 -

Total 113000 50000 - 43000 20000 - Jathunda Mushroom

Cultivation 3(50 bags) 30000 30000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10no. 50000 50000 - - - -

Backyard poultry

220 chicks 33750 - - 33750 -

Total 133750 50000 - 63750 20000 -Grand Total

411750 235000 116750 60000

Bijhari Village Intervention Area/no. Unit Cost

involved (Rs)

I II III IV V

Patta Nathu and Tikkar

Popularization of Mushroom cultivation

50bags 5 25000 25000

Exposure visit of the farmers to Solan

1 (25 farmers)

1 15000 15000

Total 40000 40000 - - Ambota Popularization

of Mushroom cultivation

50bags 5 25000 25000

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 45000 20000 25000

Bhawanee and Garari

Popularization of Mushroom cultivation

50bags 5 25000 25000 - -

Exposure visit of the farmers to Solan

1(25 farmers)

1 15000 15000

Page 132: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 120 - 

Village Intervention Area/no. Unit Cost involved (Rs)

I II III IV V

Total 40000 40000 - - Lakho Popularization

of Mushroom cultivation

50bags 5 25000 25000 - -

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 45000 20000 25000 - Narghol and Baghed

Popularization of Mushroom cultivation

50bags 5 25000 25000

Exposure visit of the farmers to Solan

1(25 farmers)

1 15000 15000 -

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 60000 20000 40000 - - Bijhari Popularization

of Mushroom cultivation

50 bags 8 41000 41000

Exposure visit of the farmers to Solan

1(25 farmers)

2 30000 30000 -

Bee Colonies 10 Boxes per unit

2 40000 40000

Tailoring Unit - 1 144000 144000 Micro

enterprise on Soft toy making

Three days Training to the farm women

2no (25 farmers)

86900 86900

Micro enterprise on tailoring and stitching

Three days Training to the farm women

2no (25 farmers)

86900 86900

Total 428800 184000 244800 Dhabriana Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Ganoh Rajputtan

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Page 133: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 121 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Backyard poultry 60 chicks 9450 - - 9450 - Total 64450 25000 19450 20000 Ganoh Brahmana

Income generation

I no. (Tailoring Unit)

144000 144000

VermicultureUnit 3mx1m( Low cost)

2 no. 10000 10000 - - - -

Total 154000 10000 144000 Dhabriana Mushroom

Cultivation 5 (50 bags) 50000 50000

Bee-keeping 2 no.(10Boxes per unit)

40000 - - - 40000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 140000 60000 - 50000 40000 - Langheree and Neri

Mushroom Cultivation

5 (50 bags) 50000 50000

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Backyard poultry 100 chicks 15000 - - 15000 - Total 115000 50000 65000 Loharda Income

generation I no. (Tailoring Unit)

144000 144000

VermicultureUnit 3mx1m( Low cost)

8 no. 40000 40000 - - - -

Total 184000 40000 144000 G. Total 657450 185000 288000 134460 60000 Dhadwin Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Sugal and Paplohal Hazaru

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

6 no. 30000 30000 - - - -

Backyard poultry 220 chicks 34400 - - 34400 - Total 94400 30000 0 44400 20000 0 Sariana Mushroom

Cultivation 3 (50 bags) 30000 30000

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

Page 134: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 122 - 

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 100000 50000 - 30000 20000 - Paplohal Brahmana

Mushroom Cultivation

4 (50 bags) 40000 20000 20000

Bee-keeping 2 no.(10Boxes per unit)

40000 - - 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 130000 50000 20000 40000 20000 0 Baryan Mushroom

Cultivation 1 (50 bags) 10000 10000

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 35000 25000 - 10000 - - Kachhwin Mushroom

Cultivation 3 (50 bags) 30000 30000

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 100000 50000 - 30000 20000 - Dandwin Mushroom

Cultivation 5 (50 bags) 50000 50000

Bee-keeping 2 no.(10Boxes per unit)

40000 - - 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 140000 50000 0 70000 20000 0 Grand Total

599400 255000 20000 224400 100000 0

Garli

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Banan, Manhan, Bahna and Molhwin

Mushroom Cultivation

2 (50 bags) 20000 - - 20000 - -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 100 chicks 16600 - - 16600 -Total 86600 25000 25000 26600 -Sarla Mushroom

Cultivation 2 (50 bags) 20000 20000

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Total 70000 25000 25000 20000

Page 135: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 123 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Kotlu Mushroom Cultivation

2 (50 bags) 20000 20000

VermicultureUnit 3mx1m( Low cost)

8 no. 40000 20000 20000 - -

Total 60000 20000 2000 20000 - Garli and Dhuma

Mushroom Cultivation

5 (50 bags) 50000 25000 25000

Bee-keeping 3 no.(10Boxes per unit)

60000 - 20000 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Total 160000 25000 70000 45000 20000 Matkar and Khajian

Income generation I no. (Tailoring Unit)

144000 144000

Mushroom Cultivation

5 (50 bags) 50000 25000 25000

Bee-keeping 2no.(10Boxes per unit)

40000 - - 20000 20000

VermicultureUnit 3mx1m( Low cost)

9 no. 45500 25000 20500 - -

Total 279500 25000 164500 45000 45000 Ganghot Kalan Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Dhakriana and Batyana

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 100 chicks 16300 - - 16300 - Total 71300 25000 - 26300 20000 - Badhu and Gutiana

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 10000 20000 Ghanghot Khurd

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 5 no. 25000 25000 - - - -

Page 136: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 124 - 

3mx1m( Low cost)

Total 55000 25000 - 10000 20000 - Ghanghot Kalan

Income generation

I no. (Tailoring Unit)

144000 144000

Mushroom Cultivation

2 (50 bags) 22550 22550

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 211550 25000 144000 22550 20000 G. Total 392850 100000 144000 68850 80000 Giaragram Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Maslanakalan Income generation I no. (Tailoring Unit)

144000 144000

Jhanjiani Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Gandhak and Kohlri

VermicultureUnit 3mx1m( Low cost)

5 no. 24300 - 24300

Kiarabagh Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Bagg and Desen

Mushroom Cultivation

2 (50 bags) 20000 10000 10000 -

Bee-keeping 2 no.(10Boxes per unit)

40000 - 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 - 50000 - - -

Total 110000 - 50000 30000 30000 - Kohdera Mushroom

Cultivation 2 (50 bags) 20000 10000 10000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 - Bdloi Mushroom

Cultivation 2 (50 bags) 20000 10000 10000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 -

Page 137: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 125 - 

Baghed Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

4 no. 20000 20000 - - - -

Total 30000 20000 - 10000 - - Pelehra Mushroom

Cultivation 2 (50 bags) 20000 10000 10000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 - Sunwin Brahmana and Kiara

Mushroom Cultivation

1(50 bags) 10000 10000 - -

VermicultureUnit 3mx1m( Low cost)

5 no. 24550 24550 - - - -

Total 34550 24550 - 10000 - - Kharota Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Kheri Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Sunwin Rajputtan and Kohlwin

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 50000 50000 - - - -Grand Total

530550 219550 50000 161000 100000 0

Kulehra Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Karah Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

4 no. 20000 20000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - - Total 60500 20000 - 40500 - - Lahri ghumara and Lahari Tarkhana

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

Page 138: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 126 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

and Mindwin VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total - 45000 25000 - - 20000 - Changar Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 200 chicks 30500 - - 30500 - - Total 110500 25000 25000 30500 20000 Dagwar Income

generation I no. (Tailoring Unit)

144000 - 144000 - - -

Total 144000 - 144000 - - Sunhani VermicultureUnit

3mx1m( Low cost)

4 no. 20000 20000 - - - -

Total 20000 20000 - - - - Tangar Bee-keeping 1

no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - - 20000 - Sulahari Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 215 chicks 32820 - - 32820 - Total 87820 25000 - 42820 20000 -

Grand Total

512820 140000 169000 113820 80000 -

Sohari Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Sohari Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 5 no. 25000 25000 - - - -

Page 139: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 127 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

3mx1m( Low cost) Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Magnoti Income generation I no.

(Tailoring Unit)

144000 144000

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 199000

25000 144000 10000 20000 -

Ghulera Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Barla Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Dugyar Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Grand Total

449500 125000 144000 80500 100000

Usnarkalan Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

jajal VermicultureUnit 3mx1m( Low cost)

7 no. 35000 35000 - - - -

Total 35000 35000 - - - - Narkar Bee-keeping 1

no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

8 no. 40000 40000 - - - -

Total - 60000 40000 - - 20000 -Gatapanga Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 20000 - - - 20000 -

Page 140: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 128 - 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

no.(10Boxes per unit)

Total 30000 - - 10000 20000 - Usnarkhurd Bee-keeping 1

no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

4 no. 20000 20000 - - - -

Total 40000 20000 - - - Usnarkalan Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 -Total 85500 25000 - 40500 20000 -Chukhniar Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxes per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

6 no. 30000 30000 - - - -

Total 60000 30000 - 10000 20000 - Kuryah khurd

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 35000 25000 - 10000 - - Kuryah kalan Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 2 no.(10Boxes per unit)

40000 - - - 40000 -

VermicultureUnit 3mx1m( Low cost)

15 no. 75000 50000 25000 - - -

Backyard poultry 160 chicks 24360 - - 24360 - Total 149360 50000 25000 34360 40000 0 Nara Income generation I no.

(Tailoring Unit)

144000 - 144000 - - -

VermicultureUnit 3mx1m( Low cost)

4 no. 20000 20000 - - - -

Backyard poultry 70 chicks 10740 - - 10740 - Total 174740 20000 144000 10740 0 0 Grand Total 669600 245000 169000 115600 120000 0

Page 141: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 129 - 

11. Capacity Building Bal Bihal

Bani

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24475 48950

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43500 43500

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

2 (30 farmers)

2 45700 45700

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 328500

Intervention Strategy /Issues Activity

Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture Diversification Diversificati

on towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Page 142: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 130 - 

Barsar

Bhakreri

Animals husbandry Poultry Poultry Three day Training to the farmers

with regard to management of poultry farm

1(25 farmers)

1 47400 47400

Mushroom Cultivation/Bee keeping/Micro enterprise Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 177750

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost (Rs)

Total cost (Rs)

1 2 3 4 5 6 7Agriculture Polyhouse Commercial

cultivation under polyhouse conditions

Two days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard poultry Two days Training to

the farmers with regard to management of poultry farm

1(25 farmers)

1 29300 29300

Total 72750

Intervention Strategy /Issues Activity Programme cost Unit Size No Unit

cost (Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial cultivation

under polyhouses Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture Diversification Diversification towards

drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard poultry Two day Training to

the farmers with regard to management of poultry farm

1(25 farmers)

1 20750 20750

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Page 143: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 131 - 

Bijhari

Dhabriana

Micro enterprise on value addition

Income generation Three days Training to the farm women

1no (25 farmers)

1 43550 43550

Total 228750

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry Two days Training to the farmers with regard to management of poultry farm

2 (25farmers)

2 39050 39050

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 366000

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost (Rs)

Total cost (Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial Three days Training to 1no. (25 1 43450 43450

Page 144: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 132 - 

Dhadwin

cultivation under polyhouses

the farmers on protected cultivation technology

farmers)

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

2(25 farmers)

2 38300 38300

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 365250

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

2no. (25 farmers)

1 43450 86900

Water Conservation

One days Training to the farmers on water conservation

4 no. (20 farmers0

1 12950 51800

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard One day Training to the 1(25 2 14450 28900

Page 145: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 133 - 

Garli

poultry farmers with regard to management of poultry farm

farmers)

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 78500 78500

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 333000

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24475 48950

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

2(25 farmers)

2 38300 38300

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 364500

Page 146: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 134 - 

Ganghot Kalan

Giaragram

Intervention Strategy / Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

2 no. (20 farmers0

1 27400 27400

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

2 (25 farmers)

2 26400 26400

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Total 218250

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost (Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture Animals husbandry Poultry Backyard poultry One day Training to the

farmers with regard to management of poultry farm

1(25 farmers)

3 12266 36798

Total 80248

Page 147: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 135 - 

Jhanjiani

Kiarabagh

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouse conditions

Two days Training to the farmers on protected cultivation technology

1no. (20 farmers)

1 13500 13500

Total 13500

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(20 farmers)

3 15000 45000

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

1(25 farmers)

2 14450 28900

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 294750

Page 148: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 136 - 

Kulehra

Sohari

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

1(25 farmers)

1 14450 14450

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 285000

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Horticulture Diversification Diversification Three days Training 1no (25 1 43450 43450

Page 149: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 137 - 

Usnarkalan

towards drought/frost tolerant fruit plants

to the farmers on plantation of fruit crops

farmers)

Animals husbandry Poultry Backyard poultry One day Training to

the farmers with regard to management of poultry farm

1(25 farmers)

2 14450 28900

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 249750

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

2 43450 86900

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Poultry

Farming Three day Training to the farmers with regard to management of poultry farm

1(25 farmers)

1 43550 43550

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Micro Income Three days Training to the 1no (25 1 14450 14450

Page 150: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 138 - 

Monitoring system (Watershed Level)

A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database, which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Evaluation

• During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project.

• Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target Group and Location of the Programme

Target group No. of participants Activity Location Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level

enterprise on value addition

generation farm women farmers)

Total 372000

Page 151: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 139 - 

SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members 10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Participatory Approach for Implementation of Project For the implementation of this project plan, participatory approach is more pertintent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, and user group’s etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases:

Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for

implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include: Preparation of DPR

During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalized so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 152: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 140 - 

12. Project Withdrawal and Consolidation Phase

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are: Consolidation and completion of various works

Building the capacity of the community based organization to carry out the new agenda items during post project period.

Sustainable management of developed natural resources regarding farm production system and off-farm livelihoods The following activities are to be taken up during this phase. Consolidation of Various Works

• Preparation of Project report with details about status of each intervention • Documentation of successful experiences as well as lesson learnt for future use. • Management of developed natural resource • Involving the sustainability of various interventions under the project • Formal allocation of user rights over common property resources(CPRs) • Repair, maintenance and protection of CPRs • Sustainable utilization of developed natural resources • Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / Off- Farm Livelihoods • Up scaling of successful experiences related to above aspects through revolving

fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –Withdrawal Project Management Related Aspects • Participatory planning, implementation and marketing of activities to be carried out

during consolidation phase • Terminal evolution of project as per the expected and aims

Page 153: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 141 - 

13. Activity and Budget

Balh Bihal Micro Watershed Name of Panchyat Name of Village Treatment Area ha Budget (Rs.) Balh Bihal Aghwin Upperly 12 100800 Aghwin Bulhy 14 117600 Balh Patlian 29 243600 Chaloli 12 100800 Balh Brahmana 37 310800 Jangal 15 126000 Chatpahl 18 151200 Behal 32 268800 Mathohal 28 235200 Padian 18 151200 Kot 147 1234800 Pairwin 76 638400

Executive Summary Budget Component Percent of Budget Amount (`) Administrative cost 10 657000 Monitoring 1 65700 Evaluation 1 65700 Preparatory Phase Entry Point Activities 4 262800 Institutional and Capacity building 5 328500 Detailed Project Report 1 65700 Watershed Development Phase Watershed Development Works 56 3679200 Livelihood activities 9 591300 Production System & Microenterprises 10 657000 Consolidation Phase 3 197100 Total 100 6570000

Bani Micro Watershed Name of the Panchayat Village Code

Bani Banikhas 01067700 Karwin 01067600 Kuthera 01067500 Mangroli 01067900 Thana 01065400

Executive Summary Budget Component Per cent of Budget Amount () Administrative cost 10 355500 Monitoring 1 35550 Evaluation 1 35550 Preparatory Phase Entry Point Activities 4 142200 Institutional and Capacity building 5 177750 Detailed Project Report 1 35550 Watershed Development Phase Watershed Development Works 56 1990800

Page 154: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 142 - 

Livelihood activities 9 319950 Production System & Microenterprises 10 355500 Consolidation Phase 3 106650 Total 100 3555000

Barsar Micro Watershed Name of the Panchayat Village Code Barsar Jabhal Kheri 01059800

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 145500 Monitoring 1 14550 Evaluation 1 14550 Preparatory Phase Entry Point Activities 4 58200 Institutional and Capacity building 5 72750 Detailed Project Report 1 14550 Watershed Development Phase Watershed Development Works 56 814800 Livelihood activities 9 130950 Production System & Microenterprises 10 145500 Consolidation Phase 3 43650 Total 100 1455000

Bhakreri Micro Watershed Name of the Panchayat Village Code Bhakreri Baggi 01067200 Rahil 01067100 Bhakreri 01067000 Kohwa 01067300 Makteri 01068300 Jathunda 01067400

Executive Summary Budget Component Percent of Budget Amount (Rs.)

Administrative cost 10 457500 Monitoring 1 45750 Evaluation 1 45750 Preparatory Phase Entry Point Activities 4 183000 Institutional and Capacity building 5 228750 Detailed Project Report 1 45750 Watershed Development Phase Watershed Development Works 56 2562000 Livelihood activities 9 411750 Production System & Microenterprises 10 457500 Consolidation Phase 3 137250 Total 100 4575000

Page 155: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 143 - 

Bijhari Micro Watershed Name of the Panchayat Village Code

Bijhari Patta Nathu 01083500 Tikkar 01080200 Ambota 01080000 Bhanwanee 01079900 Garari 01079700 Lakho 01079600 Narghol 01079800 Bijhari 01079400 Baghed 01079500

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 732000 Monitoring 1 73200 Evaluation 1 73200 Preparatory Phase Entry Point Activities 4 292800 Institutional and Capacity building 5 366000 Detailed Project Report 1 73200 Watershed Development Phase Watershed Development Works 56 4099200 Livelihood activities 9 658800 Production System & Microenterprises 10 732000 Consolidation Phase 3 219600 Total 100 7320000

Dhabriana Micro Watershed Name of the Panchayat Village Code Dhabriana Ganoh Rajputtan 01064700 Ganoh Brahmana 01064900 Dhabriana 0106500 Langheree 01065200 Neri 01065100 Loharda 01065300

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 730500 Monitoring 1 73050 Evaluation 1 73050 Preparatory Phase Entry Point Activities 4 292200 Institutional and Capacity building 5 365250 Detailed Project Report 1 73050 Watershed Development Phase Watershed Development Works 56 4090800 Livelihood activities 9 657450 Production System & Microenterprises 10 730500 Consolidation Phase 3 219150 Total 100 7305000

Page 156: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 144 - 

Dhandwin Micro Watershed Name of the Panchayat Village Code Dandhawin Sugal 01084100

Paplohal Hazaru 01085100 Sariana 01084800 Paplohal Brahmana 01085200 Baryan 01084700 Kachwin 01084200 Dandhwin 01084500

Executive Summary Budget Component Percent of Budget Amount

(Rs.) Administrative Cost 10 666000 Monitoring 1 66600 Evaluation 1 66600 Preparatory Phase: Entry point activities 4 266400 Institution & capacity building 5 333000 Detailed project report (DPR) 1 66600 Watershed Works Phase: Watershed development works 56 3729600 Livelihood activities 9 599400 Production system & microenterprises 10 666000 Consolidation phase: 3 199800 Total 100 6660000

Garli Micro Watershed Name of the Panchayat Village Code Garli Banani 01062800 Manhan 01062900 Bahina 01063400 Mohlwin 01063000 Sarla 01063200 Kotlu 01063100 Garlikhan 01063300 Dhuma 01065800 Mattkar 01065700 Khajian 01065900

Executive Summary Budget Component Percent of Budget Amount

(lacs) Administrative Cost 10 694500 Monitoring 1 69450 Evaluation 1 69450 Preparatory Phase: Entry point activities 4 277800 Institution & capacity building 5 347250 Detailed project report (DPR) 1 69450 Watershed Works Phase: Watershed development works 50 3472500

Page 157: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 145 - 

Livelihood activities 10 694500 Production system & microenterprises 13 902850 Consolidation phase: 5 347250 Total 100 6945000

Ghangotkalan Micro Watershed Name of the Panchayat Village Code Ghanghotkalan Dhakyana 01061900 Batyana 01062100 Adhu 01062200 Ghutiana 01062000 Ghangot Khurd 01061800 Ghangot Kalan 01061700

Executive Summary Budget Component Percent of Budget Amount

(Rs.) Administrative cost 10 436500 Monitoring 1 43650 Evaluation 1 43650 Preparatory Phase Entry Point Activities 4 174600 Institutional and Capacity building 5 218250 Detailed Project Report 1 43650 Watershed Development Phase Watershed Development Works 56 2444400 Livelihood activities 9 392850 Production System & Microenterprises 10 436500 Consolidation Phase 3 130950 Total 100 4365000

Giaragran Micro Watershed Name of the Panchayat Village Code Giaragram Maslana Kalan 01060400

Executive Summary Budget Component Percent of Budget Amount

(lacs) Administrative Cost 10 160500 Monitoring 1 16050 Evaluation 1 16050 Preparatory Phase: Entry point activities 4 64200 Institution & capacity building 5 80250 Detailed project report (DPR) 1 16050 Watershed Works Phase: Watershed development works 56 898800 Livelihood activities 9 144450 Production system & microenterprises 10 160500 Consolidation phase: 3 48150 Total 100 1605000

Page 158: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 146 - 

Jhanjiani Micro Watershed

Name of the Panchayat Village Code Jhanjiani Gandak 01061100 Jhanjhiani/ Kohlari 01061000

Executive Summary Preparatory Phase Budget per cent Amount (Rs.) Entry Point Activities 4 10800 Institutional and Capacity building 5 13500 Detailed Project Report 1 2700 Watershed Development Phase Watershed Development Works 56 151200 Livelihood activities 9 24300 Production System & Microenterprises 10 27000 Consolidation Phase 3 8100 Total 100 270000

Kiara Bag Micro Watershed

Name of the Panchayat Village Code Kiara-Bagh Bagg 01063800 Dasen 01064400 Kohdera 01064500 Badloi 01064300 Baghed 01063500 Pelehra 01064200 Sunwin Brahmana 01064000 Kiara 01063700 Kharota 01064600 Kheri 01063600 Sunwin Rajputana 01064100 Kohlwin 01063900

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 589500 Monitoring 1 58950 Evaluation 1 58950 Preparatory Phase: Entry point activities 4 235800 Institution & capacity building 5 294750 Detailed project report (DPR) 1 58950 Watershed Works Phase: Watershed development works 56 3301200 Livelihood activities 9 530550 Production system & microenterprises 10 589500 Consolidation phase: 3 176850 Total 100 5895000

Page 159: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 147 - 

Kulehra Micro Watershed Name of the Panchayat Village Code Kulhera Karah 01069300

Lahari Ghumara 01069000 Lahari tikkera 01079100 Mudhawin 01077900 Changar 01078200 Dagwar 01078600 Sunhani 01078300 Tangar 01078900 Sulhani 01078800

Executive Summary

Sohari Micro Watershed

Name of the Panchayat Village Code Sohari Ghulera 01078000

Barala 01078500 Dughiyar 01078100 Suhari 01078700 Magnuti 01079200

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 499500 Monitoring 1 49950 Evaluation 1 49950 Preparatory Phase:

Entry point activities 4 199800 Institution & capacity building 5 249750 Detailed project report (DPR) 1 49950 Watershed Works Phase: Watershed development works 56 2797200

Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 570000 Monitoring 1 57000 Evaluation 1 57000 Preparatory Phase: Entry point activities 4 228000 Institution & capacity building 5 285000 Detailed project report (DPR) 1 57000 Watershed Works Phase: Watershed development works 56 3192000 Livelihood activities 9 513000 Production system & microenterprises

10 570000

Consolidation phase: 3 171000 Total 100 5700000

Page 160: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 148 - 

Livelihood activities 9 449550 Production system & microenterprises 10 499500 Consolidation phase: 3 149850 Total 100 4995000

Usnar Kalan Micro Watershed

Name of the Panchayat Village Code Usnar Kalan Jajal 01061600 Narkar 01062700 GataPanga 01062300 Usnar Khurd 01062500 Usnar Kalan 01062600 Chukhiniar 01066000 Gurya Khurd 01066100 Gurya Kalan 01062200 Nara 01062400

Executive Summary

Budget Component Percent of Budget Amount (lacs) Administrative Cost 10 744000 Monitoring 1 74400 Evaluation 1 74400 Preparatory Phase: Entry point activities 4 297600 Institution & capacity building 5 372000 Detailed project report (DPR) 1 74400 Watershed Works Phase: Watershed development works 56 4166400 Livelihood activities 9 669600 Production system & microenterprises 10 744000 Consolidation phase: 3 223200 Total 100 7440000

Page 161: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP Hamirpur-II: Bijhari    Page ­ 149 - 

14. Summary

Total Panchayats : 15 Total Villages : 100

Name of Micro-Watershed : Code

Kulehra 1A2A3B1a Dhabriana 1A2A3M2a Bijhari 1A2A3B1d Bhakreri 1A2A3C2a Usnar Kalan 1A2A3L1a

Consolidated Budget Allocation

Name of Panchyat

Area ha

AC Mon. Eva. EPA ICB DPR WD WorksLA PSAM CP Total

Giara Gran 107 160500 16050 16050 64200 80250 16050 898800 144450 60500 48150 1605000

Jhanjhiani 18 27000 2700 2700 10800 13500 2700 151200 24300 27000 8100 270000

Usnar Kalan 496 744000 74400 74400 297600 372000 74400 4166400 669600 744000 223200 7440000

Ganghot Kalan 291 436500 43650 43650 174600 218250 43650 2444400 392850 436500 130950 4365000

Kulehra 380 570000 57000 57000 228000 285000 57000 3192000 513000 570000 171000 5700000

Sohari 333 499500 49950 49950 199800 249750 49950 2797200 449550 499500 149850 4995000

Dandhwin 444 666000 66600 66600 266400 333000 66600 3729600 599400 666000 199800 6660000

Barsar 97 145500 14550 14550 58200 72750 14550 814800 130950 145500 43650 1455000

Bhakreri 305 457500 45750 45750 183000 228750 45750 2562000 411750 457500 137250 4575000

Bani 237 355500 35550 35550 142200 177750 35550 1990800 319950 355500 106650 3555000

Dhabriana 487 730500 73050 73050 292200 365250 73050 4090800 657450 730500 219150 7305000

Kiara Bagg 393 589500 58950 58950 235800 294750 58950 3301200 530550 589500 176850 5895000

Garli 486 729000 72900 72900 291600 364500 72900 4082400 656100 729000 218700 7290000

Bijhari 488 732000 73200 73200 292800 366000 73200 4099200 658800 732000 219600 7320000

Balh Bihal 438 657000 65700 65700 262800 328500 65700 3679200 591300 657000 197100 6570000

Total 5000 7500000 750000 750000 3000000 3750000 750000 42000000 6750000 7500000 250000 75000000

Page 162: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme
Page 163: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

 

Page 164: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Balh Bihal  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Balh Bihal)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 165: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Balh Bihal  

Contents

Sr. No. Particulars Page No.

PROJECT AT A GLANCE

1. Introduction 1

2. General Description of Watershed Area 4

3. SWOT Analysis 10

4. Entry Point Activities 14

5. Water Harvesting 15

6. Drinking Water` 18

7. Pisciculture 19

8. Soil Conservation 20

9. Agriculture 24

10. Horticulture 27

11. Animal Husbandry 28

12. Convergence Approach 29

13. Livelihood Activities 30

14. Monitoring System 32

15. Evaluation 33

16. Capacity Building 34

17. Project Withdrawal and Consolidation 35

18. Budget 37

19. Annexures 38

Page 166: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Balh Bihal  

PROJECT AT A GLANCE Name of the Project : IWMP Block : Bijhar District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Balh Bihal PIA : BDO, Bijhar Location : 76030’44.64"E - 31029’44.64"N Total geographical area : 617ha Treatable area : 438 ha Irrigated area : nil Total No. of families : 377 Total Population : 1892 Male : 866 Female : 1026 Sex ratio : 1.18 Schedule Caste Male Female

: 501 233 268

Literacy Male: Female:

: : :

1342 656 686

 

Page 167: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 1 

1. Introduction Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. Physiographic Features The area is characterized by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters.

Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate

during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 168: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 2 

Executive Summary

Budget Component Percent of Budget Amount (`) Administrative cost 10 657000 Monitoring 1 65700 Evaluation 1 65700 Preparatory Phase Entry Point Activities 4 262800 Institutional and Capacity building 5 328500 Detailed Project Report 1 65700 Watershed Development Phase Watershed Development Works 56 3679200 Livelihood activities 9 591300 Production System & Microenterprises 10 657000 Consolidation Phase 3 197100 Total 100 6570000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were

collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Page 169: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 3 

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams

along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the

project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain.

Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 170: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 4 

2. General Description of Watershed Area

Bijhari microwatershed lies in Bijhari block of district Hamirpur situated between 76o

13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Demographic Features of Balh bihal Panchayat

The general demographic features of the Balh Bihal Watershed are given in the Table . The watershed is spread over 12 villages. The total number of households in this watershed is 377. The total population is 1892 of which 866 are males and 1026 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 501. The sex ratio stands at 1185 females for every 1000 males for watershed area.

Land use: Balh bihal Panchayat extends over an area of 617 ha. Out of total land in the watershed, cultivated land stood at 152 ha which is totally rain fed. The area under forests on the other hand was 179 ha. The area under horticulture is negligible in the watershed area. Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Aghwin Upperly 12 0 10 2 0 10 12 Aghwin Bulhy 14 0 8 6 0 8 14 Balh Patlian 29 0 16 13 0 16 29 Chaloli 12 0 0 12 0 0 12 Balh Brahmana 47 10 22 15 00 22 37 Jangal 15 0 4 11 0 4 15 Chatpahl 18 0 5 13 0 5 18

Villages No. of House-Holds

Total Population

Male Female Male SC

Female SC

Literate male

Literate female

Aghwin Upperly 5 19 12 7 0 0 10 5 Aghwin Bulhy 23 126 52 74 23 30 38 50 Balh Patlian 38 191 90 101 32 38 75 69 Chaloli 8 40 20 20 0 0 12 12 Balh Brahmana 34 206 100 106 10 13 68 62 Jangal 11 62 29 33 0 0 21 22 Chatpahl 3 13 6 7 6 7 4 3 Behal 40 187 84 103 13 17 60 65 Mathohal 29 138 58 80 0 0 48 52 Padian 44 209 92 117 0 0 72 76 Kot 69 362 170 192 57 57 129 138 Pairwin 73 339 153 186 92 106 119 132 Total 377 1892 866 1026 233 268 656 686

Page 171: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 5 

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Behal 32 0 17 15 0 17 32 Mathohal 46 18 9 19 0 9 28 Padian 18 0 6 12 0 6 18 Kot 272 125 31 116 0 31 147 Pairwin 102 26 24 52 0 24 76 Total 617 179 152 286 0 152 438 Source: Revenue Department, District Hamirpur Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motor able road connects all the panchayats. As regards the health facilities, there is one primary health centers, one health sub-centers and 2 private clinics available in the area. There are sufficient educational facilities available in the area. There are 2 primary schools and 2 middle schools. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 1 tailoring centers and 7 anganwari centers in the catchment area.

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Balh Bihal Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Balh Bihal Watershed Panchayat Primary Middle High Sr. Secy Tailoring

Centre Aganwari Centres

Total Literate in the village

Balh Bilah 2 2 0 0 1 7 2358 Source: Directorate of Economics and Statistics, Govt. of HP Existing production pattern of different crops Crops Area (ha) Production (q) Productivity (q/ha) Maize 141 2594 18.4

Sr. No. Block/Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

1 Balh Bilah 290 1 550 1 1

Sr. No. Block/Panchayat *CHC *PHC *Dispensary *Sub

Center *Private Clinic

**Dispensary

1 Balh Bilah 0 0 0 1 2 0

Page 172: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 6 

Crops Area (ha) Production (q) Productivity (q/ha) Mash 2.0 12 6.0 Wheat 141 2199.6 15.6 Toria 32 224 7.0 Gram 0.5 3 6 Vegetables 3.0 1020 340 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg seed Not done F 6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows

Broadcasting

F

Page 173: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 7 

Broadcasting Broadcasting N 9. Weed management:

Chemical herbicides Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P

Page 174: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 8 

Crop: Cauliflower Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 175: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 9 

Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap

Page 176: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 10 

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area.

STRENGTHS Agriculture

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can

be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully on

marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of

buffaloes are of improved breeds. Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop

residues, weeds and fodder crops supply the dry/green fodder for rest of the year. Improved sticks of grasses and nursery of fodder trees are available with many

departments like SAUs/KVK/Farmers for improvement of grass lands and pastures. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Veterinary clinical services are available within 10 km distance in the district. Markets for milk and milk products are available in the local areas. The procurement of

milk from rural areas is also being done by the milk federation. Intensive Dairy Development Project is in operation in the district for breed

improvement, dissemination of better management practices and commercialization of the activities.

Page 177: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 11 

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

WEAKNESSES The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received

during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The soils in the

development block Bijhari is gravely. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Farmers use higher seed rate as compared to the recommendation of the CSK HPKV which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Migration of rural youth to urban areas and preference to jobs other than agriculture

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Plenty of scope for rain water harvesting during rainy season which can be used as life

saving irrigation for plantation and high value cash crops. Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Page 178: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 12 

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to address

scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units) for

value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Page 179: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 13 

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace.

Issues Emerging out of SWOT Analysis Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and crop

selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like berseem,

sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 180: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 14 

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The details of the entry point activities suggested by the people during the PRA exercise are as under:

VILLAGE WISE PRA of PANCHAYAT BALH BIHAL

Pradhan: Sh. Sunil Kumar 98051 87406 General Information: Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat, Paddy, Sugarcane & Maize

Pulses Mash, Soybean and Gram Oil seed crops Sarson & Til Vegetables Peas, Brinjal, Cucurbits, Bhindi and

Colocacea

Horticulture and MAPs

Amla, Harad, Bahera, Guava, Mango, papaya, Ber, Pomegranate & Citrus

Interventions Needed

- Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per cent Buffaloes 90 Local breeds 6-10 liter Milk yield during

favorable conditions Cows 05 Jerseys 8-10 liter Milk yield during favorable

conditions. Problem repeat inbreeding and green fodder

Ox 20 fmilies In whole panchayat Goats 40 families 01 liter Milk yield during favorable conditions Sheep - - Equines - One family Poultry 01 50 backyard

Page 181: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 15 

5. Water Harvesting

Proposed water bodies Water bodies

Agwn Bulh

Chaloli

Balh Brahmana

Jangal

Behal

Mathohal

Padian

ChatPahal

Kot

Total No.

Unit Cost

Total Cost

Pacca tank 5mx4mx1m

- - 3 - - - - 1 - 4 103774 415096

Well Open Sink type of 2.4 m dia and 3 m deep

1 2 2 1 4 2 2 1 8 23 18676 429548

Tube Well

- 1 1 295301

177181 (IWMP

) + 118120 Farmer share

Total

1139945 +

118120 Farmer share

List of sites for proposed water structures and expected outcomes in Balh Bihal Panchayat: Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Pacca tank 5mx4mx1m

ChatPahal In the land of Sh Parkash Chand

103774 103774 - For irrigation of 15 kanal area

Balh Brahmana

In the land of Sh. Ranjha Ram

103774 103774 - For irrigation of 25 kanal area

In the land of Sh Paras ram

103774 103774 - For irrigation of 6 kanal area

In the land of Sh Jagdish Chand

103774 103774 - For irrigation of 15kanal area

Well Open Sink type of 2.4 m dia and 3 m deep

Jangal In the land of Sh Brij lal Mansa Ram at Phatlian

18676 18676 For irrigation of 70 kanal area

Chaloli In the land of Sh Parkash Chand

18676 18676 For irrigation of 15 kanal area

Page 182: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 16 

Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

In the land of Sh. Som Dutt/Braham Dutt

18676 18676 For irrigation of 15 kanal area

Mathohal In the land of Sh. Dalip Singh/Mehar Singh near LORD SHIV temple

18676 18676 For irrigation of 50 kanal area

In the land of Sh Uham Singh

18676 18676 For irrigation of 20 kanal area

Balh Brahmana

In the land of Sh. Hans Raj

18676 18676 For irrigation of 15 kanal area

In the land of Sh. Paras Kr. At Jol

18676 18676 For irrigation of 10 kanal area

Behal In the land of Sh. Gautam Pal

18676 18676 For Irrigation of 10 kanal area

In the land of Sh Yash Pal

18676 18676 For Irrigation of 100 kanal area

In the land of Ajeet Singh

18676 18676 For Irrigation of 10 kanal area

In the land of Smt. Bachni Devi

18676 18676 For Irrigation of 10 kanal area

Agwin Bulhi

In the land of Sh Burfi Ram

18676 18676 For Irrigation of 24 kanal area

Kot In the land of Sh. Kuldeep Kumar at Bulha Badh

18676 18676 For Irrigation of 100 kanal area

In the land of Sh. Surender Singh

18676 18676 For Irrigation of 22 kanal area

In the land of Sh. Ravinder Kumar Kumar

18676 18676 For Irrigation of 10 kanal area

In the land of Sh. Subhash Chand

18676 18676 For Irrigation of 40 kanal area

In the land of Sh. Suram Singh at Baghh wala Chau

18676 18676 For Irrigation of 20 kanal area

In the land of Sh. Hans raj

18676 18676 For Irrigation of 15kanal area

In the land of Sh. Mehar Singh

18676 18676 For Irrigation of 28 kanal area

In the land of Sh. 18676 18676 For Irrigation

Page 183: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 17 

Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Prakash Chand of 27 kanal area

Padian In the land of Sh. Ram Rath

18676 18676 For Irrigation of 20 kanal area

In the land of Sh. Pritam Chand

18676 18676 For Irrigation of 22kanal area

ChatPahal In the land of Sh Sh. Jagdish Chand at Balhi.

18676 18676

Tube well Kot In the land of Sh. Sada Ram

295301 295301 For Irrigation of 100 kanal area

Page 184: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 18 

6. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking

water (months) 1. Anghwin Upperli IPH pipeline 10 2. Anghwin Bulhi IPH pipeline 10 3. Balh Patlian IPH pipeline 9 4. Chaloli IPH pipeline 9 5. Balh Brahmana IPH pipeline 8 6. Jangal IPH pipeline 11 7. Chatphal IPH pipeline 10 8. Behal IPH pipeline 10 9. Matmohal IPH pipeline 9-10 10. Padian IPH pipeline 11 11 Kot IPH pipeline 10 12 Pairwin IPH pipeline 9-10 13 Karah IPH pipeline 11 Proposed status of drinking water Particulars Location Numbers Size

(Meters) Remarks

Cost

Village Bihal- Ravinder- Bhutto Well Sink type of 2.4 m dia and 3 m deep In Harijan Basti 01

For Drinking

18676

Balh Brahmana Well Sink type of 2.4 m dia and 3 m deep In Harijan Basti 01

For Drinking

18676

Total 37352

Page 185: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 19 

7. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery

department should organize some awareness camps in the panchayat as there is scope for pisciculture in some areas.

Page 186: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 20 

8. Soil Conservation Watershed Activities to be undertaken Village wise Village Location Particulars No. Cost

Bihal on the land of Sh, Birbal/Jagat Ram on Kodhri Khad

Check Dam RCC with cement plaster 8mx1m, 2mx2m

01 72283

Total 72283

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Behal Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Rapar cho (Jagdish land to Kodari land)

4 39100

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Dim cho (Kartar Singh land to Mihinder Singh Surinder Singh land)

6 117300

Total 10 156400 102837 53263 Aghwin upperly Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Bhidya wala cho 3 43986

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Gian chand Roshan lal Balhi

2 119534

Total 5 163520 100800 62720 Aghwin Buuerly

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Baeya da cho 2 29324

Goniya da cho 2 29324 Pange da cho 4 58648 Verna da cho

(Shop to lindi khadd)

4 58648

Total 12 175944 117600 58344 Balh Patlian Check dam stone &

wire crated (Spur) 3mx1.25x2.5m

Paani ka cho (Main road to lindi khadd)

2 29324

Pangula ka cho (Main road to lindi khadd)

2 29324

Jagan Nath Amar Nath land (Jandyale Amb)

2 29324

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Kodari khadd (balh Brahmana to Pairwin)

3 179301

Total 267273 243600 23673 Chaloli

Check dam stone & wire crated (Spur)

Jangal to Mathohal ke boundry tak

2 119534 63448 56086

Page 187: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 21 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

10mx1.25x2.5m Total 119534 63448 56086 Jangal Check dam stone &

wire crated (Spur) 10mx1.25x2.5m

Govind, Baldev & others ki zameen ke pass

2 119534

Total 119534 107324 12210 Mathohal

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Kut cho (Jagbir Singh land to Lakha Ram land)

2 29324

Ambia de cho (Jangel to Balhi tak)

3 43986

Balh wale cho (Jangal to Balhi)

3 43986

Check dam stone & wire crated (Spur) 10mx1.25x2.5m

Jangal Nallah 2 119534

Total 10 236830 197848 38982 Padian

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Sarola da cho (Gallu ghatta to Taleran tak)

6 87972

Purana guard khana to well

3 43986

Total 169310 151200 18110 Kot Check dam stone &

wire crated (Spur) 10mx1.25x2.5m

Lindi khadd Jangal se Phanchi Ram Kot se jabali tak

10 597670

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Jamani de cho (Tota Ram house to Lindi khadd tak)

3 43986

Harua de cho (Sunder ram house to lindi khadd tak )

2 29324

Gharana da cho (Kisori ram house to lindi khadd )

3 43986

Balakrupi cho (Balakrupi to lindi khadd)

3 43986

Chanaute cho (Sada ram house to lindi khadd)

3 43986

Bang wala cho (Capt. Mohinder to lindi khadd)

5 73310

Some house to Shamshaan ghaat

4 58648

Chatpahal wala cho to lindi khadd

4 58648

Khala wala cho 3 43986 Total 40 1037530 908211 129319 Pairwin Check dam stone & Kodari khadd Balh 9 537903

Page 188: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 22 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 10mx1.25x2.5m

brahmna to kallar

Check dam stone & wire crated (Spur) 6mx1.25x2.5m

Khole wala nallah (Gian chand /Sukh Dev ke makaan ke saath)

1 36660

Check dam stone & wire crated (Spur) 4mx1.25x2.5m

Paidla cho-Balle (Peharwin)

2 29324

Check dam stone & wire crated (Spur) 3mx1.25x2.5m

Peharwin cho rajkumar land to well

2 29324

Tank wala nallah (Hari Ram house to Paras Ram land)

2 29324

Kallar-khadd cho (Suresh house ke pass jangal gaon)

2 29324

Total 18 691859 638400 53459 Grand Total 3137734 2631268 506166

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence(MNREGA)

Behal Well Open Sink type of 2.4 m dia and 3 m deep

93380 93380 -

Check Dam 8mx(2m+1m)/ 2mx2m and No.

72283 72283 -

Check dam stone & wire crated (Spur 156400

103137 53263

Total 322063 268800 53263 Aghwin upperly

Check dam stone & wire crated (Spur 163520

100800 62720

Total 163520 100800 62720 Aghwin Buuerly

Well OpenSink type of 2.4 m dia and 3 m deep

18676 18676 - Check dam stone &

wire crated (Spur 175944 98924 77020

Total 194620 117600 77020 Balh Patlian Check dam stone &

wire crated (Spur 267273 243600 23673

Total 267273 243600 23673 Chaloli

Well OpenSink type of 2.4 m dia and 3 m deep

37352 37352 Check dam stone &

wire crated (Spur) 119534 63448 56086

Page 189: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 23 

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Total 156886 100800 56086 Balh Brahmana

Pacca tankRCC 5mx4mx1m 311322 - -

Well OpenSink type of 2.4 m dia and 3 m deep

56028 - - Total 367350 310800 56550 Jangal Well OpenSink type of 2.4

m dia and 3 m deep 18676 18676

Check dam stone & wire crated (Spur)

119534 107324 12210

Total 138210 126000 12210 Chat pahl Chahar

Pacca tankRCC 5mx4mx1m

103774 103774 - Well OpenSink type of 2.4

m dia and 3 m deep 103774 103774 -

Total 122450 122450 - Mathohal

Well Open Sink type of 2.4 m dia and 3 m deep 37352 37352 -

Check dam stone & wire crated (Spur) 236830

197848 38982

Total 274182 235200 38982 Padian

Check dam stone & wire crated (Spur)

169310 151200 18110

Total 169310 151200 18110 Kot Well Open Sink type of 2.4

m dia and 3 m deep 149408 149408 -

Check dam stone & wire crated (Spur) 1037530

908211 129319

Bore well 200mmx150mmat 70m depth 295301 177181 118120*( farmers share)

Total 1482239 1234800

129319 +118120 ( farmers share)

Pairwin

Check dam stone & wire crated (Spur) 691859

638400 53459

Total 691859 638400 53459 Grand Total

3245600 2818850 308630 +118120 ( farmers share)

Page 190: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 24 

9. Agriculture Institutional and capacity building:

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Agwin Upper & Bulhy, Balh patian and Chaloli

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24475 48950

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43500 43500

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

2 (30 farmers)

2 45700 45700

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Value Addition Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 328500

Page 191: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 25 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 45500 20000 22500 - - - Balh Brahmana, Jangal and Chatpahl

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 45000 - - -

Total 62500 40000 22500 Behal , Mathohal and Padian

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Kot Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower,

2 ha 90000/- @ Rs.45000/ha

- 45000 45000 - -

Page 192: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 26 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cabbage, brinjal, ginger, turmeric etc.

Total 170000 40000 85000 45000 Pairwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Grand Total 403000 180000 175000 450000 Expected outcomes in Agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 141 18.4 160 25.0 3. Mash 2.0 6.0 5 8.0 4. Wheat 141 15.6 160 18.0 5. Toria 32 7.0 40 8.0 6. Gram 0.5 6 1.0 7.0 7. Vegetables 3.0 340 4 400

Page 193: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 27 

10. Horticulture Village Intervention Area Cost involved

(Rs) I II III IV V

Agwin Upper & Bulhy, Balh patian and Chaloli

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 - - 20000 - -Balh Brahmana, Jangal and Chatpahl

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Behal , Mathohal and Padian

Diversification towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Kot Diversification towards

drought/frost tolerant fruit plants 1ha 40000 - - 40000 -

Total 1ha 40000 40000 Pairwin Diversification towards

drought/frost tolerant fruit plants 1 40000 40000

Total 1ha 40000 40000 Grand Total 160000 160000 *additional area (cultivable wasteland) will be brought under cultivation Horticultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 194: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 28 

11. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Agwin Upper & Bulhy, Balh patian and Chaloli

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 - - - Balh Brahmana, Jangal and Chatpahl

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 - - - Behal , Mathohal and Padian

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 - Kot Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 37400 37400 Pairwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Control of endo and ecto parasites

85 animals

6600 - 6600

Total 26600 - 26600 Grand Total

94000 94000

Total Budget under production system and micro enterprises S. No. Activity Total budget 1. Agriculture 403000 2. Horticulture 160000 3. Animal husbandry 94000 Grand Total 657000

Page 195: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 29 

12. Convergence Approach

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme loke NWDPRA. This may also involve harmonized use of resources available from other on ging/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan Bagwan

Samridhi Yojna Polyhouses, Micro irrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nurseries: Distribution of silk worm, disinfection of private rearing houses, technical assistance and guidance and marketing of cocoons

Department of industries

Page 196: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 30 

13. Livelihood Activities

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Agwin Upper & Bulhy, Balh patian and Chaloli Total

Mushroom Cultivation

3 (50 bags) 30000 10000 20000 -

Vermiculture Unit 3mx1m( Low cost)

5 no. 25000 - 25000 10000 20000 -

Total 55000 - 25000 10000 20000 - Balh Brahmana, Jangal and Chatpahl

Mushroom Cultivation

2(50 bags) 20000 20000 -

Vermiculture Unit 3mx1m( Low cost)

7no. 35000 35000 - - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

Total 75000 35000 - 20000 20000 - Behal , Mathohal and Padian

Mushroom Cultivation

2 (50 bags) 20000 10000 10000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

Total 90000 50000 - 10000 30000 - Kot Mushroom

Cultivation 3 (50 bags) 30000 - - 30000 - -

Tailoring Unit 1 144000 144000 Vermiculture Unit

3mx1m( Low cost) 5 no. 25000 25000 - - - -

Bee-keeping 2 no.(10Boxes

per unit)

40000 - - 20000 20000 -

Backyard poultry 100 chicks 20000 - - 20000 - Total 259000 25000 144000 70000 20000 Parwin Mushroom

Cultivation 2(50 bags) 20000 20000 - -

Vermiculture Unit 3mx1m( Low cost)

8 no. 40000 40000 - - - -

Backyard poultry 200 chicks 32300 - - 32300 - Bee-keeping 1

no.(10Boxes per unit)

20000 - - - 20000 -

Total 112300 40000 52300 20000

Page 197: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 31 

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Total 85500 25000 - 40500 20000 - Kheri Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Sunwin Rajputtan and Kohlwin

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 50000 50000 - - - - Grand Total

591300 150000 169000 162300 110000 -

Page 198: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 32 

14. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Page 199: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 33 

15. Evaluation

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 200: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 34 

16. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes •

Target group No. of participants

Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 201: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 35 

17. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new

agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The foolowing activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Upscaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 202: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 36 

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertinent because it is the peoples pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawl phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 203: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 37 

18. Budget

Name of Panchyat Name of Village Treatment Area ha Budget (Rs.)

Balh Bihal Aghwin Upperly 12 100800

Aghwin Bulhy 14 117600

Balh Patlian 29 243600

Chaloli 12 100800

Balh Brahmana 37 310800

Jangal 15 126000

Chatpahl 18 151200

Behal 32 268800

Mathohal 28 235200

Padian 18 151200

Kot 147 1234800

Pairwin 76 638400

Page 204: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 38 

Annexures

Page 205: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 39 

Cost Estimate for Training programmes Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for awareness camp Sr. No. Particular Cost (Rs) 1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000 Total 12000 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on bee keeping for seven days duration

Page 206: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Balh Bihal  Page 40 

Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 207: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bani  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Bani)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 208: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bani  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 4

3. SWOT Analysis 9

4. Entry Point Activities 11

5. Drinking Water 12

6. Soil Conservation 13

7. Agriculture 17

8. Horticulture 19

9. Animal Husbandry 20

10. Livelihood Concerns 21

11. Monitoring System 22

12. Evaluation 23

13. Capacity Building 24

14. Project Withdrawal and Consolidation 25

15. Annexures 27

Page 209: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bani  

PROJECT AT A GLANCE Name of the Project : IWMP-II Block : Bijhari District : Hamirpur Agro- Climatic Zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Bani PIA : BDO, Bijhar Location : 76031’59.52"E - 31031’59.52"N Total geographical area : 247 ha Treatable area : 237 ha Irrigated area : Nil Total No. of families : 303 BPL families : 42 Total Population : 1524 Male : 748 Female : 746 Sex ratio : 1.002 Schedule Caste Male Female

: 214 115 99

Literacy Male: Female:

: : :

1086 572 514

 

Page 210: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 1 

1. Introduction and Budget Bani micro watershed lies in Bijhari block of district Hamirpur situated between

76031’59.52"E - 31031’59.52"N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bani watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district.

Name of the Panchayat Village Code Bani Banikhas 01067700 Karwin 01067600 Kuthera 01067500 Mangroli 01067900 Thana 01065400 Executive Summary Budget Component Per cent of Budget Amount (`) Administrative cost 10 355500 Monitoring 1 35550 Evaluation 1 35550 Preparatory Phase Entry Point Activities 4 142200 Institutional and Capacity building 5 177750 Detailed Project Report 1 35550 Watershed Development Phase Watershed Development Works 56 1990800 Livelihood activities 9 319950 Production System & Microenterprises 10 355500 Consolidation Phase 3 106650 Total 100 3555000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed.

Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

Page 211: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 2 

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from

different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc.

Transact walk:

The technical teams did the transect walk through various drainage courses and

streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 212: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 3 

Demographic Features of Bani Watershed

The general demographic features of the Bani Watershed are given in Table 2. The watershed is spread over 5 villages. The total number of households in this watershed is 303. The total population is 1524 of which 748 are males and 776 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 214. The sex ratio stands at 1037 females for every 1000 males for watershed area. Table : Demographic Features of Bani Panchayat

Villages No. of House-Holds

Total Population

Male female Male SC

Female SC

MaleST

Female ST

Literate male

Literate female

Bani Khas

165 820 410 410 71 58 0 0 291 272

Karwin 40 194 101 93 2 1 0 0 90 59 Kuthera 5 27 17 10 15 7 0 0 16 9 Mangroli 19 86 35 51 2 7 0 0 32 38 Thana 74 397 185 212 25 26 0 0 143 136 Total 303 1524 748 776 115 99 0 0 572 514

Bani Panchyat extends over an area of 247 ha. Out of total land in the watershed,

cultivated land stood at 88 ha which is totally rain fed. The area under forests on the other hand was 10 ha.

Panchayat / Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Bani Khas 41 0 24 17 0 24 41 Karwin 30 0 14 16 0 14 30 Kuthera 10 0 5 5 0 5 10 Mangroli 22 1 8 13 0 8 21 Thana 144 9 37 98 0 37 135 Total 247 10 88 149 0 88 237 Source: Revenue Department, District Hamirpur

The major proportion (about 95 per cent) of total cropped area in Bani panchayat is

under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area.

Page 213: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 4 

2. General Description of Project Area Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motor able road connects all the three panchayats. As regards the health facilities, there is one community health centre, one health sub-centers and four private clinics available in the area. Resultantly, the infant mortality is very low in the area. There are sufficient educational facilities available in the area. There are 3 primary schools, 1 are middle school, and 1senior secondary school. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 1 tailoring centers and 5 anganwari centers in the catchment area Panchayat-wise Basic Amenities in Bani Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Bani Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Bani Panchayat Panchayat

Primary Middle High Sr. Secy

Tailoring Centre

Aganwari Centres

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Bani 3 1 0 1 1 5 0 0 2321 Source: Directorate of Economics and Statistics, Govt. of HP Existing area, production and productivity of different crops in Bani Panchayat: Crops Area (ha) Production (q) Productivity (q/ha) Maize 71 1306 18.4 Mash 0.5 3 6 Wheat 72 1238 17.2 Toria 3 21 7 Gram 1 6 6 Vegetables 1 310 310 Source: On the basis of PRA done in the panchyat.

Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

Bani 434 1 543 1 1

Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Bani 0 0 0 1 1 0

Page 214: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 5 

Critical gaps worked out in major crops On the basis of PRA exercise and survey in different watershed areas, production and

technological gaps were worked in the major agricultural crops, which are as under. Cereal crops: Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rain fed Sr.No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management:

Page 215: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 6 

Chemical herbicides Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Pulse Crop: Mash Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Vegetable Crop: Peas Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P

Page 216: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 7 

*F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr.No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 217: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 8 

Crop: Colocasia Farming Situation: Rain fed Sr.No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 218: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 9 

3. SWOT Analysis

A critical analysis of Strength, Weakness, Opportunities and Threats of the watershed

area of the Panchayat Bani was done on the basis of primary, secondary and technical data. STRENGTHS

Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. The whole of the area is connected with motor able road Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop

residues, weeds and fodder crops supply the dry/green fodder for rest of the year. WEAKNESSES

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

Poor management of natural resources by the beneficiaries. More than 95 per cent of net area sown is rain fed. The average size of land holding is small (0.6 ha) and scattered. Land holdings are marginal and small. Market facility are not adequate

OPPORTUNITIES

Diversification is possible in the Kharif season (rainy season) with introduction of vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under the scope of irrigation through water harvesting.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

Scope for improving pastures through planting of quality grasses and fodder plants. Scope of organic farming of cereals and pulses.

Page 219: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 10 

THREATS

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (cultivable lands, pastures, road sides, river banks etc.)

Increasing cases of infertility in cattle causing stray animal menace

Page 220: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 11 

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.13500/-) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

Existing water bodies villages wise under Bani Panchayat: Water bodies Mangroli Thana Kuthera Karwin BaniKhas Pacca tank - - - 2 - Poly tank - - - - - Tube well - - - 3 - Proposed water bodies villages wise under Bani Panchayat: Water bodies

Bani Khas

Karwin Kuthera Mangroli Thana Total No. Unit cost

Total cost

Pacca Tank 5mx4mx1m

1 - - - 2 03 103774 311322

Total 311322 List of sites for proposed water structures and expected outcomes under Bani Panchayat: Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Pacca Tank 5mx4mx1m

Bani Khas

In the land of Sh. Purshotum

103774 103774 - For irrigation of 30 kanal area

Thana In the land of Sh. Brij lal

103774 103774 - For irrigation of 20 kanal area

In the land of Smt. Manju Kumari w/o Sh, Purshotum

103774 103774 - For irrigation of 15 kanal area

Page 221: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 12 

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking water (months) 1. Banikhas IPH pipeline 11 2. Karwin IPH pipeline 11 3. Kuthera IPH pipeline 11 4. Mangroli IPH pipeline 11 5. Thana IPH pipeline 11 Proposed Activities For Availability Of Drinking Water

The following activities are proposed to enhance the drinking water availability in the panchayat Particulars Village Location Numbers Size Remarks Cost Open Well Karwin In the field

of Sh. Sita Ram

01 Open sink type 2.4m dia & 3m deep

For Drinking water

18676

Babri Under the Peepal tree

01 1.2mx1.2mx0.9m For Drinking water

19353

Total 38029 Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 11 12

Page 222: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 13 

6. Soil Conservation Particulars Bani

Khas Karwin Kuthera Mangroli Thana Size Numbers Cost

Check Dam RCC with cement plaster

1 10mX1, 2mX2m

01 90677

Check Dam RCC with cement plaster

2 1 6mx1m, 2mx2m

03 162648

Total 253325Structures Village Location Actual

budget Budget from IWMP

Expected outcomes

Check Dam RCC with cement plaster 10mX1, 2mX2m

Thana In Paniali near the land of Sh. Sada Ram

90677 90677 For irrigation of 200 kanal area

Total 90677 90677 6mx1m, 2mx2m

Bani Khas On Jarlu Main Chau near the land of Sh. Bakil Singh

54216 54216 For irrigation of 200 kanal area

On Churna wala Chau near the land of Sh. Ajit/Sant Ram

54216 54216 For irrigation of 600 kanal area

Total 108432 108432 Kuthera With the land of

Sh. Balbir Singh 54216 54216 For irrigation of 50 kanal

area Total 54216 54216 Grand Total 253325 253325 Village Structures Location No. Actual Budget IWMP

Budget Convergence (MNREGA)

Bani Khas Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Lunda Cho (Parkash Chand/Balbir chand land to Gian Chand land)

3 29325

Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Balia da Cho (Road to Khwaja Khadd)

3 43986

Jaralu wala Cho (Om Parkash land to Lunda cho)

3 43986

Lunda Cho/Harijan Basti (Gian singh & Ranjit Singh land)

3 43986

Page 223: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 14 

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Lunda Cho (Rattan Chand land to Mohinder Sant Ram land)

2 39100

Total 200383

132194 68189

Karwin Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Nallah Bani Bande to Chharda Tak (Bakil singh Land)

3 43986

Radha Soami Nias to Balia (Kuthere) tak

3 43986

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Public Science School Bani to Water bodi tak

3 58650

Nalua wala cho (Nulu bain to Churne wala cho)

5 97750

Total 244372 213971 30401

Kuthera Check dam stone & wire crated (Spur) 3mx1.25mx2 m

Nalu to Lunde da gharaat

3 43986

29784

14202

Total 43986 29784

14202

Mangroli Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Rakkar Cho (near Jagdish, Ravinder Land)

2 19550

Kara Khara –

Nikku Ram, Ranbir Singh ki jameen ke sath

2 19550

Kara Khara, near

Raghubirs land 3 29325

Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Pankal nala Burda (Road) to Khwaja khadd

4 58648

Kawalia – Balloo

wala cho Janj ghar 4 58648

Total 185721 176400 9321

Thana Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Roshan lal house to water bodi

2 29324

Kiari cho (Sade Ram land to ajit singh ke phat)

4 58648

Vinod Kumar land to water bodi

4 58648

Page 224: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 15 

Virendar land gohar to water bodi

6 87972

Sambhu house to Lunda cho tak

6 87972

Check dam stone & wire crated (Spur) 4mx1.25mx2 m

Pathia da cho (Mandir to Ranbir house)

5 97750

Gada wala cho (Road to Khwaja khadd tak)

2 39200

Jandral cho (Purshotam singh house to Khwaja khadd)

4 78200

Kankar Aato

Panga (Brij lal, Kartar singh to Girdhari land)

4 78200

Aato Panga

(Rajinder singh land to Nand ram/Ramesh land)

4 78200

Bhindia da panga-

Nallah de panga (Nand ram land to Khadd)

4 78200

Khalyan de panga

(Jashbir to water bodi)

2 39100

Sita ram ki road se

khadd tak 4 78200

Khil thana

/Harijan Basti 2 39100

Total 928714

835775

92939 Village Wise Budget Allocation under Soil Conservation Village Particulars Total Cost IWMP

Budget Convergence(MNREGA)

Bani Khas Pacca tank 5mx4mx1m

103774 103774

Check Dam RCC with cement plaster

108432 108432

Check dam stone & wire crated (Spur)

200383

132194 68189

Total 412589 344400 68189

Page 225: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 16 

Karwin Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Babri 19353 19353 - Check dam stone & wire

crated (Spur) 244372

213971 30401

Total 282401 252000 30401 Kuthera Check Dam RCC with

cement plaster 54216 54216 -

Check dam stone & wire crated (Spur)

43986 29784 14202

Total 98202 84000 14202 Mangroli Check dam stone & wire

crated (Spur) 185721 176400 9321

Total 185721 176400 9321 Thana Pacca tank

5mx4mx1m 207548 207548 -

Check Dam RCC with cement plaster

90677 90677 -

928714

835775 92939

Total 1226939 1134000 92939 Grand Total 2205852 1990800 215052

Page 226: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 17 

7. Agriculture

Existing Scenario of Agriculture, Horticulture and Animal Husbandry Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield on favorable conditions

Pulses Nil Wish to grow with new technology and innovations

Oil seed crops Sarson, Toria & Til and Soyabean Satisfactory with production & yield Vegetables Cucurbits & Bhindi, cole crops and

Root crops Wish to grow others on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs

Amla, Harad, Bahera, Anar, Guava, Lithchi & Citrus

Wish to grow others crops if improved varieties provided suitable for these locations.

Livestock Animals Per cent Buffaloes 80 Local breeds 8-10 litre Milk yield during

favorable conditions Cows 10 Jerseys 8-10 litre Milk yield during favorable

conditions. Problem of Infertility. Local breeds 1 3-4 litre Milk yield during favorable conditions Ox - 02 pairs in Panchayat Goats 10 0.5- 1 litre Milk Yield Sheep Nil - Equines - 08 No. Poultry Nil Backyard with having 02 families

Institutional and capacity building: Proposed Interventions to Increase Production system (Farm Based Micro Enterprises):

Intervention Strategy /Issues Activity

Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Poultry Three day Training to the

farmers with regard to management of poultry farm

1(25 farmers)

1 47400 47400

Mushroom Cultivation/Bee keeping/Micro enterpriseMicro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 177750

Page 227: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 18 

Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Bani Khas Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Karwin Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 -

Total 20000 20000 - - - Kuthera and Mangroli

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Thana Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1.5 ha 69800 @ Rs. 40000/ha

40000 29800 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 114800 40000 22500 22500 - - Grand Total 174800 100000 52300 22500 - -

Page 228: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 19 

8. Horticulture

Village Intervention Area/no. Cost involved (Rs) I II III IV V Bani Khas Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Karwin Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kuthera and Mangroli

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Thana Diversification towards

drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand Total 2.5 100000 - - 100000 - -

Page 229: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 20 

9. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs) I II III IV V

Bani Khas Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Karwin Control of endo and ecto

parasites 100 animals

7400 - 7400

Total 7400 - 7400 Kuthera and Mangroli

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

3 5900 - 5900

Total 5900 - 5900 Thana Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 47400 - 47400 Grand Total 80700 80700

Activity Total budget Agriculture 174800 Horticulture 100000

Animal husbandry 80700 Grand Total 355500

Expected outcomes from agricultural crops in Bani Panchyat Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) Maize 71 18.4 100 25.0 Mash 0.5 6 1 8.0 Wheat 72 17.2 100 18.0 Toria 3 7 2 8.0 Gram 1 6 2 7.0 Vegetables 1 310 3 400

*additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops in Bani Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 230: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 21 

10. Livelihood Activities

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Bani Khas

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 120 chicks 18000 - - 18000 -

Total 53000 25000 28000 Karwin Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

2 no. 10000 10000 - - - -

Total 40000 10000 10000 20000 - Kuthera and Mangroli

Mushroom Cultivation

1 (50 bags) 10000 10000

Backyard poultry 120 chicks 5000 - - 5000 - VermicultureUnit

3mx1m( Low cost) 5 no. 25000 25000 - - - -

Total 40000 25000 - 15000 - Thana Income generation I no.

(Tailoring Unit)

144000 144000

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

3 no. 12950 12950 - - -

Total 186950 156950 10000 20000

Page 231: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 22 

11. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Page 232: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 23 

12. Evaluation During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 233: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 24 

13. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes •

Target group and location of the programme Target group No. of participants Activity Location Member of Gram Shabha All Awareness camps Panchayat level PRI/VLI members 10 Watershed implementation and

management Block level

SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional

PIAs, WDTs members 10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 234: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 25 

14. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are: • Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources (CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price.

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Participatory approach for implementation of project

Page 235: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 26 

For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, and user groups’ etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases:

Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for

implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include: • Taking up entry point activities to establish credibility of the watershed Development

team (WDT) and create a rapport with the village communities. • Initiating the development of village level institutions as watershed committee (WC),

help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalized so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 236: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 27 

Annexures

Page 237: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bani  Page 28 

Cost Estimate for Training programmes

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for three

days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organizer and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for awareness camp Sr. No. Particular Cost (Rs) 1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5 lectures 1250 4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000

Total 12000 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for three

days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organizer and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven

days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organizer and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050

Total 77550

Page 238: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

 

IWMP‐Hamirpur‐II Panchayat Barsar  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Barsar)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 239: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

 

IWMP‐Hamirpur‐II Panchayat Barsar  

Contents S.

No. Particulars Page No.

1. Introduction and Budget 1

2. General Description of Project Area 3

3. SWOT Analysis 8

4. Entry Point Activities 10

5. Drinking Water 11

6. Soil Conservation 12

7. Agriculture 13

8. Horticulture 15

9. Animal Husbandry 16

10. Pisciculture 17

11. Convergence 18

12. Livelihood Concerns 19

13. Monitoring System 20

14. Evaluation 21

15. Capacity Building 22

16. Project Withdrawal and Consolidation 23

17. Annexures 25  

 

 

 

 

Page 240: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

 

IWMP‐Hamirpur‐II Panchayat Barsar  

PROJECT AT A GLANCE

Name of the Project : IWMP Block : Bijhari District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Barsar PIA : BDO, Bijhar Location : 76o 25’ 58” E - 31o 31’ 58” N Total geographical area : 119 Treatable area : 97 Irrigated area : Nil Total No. of families : 44 BPL families : 25 Total Population : 234 Male : 126 Female : 108 Sex ratio : 0.85 Schedule Caste Male Female

: 44 27 17

Literacy Male: Female:

: : :

175 97 78

 

Page 241: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 1 

1. Introduction

The Barsar micro watershed which has been selected for development under the National Watershed Development Project for Rain fed Areas (NWDPRA) falls in the Developmental Block Bijhari, District Hamirpur.

Name of the Panchayat Village Code Barsar Jabhal Kheri 01059800 1.1.2 Executive Summary

Budget Component Percent of Budget Amount (`) Administrative cost 10 145500 Monitoring 1 14550 Evaluation 1 14550 Preparatory Phase Entry Point Activities 4 58200 Institutional and Capacity building 5 72750 Detailed Project Report 1 14550 Watershed Development Phase Watershed Development Works 56 814800 Livelihood activities 9 130950 Production System & Microenterprises 10 145500 Consolidation Phase 3 43650 Total 100 1455000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement

Page 242: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 2 

6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams

along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the

project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain.

Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.  

 

 

Page 243: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 3 

2. General Description of Watershed area

Barsar micro watershed lies in Bijhari block of district Hamirpur situated between 76o 25’ 58” E - 31o 31’ 58” N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Barsar watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district.

Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west, Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 776 hactares. There are 12 villages under 3 panchayats in the watershed.

Physiographic Features

The area is characterized by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the slopes. The width of terrace varies from five to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent.

Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 244: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 4 

Demographic Features of Barsar Panchayat Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Jabal Kheri

44 234 126 108 27 17 0 0 97 78

Total 44 234 126 108 27 17 0 0 97 78

Description of Poverty Programmes in Barsar Panchayat

Panchayat BPL families

BPL SC

families

BPL ST families

Population under

poverty alleviation

programme

Fair price shop

HH’s purchases food grain

through PDS

Houses constructed for

houseless families

Barsar 44 25 2 479 1 763 2

Land use:

Jabal kheri village of Barsar Panchyat extends over an area of 119 ha. Out of total land in the watershed, cultivated land stood at 20 ha which is totally rain fed. The area under forests on the other hand was 22 ha. Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Jabal Kheri 119 22 20 77 0 20 97 Source: Revenue Department, District Hamirpur

The major proportion (about 95 per cent) of total cropped area in Barsar panchayat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area.

Page 245: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 5 

Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects all the three panchayats. As regards the health facilities, there is one community health centre, one health sub-centers and four private clinics available in the area. Resultantly, the infant mortality is very low in the area. There are sufficient educational facilities available in the area. There are 3 primary schools and 1 high school. The literacy was quite high at 80 per cent in the watershed. In addition to these, there is 1 tailoring centers and 9 anganwari centers in the catchment area.

Table: Panchayat-wise Basic Amenities in Barsar panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Barsar Panchayat

Description of Education Facilities in Barsar panchayat Panchayat

Primary Middle

High

Sr. Secy

Tailoring Centre

Aganwari Centres

Barsar 3 0 1 0 1 9 Source: Directorate of Economics and Statistics, Govt. of HP Existing area, production and productivity of different crops in J panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize

11 191 17.4

Wheat 14 250

17.9

Vegetables 1 310

310

Source: On the basis of PRA done in the panchayat. Critical gaps worked out in major crops of Barsar Panchayat

Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

Barsar 566 1 763 1 1

Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Barsar 1 0 0 0 2 0

Page 246: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 6 

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha)

10-15 t/ha 22.5 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha)

40-45 q/ha 18.4 q/ha P

*F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed

Sr. No. Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time Mid October-Mid November

Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP

@2.5 g/kg seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP

Not done

F

Page 247: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 7 

2,4-D 50 WP Not done F 10. Pest management: As per

recommendations Not done F

11. Disease management As per recommendations

Not done F

12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg seed Not done F 6. Fertilizers (kg/ha):

Basal (NPK) 20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5

g+Bavistin 50WP @1.0 g/kg seed

Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P

Page 248: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 8 

3. SWOT Analysis

A critical analysis of Strength, Weakness, Opportunities and Threats of the watershed area of the Panchayat Barsar was done on the basis of primary, secondary and technical data. Strengths

Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. The whole of the area is connected with motor able road Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of

buffaloes are of improved breeds. Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop

residues, weeds and fodder crops supply the dry/green fodder for rest of the year. Weaknesses

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

Poor management of natural resources by the beneficiaries. More than 95 per cent of net area sown is rain fed. The average size of land holding is small (0.6 ha) and scattered. Land holdings are marginal and small. Market facility are not adequate

Opportunities Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under the scope of irrigation through water harvesting.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

Scope for improving pastures through planting of quality grasses and fodder plants. Scope of organic farming of cereals and pulses.

Page 249: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 9 

Threats Occurrence of severe frost at every 4-5 years interval causing damage to fruits like

mango, papaya, banana. There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to

the cultivated crops. Infestation of forest areas and other common land resources with obnoxious weeds

(Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (cultivable lands, pastures, road sides, river banks etc.)

Increasing cases of infertility in cattle causing stray animal menace

Page 250: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 10 

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.13500/-) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

Watershed Development Activities Existing water bodies:

Sr. No. Water bodies 1

1 Kuhl - 2 Earthen tank (Talai) 3 3 Lift irrigation One family

Proposed Water bodies villages wise under Barsar Panchayat: Water bodies Jabbal Kheri Total No. Unit cost Total cost Pacca Tank (5mx4mx1m) 4 4 103774 415096 Well 1 1 18676 18676 Total 433772 List of sites for proposed water structures and expected outcomes in Barsar Panchayat: Water structures

Village Location Total Cost/village

IWMP Budget Expected outcomes

Pacca Tank 5mx4mx1m

Jabbal Kheri

Near Mahila Mandal Jabbal

103774 103774 For irrigation of 50 kanal area

In the Land of Sh. Onkar Singh

103774 103774 For irrigation of 70 kanal land

Duggar khad 103774 103774 For irrigation of 40 kanal land

In the land of Sh. Kamal Dev

103774 103774 For irrigation of 10 kanal land

Total 415096 415096

Well In the land of Sh. Madan Lal

18676 18676 For irrigation of 25 kanal area

Total 18676 18676

Page 251: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 11 

5. Drinking Water

Existing status of drinking water Villages Source of drinking water Availability of drinking water (months) Jabbal Kheri IPH pipeline 10*

IPH pipeline 10 Babri 12 Hand pump 12

List of Proposed activities for availability of drinking water

Villages Particulars Location No. Total Cost (Rs)

Budget from IWMP

Farmer share

Remarks

Jabbal Kheri

Hand Pump Harijan Basti Kheriqan on land of Sh. Ranjit Singh

01 101541

101541 - For drinking

Tube- Well Sh. Jagat Ram Khereian

01 295301 177181 118120 For Drinking of 15 families and irrigation of 50 kanal area

Total 02 396842 278722 118120

Page 252: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 12 

6. Soil Conservation

Villages Structure/work Activities to be undertaken Check Dam

6mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/ identification

Actual budget Budget from IWMP

Proposed Convergence

Expected outcomes

Jabbal kheri

1 Ananti khad cho

54216 54216 - Irrigation of 150 kanal area

Total 54216 54216 - Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Jabbal kheri Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Cheli wala Cho (Koot to Baag)

3 43986 -

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Mahila Mandal ghar to Jabbal water body

2 73320 -

Total 117306 48090 69216 Village wise budget allocation under soil conservation

Village Particulars Total Cost IWMP Budget

Convergence (MNREGA)

Jabbal kheri Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Hand Pump 101541 101541 Tube- Well* 177181** 177181 Check Dam 6m(2m+1m)/

2mx2m and No. 54216 54216

Check dam stone & wire crated (Spur)

117306 48090 69216

Total 884016 814800 69216 Farmer share =*854216 ** Excluding Farmer share. Consolidated Works in Panchayat Barsar

Particulars Size Numbers Cost Check dam stone & wire crated (Spur)

6mx1.25mx2m 11 No. 403260

Check Dam RCC with cement plaster

6mx1m, 2mx2m 1 No. 54216

Total 457476

Page 253: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 13 

7. Agriculture

Existing Scenario of Agriculture, Horticulture and Animal Husbandry Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield

Pulses Gram Growth satisfactory during favorable conditions Oil seed crops Sarson Satisfactory with production & yield Vegetables Onion, cauliflower and cabbage Wish to grow on facilitating sure Irrigation. Also

needs assure marketing Horticulture and MAPs

Amla, Mango, papaya & Citrus Needs of improved varieties provided suitable for these locations.

Interventions Needed - Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per cent Buffaloes 100 Local breeds 6-7 liter Milk yield during favorable

conditions Cows 10 Jersey’s 8-10 liter Milk yield during favorable

conditions. Problem repeat inbreeding and green fodder

Ox 35 families In whole panchayat Goats 02 families 01 liter Milk yield during favorable conditions Sheep 02 families - Equines - - Poultry 0 05 families backyard

Institutional and capacity building:

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture:

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost (Rs)

Total cost (Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouse conditions

Two days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard poultry Two days Training to the

farmers with regard to management of poultry farm

1(25 farmers)

1 29300 29300

Total 72750

Page 254: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 14 

Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Jabbal Kheri Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

- 40000 - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 22500 62500 - - -

Page 255: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 15 

8. Horticulture

Village Intervention Area/no. Cost involved (Rs) I II III IV V Jabbal Kheri

Diversification towards drought/frost tolerant fruit plants

1.0 ha 40000 - - 40000 - -

Total 0.5ha 40000 40000

Page 256: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 16 

9. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Jabbal Kheri

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20500 - - 10000 10500 -

Total 10 20500 - - 10000 10500 Total Budget under production system and micro enterprises

Activity Total budget Agriculture 85000 Horticulture 40000

Animal husbandry 20500 Grand Total 145500

Expected outcomes from agricultural crops in Barsar Panchyat Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) Maize 11 17.4 15 22 Wheat 14 17.9 17 20 Vegetables 1 310 2 340

Page 257: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 17 

10. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery

department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 258: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 18 

11. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other on going/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following on-going schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project

Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission

4 Pt. Deen Dayal Upadhyay Kisan Bagwan Samridhi Yojna

Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna

( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries:

Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industies

Page 259: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 19 

12. Livelihood Concerns

Proposed Interventions to Increase Livelihood Activities: Village Intervention Area/no. Cost

involved (Rs)

I II III Iv v

Jabbal Kheri

Mushroom Cultivation 3(50 bags) 30000 - - 30000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 2 (100) chicks 30950 - - 30950 - - 130950 25000 25000 60950 20000

Page 260: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 20 

13. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project

in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Page 261: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 21 

14. Evaluation

During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 262: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 22 

15. Capacity Building

For effective implementation of the watershed activites, capacity building and skill developemnt at watershed level are one of the important components. The activiteies proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 263: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 23 

16. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new

agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase.

Implementation of Farm Production System / off- farm livelihoods: • Upscaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price.

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase

Page 264: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 24 

• Terminal evolution of project as per the expected and aims Participatory Approach for Implementation of Project

For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups ctc. According to their interests and use of resources being created during the implementation phase.

The duration of the project is five year and divided in three different phases:

Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase.

Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 265: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 25 

Annexures

Page 266: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 26 

Cost Estimate for Training programme of three days duration

Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500

6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300

Page 267: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Barsar  Page 27 

Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for

seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 268: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bhakreri  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Bhakreri)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 269: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bhakreri  

Contents S.

No. Particulars Page No.

1. Introduction and Budget 1

2. General Description of Project Area 3

3. SWOT Analysis 9

4. Entry Point Activities 15

5. Drinking Water 17

6. Soil Conservation 18

7. Capacity Building 21

8. Agriculture 23

9. Horticulture 25

10. Animal Husbandry 26

11. Pisciculture 28

12. Convergence 29

13. Livelihood Concerns 30

14. Monitoring System 31

15. Project Withdrawal and Consolidation 32

16. Annexures 34  

 

 

Page 270: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Bhakreri  

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Bhakreri

No. of Micro Watersheds : -

PIA : BDO, Bijhar

Location :

Total geographical area : 399 ha

Treatable area : 305 ha

Irrigated area : nil

Total No. of families : 222

BPL families : 31

Total Population : 1099

Male : 539

Female : 560

Sex ratio : 1.09

Schedule Caste

Male

Female

: 265

141

124

Literacy

Male:

Female:

:

:

:

843

436

407

 

Page 271: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 1 

1. Introduction and Budget The Bhakreri micro watershed which has been selected for development under the National

Watershed Development Project for Rainfed Areas (NWDPRA) falls in the Developmental Block Bijhari, District Hamirpur.

Name of the Panchayat Village Code Bhakreri Baggi 01067200 Rahil 01067100 Bhakreri 01067000 Kohwa 01067300 Makteri 01068300 Jathunda 01067400 Executive Summary of the budget:

Budget Component Percent of Budget Amount (Rs.)

Administrative cost 10 457500 Monitoring 1 45750 Evaluation 1 45750 Preparatory Phase Entry Point Activities 4 183000 Institutional and Capacity building 5 228750 Detailed Project Report 1 45750 Watershed Development Phase Watershed Development Works 56 2562000 Livelihood activities 9 411750 Production System & Microenterprises 10 457500 Consolidation Phase 3 137250 Total 100 4575000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

Page 272: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 2 

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams

along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 273: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 3 

2. General Description of Project Area

Bhakrari microwatershed lies in Bijhari block of district Hamirpur situated between 76o

13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bhakri watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district. Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 776 hactares. There are 12 villages under 3 panchayats in the watershed. Physiographic Features

The area is characterized by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the slopes. The width of terrace varies from five to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate

during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon

Page 274: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 4 

rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation. Demographic Features of Bhakreri Watershed

The general demographic features of the Bhakreri Watershed are given in Table 2. The watershed is spread over 6 villages. The total number of households in this watershed is 222. The total population is 1099 of which 239 are males and 560 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 265. The sex ratio stands at 1039 females for every 1000 males for watershed area.

Demographic Features of Bhakreri Panchayt Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Literate male

Literate female

Baggi 39 182 85 97 12 8 70 66 Rahil 7 40 20 20 0 0 18 13 Bhakreri 117 570 288 282 101 89 239 224 Kowa 27 133 68 65 25 23 49 41 Makteri 27 156 69 87 3 4 52 57 Jathunda 5 18 9 9 0 0 8 6 Total 222 1099 539 560 141 124 436 407 Land use:

Bhakreri Panchyat extends over an area of 399 ha. Out of total land in the watershed,

cultivated land stood at 71 ha which is totally rain fed. The area under forests on the other hand was 94 ha. Panchayat/Village

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Baggi 35 4 13 18 0 13 31 Rahil 12 0 5 6 0 5 12 Bhakreri 83 6 22 55 0 22 77 Kowa 33 1 9 23 00 9 32 Makteri 112 55 13 44 0 13 57 Jathunda 124 28 9 87 0 9 96 Total 399 94 71 233 0 71 305 Source: Revenue Department, District Hamirpur

Page 275: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 5 

Description of Poverty Programmes in Bhakreri Panchayat:

Panchayat BPL families

BPL SC families

BPL ST families

Population under poverty alleviation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Bhakreri 31 6 0 180 0 270 3 Basic Amenities in Bhakreri Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Bhakrari micro watershed

Source: Directorate of Economics and Statistics, Govt. of HP. Description of Education Facilities in Bhakrari micro watershed Panchayat

Primary Middle High Sr. Sec. Tailoring Centre

Aganwari Centres

Total Literate in the village

Bhakreri 1 0 0 0 1 4 1126 Source: Directorate of Economics and Statistics, Govt. of HP Existing area, production and productivity of different crops in Bhakreri panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 62 1140 18.4 Mash 0.5 3 6 Wheat 60 1032 17.2 Toria 2 14 7 Gram 0.5 3 6 Vegetables 1 310 310 Critical gaps worked out in major crops of Usnarkalan panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Cereal crops: Crop: Maize Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P

Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2

Yes-1; No.-2 Yes-1; No.-2

Bhakreri 208 1 288 1 1

Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Bhakreri 0 0 0 0 1 0

Page 276: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 6 

5. Seed treatment Bavistin 50WP @2.5 g/kg seed

Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Pulse crops: Crop: Mash Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

Page 277: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 7 

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management:

Page 278: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 8 

Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P

Page 279: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 9 

3. SWOT Analysis SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analyzed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. The topography of area is moderately hilly and undulating which makes the soil of the

district well drained Soil conservation and rainwater harvesting activities have been undertaken by the

Department of Agriculture in some parts. Climatic conditions of the district are relatively moderate which offer good scope of

rearing wide range of livestock and poultry species. About 35 per cent of the total geographical area is under pastures/grass lands/waste land

etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

The forest areas, common lands, river beds and neglected pieces of private lands are full of obnoxious weeds which can be utilized for the production of vermi-compost by the farmers.

Agriculture

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed by

about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and wheat

yet about 30 per cent farmers use kera (broadcasting method).

Page 280: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 10 

Horticulture

The mushroom growing activities can be undertaken throughout the year due to availability of raw material and high demand in the market

Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can be used for the production of variety of value added products.

The medicinal plants such as harad, bahera and amla can also be grown successfully on marginal and sub-marginal lands.

Animal Husbandry

Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of buffaloes are of improved breeds.

Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop residues, weeds and fodder crops supply the dry/green fodder for rest of the year.

Improved sticks of grasses and nursery of fodder trees are available with many departments like SAUs/KVK/Farmers for improvement of grass lands and pastures.

The climatic conditions are suitable for rearing of cows and buffaloes successfully. Veterinary clinical services are available within 10 km distance in the district. Markets for milk and milk products are available in the local areas. The procurement of

milk from rural areas is also being done by the milk federation. Intensive Dairy Development Project is in operation in the district for breed

improvement, dissemination of better management practices and commercialization of the activities.

Credit facilities are available in the district under different departmental and credit institutional schemes.

Good scope of poultry enterprise especially broiler as the population of small ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

Others

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

The literacy level in the district is higher as compared to other parts of the statehelping in the general awareness and acceptability of the improved technologies responsive.

Retired military personnel and educated un-employed youth having entrepreneurial ability are available.

Fertilizer sale outlets are available near the villages.

Page 281: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 11 

Weaknesses Natural Resources

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The soils in the development block Bijhari is gravely.

The sloppy landscape causes quick run-off of rain water due to which ground water recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Scanty/poor vegetative cover on the forest/common lands.

Agriculture Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices. More than 95 per cent of net area sown is rain fed. The average size of land holding is small (0.6 ha) and scattered. Erratic rainfall leading to moisture stress during different stages of crop growth in

summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass in

form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Horticulture .

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops.

Page 282: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 12 

Lack of knowledge about the grading and proper packing of fruits. Animal Husbandry

Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle yet

farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and management of

livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Non-adoption of deworming and vaccination schedule. Lack of awareness about the scientific storage/preservation methods of green fodder and

storage for lean periods. Inability/unwillingness of farmers to transport their diseased animals to

hospital/dispensary due to hilly tract in some parts of the district. Others

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits with

farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities

Natural Resources Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as life

saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment fodder

supply and reduce fire hazards Agriculture

Diversification is possible in the Kharif season (rainy season) with introduction of vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

Recommendations available for the control of major insect, pest and diseases. Intensive crop production is possible in lower portions of the district

Horticulture The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and

upgraded for more productivity.

Page 283: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 13 

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Animal Husbandry Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to address

scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. Others

New schemes like promotion of export of high value crops and multiplication of HYV seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units) for

value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level.

Page 284: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 14 

Improper and non-judicious use of irrigation with respect to water use efficiency and crop selection.

Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like berseem,

sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 285: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 15 

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The details of the entry point activities suggested by the people during the PRA exercise are as under VILLAGE WISE PRA OF BHAKRERI MICRO WATERSHED Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield

Pulses Nil Growth satisfactory during favorable conditions Oil seed crops Sarson, Toria Satisfactory with production & yield Vegetables Kitchen gardening Wish to grow on facilitating sure Irrigation. Also

needs assure marketing Horticulture and MAPs

Amla, Mango, papaya, banana, harad, bahera & Citrus

Needs of improved varieties provided suitable for these locations.

Interventions Needed - Most of the people are employed hence, less interest in Agriculture and Animal husbandry.

Livestock Animals Per cent Buffaloes 40

Local breeds 6-7 liter Milk yield during favorable conditions

Cows 30 Jersey’s 8-10 liter Milk yield during favorable conditions.

Ox 05 pairs In whole panchayat Goats 2 01 liter Milk yield during favorable conditions Sheep - - Equines - Poultry - -

Watershed development activities:

Page 286: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 16 

Existing water bodies villages wise under: Water bodies 1 Earthen tank (Talai) 1 Pacca tank 1 Tube well 2

Proposed water bodies villages wise Water bodies

Baggi Rahil Bhakreri Kowa Makteri Jathunda Total No.

Unit cost Total cost

Pacca Tank 5mx4mx1m

- - - - - 1 1 103774 103774

Total 103774 List of sites for proposed water structures and expected outcomes in Bhakreri Panchayat Water structures

Village Location Total Cost IWMP Budget

Convergence Expected outcomes

Pacca Tank 5mx4mx1m

Jathunda In the Land of Sh. Gurbachan Singh

103774 103774 - For the irrigation of 30 kanal land area

Page 287: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 17 

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking

water (months) 1. Baggi IPH pipeline 11 2. Rahil IPH pipeline 11 3. Bhakreri IPH pipeline 11 4. Kohwa IPH pipeline 11 5. Makteri IPH pipeline 11 6. Jathunda IPH pipeline 11 7. Thana IPH pipeline 11 Proposed status of drinking water: Water bodies Baggi Kahil Bhakreri Kowa Makteri Jathunda Total

No. Unit cost

Total cost

Open Well - - - - - 1 1 18676 18676 Total 18676

List of sites for proposed water structures and expected outcomes in Bhakreri Panchayat: Water structures Village Location Expected outcomes Well Jathunda In the Land of Capt. Ramesh/Suresh at Jol For the drinking of land area

60 families Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 11 12

Page 288: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 18 

6. Soil Conservation

Watershed Activities to be undertaken Village wise Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/ identification

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 On the land of Sh

54216 54216 - Irrigation of 50 kanal area

Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Baggi

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Bikram jeet Singh (Cheedh)/Prithi Singh/Gian Chand/Kashmir Singh/Sukh Ram land to khwaja khadd tak0

4 78200

Pritam Singh-Balbir Singh

2 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Pritam Singh/Diwan Chand

2 29324

PWD Rest House to Kahwa Body tak

5 73310

Balbir singh- Yash pal-Kuldeep land

2 29324

Yashpal –Kuldeep land

3 43986

Total 293244 260400 32844 Rahil Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Baldev-Anant Ram land

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Opposite of Yashpal land-Baldev Anant ram

2 39100

Total 112410 100800 11610 Bhakreri Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Shyah de panga (Sher Singh land to Kashmir Singh land)

6 117300

Kashmir singh land ( Both tributaries)

4 78200

Roshan and Kashmir land

3 39100

Handia da cho (Prem Singh & other s land)

5 97750

Page 289: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 19 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Kashmir singh Rattan Chand

2 29324

Jaisi land to Rattan land

10 146620

Sita Ram (Bamboo) to water body

8 117296

Total 38 625590 592584 33006 Kowa Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Bakhtaura Singh land to Kuldeep Singh house

8 117296

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Gurbachan singh land

2 19550

Total 136846 136846 Nil Makteri

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Vishal land to Makandi land

4 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Ramesh Chand land to Rattan chand land

5 71110

Puran singh land to Banku Ram land

8 117296

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Rajinder Singh (Gahrian )to Khokhli (Rattan Chand land)

15 293250

Total 520756 478800 41956 Jathunda Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Chamel Singh/ Shiv Raj to capt. Ramesh land

7 68425

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Chamel Singh/ Shiv Raj to capt. Ramesh land

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mohindra Agency to water body

20 391000

Total 32 532735 532735 - Grand Total

2221581 2102165 119416

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Baggi Check dam stone & wire crated (Spur 293244 260400 32844 Total 293244 260400 32844 Rahil Check dam stone & wire crated (Spur 112410 100800 11610 Total 112410 100800 11610 Bhakreri Check Dam 6m(2m+1m)/2mx2m and No. 54216 54216 - Check dam stone & wire crated (Spur 625590 592584 33006 Total 679806 646800 33006

Page 290: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 20 

Village Particulars Total Cost

IWMP Budget

Convergence (MNREGA)

Kowa Check dam stone & wire crated (Spur 136846 136846 Nil Total 136846 136846 Nil Makteri

Check dam stone & wire crated (Spur 520756 478800 41956

Total 520756 478800 41956 Jathunda Pacca tank RCC

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 532735 532735 - Total 655185 655185 - Grand Total 2398247 2278831 119416

Page 291: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 21 

7. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Institutional and capacity building

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost (Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture

Page 292: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 22 

Diversification Diversification towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

1(25 farmers)

1 20750 20750

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on value addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43550 43550

Total 228750

Page 293: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 23 

8. Agriculture

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Baggi Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Bhakreri Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 62500 - - - Kowa Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 0.5 20000 20000 - - - Makteri Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 62500 - - - Jathunda Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Page 294: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 24 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

cereals, pulses and oilseeds

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45500/- @ Rs.45500/ha

- 45500 - - -

Total 85500 85500 Grand Total

250500

Page 295: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 25 

9. Horticulture

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Bhakreri Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Makteri Diversification towards

drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Jathunda Diversification towards

drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand Total

100000 100000

Page 296: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 26 

10. Animal Husbandry

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Baggi Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000

Kahil Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50animals 3700 - 3700

Total 13700 - 13700

Bhakreri Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Total 20000 - 10000 10000 Kowa Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Makteri Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 25000 - 25000 -

Total 25000 25000 Jhatunda Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 8800 - 8800 -

Total 8800 8800 Grand Total 107000 107000 Total Budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 250500 2. Horticulture 100000 3. Animal husbandry 107500 Grand Total 457500

Page 297: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 27 

Area under Crops Crops Area (ha) Production (q) Productivity (q/ha) Maize 62 1140 18.4 Mash 0.5 3 6 Wheat 60 1032 17.2 Toria 2 14 7 Gram 0.5 3 6 Vegetables 1 310 310 Expected outcomes from agricultural crops in Bhakreri Panchayat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 62 18.4 70 25.0 2. Mash 0.5 6 1.0 8.0 3. Wheat 60 17.2 70 18.0 4. Toria 2 7 5 8.0 5. Gram 0.5 6 1 7.0 6. Vegetables 1 310 2 400

*additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops in Bhakreri Panchayat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8

Page 298: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 28 

11. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for pisciculture in some areas.

Page 299: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 29 

12. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other on going/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following on-going schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project

Distribution of earth worms and vermin-compost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan

Bagwan Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industies

Page 300: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 30 

13. Livelihood Concerns

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Baggi Vermiculture Unit 3mx1m( Low cost)

7 no. 35000 35000 - - - -

Total 35000 35000 - - - -

Kahil Vermiculture Unit 3mx1m( Low cost)

3 no. 15000 15000 - - - -

Total - 15000 15000 - - - - Bhakreri Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 80000 50000 - 10000 20000 - Kowa Vermiculture Unit

3mx1m( Low cost) 7no. 35000 35000 - - - -

Total 35000 35000 - - - Makteri Mushroom

Cultivation 2(50 bags) 20000 - - 20000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Backyard poultry 150 chicks 23000 - - 23000 - Total 113000 50000 - 43000 20000 - Jathunda Mushroom

Cultivation 3(50 bags) 30000 30000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

Vermiculture Unit 3mx1m( Low cost)

10no. 50000 50000 - - - -

Backyard poultry 220 chicks 33750 - - 33750 - Total 133750 50000 - 63750 20000 -

Grand Total

411750 235000 116750 60000

Page 301: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 31 

14. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project

in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 302: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 32 

32. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new

agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 303: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 33 

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups ctc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 304: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 34 

ANNEXURES

Page 305: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 35 

Cost Estimate for Training programmes Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for three days( Lunch

and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organizer and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for three days( Lunch

and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5 lectures 1250 4. Vegetable seed kit for kitchen garden @ 50/participant 5000 5. TA/DA /POL for resource personnel & other staff 1500 Total 13750 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven days(

Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300

Page 306: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Bhakreri  Page 36 

Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven days(

Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 307: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat‐Bijhari  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 308: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat‐Bijhari  

Contents S.

No. Particulars Page No.

PROJECT AT A GLANCE

1. Introduction and Budget 1

2. General Description of Project Area 3

3. SWOT Analysis 11

4. Entry Point Activities 16

5. Drinking Water 18

6. Soil Conservation 19

7. Capacity Building 22

8. Agriculture 24

9. Horticulture 25

10. Animal Husbandry 26

11. Pisciculture 28

12. Convergence 29

13. Livelihood Concerns 30

14. Monitoring System (Watershed Level) 32

15. Project Withdrawal and Consolidation 33

16. ANNEXURES 35  

 

 

 

 

Page 309: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat‐Bijhari  

PROJECT AT A GLANCE

Name of the Project : IWMP Block : Bijhari District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Bijhari No. of Micro Watersheds : - PIA : BDO, Bijhar Location : 76o 13” and 76o 44” on East longitudes and 31o

52” and 31o 58” North latitudes Total geographical area : 652 ha Treatable area : 526 ha Irrigated area : nil Total No. of families : 660 BPL families : 38 Total Population : 3140 Male : 1488 Female : 1652 Sex ratio : 1.11 Schedule Caste Male Female

: 466 249 217

Literacy Male: Female:

: : :

2301 1176 1125

 

 

Page 310: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 1

1. Introduction and Budget

The Bijhari watershed which has been selected for development under the National Watershed Development Project for Rainfed Areas (NWDPRA) falls in the Developmental Block Bijhari, District Hamirpur.

Name of the Panchayat Village Code Bijhari Patta Nathu 01083500 Tikkar 01080200 Ambota 01080000 Bhanwanee 01079900 Garari 01079700 Lakho 01079600 Narghol 01079800 Bijhari 01079400 Baghed 01079500

Executive Summary

Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 732000 Monitoring 1 73200 Evaluation 1 73200 Preparatory Phase Entry Point Activities 4 292800 Institutional and Capacity building 5 366000 Detailed Project Report 1 73200 Watershed Development Phase Watershed Development Works 56 4099200 Livelihood activities 9 658800 Production System & Microenterprises 10 732000 Consolidation Phase 3 219600 Total 100 7320000

Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed.

Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

Page 311: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 2

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different

departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the

project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain.

Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 312: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 3

2. General Description of Project Area Bijhari micro watershed lies in Bijhari block of district Hamirpur situated between 76o

13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 meters above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhaleth area of tehsil Barsar in east. The total geographical area of the watershed is approximately 6249 hectares. There are 100 villages under 15 panchayats in the watershed. Physiographic Features The area is characterized by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters.

Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 313: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 4

Demographic Features of Watershed The demographic features of the watershed are given in Table 2. The Bijhari panchayats

is covering 9 villages. The total number of households in this watershed is 769. The total population is 3988 of which 2262 are males and 1726 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 584. The sex ratio stands at 763 females for every 1000 male for watershed area. Demographic Features of Bijhari Watershed

The general demographic features of the Bijhari Watershed are given in Table 2. The

watershed is spread over 9 villages. The total number of households in this watershed is 660. The total population is 3140 of which 1488 are males and 1652 are females. The average family size comes around six members per household. The total scheduled caste (SC) population is 466. The sex ratio stands at 1110 females for every 1000 males for watershed area. Table2: (A) Demographic Features of Bijhari Panchayt Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Patta Nathu

6 23 10 13 0 0 0 0 09 10

Tikkar 24 98 39 59 0 0 0 0 31 41 Ambota 34 219 85 134 14 10 0 0 67 90 Bhanwanee 15 69 32 37 0 0 0 0 26 28 Garari 31 159 69 90 0 00 0 0 58 66 Lakho 88 393 186 207 0 0 0 0 147 132 Narghol 20 94 48 46 48 46 0 0 36 32 Bijhari 416 1939 955 984 185 159 0 0 752 669 Baghed 26 146 64 82 2 2 0 0 50 57 Total 660 3140 1488 1652 249 217 0 0 1176 1125 Description of Poverty Programmes in Bijhari Panchayat Land use:

Bijhari Panchyat extends over an area of 652 ha. Out of total land in the watershed, cultivated land stood at 226 ha which is totally rain fed. The area under forests on the other hand was 126 ha.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Patta Nathu 9 0 5 4 0 5 9 Tikkar 31 0 13 18 0 13 31

Page 314: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 5

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Ambota 50 0 25 25 00 25 50 Bhanwanee 14 0 6 8 0 6 14 Garari 24 0 14 10 0 14 24 Lakho 48 0 32 16 00 32 48 Narghol 24 0 14 10 0 14 24 Bijhari 419 126 102 195 0 102 293 Baghed 33 0 15 18 0 15 33 Total 652 126 226 304 0 226 526 Source: Revenue Department, District Hamirpur

The major proportion (about 95 per cent) of total cropped area in Bijhari block is under

food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The cropping intensity in the bijari panchayat was estimated to be 184 per cent. Total numbers of agricultural workers are 1010. Maize, paddy, mash, cowpea, sesame are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area. Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects all the panchayats. As regards the health facilities, there is one primary health centers, one health sub-centers and 5 private clinics available in the area. There are sufficient educational facilities available in the area. There are 3 primary schools, 1 high and 1 senior secondary schools. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 5 anganwari centers in the catchment area.

Page 315: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 6

Panchayat-wise Basic Amenities in Bijhari Panchayat

Description of Health Facilities in Bijhari Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Table Description of Education Facilities in Bijhari panchayat Panchayat Primary Middle High Sr.

Secy Tailoring Centre

Aganwari Centres

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Bijhari 3 0 1 1 0 5 0 2 2994 Source: Directorate of Economics and Statistics, Govt. of HP

Existing area, production and productivity of different crops

Source: On the basis of PRA done in the Panchyat. Critical gaps worked out in major crops

On the basis of PRA exercise and survey in different watershed areas, production and

technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F

Block/Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2

Yes-1; No.-2 Yes-1; No.-2

Bijhari 475 1 769 1 1

Block/Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Bijhari 0 1 0 0 3 1

Crops Area (ha) Production (q) Productivity (q/ha) Maize 95 1843 19.4 Mash 1.0 5.6 5.6 Wheat 92 1490.4 16.2 Toria 3 20.4 6.8 Gram 1.0 6 6 Vegetables 1.0 300 300

Page 316: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 7

Sr. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 317: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 8

Crop: Mash Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N

Page 318: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 9

4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N

Page 319: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 10

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 320: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 11

3. SWOT Analysis

Strengths Climatic conditions of the district are relatively moderate which offer good scope of

rearing wide range of livestock and poultry species. About 35 per cent of the total geographical area is under pastures/grass lands/waste land

etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed by

about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and wheat

yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can

be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully on

marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of

buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small ruminants

(sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Page 321: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 12

Weaknesses The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received

during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices. The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different stages

of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass in

form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Page 322: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 13

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle yet

farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and management of

livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits with

farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as life

saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment fodder

supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations. Diversification towards cash crops is also possible through the utilization of created

irrigation potential and rain water harvesting sites. The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and

upgraded for more productivity. The climatic conditions of area are congenial for the production of mushroom throughout

the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available.

Page 323: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 14

The abundant availability of green fodder in kharif/rainy season can be utilized to address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units) for

value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and crop

selection. Improvement of local germ-plasm of maize to make it resistant to lodging.

Page 324: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 15

Low investment in agriculture sector despite availability of huge subsidies in critical inputs and implements by the government.

Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like berseem,

sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 325: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 16

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat. Village wise PRA of panchayat bijhari Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat, Maize & Sugarcane

Pulses Mash Oil seed crops Sarson, Toria, til & soyabean Vegetables Onion, cauliflower, Brinjal, tomato,

Raddish, Palak, Potato, Cucurbits, bhindi and cabbage

Horticulture and MAPs

Amla, Mango, papaya, banana, harad, bahera, pomegranate & Citrus

Interventions Needed

.

Livestock Animals Per cent Buffaloes 95

Local-95

Local breeds give 3-4 liter Milk yield during favorable conditions

Cows 5 Jersey Breeds give 08 liter Milk yield

Ox 10 pairs In whole panchayat Goats 100 01 liter Milk yield during favorable conditions Sheep 05 - Equines 07 - Poultry - BackYard 10 per cent

Fishery 02 Watershed Development Activities: Existing water bodies villages wise: Sr. No. Water bodies No.

1 Earthen tank (Talai) 3

2 Pacca tank 02

3 Tube well 7

Page 326: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 17

Proposed water bodies villages wise under Bijhari Panchayat: Water bodies Ambota Narghol Bijhari No. Unit cost Total cost Pacca tank (5mx4mx1m) - 2 2 103774 207548 Well Open Sink type of 2.4 m dia and 3 m deep

- 1 1 2 18676 37352

Tube well 1 1 295301

177181(IWMP) + 118120(Farmers share)

Total

422081 + 118120 (Farmers share)

List of sites for proposed water structures and expected outcomes in Bijhari Panchayat: Water structures

Village Location Total Cost IWMP Budget Expected outcomes

Pacca Tank (5mx4mx1m)

Bijhari On the land of Sh Amar Nath

103774 103774 For irrigation of 16 kanal area

On the land of Sh gian Chand

103774 103774 For irrigation of 13 kanal area

Well Open Sink type of 2.4 m dia and 3 m deep

Narghol On the land of Sh. Anant Ram

18676 18676 For irrigation of 12 kanal area

Bijhari On the land of Sh. Gian Chand

18676 18676 For irrigation of 30 kanal area

Tube-well Bijhari On the Land of Sh. Jagdev Singh

295301

177181(IWMP) + 118120(Farmers share)

For irrigation of 20 kanal area

Page 327: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 18

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking

water (months) 1. Patta Nathu IPH pipeline 10 2. Tikker IPH pipeline 10 3. Ambota IPH pipeline 11 4. Bhanwanee IPH pipeline 10 5. Garadi IPH pipeline 9 6. Lakho IPH pipeline 11 7. Narghol IPH pipeline 10 8. Bijahari IPH pipeline 10 9. Baghed IPH pipeline 9-10 Proposed status of drinking water: nil

Page 328: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 19

6. Soil Conservation

Watershed Activities to be undertaken Village wise: Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Patta Nathu

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Julfi Ram ki zameen se Siaru ke naalu tak

2 39100

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Vinod land to Joginder land

2 73320

Total 112420 75600 36820 Tikkar

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chhimbe ke ghar se kotle tak

6 117300

Total 117300 117300 Nil Ambota

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Ambota school to Hambotu ke end tak

10 195500

Khill se Jabrali tak 15 293250 Total 488750 120000 68750 Bhawanee Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Bhawani machine se ambota village

4 78200

Banani machine se chalrai Gaon ke dor

4 78200

Total 156400 117600 38800 Garari

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kumhar babri se Syaru da nallah

8 156400

Vidya sagar land se Matoli sudesh master ke khet tak

3 58650

Total 215050 201600 13450 Lakho

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chauthe Vars (Dharam chand land to Ramesh land)

6 117300

Jol wala cho 6 117300 Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Maggar wala cho se shamshaan ghaat tak

6 219960

Total 454560 403200 51360 Narghol Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Bhag Singh ke ghar se kotlu nallah ke saath

4 78200

Bhag chand ki zameen se julfi ram ke ghar tak

3 58650

Jindu ram ke ghar se gardi ke nallu

3 58650

Page 329: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 20

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

tak Total 195500

182924 12576

Bijahri

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Bazaar well se nallu tak

6 219960

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

‐ Do- 4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Chanderuhi ke ghar se Pattharian wale soo tak

3 109980

Anant ram ke ghar se baudi tak

2 73320

Madan ke ghar se Mehar Singh ke khet tak

2 73320

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

Devi Singh ke ghar se Hari Ram ke khet jaad tak

3 179301

Khurpari se Narghol ki baudi tak

4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Khurpari se Narghol ki baudi tak

4 146640

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

Balbir Singh ke khet se Shamsher ghar tak

4 239068

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

3 109980

Badu ka cho se Jagan nath ki balli tak

5 183300

Check dam stone & wire crated (Spur) 4mx1.25mx2.5m

Vijay Singh ke khet se Bijhri gardi sadak tak

4 78200

Check dam stone & wire crated (Spur) 6mx1.25mx2.5m

Balh Nallah 2 73320

Total 46 1964525 1941595 225930 Baghed Check dam stone &

wire crated (Spur) 6mx1.25mx2.5m

Nallah 5 183300

Fencing 500m 150440 Total 333740 277200 56540 Grand Total

4038245 3437019 504226

Page 330: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 21

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Patta Nathu

Check dam stone & wire crated (Spur 112420 75600 36820

Total 112420 75600 36820 Tikkar

Check dam stone & wire crated (Spur 117300 117300 Nil

Total 117300 117300 Nil Ambota

Check dam stone & wire crated (Spur 488750 120000 68750

Total 488750 120000 68750 Bhawanee

Check dam stone & wire crated (Spur 156400 117600 38800

Total 156400 117600 38800 Garari

Check dam stone & wire crated (Spur 215050 201600 13450

Total 215050 201600 13450 Lakho

Check dam stone & wire crated (Spur 454560 403200 51360

Total 454560 403200 51360 Narghol Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur 195500

182924 12576

Total 214176 201600 12576 Bijahri Pacca tankRCC 5mx4mx1m 207548 207548 - Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676 -

Tube well 295301 177181 118120* Check dam stone & wire crated (Spur 1964525 1941595 225930 Total 2367930 2142000 225930 Baghed Check dam stone & wire crated (Spur) 183300 Fencing 150440 Total 333740 277200 56540 Grand Total 4460326 3656100 504226

Page 331: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 22

7. Capacity Building

For effective implementation of the watershed activites, capacity building and skill developemnt at watershed level are one of the important components. The activiteies proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Members of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Exhibitions

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members 10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Page 332: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 23

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry Two days Training to the farmers with regard to management of poultry farm

2 (25farmers)

2 39050 39050

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 366000

Page 333: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 24

8. Agriculture

Village Intervention Area Cost involved (Rs)

I II III IV V

Patta Nathu and Tikkar

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 20000 20000 - - - Ambota Provision of improved inputs

(viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000

Bhawanee and Garari

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 - - - Lakho Provision of improved inputs

(viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 - - - Narghol and Baghed

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500

- - -

Total 1.0 42500 20000 22500

Bijhari Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

3 ha 120000 @ Rs. 40000/ha

40000 40000

40000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

4 ha 180000/- @ Rs.45000/ha

45000 45000

45000

45000

Total 3,40,000 85000 85000

85000

45000

Grand total 422500 185000 107500

85000

45000

Page 334: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 25

9. Horticulture

Village Intervention Area Cost involved

(Rs) I II III IV V

Ambota Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Bhawanee and Garari

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Lakho Diversification towards

drought/frost tolerant fruit plants 0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Narghol and Baghed

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 - - Bijhari Diversification towards

drought/frost tolerant fruit plants 2ha 80000 - - 40000 40000 -

Total 1ha 80000 40000 40000 Grand Total 160000 120000 40000

Page 335: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 26

10. Animal Husbandry

Village Intervention Area Cost involved

(Rs) I II III IV V

Patta Nathu and Tikkar

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Control of endo and ecto parasites

100 animals

4880 - 4880

Total 24880 24880 Ambota Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

8 16100 - 16100

Total 16100 - 16100 Bhawanee and Garari

Control of endo and ecto parasites

50 animals

4090 4090

Total 4090 4090 Lakho Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

05 10000 10000

Control of endo and ecto parasites

50animals

3856 3856

Total 13856 13856 Bijhari Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

40 80000 20000 20000 20000 20000

Control of endo and ecto parasites

150 animals

10574 - 10574

Total 90574 - 30574 Grand Total 149500 20000 89500 20000 20000

Expected outcomes from agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 95 19.4 100 25.0 2. Mash 1.0 5.6 2 8.0 3. Wheat 92 16.2 100 18.0

Crops Area (ha) Production (q) Productivity (q/ha) Maize 95 1843 19.4 Mash 1.0 5.6 5.6 Wheat 92 1490.4 16.2 Toria 3 20.4 6.8 Gram 1.0 6 6 Vegetables 1.0 300 300

Page 336: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 27

4. Toria 3 6.8 5 8.0 5. Gram 1.0 6 2 7.0 6. Vegetables 1.0 300 2 400

*additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops in Kulehra Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8

Page 337: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 28

11. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 338: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 29

12. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following on going schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan

Bagwan Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technical assistance and guidance and marketing of cocoons

Department of industies

Page 339: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 30

13. Livelihood Concerns Proposed Interventions to Increase Livelihood Activities

Village Intervention Area/no. Unit Cost involved

(Rs)

I II III IV V

Patta Nathu and Tikkar

Popularization of Mushroom cultivation

50bags 5 25000 25000

Exposure visit of the farmers to Solan

1 (25 farmers)

1 15000 15000

Total 40000 40000 - - Ambota Popularization of

Mushroom cultivation

50bags 5 25000 25000

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 45000 20000 25000

Bhawanee and Garari

Popularization of Mushroom cultivation

50bags 5 25000 25000 - -

Exposure visit of the farmers to Solan

1(25 farmers)

1 15000 15000

Total 40000 40000 - - Lakho Popularization of

Mushroom cultivation

50bags 5 25000 25000 - -

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 45000 20000 25000 - Narghol and Baghed

Popularization of Mushroom cultivation

50bags 5 25000 25000

Exposure visit of the farmers to Solan

1(25 farmers)

1 15000 15000 -

Bee Colonies 10 Boxes per unit

1 20000 20000

Total 60000 20000 40000 - - Bijhari Popularization of

Mushroom cultivation

50 bags 8 41000 41000

Exposure visit of the farmers to

1(25 farmers)

2 30000 30000 -

Page 340: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 31

Village Intervention Area/no. Unit Cost involved

(Rs)

I II III IV V

Solan Bee Colonies 10 Boxes

per unit 2 40000 40000

Tailoring Unit - 1 144000 144000 Micro enterprise

on Soft toy making

Three days Training to the farm women

2no (25 farmers)

86900 86900

Micro enterprise on tailoring and stitching

Three days Training to the farm women

2no (25 farmers)

86900 86900

Total 428800 184000 244800

Page 341: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 32

14. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project

in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 342: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 33

15. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new

agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The foolowing activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 343: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 34

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertinent because it is the peoples pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR

During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase.

Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 344: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 35

ANNEXURES

Page 345: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat-Bijhari Page 36

Cost Estimate for Training programmes Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for three

days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5 lectures 1250 4. Vegetable seed kit for kitchen garden @ 50/participant 5000 5. TA/DA /POL for resource personnel & other staff 1500 Total 13750 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven days(

Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven days(

Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 346: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II:Bijhari (Dhabriana)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 347: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  

Contents S.

No. Particulars Page No.

1. Introduction and Budget 1

2. General Description of Project Area 4

3. SWOT Analysis 10

4. Entry Point Activities 15

5. Drinking Water 18

6. Soil Conservation 19

7. Capacity Building 23

8. Agriculture 24

9. Horticulture 26

10. Animal Husbandry 27

11. Convergence 29

12. Livelihood Concerns 30

13. Monitoring System 31

14. Project Withdrawal and Consolidation 33

15. ANNEXURES 35  

 

 

 

 

 

 

 

Page 348: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Dhabriana

PIA : BDO, Bijhari

Location : 76o 29’ 37.32” E -31o 32’ 37.32” N

Total geographical area : 594 ha

Treatable area : 487 ha

Irrigated area : nil

Total No. of families : 244

BPL families : 26

Total Population : 1221

Male : 561

Female : 661

Sex ratio : 1.17

SC

Male

Female

: 295

141

154

Literacy

Male:

Female:

:

:

:

884

432

452

 

 

Page 349: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 1 

1. Introduction and Budget

Dhabriyana micro watershed lies in Bijhari block of district Hamirpur situated between 76o 29’ 37.32” E -31o 32’ 37.32” N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bijhari watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district.

Name of the Panchayat Village Code Dhabriana Ganoh Rajputtan 01064700 Ganoh Brahmana 01064900 Dhabriana 0106500 Langheree 01065200 Neri 01065100 Loharda 01065300 Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 730500 Monitoring 1 73050 Evaluation 1 73050 Preparatory Phase Entry Point Activities 4 292200 Institutional and Capacity building 5 365250 Detailed Project Report 1 73050 Watershed Development Phase Watershed Development Works 56 4090800 Livelihood activities 9 657450 Production System & Microenterprises 10 730500 Consolidation Phase 3 219150 Total 100 7305000

Page 350: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 2 

Methodology A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were

collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams

along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the

project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSK HPKV Palampur. Standard

Page 351: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 3 

estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground trusting of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 352: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 4 

2. General description of Project Area Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1554 hactares. There are 28 villages under 3 panchayats in the microwatershed. Physiographic Features

Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 25 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate

during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation. Demographic Features of Dhabriana Watershed

The general demographic features of the Dhabriana Watershed are given in Table 2. The watershed is spread over 6 villages. The total number of households in this watershed is 244. The total population is 1202 of which 561 are males and 661 are females. The average family size comes around four members per household. The total scheduled caste (SC) population is 295. The sex ratio stands at 1178 females for every 1000 males for watershed area.

Page 353: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 5 

Villages No. of House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Ganoh Rajputtan

34 156 72 84 40 41 0 0 62 64

Ganoh Brahmana

45 213 93 120 20 21 0 0 68 79

Dhabriana 71 341 152 189 35 36 0 0 127 128 Langheree 9 35 14 21 0 0 0 0 11 13 Neri 21 93 60 53 0 0 0 0 26 37 Loharda 64 364 170 194 46 56 0 0 138 131 Total 244 1202 561 661 141 154 0 0 432 452

Land use:

Dhabriana Panchyat extends over an area of 594 ha. Out of total land in the watershed, cultivated land stood at 104 ha which is totally rain fed. The area under forests on the other hand was 107 ha. The area under horticulture is negligible in the watershed area.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Ganoh Rajputtan 58 7 12 39 0 12 51 Ganoh Brahmana 139 40 22 77 0 22 99 Dhabriana 126 18 28 80 0 28 108 Langheree 39 0 2 37 0 2 39 Neri 61 10 10 41 0 10 51 Loharda 171 32 30 109 0 30 139 Total 594 107 104 383 0 104 487 Source: Revenue Department, District Hamirpur

Description of Poverty Programmes in Dhabriyana Panchayat Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Dhabriana 26 10 0 290 1 317 2 Table: Basic Amenities in Dhabriyana Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

Dhabriana 211 1 338 1 1

Page 354: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 6 

Description of Health Facilities in Dhabriyana Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Table: Existing production pattern of different crops Crops Area (ha) Production (q) Productivity (q/ha) Maize 126.9 2334.9 18.4 Mash 2.0 12.0 6.0 Wheat 130.0 2028 15.6 Toria 45.0 315 7.0 Gram 0.5 3 6 Vegetables 3.0 1000 333.3 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops of Dhabriana Panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Block/Panchayat *CHC *PHC *Dispensary *Sub Center

*Private Clinic

**Dispensary

Dhabriana 0 0 0 2 0 0

Page 355: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 7 

CROP: Wheat Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 356: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 8 

Crop: Peas Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed

Page 357: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 9 

Sr. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8.

Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 358: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 10 

3. SWOT Analysis SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed by

about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and wheat

yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can

be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully on

marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of

buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully.

Page 359: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 11 

Good scope of poultry enterprise especially broiler as the population of small ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Weaknesses The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received

during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices. The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different stages

of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass in

form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Page 360: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 12 

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle yet

farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and management of

livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits with

farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as life

saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment fodder

supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Page 361: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 13 

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to address

scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units) for

value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, which causes havoc to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Page 362: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 14 

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and crop

selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like berseem,

sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 363: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 15 

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The details of the entry point activities suggested by the people during the PRA exercise are as under: WATER HARVESTING Existing water bodies: Water bodies 1 2 3 4 5 6 Kuhl - - - - - - Earthen tank (Talai) - 02 01 - - - Dam - - - - - - Pacca tank - - - - - - Poly tank - - - - - - Hand Pump 01 01 03 - - 04 Roof water - - - - - - Lift irrigation - - - - - - Any other (well) 3 2 2 - 1 4 Proposed water bodies Water bodies

Ganoh Rajputtan

Ganoh Brahmana

Dhabriana Langhere Neri Loharda Total No.

Unit cost

Total cost

Pacca Tank 5mx4mx1m

- 2 2 - - 3 103774

RWHT - 5 13 10 26909 Well 1 1 - - 18676 Tube well - - 2 295301 590602(

354361 from IWMP and 236241 farmers share)

Total List of sites for proposed water structures and expected outcomes Village Water

structures Location Total Cost IWMP

Budget Convergence Expected

outcomes Ganoh Rahputtan

Well In the land of Sh. Babu Ram

18676 18676 For irrigation of 30 kanal

Page 364: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 16 

Village Water structures

Location Total Cost IWMP Budget

Convergence Expected outcomes area

Langhere RWHT In the land of Sh. Prithi & Madan

26909 26909 For irrigation of 9 kanal area

In the Land of Sh. Harrnam Singh

26909 26909 For irrigation of 7 kanal area

In the Land of Sh. Surjit Singh

26909 26909 For irrigation of 10 kanal area

In the Land of Sh. Chaudhary Ram

26909 26909 For irrigation of 16 kanal area

In the Land of Sh. Lithu Ram

26909 26909 For irrigation of 12 kanal area

Dhabriana Pacca

Tank 5mx4mx1m

In the land of Sh. Jaswant Singh

103774 103774 -

In the land of Sh. Madan Lal

103774 103774 -

Ganoh Brahmana

Pacca Tank 5mx4mx1m

In the land of Dr. Ram Chand

103774 103774

In the land of Sh. Roshan Lal

103774 103774

well In the land of Sh. Roshan Lal

18676 18676 For the Irrigation of 200 Kanal Land

Neri RWHT For Sh. Sohan lal, Om Prekash, Ammar Nath, Brij Nath, Vicky, Ramesh Chand, Hem Raj, Sant Ram, Bidhi Chand, Khajana Ram, Krishan Chand, Amar Nath & Prakash Chand.

349817 349817 -

Loharda Pacca Tank 5mx4mx1m

On the lands of Sh. Om Prakash

103774 103774 For irrigation of 10 kanal area

On the land of Smt. Suresh Kumari Walia

103774 103774 For irrigation of 12 kanal

Page 365: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 17 

Village Water structures

Location Total Cost IWMP Budget

Convergence Expected outcomes area

In Harijan Basti at Gara

103774 103774 For irrigation of 15 kanal area

RWHT On the Lnad of Sh. Baldev Singh, Rajinder Singh, Surat Singh, Vijay Kumar, Baldev Singh, Desh Raj, Kartar Chand, Veena Devi, Suresh & Gurbachan Singh.

269090 269090

Tube well On the land of Sh. Om Prakash

590602 354361 236241(IWMP) & 236241 ( farmers share)

For irrigation of 80 kanal area

On the land of Sh. Attar Singh

For irrigation of 150 kanal area

Page 366: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 18 

5. Drinking Water

Existing status of drinking water

Proposed Drinking water structures: Nil

Villages Source of drinking water Availability of drinking water (months)

Ganoh Rajputana IPH pipeline 11 Ganoh Brahmana IPH pipeline 11 Dhabriana IPH pipeline 11 Langheree IPH pipeline 11 Neri IPH pipeline 11 Loharda IPH pipeline 11

Page 367: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 19 

6. Soil Conservation

Watershed Activities to be undertaken Village wise Structures Check Dam 10m(2m+1m)/2mx2m Check Dam

6m(2m+1m)/2mx2m Loharda 1 1 Langhere 1 Dhabriana - 1 Unit cost 90677 54216 Total cost 181354 108432 Grand Total 289786 List of sites for proposed activities and expected outcomes Sructures village Location Total

Cost IWMP Budget

Convergence Expected outcome

Check Dam 10m(2m+1m)/2mx2m

Langhere On the land of Sh. Shankar Dass

90677 90677 For the Irrigation of 500 kanal land

Loharda On the land of Sh. Subhash Chand

90677 90677 For the Irrigation of 1000 kanal land

Check Dam 6m(2m+1m)/2mx2m

Loharda On the land of Sh. Madan Lal

54216 54216 For the Irrigation of 800 kanal land

Dhabriana In Bain di Balh 54216 54216 For the Irrigation of 60 kanal land

Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Ganoh Rajputan

Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Shobhe di bali Cho (Jagan Nath land to Babu Ram ke banne Tak

4 239068

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gaala de cho (Hari Chand land to Shobe di Bali)

3 58650

Shobhe di bali Cho (Jagan Nath land to Babu Ram ke banne Tak

6 117300

Page 368: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 20 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Total 13 415018 409726 5292 Ganoh Brahmna

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Malti wala cho (Road to Khabran)

10 146620

Darya de cho 5 73310 Ladian wala

cho (Mandir to Varun Balli)

5 73310

Balha wala cho (Shamsher Ghat to Varun Balli)

5 73310

Fencing Mandir to Gahari-Piploo tak

1000m 300880

Total 10 146620 84566 62054 Dhabriana

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Bayan da Balh Wale cho Dev Raj Land to water bodi se niche tak

4 58648

Kwali (Ramesh land to Nalu wala cho)

2 29324

Pattian Gaon(Khwaru walacho to school wala cho)

3 43986

Khwaru wale cho to jabali tak

4 58648

Ambia de cho (Jodha Ram land to Ramesh Land)

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jalana de cho se Jaryat &cho kachhi

5 73310

Check dam stone & wire crated (Spur) 10mx1.25mx2.5m

Jalana de cho se Jaryat &cho kachhi

5 298835

Kharota ke saath (Dina Nath/Bhagat Ram?Bali Ram/Anant Ram land)

5 119534

Page 369: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 21 

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Total 33 755595 645436 110159 Langheree

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Nayal dug cho (Ranjit land to Shankar Das land

10 146620 102378 44242

Total 146620 102378 44242 Neri Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Paniali to Neri Kiara tak

8 117296 78583 38713

Total 117296 78583 38713 Loharda Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Chaun kwali/ Bain wala cho (Prakash Chand land to Balyat tak)

10 195500 87934 44242

Total 195500 87934 44242 Grand Total

1776649 1408623 304702

VILLAGE WISE BUDGET ALLOCATION UNDER SOIL CONSERVATION Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Ganoh Rajputan

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur

415018 409726 5292

Total 433694 428400 5394 Ganoh Brahmna

Pacca tankRCC 5mx4mx1m

207548 207548

Well Open Sink type of 2.4 m dia. and 3 m deep

18676 18676

Check dam stone & wire crated (Spur

146620 84566 62054

Total 893654

831600 62054

Dhabriana

Pacca tankRCC 5mx4mx1m

207548 207548

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216 -

Check dam stone & wire crated (Spur

755595 645436 110159

Total 1017359 907200 110159 Langheree

Check Dam 10m(2m+1m)/2mx2m

90677 90677

RWHT(2mx2mx1m) 134545 134545 Check dam stone & wire crated

(Spur 146620 102378 44242

Page 370: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 22 

Total 371842

327600 44242

Neri RWHT(2mx2mx1m) 349817 349817 Check dam stone & wire crated

(Spur 117296 78583 38713

Total 467113 428400 38713 Loharda Pacca tankRCC

5mx4mx1m 311322 311322

RWHT(2mx2mx1m) 269090 269090 Tube well of 200mm x 150 mm

size at 70 m depth 295301 354361 236241( farmers share)

Check Dam 10m(2m+1m)/2mx2m

90677 90677 -

Check Dam 6m(2m+1m)/2mx2m

54216 54216 -

Check dam stone & wire crated (Spur

195500 87934 107566

Total 1275166 1167600 107566 Grand Total 4458828 4090800 368128

Page 371: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 23 

7. Capacity Building

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost (Rs)

Total cost (Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard poultry Two day Training to the

farmers with regard to management of poultry farm

2(25 farmers)

2 38300 38300

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 365250

Page 372: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 24 

8. Agriculture

Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield

Pulses Mash, Soybean and Gram Growth satisfactory during favorable conditions Oil seed crops Sarson, Toria & Til Satisfactory with production & yield Vegetables Potato, Adarak, Raddish, Turnip,

Colocacea and Turmeric Wish to grow on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs

Amla, Harad, Bahera, Anar, Guava, Mango, Bilva, Papaya, Pear & Citrus

Needs of improved varieties provided suitable for these locations.

Fodder Crops Chari and Bajra Good Yield Livestock Animals Per cent

Buffaloes 90 Local breeds 2-10 liter Milk yield during favorable conditions

Cows 10 Jerseys 5-12 liter Milk yield during favorable conditions.

Ox - 15 pairs in village Goats 04 0.5- 1 liter Milk Yield Sheep - - Equines - 06 families Poultry -

Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Ganoh Rajputtan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 - - - Ganoh Brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500

Page 373: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 25 

Dhabriana Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500

Total 85000 40000 22500 22500 Langheree and Neri

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 60000 22500 - - - Loharda Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - - Grand Total

400000 200000 152500

67500

Page 374: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 26 

9. Horticulture

Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Ganoh Rajputtan

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ganoh Brahmana

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Dhabriana Diversification towards

drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Langheree and Neri

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

1ha 40000 40000 Loharda Diversification towards

drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Grand Total

180000 180000

Page 375: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 27 

10. Animal Husbandry

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Ganoh Rajputtan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Ganoh Brahmana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

60 animals

4800 - 4800

Total 44800 44800 Dhabriana Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Total 30000 - 30000 Langheree and Neri

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

20000 - 20000 Loharda Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

70 animals

5700 - 5700

Total 45700 45700 Grand Total

150500 150500

Total Budget under production system and micro enterprises Sr. No. Activity Total budget

1. Agriculture 400000 2. Horticulture 180000 3. Animal husbandry 150500

Grand Total 730500

Page 376: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 28 

Expected outcomes Agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 126.9 18.4 200 25.0 3. Mash 2.0 6.0 5 8.0 4. Wheat 130.0 15.6 210 18.0 5. Toria 45.0 7.0 100 8.0 6. Gram 0.5 6 10 7.0 7. Vegetables 3.0 333.3 10 400

*additional area (cultivable wasteland) will be brought under cultivation Horticultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 377: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 29 

11. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sect oral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan

Bagwan Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna, Milch Animals Insurance Scheme ( Animal Husbandry Deptt)

Dairy development

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nurseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industries

Page 378: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 30 

12. Livelihood Concerns

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Ganoh Rajputtan

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 60 chicks 9450 - - 9450 - Total 64450 25000 19450 20000 Ganoh Brahmana

Income generation I no. (Tailoring Unit)

144000 144000

VermicultureUnit 3mx1m( Low cost)

2 no. 10000 10000 - - - -

Total 154000 10000 144000 Dhabriana Mushroom

Cultivation 5 (50 bags) 50000 50000

Bee-keeping 2 no.(10Boxes

per unit)

40000 - - - 40000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 140000 60000 - 50000 40000 - Langheree and Neri

Mushroom Cultivation

5 (50 bags) 50000 50000

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Backyard poultry 100 chicks 15000 - - 15000 - Total 115000 50000 65000 Loharda Income generation I no.

(Tailoring Unit)

144000 144000

VermicultureUnit 3mx1m( Low cost)

8 no. 40000 40000 - - - -

Total 184000 40000 144000 G. Total 657450 185000 288000 134460 60000

Page 379: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 31 

13. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. EVALUATION

During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 380: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 32 

For effective implementation of the watershed activities’, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 381: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 33 

14. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new

agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase.

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to be

carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 382: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 34 

PROJECT IMPLEMENTATION Participatory approach for implementation of project

For the implementation of this project plan, participatory approach is more pertinent because it is the peoples programme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration

I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for

implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 383: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 35 

ANNEXURES

Page 384: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchayat Dhabriana  Page 36 

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @

260/participant/day for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @

260/participant/day for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day for seven

days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 385: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Dhandwin  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Dhandwin)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 386: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Dhandwin  

Contents S.

No. Particulars Page No.

1. Introduction and Budget 1

2. General Description of Project Area 4

3. SWOT Analysis 11

4. Entry Point Activities 16

5. Drinking Water 18

6. Soil Conservation 19

7. Agriculture 22

8. Horticulture 25

9. Animal Husbandry 26

10. Pisciculture 28

11. Convergence 29

12. Livelihood Concerns 30

13. Monitoring System 31

14. Capacity Building 32

15. Project Withdrawal and Consolidation 34

16. ANNEXURES 35  

 

 

 

 

 

 

Page 387: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Dhandwin  

PROJECT AT A GLANCE

 

Name of the Project : IWMP Block : Bijhari District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Dhandwin PIA : BDO, Bijhar Location : 76o 13” and 76o 44” on East longitudes and 31o

52” and 31o 58” North latitudes Total geographical area : 464 ha Treatable area : 444 ha Irrigated area : nil Total No. of families : 241 BPL families : 32 Total Population : 1168 Male : 518 Female : 650 Sex ratio : 1.25 Schedule Caste Male Female

: 186 98 88

Literacy Male: Female:

: : :

851 403 443

 

 

Page 388: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 1

1. Introduction and Budget

Dhandwin panchayat is located in Bijhari Block of Hamirpur district. The panchayat consists of nine revenue villages viz.Karah, Lahari Ghumara, Lahari Tarkahana, Mudhawin, Changar, Dagwar, Sunhani, Tangar, Sulhani. The altitude varied from 650 to 850 meter above mean sea level. Total geographical area of the panchayat is 464 ha and the treatable area is 444 ha while the irrigated area in the panchayat is nil. The total number of households in this watershed is 241. The total population is 1168 of which 518 are males and 650 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 186. Of the total 32 BPL families, 12 belong to SC category.

The dominant cropping pattern in the entire Panchayat is Maize in kharif and in rabi. Blackgram and Gram are also grown but the acreage is very less. Ploughing is done only by tractor and there is no other mechanization. No plant protection measures are taken up. Marketing is not done as there is no marketable surplus and crop failures due to drought are frequent.

Name of the Panchayat Village Code Dandhawin Sugal 01084100

Paplohal Hazaru 01085100 Sariana 01084800 Paplohal brahmana 01085200 Baryan 01084700 Kachwin 01084200 Dandhwin 01084500

Executive Summary Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 666000 Monitoring 1 66600 Evaluation 1 66600 Preparatory Phase: Entry point activities 4 266400 Institution & capacity building 5 333000 Detailed project report (DPR) 1 66600 Watershed Works Phase: Watershed development works 56 3729600 Livelihood activities 9 599400 Production system & microenterprises 10 666000 Consolidation phase: 3 199800 Total 100 6660000

Page 389: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 2

Methodology A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

Page 390: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 3

The maps have been prepared using the GPS survey and ground truthing of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 391: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 4

2. General Description of Project Area

Dandwin micro watershed lies in Bijhari block of district Hamirpur situated between 76o 13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Physiographic Features Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation. Demographic Features of Dandwin Panchayat Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Sugal 12 51 24 27 0 0 0 0 18 16 Paplohal Hazaru

35 189 88 101 21 17 0 0 65 75

Sariana 46 229 101 128 5 6 0 0 73 86 Paplohal Brahmana

33 174 77 97 17 17 0 0 67 76

Baryan 2 11 6 5 4 3 0 0 4 4 Kachhwin 58 275 114 161 32 27 0 0 87 104 Dandwin 55 239 108 131 19 18 0 0 89 82 Total 241 1168 518 650 98 88 0 0 403 443

Page 392: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 5

Panchayats BPL families

BPL SC families

BPL ST families

Population under poverty alleviation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless families

Dhandwin 32 11 - 240 0 442 3 Land use:

Dandwin Panchyat extends over an area of 464 ha. Out of total land in the watershed, cultivated land stood at 147 ha which is totally rain fed. The area under forests on the other hand was 20 ha.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Sugal 5 0 3 2 0 3 5Paplohal Hazaru 67 0 17 50 0 17 67Sariana 80 0 19 61 0 19 80Paplohal Brahmana 106 20 26 60 0 26 86Baryan 27 0 8 19 0 8 27Kachhwin 76 0 45 30 0 45 76Dandwin 103 0 29 73 0 29 103Total 464 20 147 295 0 147 444Source: Revenue Department, District Hamirpur

The major proportion of total cropped area in Dhandwin panchayat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. The cropping intensity in the watershed area was estimated to be 188 per cent. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area.

Basic Amenities in Dhandwin Micro Watershed

Source: Directorate of Economics and Statistics, Govt. of HP

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

Dhandwin 245 1 462 1 1

Page 393: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 6

Table 6: Description of Health Facilities in Dhandwin MicroWatershed

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Dhandwin MicroWatershed Panchayat

Primary Middle

High

Sr. Secy

Tailoring Centre

Aganwari Centres

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Dhandwin 1 1 0 0 1 4 0 0 1681 Source: Directorate of Economics and Statistics, Govt. of HP Table: Existing area, production and productivity of different crops Crops Area (ha) Production (q) Productivity (q/ha) Maize 125 2300 18.4 Mash 1 5.7 5.7 Wheat 131 2253 17.2 Toria 8 48 6.0 Gram 0.5 3 6.1 Vegetables 1 350 350 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Block/Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Dhandwin 0 0 0 0 1 0

Page 394: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 7

CROP: Wheat Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time Mid October-Mid November

Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha)

10 t/ha 20 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations

Not done F

11. Disease management

As per recommendations

Not done F

12. Average yield (q/ha)

25-30 q/ha 15.6 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time June end – 10 July June end – 10 July

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical

Weeding/hoeing

Being done

N

Page 395: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 8

Chemical herbicides Pendimethalin 35 EC Not done F 9. Pest management:

Blister Beetle As per recommendation

Not done

F

10. Disease management

As per recommendation

Not done F

11. Average yield (q/ha)

8-10 q/ha 6.0 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time October-November October-November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 100 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October

N

2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

Page 396: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 9

6. Organic Manure (t/ha)

25 t/ha 20 t/ha P

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation

Not done F

10. Disease management Late blight

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 70-80 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing

practiceGap in adoption (F/P/N)*

1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N

Page 397: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 10

4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8.

Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 398: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 11

3. SWOT Analysis

Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and

wheat yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small

ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Page 399: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 12

Weaknesses The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is

received during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different

stages of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year.

Page 400: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 13

Preference of natural service with local bulls in case of buffaloes as success rate of artificial insemination is low.

A large proportion of cattle and buffaloes in the district are non-descriptive and low yielders.

Although the maintenance and per unit milk production cost is lower in case of cattle yet farmers prefer rearing buffaloes over cows.

Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper clinical diagnosis and treatment.

Traditional/unscientific method of feeding (low adoption of chaffing) and management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants.

Page 401: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 14

New schemes like promotion of export of high value crops and multiplication of HYV seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies.

Page 402: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 15

Development of improved varieties of fodders for pastures and field crops like berseem, sorghum, oats etc. suitable to Hamirpur conditions.

Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 403: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 16

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The details of the entry point activities suggested by the people during the PRA exercise are as under: WATER HARVESTING Proposed water bodies villages wise under Dhandwin Panchayat: Water bodies

Sugal Paplohal Hazaru

Paplohal brahmana

Baryan Sariana

Kachwin

Dandhwin

No Unit cost

Total cost

Pacca Tank 5mx4mx1m

0 3 0 2 0 1 2 8 103774 830192

Well Open Sink type of 2.4 m dia and 3 m deep

0 0 0 0 2 0 1 3 18676 56028

Bore well 200mmx150mm at 70m depth

- - - - - - 2 2 295301 354361+ farmer 40% share i.e.236241 =590602

Total 1240581

List of sites for proposed water structures and expected outcomes Water structures Village Location Total

Cost/village IWMP Budget

Convergence Expected outcomes

Pacca Tank 5mx4mx1m

Paplohal Hazaru

In the Land of Sh Partap Singh

103774 103774 - For irrigation of 8 kanal area

In the Land of Sh Joginder Singh

103774 103774 - For irrigation of 6 kanal area

In the Land of Sh Rajinder singh

103774 103774 - For irrigation of 10 kanal area

Baryan In the Land of Sh Hari Singh

103774 103774 - For irrigation of 6 kanal area

In the Land of 103774 103774 - For

Page 404: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 17

Sh Sita Ram irrigation of 7 kanal area

Kachwin In the Land of Sh Dhani Ram

103774 103774 - For irrigation of 8 kanal area

Dandhwin In the Land of Sh Chamel singh

103774 103774 - For irrigation of 10 kanal area

In the Land of Sh Kuldeep singh

103774 103774 - For irrigation of 8 kanal area

Well Open Sink type of 2.4 m dia and 3 m deep

Sariana In the Land of Sh Kashmir singh

18676 18676 - For irrigation of 5 kanal area

In the Land of Smt Kalti devi

18676 18676 - For irrigation of 12 kanal area

Dandhwin In the Land of Sh Mohinder singh

18676 18676 - For irrigation of 7 kanal area

Bore well 200mmx150mmat 70m depth

Dandhwin In the Land of Sh Balwant singh

590602 354361 236241 farmers share( 40%)

For irrigation of 25 kanal area

In the Land of Sh hans Raj

For irrigation of 50 kanal area

Page 405: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 18

5. Drinking Water Existing status of drinking water Villages Source of drinking water Availability of drinking water

(months) Sugal IPH pipeline 10 Paplohal Hazaru IPH pipeline 10 Sariana IPH pipeline 10 Paplohal brahmana IPH pipeline 10 Baryan IPH pipeline 10 Kachwin IPH pipeline 10 Dandhwin IPH pipeline 10

Proposed Drinking water structures: nil

Page 406: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 19

6. Soil Conservation Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Paplah Hazaru

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Beri cho(Rajinder land to Baldev land)

2 39100

Balia wala cho( Roshan house to Jagdish Chand)

6 117300

Bane da cho ( Hari Ram land to Raghubir Land)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Galue da cho (Joginder Singh land0

2 73320

Total 268820 251478 17342 Sariana Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Bain wala cho ( Amar Singh land to Main road)

4 58648

Gaare da cho ( Sarwan singh land to Janj ghar)

4 58648

Jolkhi cho ( Main road to Duni Chand/Hari singh land)

3 43986

Bagae da cho ( Main road to Amar singh/ Sukh Ram land)

2 29324

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Kaillu da cho( Amar Singh land to Ramesh Ballha land)

2 39100

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Dadhwin khud ( Mandiara to Paploh Brahmana)

10 482100

Total 711806

634948 76858

Paploh Brahmana

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mohra da cho( Jagan Nath/Amin Chand land)

4 78200

Chhale da cho 10 195500 Khaite da cho (

Kamal dev land to Dev Das bamboo)

2 39100

Daya Ram land 2 39100

Page 407: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 20

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

to rattan chand land

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Khoo wala cho ( Rajinder land to Rattan chand land)

8 117296

Moran da choi 2 29324 Fencing ( parkash chand

land to rajinder kr land

1000m 300880

Total 799400

722400 77000

Baryan Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gaare da cho ( Sarwan singh land to Janj ghar)

2 39100

Total 39100 19252 19848 Kachwin Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Lohar ke ghar wala nallah( Sarwan singh land to Satish land)

7 102634

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kuan wala nala( Ramesh house to Lekh Ram land)

5 97750

Tukari wala cho( Duni Ram land to Sarwan singh/Deep Singh land

4 78200

Kaghar wala cho( Satya devi land to Dhani Ram land)

6 117300

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Khatte butte wale nallah( Raghubir land to Daya Ram land.

3 109980

Pud wala nallah(Dhani Ram land to Parkash chand land)

2 73320

Total 579184

534626 44558

Dhandwin Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans raj ke god se mukhtiar singh land

3 43986

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mehar Singh land to Rupan Devi land)

4 78200

Chamel singh land to Amin Chand land

4 78200

Check dam stone & Karyali ka cho 3 109980

Page 408: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 21

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 6mX1.25mX2.5m

( road to balwant land

Total 310366

284615 25751

Village wise budget allocation under soil conservation Village Particulars Total

CostIWMP Budget

Convergence (MNREGA)

Paplah Hazaru

Pacca tank 5mx4mx1m

311322 311322 -

Check dam stone & wire crated (Spur

268820 251478 17342

Total 580142 562800 17342 Sariana Well Open

Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Check dam stone & wire crated (Spur

711806 634948

76858

Total 749158 672300 76858 Paploh Brahmana

Check dam stone & wire crated (Spur) and fencing

799400 722400 77000

Total 799400 722400 77000

Baryan Pacca tank 5mx4mx1m 207548 207548 -

Check dam stone & wire crated (Spur 39100 19252 19848

Total 246648 226800 19848 Kachwin Pacca Tank

5mx4mx1m 103774 103774 Check dam stone & wire

crated (Spur 579184 534626 44558

Total 682958 638400 44558 Dhandwin Pacca Tank

5mx4mx1m 207548 207548 Well Open

Sink type of 2.4 m dia and 3 m deep 18676 18676

Check dam stone & wire crated (Spur

310366 284615 25751

Bore well 200mmx150mmat 70m depth

354361 354361

Total 890951 865200 25751 Sugal Check dam stone & wire

crated (Spur 58650 42000 16650 Total 58650 42000 16650 Grand Total 4007907 3729900 278007

Page 409: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 22

7. Agriculture

Institutional and capacity building

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises)

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

2no. (25 farmers)

1 43450 86900

Water Conservation

One days Training to the farmers on water conservation

4 no. (20 farmers0

1 12950 51800

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

1(25 farmers)

2 14450 28900

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 78500 78500

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 333000

Page 410: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 23

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Sugal and Paplohal Hazaru

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

- 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 - 62500 Paplohal brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - - Sariana Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - - Baryan Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Diversification 0.5 ha 22500/- @ - 22500 - - -

Page 411: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 24

towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

Rs.45000/ha

Total 42500 20000 22500 - - - Kachwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

- 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 - 62500 - - - Dandhwin Provision of

improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 85000 40000 22500 22500 - - Grand Total 422500 140000 215000 67500 0 0

Page 412: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 25

8. Horticulture

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Sugal and Paplohal Hazaru

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 20000 Paplohal brahmana

Diversification towards drought/frost tolerant fruit plants

1ha 40000 - - 40000 - -

Total 40000 - - 40000 - - Sariana Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 - - 20000 - - Kachwin Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 - - 20000 - - Dandhwin Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 20000 - - 20000 - - Grand Total 120000 0 0 120000 0 0

Page 413: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 26

9. Animal Husbandry

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Sugal and Paplohal Hazaru

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Total 20000 - 20000 - - - Paplohal brahmana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

100 animals 7400 - 7400

Total 27400 27400 Sariana Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000 - - -

Total 5 10000 - 10000 - - - Baryan Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

4 9500 - 9500 - - -

Total 9500 - 9500 - - -Kachwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

100 animals 7400 - 7400

Total 27400 27400 Dandhwin Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000 - - -

Control of endo and ecto parasites

125animals 9200 - 9200

Total 29200 0 29200 Grand Total 123500 - 123500 - - -

Page 414: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 27

Total Budget under production system and micro enterprises S. No. Activity Total budget 1. Agriculture 422500 2. Horticulture 120000 3. Animal husbandry 123500 4. Grand Total 666000 Expected outcomes from agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 125 18.4 141 25.0 3. Mash 1 5.7 4 8.0 4. Wheat 131 17.2 150 18.0 5. Toria 8 6.0 10 8.0 6. Gram 0.5 6.1 5 7.0 7. Vegetables 1 350 5 400

*additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Harad - - 1 10 2. Aonla - - 1 8

Page 415: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 28

10. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 416: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 29

11. Convergence

Watershed management is a single window, integrated area development programme.

Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan

Bagwan Samridhi Yojna Polyhouses, Micro irrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industries

Page 417: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 30

12. Livelihood Concerns

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Sugal and Paplohal Hazaru

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

6 no. 30000 30000 - - - -

Backyard poultry 220 chicks 34400 - - 34400 - Total 94400 30000 0 44400 20000 0 Sariana Mushroom

Cultivation 3 (50 bags) 30000 30000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 100000 50000 - 30000 20000 -Paplohal Brahmana

Mushroom Cultivation

4 (50 bags) 40000 20000 20000

Bee-keeping 2 no.(10Boxesper unit)

40000 - - 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 130000 50000 20000 40000 20000 0 Baryan Mushroom

Cultivation 1 (50 bags) 10000 10000

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 35000 25000 - 10000 - - Kachhwin Mushroom

Cultivation 3 (50 bags) 30000 30000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 100000 50000 - 30000 20000 - Dandwin Mushroom

Cultivation 5 (50 bags) 50000 50000

Bee-keeping 2 no.(10Boxesper unit)

40000 - - 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 140000 50000 0 70000 20000 0Grand Total

599400 255000 20000 224400 100000 0

Page 418: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 31

13. Monitoring System A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database, which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. EVALUATION

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc

Page 419: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 32

14. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat

Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertintent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

Page 420: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 33

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works

envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 421: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 34

15. Project Withdrawal and Consolidation The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods:

• Up scaling of successful experiences related to above aspects through revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to

be carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 422: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 35

ANNEXURES

Page 423: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 36

Cost Estimate for Training programmes Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 75006. Organizer and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. Vegetable seed kit for kitchen garden @ 50/participant 5000 5. TA/DA /POL for resource personnel & other staff 1500 Total 13750 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 25003. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs)

Page 424: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Dhandwin Page 37

1. Boarding & lodging for 25 participants @ 260/participant/day for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 425: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Garli  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Garli)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 426: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Garli  

Contents S.

No. Particulars Page No.

PROJECT AT A GLANCE

1. Introduction 1

2. General Description of Project Area 5

3. SWOT Analysis 10

4. Entry Point Activities 15

5. Drinking Water 17

6. Soil Conservation 18

7. Agriculture 22

8. Horticulture 25

9. Animal Husbandry 26

10. Convergence 28

11. Livelihood Concerns 29

12. Monitoring System 30

13. Capacity Building 31

14. Project Withdrawal and Consolidation 32

15. Annexures 34  

 

 

 

 

Page 427: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Garli  

 

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Garli

PIA : BDO, Bijhari

Location : 76o 39’ 46.8” E - 31o 31’ 46.8” N

Total geographical area : 515 ha

Treatable area : 487 ha

Irrigated area : nil

Total No. of families : 418

BPL families : 52

Total Population : 2031

Male : 914

Female : 1117

Sex ratio : 1.22

SC

Male

Female

: 288

134

154

Literacy

Male:

Female:

:

:

:

1421

713

708

 

 

 

 

 

 

Page 428: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 1

1. Introduction

Garli micro watershed lies in Bijhari block of district Hamirpur situated between 76o 39’ 46.8” E - 31o 31’ 46.8” N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bijhari watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district. Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1554 hactares. There are 28 villages under 3 panchayats in the microwatershed. Physiographic Features

Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 25 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild

climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 429: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 2

Micro watersheds in the project area

Name of the Panchayat Village Code Garli Banani 01062800 Manhan 01062900 Bahina 01063400 Mohlwin 01063000 Sarla 01063200 Kotlu 01063100 Garlikhan 01063300 Dhuma 01065800 Mattkar 01065700 Khajian 01065900 Executive Summary Budget Component Percent of Budget Amount (lacs) Administrative Cost 10 694500 Monitoring 1 69450 Evaluation 1 69450 Preparatory Phase: Entry point activities 4 277800 Institution & capacity building 5 347250 Detailed project report (DPR) 1 69450 Watershed Works Phase: Watershed development works 50 3472500 Livelihood activities 10 694500 Production system & microenterprises 13 902850 Consolidation phase: 5 347250 Total 100 6945000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were

collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement

Page 430: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 3

6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and

streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Demographic Features of Garli Watershed

The general demographic features of the Garli Watershed are given in Table 2. The watershed is spread over 10 villages. The total number of households in this watershed is 418. The total population is 2043 of which 914 are males and 1117 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 288. The sex ratio stands at 1222 females for every 1000 males for watershed area.

Page 431: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 4

Villages No. of House-Holds

Total Population

Male Female Male SC

Female SC

Literate Male Literate Female

Banan 13 65 28 37 0 0 18 22 Manhan 0 0 0 0 0 0 0 0 Bahna 68 344 151 193 10 12 122 116 Mohlwin 8 41 15 26 0 0 11 16 Sarla 0 0 0 0 0 0 0 0 Kotlu 84 407 187 220 16 17 145 140 Garli Khas 81 359 151 206 35 53 119 127 Dhuma 12 69 31 28 5 4 24 20 Mattkar 49 220 104 116 21 20 81 76 Khajian 103 538 247 291 47 48 193 191 Total 418 2043 914 1117 134 154 713 708

Land use:

Garli Panchyat extends over an area of 515 ha. Out of total land in the watershed, cultivated land stood at 157 ha which is nearly totally rain fed. The area under forests on the other hand was 29 ha.

Panchayat/ Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Banan 11 2 5 4 0 5 9 Manhan 12 2 6 4 0 6 10 Bahna 28 4 11 13 0 11 24 Mohlwin 17 2 5 4 0 5 15 Sarla 53 1 6 46 0 6 52 Kotlu 44 0 17 27 2 15 44 Garli Khas 113 16 37 60 0 37 97 Dhuma 13 0 5 8 0 5 13 Mattkar 27 2 12 13 0 12 25 Khajian 197 0 53 55 0 0 197 Total 515 29 157 234 2 102 486 Source: Revenue Department, District Hamirpur

Page 432: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 5

2. General Description of Project Area Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Garli 52 19 0 342 1 581 3 Basic Amenities:

All the villages in the Garli Panchayat have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects the panchayats. As regards the health facilities, there is one health sub-centers and two private clinics available in the area. There are sufficient educational facilities available in the area.

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Garli micro watershed

Crops Area (ha) Production (q) Productivity (q/ha) Maize 145 2668 18.4 Mash 2 12 6.0 Wheat 151 23556 15.6 Toria 5 35 7.0 Gram 1 6 6 Vegetables 1 333 333 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops of Garli Panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Block/ Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2

Yes-1; No.-2 Yes-1; No.-2

Garli 487 1 595 1 1

Block/ Panchayat

*CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary

Garli 0 0 0 1 2 0

Page 433: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 6

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time Mid October-Mid November

Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha)

10 t/ha 20 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations

Not done F

11. Disease management

As per recommendations

Not done F

12. Average yield (q/ha)

25-30 q/ha 15.6 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time June end – 10 July June end – 10 N

Page 434: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 7

July 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management

As per recommendation

Not done F

11. Average yield (q/ha)

8-10 q/ha 6.0 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time October-November October-November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 100 q/ha P

Page 435: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 8

*F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October

N

2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic Manure (t/ha)

25 t/ha 20 t/ha P

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation

Not done F

10. Disease management Late blight

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 70-80 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Page 436: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 9

Band application Band application N 8. Weed management:

Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing

practice Gap in adoption (F/P/N)*

1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seedNot done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8.

Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 437: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 10

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and

wheat yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small

ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Page 438: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 11

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Weaknesses The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is

received during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different

stages of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

Page 439: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 12

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle

yet farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Page 440: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 13

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (cultivable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations.

Page 441: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 14

Motivation of un-employed educated rural youth to adopt high income generating agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 442: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 15

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. WATER HARVESTING Proposed water bodies Water bodies Bahnan Kotlu Garli Khas Matkar Khajian Total No. Unit cost Total costPacca Tank 5mx4mx1m

2 - 2 4 103774 415096

RWHT 3 3 2 2 1 11 26909 295999 Well 4 4 18676 74704 Total 785799 List of Proposed Water bodies: Particulars Location Numbers Size (Meters) Remarks Village Garli Ward No. 1 Well

In the land of Sh. Ranjit Singh at Jol

01 4 no. For irrigation of 15 kanal land

In the land of Sh. Mehar Ram

01 For irrigation of 10 kanal land

In the land of Sh. Rothal Ram

01 For irrigation of 10 kanal land

In the land of Sh. Partap Singh at Dib

01 For irrigation of 50 kanal land

Harijan Basti at Garli RWH Tank

In the Land of Sh. Suhru Ram

01 2mx2mx1m (2 no.)

For irrigation of 02 kanal land

In the Land of Sh. Suharu Ram at Tapper

1 For the irrigation of 50 kanal land area

Village: Kotlu Brahmana Ward Ward No. 3 Member: Sh. Baldev Sharma RWH Tank In the Land of

Smt. Sunil Kumari

01 2mx2mx1m (3 no.)

For irrigation of 02 kanal land

In the Land of Sh. Jagdish Chand

01 For irrigation of 01 kanal land

In the Land of Sh. Baldev Dass

01 For irrigation of 02 kanal land

Pacca Tank 5mx4mx1m

On the land of Smt. Sunil Kumari

1 5mx4mx1m For irrigation of 03 kanal area

On the land of Sh. Baldev Dass

1 For irrigation of 04 kanal area

Page 443: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 16

Particulars Location Numbers Size (Meters) Remarks Village: Lower Khajian Ward No. 5 Member: Smt. Karjo Devi RWH Tank In the land of Sh.

Mangat Ram 01 2mx2mx2m (01) For irrigation of 07 kanal land

Pacca Tank 5mx4mx1m

On the lands of Sh. Mangat Ram

1 5mx4mx1m For irrigation of 7 kanal area

On the land of Bhagat Ram

1 5mx4mx1m For irrigation of 8 kanal area

Village: Bahnan RWH Tank 3 5mx4mx1m For irrigation of 100 kanal area Village: Matkar Ward No. 7 Member: Sh. Dev Raj Dehal RWH Tank

In the land of Sh. Sh. Nirmal Singh

01 2mx2mx1m (02)

For irrigation of 100 kanal land

In the land of Sh. Sh. Sarwan Singh/Kashmir Singh Khuare wali Land

01 For irrigation of 100 kanal land

Page 444: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 17

5. Drinking Water

Existing status of drinking water Villages Source of drinking water Availability of drinking water (months) Banani IPH pipeline 11 Manhan IPH pipeline 11 Bahina IPH pipeline 11 Mohlwin IPH pipeline 11 Sarla IPH pipeline 11 Kotlu IPH pipeline 11Garlikhan IPH pipeline 11 Dhuma IPH pipeline 11 Matkar IPH pipeline 11 Khajian IPH pipeline 11 Sr. No. Water bodies 1 2 3 4 5 6 7 8 9 10 1 Kuhl - - - - - - - - - - 2 Earthen tank (Talai) - - - - - - 1 - 1 1 3 Dam 1 - - - - 1 - 2 - 1 4 Pacca tank - - - - - - 1 - - 5 Poly tank - - - - - - - - - 6 Tube well - - - - 1 - - - - 7 Roof water - - - - - - - - - 8 Lift irrigation - 1 - - - - - - - 9 Any other (well) - - - - - - - - - Proposed water bodies for drinking water: Water bodies Kotlu Garli Khas Mohlwin Khajian Total No. Unit cost Total Cost Hand Pump - 2 - - 2 101541 203082 Water structures

Village Location Expected outcomes

Hand Pump Garli On the land of Sh. Charan Dass Harijan Basti For drinking of 20 families On the land of Sh. Dev Raj For drinking of 15 families Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 11 11-12

Page 445: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 18

6. Soil Conservation

Watershed Activities to be undertaken Village wise

Structures Garli Khas

Khajian Total No. Unit cost Total Cost

Budget from IWMP

Proposed Convergence

Check Dam 8m(2m+1m)/2mx2m

3 1 4 72283 289132 289132 -

Khajian On the land of Sh. Bhagat Ram For irrigation of 100 kanal area Garli On the land of Sh. Pawan Kumar/Lekh

Raj at Matoli Nallah For irrigation of 250 kanal area

On the land of Sh. Dev Raj/Sarwan Singh at Nihar Dugh

For irrigation of 100 kanal area

On the land of Mangat Ram/Dev Raj at Matoli Nallah

For irrigation of 150kanal area

Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Manhan Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Nika Ram land to main nallah9khazian0

5 97750 84000 13750

Total 97750 84000 13750 Bahina Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Tile se khazian nale tak

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.0m

Munshi Ram well to molwi ram land

4 146640

Total 224840 201600 23240 Mohlwin Check dam stone &

wire crated (Spur) 8mX1.25mX2.5m

Barbi Ram / hans raj land to main khazian nallah

2 96420

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Roshan lal land tp Banahan

3 43986

Total 140406 126000 14406 Sarla Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Jagdish chand land to Bimla devi land

3 43986

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Balakrupi to main khudd

3 58650

Jagdish chand land to garli bridge

3 58650

Shakti chand land to Sita ram land

2 39100

Check dam stone &

wire crated (Spur) 6mX1.25mX2.0m

Balakrupi to main khudd

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Balakrupi to main khudd

4 192840

Total 466546 436800 24746

Page 446: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 19

Kotlu Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Lunda wala nallah( Sri ram land to Dhani ram land0

2 96420

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Kutta wala nallah( Desh raj land to Subhash land)

2 73320

Total 169740

81325 88415

Garli khas Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jol wala nallah( Milkhi ram to Matoli Nallah

4 78200

Dular singh house to Kangari nallah to Matoli Nallah

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Srwan ( Kabir panthi ) house nallah

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Khoba rada nallah( Charan dass land to Ghumar khud)

2 96420

Total 326140

266320 59820

Dhuma Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Mandir nallah to khill( Parkash chand)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Mandir nallah to khill( Parkash chand)

3 109980

Total 149080 109200 39880

Mattkar Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Kud nallah bodi harijan basti (Dev raj land to Matoli nallah

5 97750

Kuta da cho( Piar chand house to road side

4 78200

Total 175950 156182 19768 Khazian Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Garib dass house to water bodi

3 109980

Check dam stone & wire crated (Spur) 4mX1.25mX2.0

Inder house to pritam land tp main nallah

4 78200

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Mata mandir to main nallah khazian

4 58648

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jol wala nallaha ( jai ram land to rattan chand land)

3 58650

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Doag wala nallah: main road to khawaja

4 78200

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Hans raj land to rattan chand land

2 38100

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gujjar ram house to main nallah khazian

6 117300

Page 447: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 20

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Gujjar ram house to main nallah khazian

2 96420

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Jagan nath land to main nallah khazian

5 97750

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Sukh ram house to main nallah khazian

6 87972

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Sukh ram house to main nallah khazian

4 78200

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Sukh ram house to main nallah khazian

2 96420

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Poultry farm nallah 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Pogar panga( kamal kishor land to Pogar panga

4 78200

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Dukhral ( Sambhu ram ) to Khawaja( Chaman lal)

4 146640

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Janj ghar to Khawaja khud

4 146640

Total 59 1396644 1245519 151125 Grand Total

3147096 2706946 435150

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Bhanan RWHT(2mx2mx1m) 80727 75600 4627 Total 80727 75600 4627 Manhan Check dam stone &

wire crated (Spur 97750 84000 13750

Total 97750 84000 13750 Bahina Check dam stone &

wire crated (Spur 224840 201600 23240

Total 224840 201600 23240 Mohlwin Check dam stone &

wire crated (Spur 140406 126000 14406

Total 140406 126000 14406 Sarla Check dam stone &

wire crated (Spur 466546 436800 24746

Total 466546 436800 24746 Kotlu RWHT(2mx2mx1m) 80727 80727 Pacca tankRCC

5mx4mx1m 207548 207548

Check dam stone & wire crated (Spur

169740

81325 88415

Total 458015 369600 88415 Garli khas RWHT(2mx2mx1m) 53818 53818 Well Open

Sink type of 2.4 m dia and 3 m 74704 74704

Page 448: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 21

deep

Hand pump 203082 203082 Check Dam

8m(2m+1m)/2mx2m 216849 216849

Check dam stone & wire crated (Spur

326140

266320 59820

874593 814800 59820 Total 814827 59793 Dhuma Check dam stone & wire

crated (Spur 149080

109200 39880

Total 149080

109200 39880

Mattkar RWHT(2mx2mx1m) 53818 53818 Check dam stone & wire

crated (Spur 175950 156182 19768

Total 229768 210000 19768 Khazian Pacca tankRCC

5mx4mx1m 207548 207548

RWHT(2mx2mx1m) 26909 26909 Hand pump 101541 101541 Check Dam

8m(2m+1m)/2mx2m 73283 73283

Check dam stone & wire crated (Spur

1396644 1245519 151125

Total 1805925 1654800 151125 Grand total 1468284 1293600 169184

Page 449: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 22

7. Agriculture

Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat, Maize, Sugarcane & Paddy Satisfactory with production & yield

Pulses Nil Wish to grow Oil seed crops Sarson, Toria, til & soyabean Satisfactory with production & yield Vegetables Onion, cauliflower, Brinjal, tomato,

Raddish, Palak, Potato, Cucurbits, bhindi and cabbage

Wish to grow on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs

Amla, Mango, papaya, banana, harad, bahera, pomegranate & Citrus

Needs of improved varieties provided suitable for these locations.

Interventions Needed In forest plantation of wild fruit trees like ber, guava and other wild fruit trees.

Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per cent Buffaloes 52

Local-50 Crossbred-2

Local breeds give 3-4 liter and crossbred 6-7 liter Milk yield during favorable conditions

Cows Nil Nil Ox 10 pairs In whole panchayatGoats 5 0.5 liter Milk yield during favorable

conditions Sheep Nil - Equines 01 - Poultry 01 -

Proposed Interventions Institutional and capacity building:

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers)

2 25900 25900

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24475 48950

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Page 450: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 23

Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Banan, Manhan, Bahna and Molhwin

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 10000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Sarla Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 Kotlu Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage,

0.5 ha 22500/- @ Rs.45000/ha

- 22500

Animals husbandry Poultry Backyard

poultry Two day Training to the farmers with regard to management of poultry farm

2(25 farmers)

2 38300 38300

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Value Addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 364500

Page 451: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 24

brinjal, ginger, turmeric etc.

Total 42500 20000 22500 Garli and Dhuma

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - - Matkar and Khajian

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

2 ha 90000/- @ Rs.45000/ha

- 45000 45000 - -

Total 170000 40000 62500 45000 - - Grand Total

442500 160000 215000

Page 452: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 25

8. Horticulture Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Banan, Manhan, Bahna and Molhwin

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Sarla Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kotlu Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Garli and Dhuma

Diversification towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 1ha 40000 40000 Matkar and Khajian

Diversification towards drought/frost tolerant fruit plants

2 ha 80000 - - 40000 40000 -

Total 2ha 80000 40000 40000 Grand Total 180000 140000 40000

Page 453: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 26

9. Animal Husbandry Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Banan, Manhan, Bahna and Molhwin

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 animals

3700 - 3700

Total 13700 13700 Sarla Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 animals

3700 - 3700

Total 13700 13700 Kotlu Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Garli and Dhuma

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Matkar and Khajian

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

20 40000 - 40000

Control of endo and ecto parasites

120 animals

9100 - 9100

Total 49100 49100 Grand Total

106500 106500

Total Budget under production system and micro enterprises S. No. Activity Total budget 1. Agriculture 442500 2. Horticulture 180000 3. Animal husbandry 106500 Grand Total 729000 Expected outcomes Agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha)1. Maize 145 18.4 200 25.0

Page 454: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 27

3. Mash 2 6.0 5 8.0 4. Wheat 151 15.6 210 18.0 5. Toria 5 7.0 100 8.0 6. Gram 1 6 10 7.0 7. Vegetables 1 333 10 400

*additional area (cultivable wasteland) will be brought under cultivation Horticultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 455: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 28

10. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency

2 National Organic Farming Project

Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission

4 Pt. Deen Dayal Upadhyay Kisan Bagwan Samridhi Yojna

Polyhouses, Micro irrigation and capacity building

5 Doodh Ganga Pariyojna, Backyard Poultry Development.

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nurseries: Distribution of silk worm, disinfection of private rearing houses, technical assistance and guidance and marketing of cocoons

Department of industries

Page 456: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 29

11. Livelihood Concerns Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Banan, Manhan, Bahna and Molhwin

Mushroom Cultivation

2 (50 bags) 20000 - - 20000 - -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 100 chicks 16600 - - 16600 - Total 86600 25000 25000 26600 - Sarla Mushroom

Cultivation 2 (50 bags) 20000 20000

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Total 70000 25000 25000 20000 Kotlu Mushroom

Cultivation 2 (50 bags) 20000 20000

VermicultureUnit 3mx1m( Low cost)

8 no. 40000 20000 20000 - -

Total 60000 20000 2000 20000 - Garli and Dhuma

Mushroom Cultivation

5 (50 bags) 50000 25000 25000

Bee-keeping 3 no.(10Boxesper unit)

60000 - 20000 20000 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Total 160000 25000 70000 45000 20000 Matkar and Khajian

Income generation I no. (Tailoring Unit)

144000 144000

Mushroom Cultivation

5 (50 bags) 50000 25000 25000

Bee-keeping 2no.(10Boxes per unit)

40000 - - 20000 20000

VermicultureUnit 3mx1m( Low cost)

9 no. 45500 25000 20500 - -

Total 279500 25000 164500 45000 45000G. Total 656100

Page 457: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 30

12. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. EVALUATION

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 458: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 31

13. Capacity Building For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities’ proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat

Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 459: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 32

14. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to

be carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 460: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 33

PROJECT IMPLEMENTATION

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more

pertinent because it is the people’s pogrmme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase.

The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for

implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include: • Taking up entry point activities to establish credibility of the watershed Development

team (WDT and create a rapport with the village communities. • Initiating the development of village level institutions as watershed committee(WC),

help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 461: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 34

Annexures

Page 462: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 35

Cost Estimate for Training programme of three days duration Sr. No.

Particular Cost (Rs)

1. Boarding & lodging for 25 participants @ 260/participant/day for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 75006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450

Cost Estimate for awareness camp

Sr. No.

Particular Cost (Rs)

1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000 Total 12000

Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration

Sr. No.

Particular Cost (Rs)

1. Boarding & lodging for 25 participants @ 260/participant/day for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875

Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. Vegetable seed kit for kitchen garden @ 50/participant 50005. TA/DA /POL for resource personnel & other staff 1500Total 13750 Cost Estimate for Training programme on bee keeping for seven days duration

Page 463: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Garli Page 36

Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 30005. TA for participants @ 400 to and fro 100006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 464: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Ghangot Kalan  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II:Bijhari (Ghangot Kalan)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 465: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Ghangot Kalan  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 4

3. SWOT Analysis 9

4. Entry Point Activities 14

5. Soil Conservation 15

6. Agriculture 17

7. Horticulture 19

8. Animal Husbandry 20

9. Pisciculture 21

10. Convergence 22

11. Livelihood Concerns 23

12. Monitoring System 24

13. Capacity Building 25

14. Project Withdrawal and Consolidation 27

15. Annexures 29  

 

 

 

 

 

 

Page 466: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Ghangot Kalan  

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Ganghot Kalan

PIA : BDO, Bijhari

Location : 76o 30’ 0.48” E - 31o 29’ 0.48” N

Total geographical area : 473 ha

Treatable area : 291 ha

Irrigated area : nil

Total No. of families : 253

BPL families : 67

Total Population : 1164

Male : 527

Female : 637

Sex ratio : 1.2

SC

Male

Female

: 355

169

186

Literacy

Male:

Female:

:

:

:

823

401

422

 

Page 467: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 1

1. Introduction

Ghanghot Kalan Micro watershed lies in Bijhari block of district Hamirpur situated between 76o 30’ 0.48” E - 31o 29’ 0.48” N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1369hactares. There are 18 villages under 4 panchayats in the watershed. Physiographic Features

The area is characterised by low hill ranges, intermingled with rivulets and strems. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters.

Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild

climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.  

Page 468: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 2

Name of the Panchayat Village Code Ghanghotkalan Dhakyana 01061900 Batyana 01062100 Adhu 01062200 Ghutiana 01062000 Ghangot Khurd 01061800 Ghangot Kalan 01061700

Executive Summary of Ghanghotkalan Budget Component Percent of Budget Amount (Rs.) Administrative cost 10 436500 Monitoring 1 43650 Evaluation 1 43650 Preparatory Phase Entry Point Activities 4 174600 Institutional and Capacity building 5 218250 Detailed Project Report 1 43650 Watershed Development Phase Watershed Development Works 56 2444400 Livelihood activities 9 392850 Production System & Microenterprises 10 436500 Consolidation Phase 3 130950 Total 100 4365000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were

collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation

Page 469: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 3

9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and

streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled. Existing pattern of Agriculture:

Crops Area (ha) Production (q) Productivity (q/ha) Maize 126.9 2334.9 18.4 Mash 2.0 12.0 6.0 Wheat 130.0 2028 15.6 Toria 45.0 315 7.0 Gram 0.5 3 6 Vegetables 3.0 1000 333.3 Source: On the basis of PRA done in the panchyat.

Page 470: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 4

2. General Description of Project Area

Demographic Features of Ghanghot Kalan Watershed The general demographic features of the Ghanghot Kalan Watershed are given in

Table 2. The watershed is spread over 6 villages. The total number of households in this watershed is 253. The total population is 1164 of which 527 are males and 637 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 335. The sex ratio stands at 1209 females for every 1000 males for watershed area. Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Literate male

Literate female

Dhakyana 15 52 22 30 0 0 19 17 Batyana 18 92 44 48 5 3 36 35 Badhu 16 67 33 34 33 34 21 22 Gutiana 36 157 68 89 0 00 48 51 Ghangot Khurd

28 127 58 69 34 52 42 45

Ghangot Kalan

140 669 302 367 97 97 235 252

Total 253 1164 527 637 169 186 401 422 Description of Poverty Programmes in Ghangotkalan Micro Watershed Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Ghangot 67 26 0 310 1 414 3 Land use:

Ghanghot Kalan Panchyat extends over an area of 473 ha. Out of total land in the watershed, cultivated land stood at 96 ha which is totally rain fed. The area under forests on the other hand was 182 ha.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Dhakyana 25 6 7 12 0 7 19 Batyana 61 14 8 38 0 8 47 Badhu 8 0 5 3 00 5 8 Gutiana 59 14 17 28 0 17 45 Ghangot Khurd 51 0 12 39 0 12 51 Ghangot Kalan 269 148 47 73 0 47 121 Total 473 182 96 193 0 96 291

Page 471: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 5

Source: Revenue Department, District Hamirpur Panchayat-wise Basic Amenties in Ghanghotkalan Micro Watershed

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Ghanghot kalan Micro Watershed

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Ghanghotkalan Micro Watershed S.No Panchayat Primary Middle High Sr.

Secy Tailoring

Centre Aganwari Centres

Total Literate in the village

1 Ghangot 2 0 1 0 1 6 1417 Source: Directorate of Economics and Statistics, Govt. of HP 1.2.5 Existing area, production and productivity of different crops in Jhanjiani panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 77 1540 20 Wheat 77 1463 19 Vegetables 0.5 155 310 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops of Ganghot Kalan panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

Ghangot 258 1 418 1 1

Sr. No. Block/Panchayat *CHC *PHC *Dispensary *Sub

Center *Private Clinic

**Dispensary

1 Ghangot 0 0 0 1 2 0

Page 472: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 6

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seedNot done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 473: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 7

Crop: Peas Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 474: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 8

Crop: Ginger Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.  

Page 475: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 9

3. SWOT Analysis SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and

wheat yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small

ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Page 476: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 10

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Weaknesses The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is

received during rainy season (June-September). The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different

stages of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

Page 477: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 11

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle

yet farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Page 478: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 12

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations.

Page 479: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 13

Motivation of un-employed educated rural youth to adopt high income generating agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 480: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 14

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and the amount plays vital role in involving more people in different project developmental activities. The details of the entry point activities suggested by the people during the PRA exercise are as under: Water harvesting Proposed water bodies villages wise under Panchayat: Water bodies

Dhakriana Batyana Badhu Gutiana Ghanghot Khurd

Ghanghot Kalan

Total No.

Unit cost

Total cost

Pacca Tank 5mx4mx1m

- - - - - 4 103774 415096

Total 415096 Water structures

Village Location Total Cost/village

IWMP Budget

Expected outcomes

Pacca Tank 5mx4mx1m

Ghanghot Kalan

In land of Sh. Yash Pal 103774 103774 For irrigation of 2 kanal area

In land of Sh. Pawan Kumar in Bari-wala-Khet

103774 103774 For irrigation of 5 kanal area

In land of Sh. Mohinder Singh

103774 103774 For irrigation of 7 kanal area

In land of Sh. Partap Singh 103774 103774 For irrigation of 2 kanal area

Existing status of drinking water Villages Source of drinking water Availability of drinking water

(months) Dhakyana IPH pipeline 10*Batyana IPH pipeline 10Adhu IPH pipeline 10 Ghutiana IPH pipeline 10 Ghangot Khurd IPH pipeline 10 Ghangot Kalan IPH pipeline 10 *Full water availability except for 2 months Water bodies

Dhakriana Batyana Badhu Gutiana Ghanghot Khurd

Ghanghot Kalan

Total No.

Unit cost

Total cost

Well 1 1 2 18676 37352 Total 37352 Water structures

Village Location

Well Dhakriana In the land of Sh. Baldev Singh For Drinking beneficiaries 12 families Ghanghot

Kalan In the land of Sh. Jeet Ram at Matoli For Drinking beneficiaries 20 families

Page 481: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 15

5. Soil Conservation Watershed Activities to be undertaken Village wise: Sructures Check Dam

6m(2m+1m)/2mx2m Check Dam 8m(2m+1m)/2mx2m

Total No.

Unit cost Total cost

Dhakriana 1 2 54216 108432 Ghanghot Kalan

1 1 1 72283 72283

Total 180715 List of proposed sites Sructures Check Dam

6m(2m+1m)/2mx2m Dhakriana In the land of Sh. Jagat Ram

Ghanghot Kalan

In the land of Sh. Sarwan Singh

Check Dam 8m(2m+1m)/2mx2m

Ghanghot Kalan

In the land of Sh. Jharu Ram /Bhagat Ram at Matoli Nallah

List of Check dam stone & wire crated (Spur) Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Ghangot Kalan

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Khobla: (jai Singh land to Udho Ram)

3 109980

Tulsi Ram House to Ranjit Singh land

3 109980

Taurya Di Bael (Pratap Singh land to Sarwan /Ranjit land)

2 73320

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Phale wala cho (Sarwan Land to Sukhan devi land)

5 97750

Jeet ram land to Baggu Ram land

3 58650

Kasal nallah (Karam Chand land to Hukam chand land)

4 78200

Total 20 527880 456129 71751 Dhakyana Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Dhakyana nallah (Gian Singh house to saryali khadd)

3 109980 86708 23272

Total 3 109980 86708 23272 Badhu

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Satish kumar land to bridge

2 73320

Total 73320 67200 6120 Gutiana Fencing Tauri de bad

(Pratap Singh land)

400m 120352

Fencing Tauri de bad 250m 75220

Page 482: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 16

(Yashpal Singh land)

Dib-Rahgubir Singh/Shamsher Singh

600 m 180258

Total 375830

376100 270

Ghangot Khurd

Fencing Jolhki- Rulia Ram Land

1000m 300880 300880

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Than cho (Yashpal land to Ranjit land)

2 73320 73320

Total 374200

374200 Nil

Grand Total 1461210 1360337 101413 Village wise budget allocation under soil conservation Village Particulars Total Cost IWMP Budget Convergence

(MNREGA) Ghangot Kalan

Pacca tank 5mx4mx1m

415096 415096

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check Dam 6m(2m+1m)/2mx2m

54216 54216

Check Dam 8m(2m+1m)/2mx2m

72283 72283

Check dam stone & wire crated (Spur

527880 456129 71751

Total 1088151 1016400 71751 Dhakyana Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676

Check Dam 6m(2m+1m)/2mx2m

54216 54216

Check dam stone & wire crated (Spur

109980 86708 23272

Total 182872 159600 23272 Badhu Check dam stone &

wire crated (Spur 73320 67200 6120

Total 73320 67200 6120 Gutiana Fencing 375830 376100 270

Total 375830

376100 270

Ghangot Khurd

Fencing 300880 300880

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

73320 73320

Total 374200

374200 Nil

Grand Total 2094373 1993500 101413

Page 483: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 17

6. Agriculture

General Information of the watershed Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield

Pulses Nil Wish to grow Oil seed crops Sarson, Toria, til & soyabean Satisfactory with production & yield Vegetables Onion, cauliflower, Brinjal,

tomato, Reddish, Palak, Potato, Cucurbits, bhindi and cabbage

Wish to grow on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs

Amla, Mango, papaya, banana, harad, bahera, pomegranate & Citrus

Needs of improved varieties provided suitable for these locations.

Interventions Needed

. Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per centBuffaloes 90

Local-90

Local breeds give 3-4 liter Milk yield during favorable conditions

Cows 10 Jersey Breeds give 08 liter Milk yield

Ox 07 pairs In whole panchayat Goats 50 01 liter Milk yield during favorable conditionsSheep - - Equines - - Poultry 15 -

Intervention Strategy /

Issues Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

2 no. (20 farmers0

1 27400 27400

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

2 (25 farmers)

2 26400 26400

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Total 218250

Page 484: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 18

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture: Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Dhakriana and Batyana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 - - - Badhu and Gutiana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Ghanghot Khurd

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - Ghanghot Kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

- 22500 22500 - -

Total 125000 40000 62500 22500 - - Grand Total 207500 100000 85000 22500

Page 485: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 19

7. Horticulture

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Dhakriana and Batyana

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Badhu and Gutiana

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghanghot Khurd

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghanghot Kalan

Diversification towards drought/frost tolerant fruit plants

2 ha 80000 - - 80000 - -

Total 2ha 80000 80000 Grand Total

140000

Page 486: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 20

8. Animal Husbandry Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Dhakriana and Batyana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

80 animals

6878 - 6878

Total 16878 - 17400 Badhu and Gutiana

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 21841 - 21841

Total 21841 21841 Ghanghot Khurd

Control of endo and ecto parasites

100 animals

7073 - 7073

Total 7073 - 7073 Ghanghot Kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

170 animals

13208 - 13208

Total 43208 - 43208 Grand Total 89000 89000 Total Budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 207500 2. Horticulture 1400003. Animal husbandry 89000 Grand Total 436500 Expected outcomes from agricultural crops in sohari Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 77 20 85 22 3. Wheat 77 19 85 21 4. Vegetables 0.5 310 2 340

*additional area (cultivable wasteland) will be brought under cultivation

Page 487: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 21

9. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 488: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 22

10. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme loke NWDPRA. This may also involve harmonized use of resources available from other on ging/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following on going schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan Bagwan

Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industies

Page 489: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 23

11. Livelihood Concerns

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Dhakriana and Batyana

Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 100 chicks 16300 - - 16300 -Total 71300 25000 - 26300 20000 -Badhu and Gutiana

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 10000 20000 Ghanghot Khurd

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Ghanghot Kalan

Income generation I no. (Tailoring Unit)

144000 144000

Mushroom Cultivation

2 (50 bags) 22550 22550

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 211550 25000 144000 22550 20000 G. Total 392850 100000 144000 68850 80000

Page 490: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 24

11. Monitoring System A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. EVALUATION

During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 491: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 25

12. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat

Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Participatory approach for implementation of project

For the implementation of this project plan, participatory approach is more pertinent because it is the peoples programme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

Page 492: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 26

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR

During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase.

Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 493: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 27

13. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to

be carried out during consolidation phase • Terminal evolution of project as per the expected and aims.

Page 494: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 28

Annexures

Page 495: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Ghangot Kalan Page 29

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 75006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050Total 77550

Page 496: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Giaragran  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Giaragran)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 497: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchayat Giaragran  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 3

3. SWOT Analysis 10

4. Entry Point Activities 15

5. Drinking Water 16

6. Soil Conservation 17

7. Agriculture 18

8. Horticulture 20

9. Animal Husbandry 21

10. Pisciculture 22

11. Convergence 23

12. Livelihood Concerns 24

13. Monitoring System 25

14. Capacity Building 26

15. Project Withdrawal and Consolidation 28

16. Annexures 29  

 

 

 

 

 

Page 498: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 1

1. Introduction

Name of the Panchayat Village Code Giaragram MaSr.ana Kalan 01060400

Sr. No. Budget Component Percent of Budget Amount (lacs) 1. Administrative Cost 10 160500

Monitoring 1 16050 Evaluation 1 16050

2. Preparatory Phase: Entry point activities 4 64200 Institution & capacity building 5 80250 Detailed project report (DPR) 1 16050

3. Watershed Works Phase: Watershed development works 56 898800 Livelihood activities 9 144450 Production system & microenterprises 10 160500

4. Consolidation phase: 3 48150 Total 100 1605000

Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed.

Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects.

1. Demographic features

2. Land holding

3. Water availability

4. Water source details within the panchayat

5. Community engagement

6. Livelihood

7. Awareness about Specific programme: Watershed

8. Desire to do more activities related to occupation

9. Productivity of farms

Page 499: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 2

10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc.

Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 500: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 3

2. General Description of Project Area Giaragran Micro watershed lies in Bijhari block of district Hamirpur situated between

76o 13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography.

Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west, Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1369hactares. There are 18 villages under 4 panchayats in the watershed.

Physiographic Features

The area is characterized by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the Sr.opes. The width of terrace varies from 5 to 20 meters. Due to steep Sr.opes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land Sr.iding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the Sr.ope is very high, varies between 10-80 per cent.

Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

The objectives of the watershed development project will be:

o Conservation, development and sustainable management of natural resources.

o Enhancement of agricultural productivity and production in a sustainable manner.

o Restoration of ecological balance in the degraded and fragile rain fed eco-system

Page 501: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 4

through the introduction of multipurpose trees, shrubs and grasses. o More production from the rainfed areas. O Creation of sustained employment opportunities for the rural population

Demographic Features of Giara Gran Watershed

The general demographic features of the Giara Gran Watershed are given in Table 2. The watershed is spread over only one village. The total number of households in this watershed is 102. The total population is 469 of which 214 are males and 255 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 134. The sex ratio stands at 1192 females for every 1000 males for watershed

Demographic Features of Giara Gran

Villages No. of House-Holds

Total Population

Male female Male SC

Female SC

Literate male

Literate female

Maslana Kalan 102 469 214 255 57 77 172 174

Total 102 469 214 255 57 77 172 174

Land use:

Giara Gran watershed extends over an area of 145 ha. Out of total land in the watershed, cultivated land stood at 66 ha which is totally rain fed. The area under forests on the other hand was 38 ha.

Panchayat/Villages

Total Area

LUF

TCA Area under Non Agril. Uses

Total Un-irrigated

Area proposed for treatment (ha)

Maslana Kalan 145 38 66 41 66 107

Total 145 38 66 41 66 107

Source: Revenue Department, District Hamirpur

The major proportion of total cropped area in Giaragram Panchyat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under pulses declined continuouSr.y. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area.

Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects the panchayats. Of the total households in the area, 65.50 per cent houses have the toilet facilities. As regards the health facilities, there

Page 502: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 5

is one health sub-centers and three private clinics available in the area. There are sufficient educational facilities available in the area. There are 3 primary schools, 1 middle schools, and 1 senior secondary schools. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 1 tailoring centers and 7 anganwari centers in the catchment area.

Source: Directorate of Economics and Statistics, Govt. of HP

Description of Health Facilities in Usnar Micro Watershed

Source: Directorate of Economics and Statistics, Govt. of HP.

Description of Education Facilities in Usnar Micro Watershed

Panchayat Primary Middle High Sr. Secy

Tailoring Centre

Aganwari Centres

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Giara Gran 3 1 0 1 1 7 1 2063 Source: Directorate of Economics and Statistics, Govt. of HP

Table 8: Existing area, production and productivity of different crops in Sohari panchayat.

Crops Area (ha) Production (q) Productivity (q/ha) Maize 45 900 20 Mash 2 12 6.0 Wheat 45 837 18.6 Toria 3 21 7.0 Gram 2 12 6 Vegetables 2 680 340 Source: On the basis of PRA done in the Panchyat. Critical gaps worked out in major crops

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N

Sr. No.

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2 1 Giara Gran 250 1 544 1 1

Sr. No. Block/Panchayat *CHC *PHC *Dispensary *Sub Center

*Private Clinic

**Dispensary

1 Giara Gran 0 0 0 1 3 0

Page 503: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 6

Sr.. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Paddy: Farming Situation: Irrigated Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time

(Nursery) May end- Mid June May end- Mid June N

2. Transplanting time Mid June to End of June Mid June to End of June N 3. Spacing 20 X 15 cm Not done F 4. No. of seedlings/hill 2-3 4-5 P 5. Varieties HYVs’ Local F 6. Seed rate/ha 25-30 kg/ha 40 kg/ha P 7. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha) 10 t/ha 15 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

45:40:40 45

- 20

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

Broadcasting Broadcasting

Broadcasting Broadcasting

N N

9. Weed management: Mechanical Chemical herbicides

Puddling Butachlor 35EC

Being done Being done

N N

10. Pest management: As per recommendations Not done

F

11. Disease management

As per recommendations Not done

F

12. Average yield (q/ha) 30-35 q/ha 15.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N

Page 504: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 7

Sr.. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seedNot done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management F

Page 505: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 8

Sr.. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

Powdery mildew As per recommendation Not done 11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 506: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 9

Crop: Colocasia Farming Situation: Rain fed Sr.. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P

Page 507: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 10

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area.

SWOT Analysis for Improving Agriculture and Allied Sectors

Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and

wheat yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small

ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Page 508: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 11

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Weaknesses

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The Sr.oppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different

stages of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

Page 509: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 12

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle

yet farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities

Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

Page 510: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 13

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and Sr.oppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection.

Page 511: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 14

Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 512: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 15

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

Watershed Development Activities:

Existing water bodies villages wise under Giaragran Panchayat:

Sr. No. Water bodies Masalan kalan 1 Earthen tank(Talai) 2 2 Pacca tank 03 3 Roof water 01 Proposed water bodies villages wise under Giaragram Panchayat:

Water bodies Masalan kalan

Total No. Unit cost Total cost

Pacca Tank (5mx4mx1m)

1 1 103774 103774

RWHT(2mx2mx1m) 1 1 26909 26909 Lift irrigation Pump & Pipe 1 1 8927 8927 Total 46210 List of sites for proposed water structures and expected outcomes

Water structures Village Location Expected outcomes Pacca Tank 5mx4mx1m

Masalan kalan

On the land of Capt. Sukhdev Chand

For irrigation of 10 kanal area

RWHT(2mx2mx1m) Masalan kalan

- -

Lift irrigation Pump & Pipe

Masalan kalan

- -

Page 513: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 16

5. Drinking Water

Existing status of drinking water

Sr. No. Villages Source of drinking water Availability of drinking water (months)

1. MaSr.ana Kalan IPH pipeline 10*

*Full water availability except for 2 months Proposed Drinking water structures:

Sr. No. Structure Number Village Total Cost 1 Hand Pump 2 Maslana Kalan 203082

List of sites for proposed drinking water structures (Hand Pump):

Village structures Numbers Size (m) Location Remarks Maslana Kalan

Hand Pump 1 90mm dia HDPE pipeline with 63 mm dia outlet

On the land of Sh Desh Raj Sharma

For Drinking water for families

Hand Pump 1 On Community place

For Drinking water for 10 OBC families

Expected outcome from availability of drinking water

Sr. No. Availability of drinking water (No. of months in a year) Pre Project Expected Post Project

1. 8-10 12

Page 514: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 17

6. Soil Conservation

Watershed Activities to be undertaken Village wise

Villages Structure/work Activities to be undertaken Check Dam

8mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Masalan kalan

1 Dub Khad (Dadol) 72283 72283 - Irrigation of 30 kanal area

Total 72283 72283 - Villages Structure/work No. Activities to be undertaken Maslana kalan

Check dam stone & wire crated (Spur)

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

6mx1.25mx2.5mm 2 Community based Barla nalah

-

6mx1.25mx2.5mm 12 Karnala Nalh - Total 14 513240

Page 515: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 18

7. Agriculture Institutional and capacity building:

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture: Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Maslana kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ Rs.45000/ha

- 45000 - - -

Total 85000 40000 45000 - - -

Intervention Strategy /Issues Activity Programme cost

Unit Size No. of Units

Unit cost (Rs)

Total cost(Rs)

1 2 3 4 5 6 7

Agriculture

Polyhouse Commercial cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Horticulture

Animals husbandry Poultry Backyard poultry One day Training to the

farmers with regard to management of poultry farm

1(25 farmers)

3 12266 36798

Total 80248

Page 516: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 19

Agriculture development General Information: Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize

Pulses Mash, Soybean and Gram Oil seed crops Sarson, Toria & Til Vegetables Potato, Adarak, Raddish, Turnip,

Colocacea and Turmeric

Horticulture and MAPs

Amla, Harad, Bahera, Anar, Guava, Mango, papaya, Pear & Citrus

Needs of improved varieties provided suitable for these locations.

Fodder Crops Chari and Bajra Good Yield Livestock Animals Per cent

Buffaloes 80 Local breeds 6-10 liter Milk yield during favorable conditions

Cows 20 Jerseys 8-10 liter Milk yield during favorable conditions. Problem of next pregnancy, mostly taken 3-4 intercourse.

Local breeds 10 3-4 liter Milk yield during favorable conditions Ox - 04 pairs in villageGoats 10 0.5- 1 liter Milk Yield Sheep 05 - Equines - 05 No. Poultry 01

Total Budget under production system and micro enterprises Sr. No. Activity Total budget (Rs.) 1. Agriculture 85000 2. Horticulture 40000 3. Animal husbandry 35500 4. Grand Total 160500 Expected outcomes from agricultural crops in Giaragran Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 45 20 60 25.0 3. Mash 2 6.0 5 8.0 4. Wheat 45 18.6 60 22.0 5. Toria 3 7.0 5 8.0 6. Gram 2 6 4 7.0 7. Vegetables 2 340 3 400

Page 517: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 20

8. Horticulture

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Maslana kalan

Diversification towards drought/frost tolerant fruit plants

1.0 ha 40000 - - 40000 - -

Total 40000 40000

Expected outcomes from Horticultural crops in Giaragran Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha)1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 518: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 21

9. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Maslana kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Control of endo and ecto parasites 205 animals

15500 - 15500

Total 35500 35500 Grand Total

160500 40000 80500 40000 - -

Page 519: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 22

10. Pisciculture No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 520: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 23

11. Convergence

Watershed management is a single window, integrated area development programme.

Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme loke NWDPRA. This may also involve harmonized use of resources available from other on ging/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following on going schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan Bagwan

Samridhi Yojna Polyhouses, Micro irrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industries

Page 521: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 24

12. Livelihood Concerns

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Maslanakalan Income generation I no. (Tailoring Unit)

144000 144000

Page 522: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 25

13. Monitoring System A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper Sr.opes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 523: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 26

14. Capacity Building

For effective implementation of the watershed activites, capacity building and skill developemnt at watershed level are one of the important components. The activiteies proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat

Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Participatory approach for implementation of project

For the implementation of this project plan, participatory approach is more pertintent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, and user group’s ctc. According to their interests and use of resources being created during the implementation phase.

The duration of the project is five year and divided in three different phases:

Phase Name Duration

I Preparatory phase 1-2 years

II Watershed works phase 2-3 years

III Consolidation and withdrawl phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of

Page 524: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 27

social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase.

Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 525: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 28

15. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase-II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The foolowing activities are to be taken up during this phase.

Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods:

• Up scaling of successful experiences related to above aspects through revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects:

• Participatory planning, implementation and marketing of activities to be carried out during consolidation phase

• Terminal evolution of project as per the expected and aims

Page 526: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 29

Annexures

Page 527: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 30

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450Cost Estimate for awareness camp Sr. No. Particular Cost (Rs) 1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000 Total 12000 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 75006. Organiser and Secretarial assistance 15007. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Exposure visit of five days duration Sr. No. Particular Cost (Rs) 1. Exposure visit @ 600/farmer/day for one day duration for 25

farmers 15000

Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. Vegetable seed kit for kitchen garden @ 50/participant 5000 5. TA/DA /POL for resource personnel & other staff 1500 Total 13750 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

Page 528: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchayat Giaragran Page 31

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 529: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Jhanjiani)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 530: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 4

3. SWOT Analysis 7

4. Entry Point Activities 9

5. Drinking Water 10

6. Soil Conservation 11

7. Agriculture 12

8. Pisciculture 14

9. Convergence 15

10. Livelihood Concerns 16

11. Monitoring System 17

12. Capacity Building 18

13. Project Withdrawal and Consolidation 20

14. Annexures 21  

 

 

 

 

 

 

 

Page 531: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  

PROJECT AT A GLANCE Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Jhajiani

PIA : BDO, Bijhari

Location : 76038’578.4"E- 31028’578.4"N

Total geographical area : 18ha

Treatable area : 18ha

Irrigated area : Nil

Total No. of families : 20

Total Population : 93

Male : 46

Female : 47

Sex ratio : 1.02

Literacy

Male:

Female:

:

:

:

39

14

25

 

Page 532: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 1 

1. Introduction

Jhanjiani Micro watershed lies in Bijhari block of district Hamirpur situated between 76o 13” and 76o 44” on East longitudes and 31o 52” and 31o 58” North latitudes. The eleva-tion of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Boundaries, Location and Extent

The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1369hactares. There are 18 vil-lages under 4 panchayats in the watershed. Physiographic Features

The area is characterised by low hill ranges, intermingled with rivulets and strems. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters.

Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild cli-

mate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause inju-ries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the mini-mum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it rece-ives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Name of the Panchayat Village Code Jhanjiani Gandak 01061100 Jhanjhiani/ Kohlari 01061000

Page 533: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 2 

Executive Summary Preparatory Phase Budget per cent Amount (Rs.) Entry Point Activities 4 10800 Institutional and Capacity building 5 13500 Detailed Project Report 1 2700 Watershed Development Phase Watershed Development Works 56 151200 Livelihood activities 9 24300 Production System & Microenterprises 10 27000 Consolidation Phase 3 8100 Total 100 270000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted

Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram pan-chayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were

collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from differ-

ent departments of Government agencies such as Revenue Office, Block Development Offic-er, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

Page 534: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 3 

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Stan-dard estimates were prepared for other units and activities, taking in to consideration the local conditions. The maps have been prepared using the GPS survey and ground truthing of the terrain. Dif-ferent types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, As-sets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web por-tal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 535: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 4 

2. General Description of Project area Demographic Features of Jhanjiani Watershed Villages No. of

House-Holds Total Population

Male female Literate male

Literate female

Gandak 9 45 13 32 9 24 Kohlri 11 48 33 15 5 1 Total 20 93 46 47 14 25

Panchayats BPL families

BPL SC fami-lies

BPL ST families

Population under pover-ty allevation programme

Fair price shop

HH’s pur-chases food grain through PDS

Houses con-structed for houseless ha-milies

Jhanjiani - - 0 390 0 526 1 Land use:

Jhanjhiani Panchyat extends over an area of 18 ha. Out of total land in the wa-tershed, cultivated land stood at 8 ha which is totally rain fed. The area under forests on the other hand was 10 ha.

Panchayat / Villages

Total Area

Land under Forests

Total cul-tivated area

Area under Non Agril. Uses

Total Irri-gated

Total Un-irrigated

Area pro-posed for treatment (ha)

Gandak 11 11 Kohlri 7 7 Total 18 8 - - - 18 Source: Revenue Department, District Hamirpur The major proportion of total cropped area in Jhanjhiani Panchyat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. Basic Amenities of Jhanjian panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Jhanjian panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities Jhanjian panchayat

Block/Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2

Yes-1; No.-2 Yes-1; No.-2

Jhanjiani 326 1 526 1 1

Block/Panchayat *CHC *PHC *Dispensary *Sub Cen-

ter *Private Clinic

**Dispensary

Jhanjiani 0 0 1 0 0 0

Page 536: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 5 

Panchayat Primary Middle High Sr. Secy

Tailoring Centre

Aganwari Centres

Out Of School

Children (6-14

Years)

No. Of Schools Without Water &

Toilet Facilities

Total Literate

in the village

Jhanjiani 3 1 0 0 1 7 5 0 2501 Source: Directorate of Economics and Statistics, Govt. of HP. Existing area, production and productivity of different crops in Jhanjiani panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 7 140 20 Wheat 7 133 19 Vegetables 0.5 155 310 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops of Jhanjiani panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid Novem-

ber Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F

Page 537: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 6 

4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broad-casting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P

Page 538: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 7 

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for taking rational decisions about an enterprise under given set of situations. The decisions re-garding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and care-fully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. STRENGTHS

Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. The topography of area is moderately hilly and undulating which makes the soil of the

district well drained Soil conservation and rainwater harvesting activities have been undertaken by the Department of

Agriculture in some parts. Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can be used for the production of variety of value added products.

The medicinal plants such as harad, bahera and amla can also be grown successfully on marginal and sub-marginal lands.

Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of buffaloes are of improved breeds.

WEAKNESSES The soils are generally shallow with poor water holding capacity. The soils in the de-

velopment block Bijhari is gravely. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Farmers use higher seed rate as compared to the recommendation of the CSK HPKV which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths lead-ing to poor germination and low yields.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

Non availability of green fodder throughout the year.

Page 539: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 8 

Preference of natural service with local bulls in case of buffaloes as success rate of ar-tificial insemination is low.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities Area is suitable for planting improved grasses, fodder and timber trees Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situa-tions.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Threats

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc haz-ards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Increasing cases of infertility in cattle causing stray animal menace Issues Emerging out of SWOT Analysis

Need for strengthening the soil and water conservation activities at farmers as well as public level.

Motivation of un-employed educated rural youth to adopt high income generating agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on ara-ble and non-arable lands.

Page 540: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 9 

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members to-wards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.13500/-) outlay and the amount plays vital role in involving more people in different project developmental activities. The project im-plementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat. Water Harvesting Existing Water bodies: Nil Proposed water bodies villages wise under Jhanjiani Panchayat: Water bodies Gandak Kohlri Total No. Unit cost Total cost Well 1 2 3 18676 56028 List of sites for proposed water structures and expected outcomes: Water struc-tures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Well Gandak In the Land of Sh. Sukhdev

18676 18676 - For irriga-tion of 25 kanal land

Total

18676 18676 -

Kohlri In the Land of

Sh. Burfi Ram 18676 18676 For irriga-

tion of 15 kanal land

In the land of Sh. Kul-deep/Desh Raj

18676 18676 For irriga-tion of 10 kanal land

Total

37352 37352 -- -

Grand Total 56028 56028 - -

Page 541: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 10 

5. Drinking Water Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking water

(months) 1. Gandak IPH pipeline 10* 2. Jhanjhiani/ Kohlari IPH pipeline 10 Proposed drinking water bodies: Nil

Page 542: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 11 

6. Soil Conservation

Watershed Activities to be undertaken Village wise Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Gandak Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dugahla wala cho (Janj ghar to Kohlri)

3 43986

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Bain da nallah (Jag-dish Chand land to Wa-ter bodi)

2 39100

Total 83086

73724 9362

Kohlari Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Bhagat Ram to Udho Ram Land

2 29324

Total 29324 21448 7876 Grand To-tal

112410 95172 17238

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Gandak Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur)

83086

73724 9362

Total 101762 92400 9362 Kohlari Well Open

Sink type of 2.4 m dia and 3 m deep

37352 37352 -

Check dam stone & wire crated (Spur)

29324 21448 7876

Total 66676 58800 7876 Grand Total 168438 151200 17238

Page 543: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 12 

7. Agriculture

General Information: Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat, Maize & Sugarcane

Pulses Gram, Moong, Mash & Cowpea Oil seed crops Sarson, Til & soyabean Vegetables Onion, cauliflower, Brinjal, tomato, Garlic, Co-

riander, Potato, Cucurbits, Turmeric and cabbage

Horticulture and MAPs

Amla, Mango, papaya, Plum, banana, grapes, harad, bahera & Citrus

Interventions Needed - Soil testing, seed drill, Power til-ler and Demonstrations on Ferti-lizer application and varietal eval-uation.

Livestock Animals Per cent Buffaloes 70 Local

30 Graded Local breeds 6-7 liter Milk yield during favorable conditions

Cows 10 Jersey’s 8-10 liter and local 1-2 litre Milk yield during favorable conditions. Problem green fod-der

Ox 04 families In whole panchayat Goats 40 01 liter Milk yield during favorable condi-

tions Sheep 07 families - Equines - Poultry 0 Backyard = 50

Institutional and capacity building: Agriculture

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial cultiva-

tion under polyhouse conditions

Two days Training to the farmers on pro-tected cultivation tech-nology

1no. (20 farmers)

1 13500 13500

Total 13500

Page 544: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 13 

 

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Gandhak and Kohlri

Provision of improved inputs (viz., seeds, fertilizers, pesticides) and tools for demon-stration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 - 20000 - - - 1.8.2 b)Animal Husbandry: Village Intervention Area/no. Cost in-

volved (Rs) I II III IV V

Gandhak and Kohlri

Control of endo and ecto parasites

100 ani-mals

7000 - 7000

Total 7000 7000 Grand Total 27000 27000 - -

Total Budget under production system and micro enterprises S. No. Activity Total budget 1. Agriculture 20000 2. Horticulture 0 3. Animal husbandry 7000 4. Grand Total 27000 Expected outcomes from agricultural crops in Giaragram Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 7 20 7 22 3. Wheat 7 19 7 21 4. Vegetables 0.5 310 1 340

Page 545: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 14 

8. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however

the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 546: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 15 

9. Convergence

Watershed management is a single window, integrated area development programme. Inte-grated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme loke NWDPRA. This may also involve harmonized use of re-sources available from other on ging/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The follow-ing on going schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consul-tation with the implemen-tation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan Bagwan

Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assis-tance and guidanceand marketing of co-coons

Department of industies

Page 547: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 16 

10. Livelihood Activities

Village Intervention Area/no. Cost in-

volved (Rs)I II III IV V

Gandhak and Kohlri

VermicultureUnit 3mx1m( Low cost)

5 no. 24300 - 24300

Page 548: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 17 

11. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stake-holders know areas of importance viz., already treated areas/historical works in the area, pro-posed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key perfor-mance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 549: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 18 

12. Capacity Building

For effective implementation of the watershed activities, capacity building and skill de-

velopment at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of partic-

ipants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ pan-chayat

Water harvesting, agriculture, horticulture, fore-stry, animal husbandry, fisheries and micro en-terprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional insti-tute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional insti-tutes/ university

PIAs, WDTs mem-bers

10 Project implementation and management train-ings, reports writing and accounts maintenance

DRDA level

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertintent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups ctc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawl phase 1-2 years The major objective of the preparatory phase is to build approaches mechanism for imple-mentation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The wa-tershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on insti-tutional and work related aspects.

Page 550: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 19 

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutiona-lisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 551: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 20 

13. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources aug-mented and economic plans developed in phaseII (works Phase) are made the founda-tion to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm pro-

duction system and off-farm livelihoods. Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm Livelihoods: Upscaling of successful experiences related to above aspects through revolving fund under

Page 552: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 21 

Annexures

Page 553: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 22 

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 75006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for awareness camp Sr. No. Particular Cost (Rs) 1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000 Total 12000 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for awareness camp on nutritional security for BPL families Sr. No. Particular Cost (Rs) 1. Working lunch @ 30/participant for 100 participants 3000 2. Literature & stationary @ 30/participant 3000 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. Vegetable seed kit for kitchen garden @ 50/participant 50005. TA/DA /POL for resource personnel & other staff 1500Total 13750

Page 554: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP­Hamirpur­II Panchyyat  Jhanjiani  Page 23 

Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 125006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 30005. TA for participants @ 400 to and fro 100006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 555: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kiara Bag  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II:Bijhari (Kiarabag)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 556: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kiara Bag  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 4

3. SWOT Analysis 9

4. Entry Point Activities 13

5. Drinking Water 16

6. Soil Conservation 17

7. Agriculture 21

8. Horticulture 24

9. Animal Husbandry 25

10. Pisciculture 27

11. Convergence 28

12. Livelihood Concerns 29

13. Monitoring System 31

14. Capacity Building 32

15. Project Withdrawal and Consolidation 33

16. Annexures  

   

Page 557: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kiara Bag  

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhar

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Kiarabagh

PIA : BDO, Bijhar

Location : 760 30’ 45.72” E – 310 32’ 45.72 N

Total geographical area : 522 ha

Treatable area : 393 ha

Irrigated area : nil

Total No. of families : 331

BPL families : 62

Total Population : 1706

Male : 798

Female : 908

Sex ratio : 1.13

Schedule Caste

Male

Female

: 568

279

289

Literacy

Male:

Female:

:

:

:

1199

601

598

Page 558: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 1

1. Introduction

Kiarabagh micro watershed lies in Bijhari block of district Hamirpur situated 760 30’

45.72” E – 310 32’ 45.72 N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Bijhari watershed encompasses around six per cent of the total villages in the district covering 5.59 per cent of the total area in the district.

Boundaries, Location and Extent The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1554 hactares. There are 28 villages under 3 panchayats in the microwatershed.

Physiographic Features

Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 25 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent.

Seasons and Climate The watershed falls in the sub-humid sub-tropical zone having a relatively mild

climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 559: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 2

Micro Watersheds In The Project Area Name of the Panchayat Village Code Kiara-Bagh Bagg 01063800 Dasen 01064400 Kohdera 01064500 Badloi 01064300 Baghed 01063500 Pelehra 01064200 Sunwin Brahmana 01064000 Kiara 01063700 Kharota 01064600 Kheri 01063600 Sunwin Rajputana 01064100 Kohlwin 01063900 Executive Summary of the budget:

Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 589500 Monitoring 1 58950 Evaluation 1 58950 Preparatory Phase: Entry point activities 4 235800 Institution & capacity building 5 294750 Detailed project report (DPR) 1 58950 Watershed Works Phase: Watershed development works 56 3301200 Livelihood activities 9 530550 Production system & microenterprises 10 589500 Consolidation phase: 3 176850 Total 100 5895000

Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features

Page 560: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 3

2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 561: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 4

2. General Description of Project Area Demographic Features of Kiara Bagh Watershed

The general demographic features of the Kiara Bagh Watershed are given in Table

2. The watershed is spread over 12 villages. The total number of households in this watershed is 331. The total population is 1706 of which 798 are males and 908 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 568. The sex ratio stands at 1138 females for every 1000 males for watershed area. Demographic Features of Kiara Bagh Panchayt Villages No. of

House-Holds

Total Population

Male female Male SC

FemaleSC

MaleST

Female ST

Literate male

Literate female

Bagg 2 4 2 2 0 0 0 0 2 2 Desen 34 195 93 102 7 9 0 0 65 67 Kohdera 21 113 54 59 6 6 0 0 45 39 Badloi 43 252 121 131 109 120 0 0 91 86 Baghed 38 164 73 91 0 0 0 0 61 62 Pelehra 39 243 118 125 48 43 0 0 85 91 Sunwin Brahmana

19 74 31 43 00 0 0 0 25 28

Kiara 22 94 38 56 0 0 0 0 28 35 Kharota 28 144 63 81 5 8 0 0 47 49 Kheri 46 224 105 119 5 4 0 0 82 88 Sunwin Rajputtan

38 198 99 99 99 99 0 0 69 51

Kohlwin 1 1 1 0 0 0 0 0 1 0 Total 331 1706 798 908 279 289 0 0 601 598 Description of Poverty Programmes in Kiara Bagh Panchayat

Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Kiara Bagh 62 20 0 389 1 511 2 Land use:

Kiara Bagh Panchyat extends over an area of 522 ha. Out of total land in the watershed, cultivated land stood at 154 ha which is totally rain fed. The area under forests on the other hand was 129 ha. The area under horticulture is negligible in the watershed area.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Page 562: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 5

Bagg 7 0 4 3 0 4 7 Desen 105 63 17 8 0 17 42 Kohdera 43 0 14 29 0 14 43 Badloi 41 6 18 17 0 18 35 Baghed 30 0 13 17 00 13 30 Pelehra 48 10 19 19 0 19 38 Sunwin Brahmana 23 0 11 12 0 11 23 Kiara 8 0 3 5 0 3 8 Kharota 85 24 20 41 0 20 61 Kheri 85 26 17 42 0 17 59 Sunwin Rajputtan 26 0 11 12 0 11 26 Kohlwin 21 0 7 14 0 7 21 Total 522 129 154 219 0 154 393 Source: Revenue Department, District Hamirpur Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motor able road connects all the panchayats. As regards the health facilities, there is three health sub-centers and two private clinics available in the area. There are sufficient educational facilities available in the area.

Source: Directorate of Economics and Statistics, Govt. of HP Existing area, production and productivity of different crops Crops Area (ha) Production (q) Productivity (q/ha)Maize 141 2820 20 Mash 1 5.8 5.8 Wheat 138 2346 17 Toria 2 12 6 Gram 0.5 3 6Vegetables 1 310 310Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg Not done F

Block/Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2

Yes-1; No.-2 Yes-1; No.-2

Kiara Bag 196 1 511 1 1

Page 563: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 6

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

seed 6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

Page 564: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 7

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

In rows Not done F 8. Weed management:

Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 565: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 8

Crop: Ginger Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap

Page 566: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 9

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analyzed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop

residues, weeds and fodder crops supply the dry/green fodder for rest of the year. Improved sticks of grasses and nursery of fodder trees are available with many

departments like SAUs/KVK/Farmers for improvement of grass lands and pastures. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Veterinary clinical services are available within 10 km distance in the district. Markets for milk and milk products are available in the local areas. The procurement

of milk from rural areas is also being done by the milk federation. Intensive Dairy Development Project is in operation in the district for breed

improvement, dissemination of better management practices and commercialization of the activities.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich

Page 567: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 10

biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Weaknesses

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The soils in the development block Bijhari is gravely.

The sloppy landscape causes quick run-off of rain water due to which ground water recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Farmers use higher seed rate as compared to the recommendation of the CSK HPKV which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Migration of rural youth to urban areas and preference to jobs other than agriculture

Opportunities

Area is suitable for planting improved grasses, fodder and timber trees Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Page 568: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 11

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace

Page 569: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 12

Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 570: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 13

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

Water Harvesting Existing water bodies villages wise Water bodies 1 2 3 4 5 6 7 8 9 10 11 12 Kuhl - - - - - - - - - - - - Earthen tank (Talai) - - - - - - - - - - - - Dam - - - - - - - - - 1 - - Pacca tank - - - - - - - - - - - - Poly tank - - - - - - - - - - - - Tube well - - - - - - - - - - - - Roof water - - - - - - - - - - - - Lift irrigation - - - - - - - - - - - - Any other (well) - - - - - - - - - - - - Proposed water bodies villages wise under Kiarabagh Panchayat: Water bodies

Desen

Kohdera

Badloi

Baghed

Pelehra

Sunwin Brahmana

Kiara

Kharota

Kheri

Sunwin Rajputtan

Total No.

Unit cost Total cost

Pacca tank 5mx4mx1m

- 2 1 1 1 - - 1 - - 6 103774 622644

Well Open Sink type of 2.4 m dia and 3 m deep

4 1 3 - 1 - 1 1 4 4 19 18676 354844

Kuhl

150m 150m

13588

203820

Total 1181308 Actual budget = 1181308 Budget from IWMP= 1170688 Convergence from MNREGA for Kuhal construction in village Sunhwin brahmna=10620

Page 571: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 14

List of sites for proposed water structures and expected outcomes in Kiarabagh Panchayat: Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Pacca tank 5mx4mx1m

Kohdera In the land of Sh Gian Chand

207548 162783 44765 For irrigation of 150 kanal area

In the land of Sh Roop Singh

For irrigation of 100 kanal area

Badloi In the land of Sh Sant Ram

103774 103774 - For irrigation of 15 kanal area

Baghed In the land of Sh Subhash Chand

103774 103774 - For irrigation of 10 kanal area

Pelehra In the land of Sh Relu Ram

103774 103774 - For irrigation of 25 kanal area

Kharota In the land of Sh Parkash chand

103774 103774 - For irrigation of 40 kanal area

Well Open Sink type of 2.4 m dia and 3 m deep

Desen In the land of Sh ram Raksha

74704 74704 - For irrigation of 24 kanal area

In the land of Sh Peshawar Chand

For irrigation of 18 kanal area

In the land of Sh Raghubir Singh

For irrigation of 10 kanal area

In the land of Sh Kesar Chand

For irrigation of 10 kanal area

Kohdera In the land of Sh Ranjit Singh

18676 18676 - For irrigation of 20 kanal area

Badloi In the land of Sh Sant ram

56028 56028 - For irrigation of 40 kanal area

In the land of Sh Vinod kumar

For irrigation of 12 kanal area

Page 572: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 15

Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

In the land of Sh Harnam Singh

For irrigation of 10 kanal area

Pelehra In the land of Sh.Desh Raj

18676 18676 - For Irrigation of 17 kanal area

Kiara In the land of Sh ravinder Singh

18676 18676 - For Irrigation of 50 kanal area

Kharota In the land of Sh Parkash Chand

18676 18676 - For Irrigation of 30 kanal area

Kheri In harijan basti 74704 74704 For Irrigation of 12 kanal area

In the land of Sh rikhi Ram

For Irrigation of 8 kanal area

In the land of Ram Nath

For Irrigation of 40 kanal area

In the land of Master Ram Nath Sharma

For Irrigation of 7 kanal area

Sunwin Rajputtan

In the land of Lekh Ram

74704 74704 - For Irrigation of 40 kanal area

In the land of Shankru Ram

For Irrigation of 30 kanal area

In the land of Shankar Dass

For Irrigation of 35 kanal area

In the land of Sanjay kumar

For Irrigation of 30 kanal area

Kuhal Sunwin Brahmana

From the land of Sh Bakshi Ram to Nikka Ram

203820 193200 10620 (MNERGA)

For Irrigation of 35 kanal area

Page 573: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 16

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking water

(months) 1. Bagg IPH pipeline /Bawri 11 2. Dasen IPH pipeline /Handpump 11 3. Kohdera IPH pipeline 11 4. Badloi IPH pipeline 11 5. Baghed IPH pipeline 11 6. Pelehra IPH pipeline 11 7. Sunswin Brahmana IPH pipeline 11 8. Kiara IPH pipeline 11 9. Kharota IPH pipeline 11 10 Kheri IPH pipeline 11 11. Sunwin Rajputana IPH pipeline 11 12. Kohlwin IPH pipeline 11 Proposed activities for availability of drinking water Particulars Location Numbers Size

(Meters) Remarks Cost (Rs.)

Village Desan Ward No. 1 Member:- Sh. Parshotum Chand 88941-54805 Hand Pump In the land of

Sh. Prakash Chand

01 - For Drinking beneficiaries 15 families

101541

Village: Kharota Hand Pump

In the land of Sh. Prakash Chand

01 2 no. For Drinking beneficiaries 07 families

203082

In the land of Smt. Giano Devi

01 For Drinking beneficiaries 05 families

Village: Khodra Pattian Hand Pump In the land of

Sh. Gian Chand

01 - For Drinking beneficiaries 10 families

101541

Total Hand Pump (4 No.) 406164 Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 11 12

Page 574: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 17

6. Soil Conservation List of Check dam stone & wire crated (Spur) Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Desen Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Dhamde da cho( Sunka ram land to Prem Chand land)

2 39100

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Dhamde da cho( Sunka ram land to Prem Chand land)

2 73320

Pilyde da cho( Kashmir singh to Relu Ram land)

2 73320

Check dam stone & wire crated (Spur) 8mX1.25mX2.5m

Pilyde da cho( Kashmir singh to Relu Ram land)

1 48210

Total 233950 176555 57395 Kohdra Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Sant Ram to Parkash Chand Land

4 78200 - -

Total 78200 - - Badloi Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Sarol cho( Sant Ram to Pritam Singh land)

3 109980

Bali wala cho 2 73320 Total 183300 134198 49102 Bhaged Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Lahya da cho( Onkar land to Subhash chand land)

2 73320

Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Sarwan Kumar land to Barbi land

2 119534

Total 192854 148226 44628 Palehra Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Relu ram land to Pritam Singh land

4 78200 - -

Nalu da cho to Naun di Bali

4 78200 - -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Mitan wala cho ( Kishor kumar land to bhagan devi land)

43986 - -

Total 200386 196750s 3636 Kiara Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Balu ka Nala( Dhani Ram land to Dev datt land)

2 39100 - -

Water body wala nala( Brahmi devi land to Dhani Ram land)

2 39100 - -

Total 78200 48524 29676

Page 575: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 18

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Kharota Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Jalanu nala( Krishna Dayal land to Kuldeep chand land)

2 73320

Chalauli cho( Ram Rakha land house to Subhash chand Land)

2 73320

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Chalauli cho( Ram Rakha land house to Subhash chand Land)

3 58650

Total 205290 186868 18422 Kheri Check dam stone &

wire crated (Spur) 10mX1.25mX2.5m

Saryali khud( Shambu Ram/Dev Raj land to Ram Nath land)

6 358602 358602 -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Brahm Dass to Bansi Ram Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Sita Ram house to Duni Chand

2 39100

Shambhu Ram land to Baljit

2 39100

Total 466126 420896 45230 Sunwin Rajputtan

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Baggu di bali to Shakra Ram land

3 109980

Naun nala (Shankar dass land to Keasr dass land0

2 73320

Total 183300 143696 39604 Kohlwin Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Khildu di khad ( Rattan chand to Ranjit land )

3 109980 - -

Bali wala cho ( Sant Ram to Parkash Chand land)

2 73220 -

Total 183200 176400 6800 Bagh Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

School( dharm chand land to Ram Nath land

1 59767 58800 967

Total 59767 58800 967 Grand Total 2064573 1494163 295460

Page 576: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 19

Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence(MNREGA)

Kohdra Pacca tank 5mx4mx1m

207548 162783 44765

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Handpump 101541 101541 - Check dam stone & wire crated

(Spur 78200 78200 -

Total 405965 361200 44765 Badloi Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

56028 56028

Check dam stone & wire crated (Spur

183300 134198 49102

Total 343102 294000 49102 Baghed Pacca tank

5mx4mx1m 103774 103774 -

Check dam stone & wire crated (Spur

192854 148226 44628

Total 296628 252000 44628 Pelehra Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

200386 196750 3636

Total 322836 319200 3636 Kharota Pacca tank

5mx4mx1m 103774 103774 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Handpump 203082 203082 - Check dam stone & wire crated

(Spur 205290 186868 18422

Total 530822 512400 18422 Desen Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Page 577: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 20

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Handpump 101541 101541 - Check dam stone & wire crated

(Spur 233950 176555 57395

Total 410195 352800 57395 Kheri Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check dam stone & wire crated (Spur

466126 420896 45230

Total 540830 495600 45230 Sunwin Rajputtan

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check dam stone & wire crated (Spur

183300 143696 39604

Total 258004 218400 39604 Sunwin Brahmana

Kuhal 203820 193200 10620

Total 203820 193200 10620 Kohlwin Check dam stone & wire crated

(Spur 183200 176400 6800

Total 183200 176400 6800 Kiara Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Check dam stone & wire crated (Spur

78200 48524 29676

Total 96876 67200 29676 Bagg Check dam stone & wire crated

(Spur 59767 58800 967

Total 59767 58800 967 Grand Total 3652045 3301200 350845

Page 578: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 21

7. Agriculture

General Information: Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield

Pulses Nil Wish to grow Oil seed crops Sarson, Toria, til & soyabean Satisfactory with production & yield Vegetables Onion, cauliflower, Brinjal, tomato,

Raddish, Palak, Potato, Cucurbits, bhindi and cabbage

Wish to grow on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs

Amla, Mango, papaya, banana, harad, bahera, pomegranate & Citrus

Needs of improved varieties provided suitable for these locations.

Interventions Needed

. Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per cent Buffaloes 98

Local-90 Crossbred-08

Local breeds give 3-4 liter and crossbred 6-7 liter Milk yield during favorable conditions

Cows 02 Jersey Breeds give 6-7 liter Milk yield

Ox 07 pairs In whole panchayat Goats 2 0.5 liter Milk yield during favorable conditions Sheep 01 - Equines 02 -Poultry 05 -

Institutional and capacity building:

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(20 farmers)

3 15000 45000

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard One day Training to the 1(25 2 14450 28900

Page 579: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 22

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture: Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Bagg and Desen

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1.0 ha 45000/- @ Rs.45000/ha

- 45000 - - -

Total 85000 40000 45000 - - - Kohdera Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - - Badloi Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

Total 20000 20000 - - - - Baghed Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 - - - Pelehra Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

poultry farmers with regard to management of poultry farm

farmers)

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 294750

Page 580: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 23

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

demonstration in cereals, pulses and oilseeds Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 42500 20000 22500 Sunwin Brahmana

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - - -

Total 20000 20000 Kiara and Kharota

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Kheri Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Sunwin Rajputtan and Kohlwin

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Total 40000 40000 Grand Total

372500 260000 112500

Page 581: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 24

8. Horticulture Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Bagg and Desen

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 - - 20000 - - Kohdera Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Badloi Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kiara and Kharota

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kheri Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

100000 100000

Page 582: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 25

9. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Bagg and Desen

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

4 8000 - 8000

Control of endo and ecto parasites

190 animals

13448 - 13448

Total 21448 - 21448 - - - Kohdera Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

4 8500 - 8500

Total 8500 - 8500 Badloi Control of endo and ecto

parasites 80

animals 6300 - 6300

Total 6300 - 6300 Baghed Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

50 animals

3900 - 3900

Total 13900 - 13900 Pelehra Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Sunwin Brahmana

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 7400 - 7400 Kiara and Kharota

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Total 20000 - 20000 Kheri Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000 Sunwin Demonstration to the 5 10000 - 10000

Page 583: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 26

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Rajputtan and Kohlwin

farmers on balanced feeding and disease management to improve milk yield

Control of endo and ecto parasites

125 animals

9290 - 9290

Total 19290 - 19290 Grand Total

116838 - 116838

Total Budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 372500 2. Horticulture 100000 3. Animal husbandry 116838 4. Grand Total 589338 EXPECTED OUTCOMES Agriculture Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 141 20 175 25.0 3. Mash 1 5.8 5 8.0 4. Wheat 138 17 175 18.0 5. Toria 2 6 5 8.0 6. Gram 0.5 6 2 7.0 7. Vegetables 1 310 5 400

*additional area (cultivable wasteland) will be brought under cultivation Horticulture Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00

Page 584: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 27

10. Pisciculture No activity has been proposed in the panchayat due to lack of interest, however the fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 585: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 28

11. Convergence

Watershed management is a single window, integrated area development programme.

Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sect oral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project

Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission

4 Pt. Deen Dayal Upadhyay Kisan Bagwan Samridhi Yojna

Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industies

Page 586: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 29

10. Livelihood Concerns

Proposed Interventions to Increase Livelihood Activities:

Village Intervention Area/no. Cost

involved

(Rs)

I II III IV V

Bagg and

Desen

Mushroom

Cultivation

2 (50 bags) 20000 10000 10000 -

Bee-keeping 2 no.(10Boxes

per unit)

40000 - 20000 20000 -

VermicultureUnit

3mx1m( Low cost)

10 no. 50000 - 50000 - - -

Total 110000 - 50000 30000 30000 -

Kohdera Mushroom

Cultivation

2 (50 bags) 20000 10000 10000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 -

Bdloi Mushroom

Cultivation

2 (50 bags) 20000 10000 10000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 -

Baghed Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit

3mx1m( Low cost)

4 no. 20000 20000 - - - -

Total 30000 20000 - 10000 - -

Pelehra Mushroom

Cultivation

2 (50 bags) 20000 10000 10000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - 10000 10000 -

Sunwin

Brahmana

and Kiara

Mushroom

Cultivation

1(50 bags) 10000 10000 - -

VermicultureUnit

3mx1m( Low cost)

5 no. 24550 24550 - - - -

Page 587: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 30

Village Intervention Area/no. Cost

involved

(Rs)

I II III IV V

Total 34550 24550 - 10000 - -

Kharota Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 -

Total 85500 25000 - 40500 20000 -

Kheri Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 -

Total 85500 25000 - 40500 20000 -

Sunwin

Rajputtan

and

Kohlwin

VermicultureUnit

3mx1m( Low cost)

10 no. 50000 50000 - - - -

Total 50000 50000 - - - -

Grand

Total

530550 219550 50000 161000 100000 0

Page 588: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 31

11. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 589: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 32

12. Capacity Building

For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under: • Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the program me Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management

Block level

SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Page 590: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 33

13. Project Withdrawal And Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The foolowing activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenace and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Upscaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: Participatory planning, implementation and marketing of activities to be carried out during consolidation phase.

Page 591: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 34

Project Implementation Participatory approach for implementation of project

For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, and user groups’ etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee (WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works

envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalized so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 592: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 35

Annexures

Page 593: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 36

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner 8@ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 50005. TA for participants @ 300 to and fro 75006. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 70004. POL for field visit 30005. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300

Page 594: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kiara Bag Page 37

Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 595: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kulehra  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II:Bijhari (Kulehra)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 596: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kulehra  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 3

3. SWOT Analysis 12

4. Entry Point Activities 17

5. Drinking Water 18

6. Soil Conservation 19

7. Agriculture 21

8. Horticulture 23

9. Animal Husbandry 24

10. Pisciculture 26

11. Convergence 27

12. Livelihood 28

13. Monitoring System 29

14. Capacity Building 30

15. Project Withdrawal and Consolidation 32

16. Annexures 33  

 

 

 

 

 

 

Page 597: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Kulehra  

 

PROJECT AT A GLANCE

Name of the Project : IWMP Block : Bijhari District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Kulehra PIA : BDO, Bijhar Location : 76o 31’ 44.76” E- 31o 33’ 44.76” N Total geographical area : 480 ha Treatable area : 380 ha Irrigated area : nil Total No. of families : 335 BPL families : 38 Landless : 38 Marginal farmers : 157 Small farmers : 130 Others : 10 Total Population : 1679 Male : 751 Female : 901 Sex ratio : 1.19 Schedule Caste Male Female

: 329 157 172

Literacy Male: Female:

: : :

1197 596 601

 

Page 598: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 1

1. Introduction

Kulehara panchayat is located in Bijhari Block of Hamirpur district. The panchayat consists of nine revenue villages viz.Karah, Lahari Ghumara .Lahari Tarkahana, Mudhawin, Changar, Dagwar, Sunhani, Tangar, Sulhani. The altitude varied from 650 to 850 meter above mean sea level. Total geographical area of the panchayat is 480 ha and the treatable area is 280 ha while the irrigated area in the panchayat is nil. The total number of households in this watershed is 335. The total population is 1679 of which 751 are males and 901 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 329. Of the total 38 BPL families, 11 belong to SC category.

The dominant cropping pattern in the entire Panchayat is Maize in kharif and in rabi. Black gram and Gram are also grown but the acreage is very less. Ploughing is done only by tractor and there is no other mechanization. No plant protection measures are taken up. Marketing is not done as there is no marketable surplus and crop failures due to drought are frequent. Micro Watersheds In The Project Area Name of the Panchayat Village CodeKulhera Karah 01069300

Lahari Ghumara 01069000 Lahari tikkera 01079100 Mudhawin 01077900 Changar 01078200 Dagwar 01078600 Sunhani 01078300 Tangar 01078900 Sulhani 01078800

Executive Summary of the budget

Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 570000 Monitoring 1 57000Evaluation 1 57000 Preparatory Phase: Entry point activities 4 228000 Institution & capacity building 5 285000 Detailed project report (DPR) 1 57000 Watershed Works Phase: Watershed development works 56 3192000 Livelihood activities 9 513000 Production system & microenterprises 10 570000 Consolidation phase: 3 171000 Total 100 5700000

Page 599: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 2

Methodology A questionnaire was developed and supplied by the experts of CSKHPKV Palampur

according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 600: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 3

2. General Description of Project Area Kulhera micro watershed lies in Bijhari block of district Hamirpur situated between

76o 31’ 44.76” E- 31o 33’ 44.76” N. The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography. Boundaries, Location and Extent

The area bounded by Samtana, Lohdar, Kathiana, Karer, Balbihal Bijari, Kiarabagh

and Dabriana panchayats of the Bijari block. The total geographical area of the micro watershed is approximately 1571 hactares. There are 21 villages under 3 panchayats in the watershed. Physiographic Features

Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild

climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 601: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 4

Demographic Features of Kulehra Panchayat

The general demographic features of the KULHERA panchayat are given in Table 2. The micro watershed is spread over 9 villages. The total number of households in this watershed is 335. The total population is 1679 of which 751 are males and 901 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 329. There are 38 BPL families in the watershed out of which 11 are SC families. Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Karah 41 229 113 116 7 8 0 0 88 82 Lahri Ghumara

3 10 5 5 3 3 0 0 1 2

Lahri Tarkhana

23 94 46 48 46 48 0 0 30 32

Mundwin 3 13 5 8 5 8 0 0 4 4Changar 72 362 136 199 15 11 0 0 131 127Dagwar 128 658 302 356 81 94 0 0 236 250 Sunahni 15 68 29 39 0 0 0 0 23 24 Tangar 28 158 78 80 0 0 0 0 55 49 Sulhari 22 87 37 50 0 0 0 0 28 31 Total 335 1679 751 901 157 172 0 0 596 601Description of Poverty Programmes in Kulehra Panchayat Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Kulehra 38 11 0 326 1 481 2 Land use:

Kulehra Panchyat extends over an area of 480 ha. Out of total land in the watershed, cultivated land stood at 149 ha which is totally rain fed. The area under forests on the other hand was 100 ha. The area under horticulture is negligible in the watershed area.

Panchayat/Villages

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Karah 57 10 26 21 0 26 47 Lahri Ghumara 2 0 1 1 0 1 2 Lahri Tarkhana 2 0 1 1 0 1 2 Mundwin 36 24 8 4 0 8 12 Changar 110 7 28 75 0 28 103Dagwar 126 21 54 51 0 54 105 Sunahni 23 0 8 15 00 8 23 Tangar 46 4 14 28 0 14 42 Sulhari 78 34 9 35 0 9 44 Total 480 100 149 231 0 149 380Source: Revenue Department, District Hamirpur

Page 602: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 5

The major proportion (about 95 per cent) of total cropped area in Kulehra Panchayat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area. Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. Of the total households in the area, 77.13 per cent houses have the toilet facilities. There are sufficient educational facilities available in the area. In addition to these, there is one tailoring centers and 5 anganwari centers in the catchment area.

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Kulehra Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Table : Description of Education Facilities in Kulehra Panchayat Panchayat

Primary Middle High Sr. Secy

Tailoring Centre

Aganwari Centers

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Kulehra 2 0 0 1 1 5 0 1 1386 Source: Directorate of Economics and Statistics, Govt. of HP Existing area, production and productivity of different crops in Kulehra panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 131 2541.4 19.4 Mash 1.0 5.6 5.6 Wheat 133 2154.6 16.2 Toria 10 68 6.8 Gram 1.6 9.6 6 Vegetables 1.0 300 300

Source: On the basis of PRA done in the panchayat.

Sr. No. Block/Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2 1 Kulehra 371 1 481 1 1

Block/Panchayat *CHC *PHC *Dispensary *Sub Center *Private Clinic **Dispensary Kulehra 0 0 1 0 0 0

Page 603: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 6

Critical gaps worked out in major crops of Kulehra panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha)

10-15 t/ha 22.5 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha)

40-45 q/ha 18.4 q/ha P

*F= Full gap; P= Partial gap; N= No gap. CROP: Wheat Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time Mid October-Mid November

Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N

Page 604: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 7

Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

5. Seed treatment Bavistin 50WP @2.5 g/kg seed

Not done F

6. Organic manures (t/ha)

10 t/ha 20 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations

Not done F

11. Disease management

As per recommendations

Not done F

12. Average yield (q/ha)

25-30 q/ha 15.6 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time June end – 10 July June end – 10 July

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical

Weeding/hoeing

Being done

N

Page 605: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 8

Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

Chemical herbicides Pendimethalin 35 EC Not done F 9. Pest management:

Blister Beetle As per recommendation

Not done

F

10. Disease management

As per recommendation

Not done F

11. Average yield (q/ha)

8-10 q/ha 6.0 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time October-November October-November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 100 q/ha P

*F= Full gap; P= Partial gap; N= No gap.

Page 606: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 9

Crop: Cauliflower Farming Situation: Irrigated Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October

N

2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic Manure (t/ha)

25 t/ha 20 t/ha P

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation

Not done F

10. Disease management Late blight

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 70-80 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Ginger arming Situation: Rain fed Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

1. Sowing time September-October September-October

N

2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N

Page 607: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 10

Sr. No.

Items of package Recommended practice

Existing practice Gap in adoption (F/P/N)*

5. Seed treatment Bavistin 50WP @2.5 g/kg seed

Not done F

6. Organic Manure (t/ha)

25 t/ha 20 t/ha P

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation

Not done F

10. Disease management Late blight

As per recommendation

Not done

F

11. Average yield (q/ha)

100-150 q/ha 70-80 q/ha P

*F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended

practice Existing practice

Gap in adoption (F/P/N)*

1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5

g+Bavistin 50WP @1.0 g/kg seed

Not done F

6. Organic Manure (t/ha)

20 t/ha 20 t/ha N

7. Fertilizers (kg/ha): Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

Page 608: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 11

Sr. No. Items of package Recommended practice

Existing practice

Gap in adoption (F/P/N)*

8.

Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha)

200-225 q/ha 120-130 q/ha P

*F= Full gap; P= Partial gap; N= No gap.

Page 609: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 12

3. SWOT Analysis SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. Strengths

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds and

number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed by

about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and wheat yet

about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can be

used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully on

marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of

buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully. Good scope of poultry enterprise especially broiler as the population of small ruminants

(sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

Page 610: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 13

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming. Weaknesses

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV which

results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices. The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different stages of

crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass in

form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually operated

line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Page 611: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 14

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of artificial

insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low yielders. Although the maintenance and per unit milk production cost is lower in case of cattle yet

farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper clinical

diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and management of

livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits with

farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities

Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as life saving

irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment fodder

supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of vegetables

like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations. Diversification towards cash crops is also possible through the utilization of created irrigation

potential and rain water harvesting sites. The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and

upgraded for more productivity. The climatic conditions of area are congenial for the production of mushroom throughout the

year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available.

Page 612: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 15

The abundant availability of green fodder in kharif/rainy season can be utilized to address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV seed

through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units) for

value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace

Page 613: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 16

Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as public

level. Improper and non-judicious use of irrigation with respect to water use efficiency and crop

selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical inputs

and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating agricultural

enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like berseem,

sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and imbalanced

feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 614: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 17

4. Entry Point Activities

Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat. General Information: Agriculture Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat & Maize Satisfactory with production & yield on favorable conditions

Pulses Mash and Gram Growth satisfactory on favorable conditions Oil seed crops Sarson, Toria & Til Satisfactory with production & yield Vegetables - Wish to grow on facilitating sure Irrigation. Also

needs assure marketingHorticulture and MAPs

Amla, Harad, Bahera, Anar, Guava, Mango, papaya, kathal, Naspati, Neem & Citrus

Needs of improved varieties provided suitable for these locations.

Fodder Crops Chari and Bajra Good Yield Livestock Animals Per cent

Buffaloes 75 Local breeds 3-5 liter Milk yield during favorable conditions

Cows 15 Jerseys 8-10 liter Milk yield during favorable conditions. Problem of Infertility.

Local breeds 10 3-4 liter Milk yield during favorable conditions Ox - 15 pairs in Panchayat Goats 30 0.5- 1 liter Milk Yield Sheep 05 - Equines - 05 No. Poultry 01 Backyard with having 02 families

Water Harvesting Existing water bodies villages wise under Kulhera Panchayat:

Sr. No. Water bodies 1 Kuhl 1 2 Earthen tank (Talai) 4 3 Dam 1 4 Pacca tank 2 5 Poly tank 0 6 Tube well 3 7 Roof water 0 8 Lift irrigation 0 9 Any other (well) 20 Proposed water bodies villages wise under Kulehra Panchayat:Nil

Page 615: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 18

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking

water (months) 1. Karah IPH pipeline 10 2. Lahari Ghumara IPH pipeline 10 3. Lahari tikkera IPH pipeline 11 4. Mudhawin IPH pipeline 10 5. Changar IPH pipeline 9 6. Dagwar IPH pipeline 11 7. Sunhani IPH pipeline 10 8. Tangar IPH pipeline 10 9. Sulhani IPH pipeline 9-10 List of sites for proposed drinking water structures: Nil

Page 616: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 19

6. Soil Conservation

Villages Structure/ work

Activities to be undertaken

Check Dam 10m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Tangar 1 Tota Chau 90677 90677 Irrigation of 80 kanal area

Total 1 90677 90677 List of Check dam stone & wire crated (Spur) Village Structures Location No. Actual

Budget IWMP Budget

Convergence (MNREGA)

Karha, Lahri Ghumara & Lahri Tarkhana

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Bainja da phat 4 146640

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Well to Sunhani tak

10 146620

Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Dhaula cho to Sunhani brahmna

4 239068

Total 532328 428400 103928 Dagwar Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Bakshi Ram residence to Malkit singh

6 219960

Golu wala cho 10 366660 Harijan Basti 2 73320 Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Gujran di gaari 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Gaari wala cho 10 195500

Total 884764 882000 2764 Changar Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

Kuan se niche cho Pakka tak

2 73320

Check dam stone & wire crated (Spur) 10x1.25x2.5 m

Banku ram to birbal shop

4 239068

Ghali wali khadd

4 146640

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Matriana changar kwali ke Madhya wala nalah

4 78200

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Gabale Baas (Kuan cho)

4 58648

Changar-dagwar naala

4 58648

Chhinja da garu 5 73310

Page 617: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 20

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Total 918591 865200 53391 Sulhari

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dinanath land to Transformer sulhari

10 14662

Gahre de choi 3 43986 Dhoa da cho 3 43986 Check dam stone &

wire crated (Spur) 4mX1.25mX2.0m

Nalah/Rakha da cho

10 195500

Roshan lal land to Daljeet house

3 58650

Total 488742 369600 119142 Sunhani Check dam stone &

wire crated (Spur) 6mX1.25mX2.5m

School to Chhajju Dalip singh ke Maveshi khana tak

6 219960

Total 219960 193200 26760 Tangar

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Ballian, Roop lal to Roshan lal land

5 73310

Ropa tela 4 58648 Khoblu Cho to

Peer Mandir 2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Balua da cho to Uperla tanger da Kuan

4 78200

Gallue da cho 5 97750 Total 20 337232 262123 75109 Grand Total 3381617 3000523 381094 Village wise budget allocation under soil conservation Village Particulars Total

Cost IWMP Budget

Convergence (MNREGA)

Karha, Lahri Ghumara & Lahri Tarkhana

Check dam stone & wire crated (Spur

532328 428400 103928

Total 532328 428400 103928 Dagwar Check dam stone &

wire crated (Spur 884764 882000 2764

Total 884764 882000 2764 Changar Check dam stone &

wire crated (Spur 918591 865200 53391

Total 918591 865200 53391 Sulhari

Check dam stone & wire crated (Spur

488742 369600 119142

Total 488742 369600 119142 Sunhani Check dam stone &

wire crated (Spur 219960 193200 26760

Total 219960 193200 26760 Tangar

Check dam stone & wire crated (Spur

337232 262123 75109

Check Dam 10m(2m+1m)/ 2mx2m

90677 90677

Total 427909 352800 75109 Grand Total 3472294 3091200 381094

Page 618: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 21

7. Agriculture

Institutional and capacity building:

Proposed Interventions to Increase Production system Agriculture: Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Karah Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

- -

Total 40000 40000 - - - Lahri ghumara and Lahari

Provision of improved inputs (viz., seeds, fertilizers, pesticides and

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard

poultry One day Training to the farmers with regard to management of poultry farm

1(25 farmers)

1 14450 14450

Mushroom Cultivation/Bee keeping/Micro enterprise Mushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 285000

Page 619: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 22

Tarkhana and Mindwin

tools ) for demonstration in cereals, pulses and oilseeds

Total 20000 20000 Changar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Dagwar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Sunhani Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - - -

Total 0.5 ha 20000 20000 - - - - Tangar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Total 1 ha 40000 40000 - - - - Suhlari Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 Grand total

352500 285000 67500

Page 620: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 23

8. Horticulture Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Karah Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Lahri ghumara and Lahari Tarkhana and Mindwin

Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Changar Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Dagwar Diversification towards

drought/frost tolerant fruit plants

1.0 ha 40000 - 20000 20000 - -

Total 1.0 ha 40000 - 20000 20000 - - Suhlari Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

120000 20000 100000

Page 621: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 24

9. Animal Husbandry Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Kulehra Control of endo and ecto parasites

100 animals

7400 - 7400

Total 7400 - 7400 Lahri ghumara and Lahari Tarkhana and Mindwin

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

4 8000 - 8000

Total 8000 - 8000 Changar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Control of endo and ecto parasites

80 animals

6000 6000

Total 26000 - 16000 10000 Dagwar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 10000 10000

Control of endo and ecto parasites

50animals 3700 3700

Total 23700 10000 13700 Sunhani Control of endo and

ecto parasites 100 animals

7400 - 7400

Total 7400 - 7400 Tangar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

60 animals

4500 - 4500

Total 14500 - 14500 Suhlari Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 5 10000 - 10000 Grand Total

97000 10000 77000 10000

Page 622: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 25

Total Budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 352500 2. Horticulture 120000 3. Animal husbandry 97000 4. Grand Total 569500 Expected outcome Agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Maize 131 19.4 150 25.0 2. Mash 1.0 5.6 10 8.0 3. Wheat 133 16.2 150 18.0 4. Toria 10 6.8 50 8.0 5. Gram 1.6 6 5 7.0 6. Vegetables 1.0 300 4 400 *additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops in Kulehra Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Harad - - 1 10 2. Aonla - - 1 8

Page 623: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 26

10.  Pisciculture 

No activity has been proposed in the panchayat due to lack of interest, however the

fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas. Use And Requirement Of Farm Machinery Sr. No. Particulars Existing Requirement 1 Maize Shellar 14 14 2 Wheat Thresher 08 - 3 Tractor - - 4 Iron plough 15 - 5 Weeder - 356 Sprey Pump 10 207 Chaf Cutter 10 per cent 60 8 Collection centre - 01 9 Cooperative societies 01 01 10 Bank - 01 11 Milk Centre - 01 Schemes: Know how Sr. No. Particulars Know how Remarks 1 Agricultural schemes Few People wish to be benefited more

and more 2 Horticultural Very few Demand of nursery of new and

improved horticulture Crops suitable for their area

3 Livestock (Doodh –Ganga) Few Maximum people have no knowledge of Doodh ganga-Pariyojna

4 Mid Himalaya - - 5 Others - -

Page 624: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 27

11. Convergence

Watershed management is a single window, integrated area development program me.

Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency

2 National Organic Farming Project

Distribution of earth worms and vermin-compost unit

3 Horticulture Technology Mission

4 Pt. Deen Dayal Upadhyay Kisan Bagwan Samridhi Yojna

Polyhouses, Micro irrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industries

Page 625: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 28

10. Livelihood Proposed Interventions to Increase Livelihood Activities: Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Karah Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit 3mx1m( Low cost)

4 no. 20000 20000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - - Total 60500 20000 - 40500 - - Lahri ghumara and Lahari Tarkhana and Mindwin

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total - 45000 25000 - - 20000 - Changar Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

10 no. 50000 25000 25000 - - -

Backyard poultry 200 chicks 30500 - - 30500 - - Total 110500 25000 25000 30500 20000 Dagwar Income generation I no.

(Tailoring Unit)

144000 - 144000 - - -

Total 144000 - 144000 - - Sunhani VermicultureUnit

3mx1m( Low cost) 4 no. 20000 20000 - - - -

Total 20000 20000 - - - - Tangar Bee-keeping 1 no.(10Boxes

per unit) 20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 45000 25000 - - 20000 - Sulahari Mushroom

Cultivation 1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 215 chicks 32820 - - 32820 - Total 87820

25000 - 42820 20000 -

Grand Total

512820 140000 169000 113820 80000 -

Page 626: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 29

11. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database, which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project.

• Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products

Increased household incomes of landless and marginal farmers etc

Page 627: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 30

12. Capacity Building For effective implementation of the watershed activites, capacity building and skill developemnt at watershed level are one of the important components. The activiteies proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Project Implementation Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertintent because it is the peoples pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups ctc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

Page 628: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 31

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalized so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 629: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 32

13. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawl phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phaseII (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the new agenda items

during post project period. • Sustainable management of developed natural resources regarding farm production system

and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management Society or the

Watershed Committee is made responsible to generate revenue, manage the resources and lookafter repair and maintenance of the structures raised during implementation phase Implementation of Farm Production System / off- farm livelihoods:

• Up scaling of successful experiences related to above aspects through revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price Post –withdrawal project management related aspects:

• Participatory planning, implementation and marketing of activities to be carried out during consolidation phase

• Terminal evolution of project as per the expected and aims

Page 630: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 33

Annexures

Page 631: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Kulehra Page 34

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050Total 77550

Page 632: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Sohari  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Sohari)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 633: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Sohari  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 4

3. SWOT Analysis 10

4. Entry Point Activities 15

5. Drinking Water 17

6. Soil Conservation 18

7. Agriculture 21

8. Horticulture 23

9. Animal Husbandry 24

10. Pisciculture 26

11. Convergence 27

12. Livelihood 28

13. Monitoring System 29

14. Capacity Building 30

15. Project Withdrawal and Consolidation 32

16. Annexures 33  

 

 

 

 

 

 

Page 634: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Sohari  

 

PROJECT AT A GLANCE

Name of the Project : IWMP Block : Bijhari District : Hamirpur Agro- climatic zone : I (sub-humid sub-tropical zone) Name of the Panchayat : Sohari PIA : BDO, Bijhari Location : 76o 30’58.32’’E and 31o 32’58.32’’N Total geographical area : 366 ha Treatable area : 333 ha Irrigated area : nil Total No. of families : 418 BPL families : 38 Marginal farmers : 380 Small farmers : 70 Others : 86 Total Population : 1947 Male : 876 Female : 1071 Sex ratio : 1.2 Schedule Caste Male Female

: 482 232 250

Literacy Male: Female:

: : :

922 443 479

 

 

Page 635: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 1

1. Introduction Boundaries, Location and Extent

The area bounded by Samtana, Lohdar, Kathiana, Karer, Balbihal Bijari, Kiarabagh and Dabriana panchayats of the Bijari block. The total geographical area of the micro watershed is approximately 366 hactares. Physiographic Features Low hill ranges, intermingled with rivulets and streams, characterize the area. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent. Seasons and Climate

The watershed falls in the sub-humid sub-tropical zone having a relatively mild climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

The dominant cropping pattern in the entire Panchayat is Maize in kharif and in rabi. Blackgram and Gram are also grown but the acreage is very less. Ploughing is done only by tractor and there is no other mechanization. No plant protection measures are taken up. Marketing is not done as there is no marketable surplus and crop failures due to drought are frequent. The objectives of the watershed development project will be:

o Conservation, development and sustainable management of natural resources.

o Enhancement of agricultural productivity and production in a sustainable manner.

o Restoration of ecological balance in the degraded and fragile rain fed eco-system through the introduction of multipurpose trees, shrubs and grasses.

o More production from the rain fed areas. O Creation of sustained employment opportunities for the rural population

Page 636: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 2

Name of the Panchayat Village Code

Sohari Ghulera 01078000 Barala 01078500

Dughiyar 01078100 Suhari 01078700

Magnuti 01079200 Executive Summary of the budget:

Budget Component Percent of Budget Amount (Rs.) Administrative Cost 10 499500 Monitoring 1 49950 Evaluation 1 49950 Preparatory Phase:

Entry point activities 4 199800 Institution & capacity building 5 249750 Detailed project report (DPR) 1 49950 Watershed Works Phase: Watershed development works 56 2797200 Livelihood activities 9 449550 Production system & microenterprises 10 499500 Consolidation phase: 3 149850 Total 100 4995000 Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area. The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Page 637: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 3

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and

streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the

terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled. Table: Existing area, production and productivity of different crops in Sohari panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 126.9 2334.9 18.4 Paddy 1.2 18 15Mash 2.0 12.0 6.0 Wheat 130.0 2028 15.6 Toria 45.0 315 7.0 Gram 0.5 3 6 Vegetables 3.0 1000 333.3 Source: On the basis of PRA done in the panchyat.

Page 638: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 4

2. General Description of Project Area Demographic Features of Sohari Watershed

The watershed is spread over 5 villages. The total number of households in this

watershed is 418. The total population is 1947 of which 876 are males and 1071 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 482. Of the total 38 BPL families, 16 belong to SC category. Panchayats HH Total

Population Male female Male

SC FemaleSC

MaleST

Female ST

Literate male

Literate female

Sohari 158 765 367 398 157 168 0 0 50 34 Magnoti 69 315 141 174 1 2 0 0 120 109 Ghulera 76 362 162 200 37 38 0 0 121 145 Barla 50 230 96 134 34 37 0 0 78 82 Dugyar 65 275 110 165 3 5 0 0 74 109 Total 418 1947 876 1071 232 250 0 0 443 479 Description of Poverty Programmes in Sohari Panchat Panchayat BPL

families BPL SC families

BPL ST families

Population under poverty alleviation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless families

Sohari 38 16 0 341 2 506 3 Land use:

Sohari Panchyat extends over an area of 692 ha. Out of total land in the watershed, cultivated land stood at 139 ha which is totally rain fed. The culturable wasteland accounted for 29.19 per cent of the total area in the watershed. The area under forests on the other hand was 8.74 per cent. The area under horticulture is negligible in the watershed area. Land use pattern Villages / Panchayat

Total Area

Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Sohari 78 3 19 56 0 19 74 Magnoti 100 5 31 64 0 31 95 Ghulera 50 0 44 6 0 44 50 Barla 68 14 27 27 0 27 54 Dugyar 70 10 18 41 0 18 60 Sohari Panchayat 366 32 139 194 0 139 333 Source: Census, 2001

Page 639: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 5

The major proportion of total cropped area in Sohari Panchyat is under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy and pulses declined continuously. The cropping intensity in the watershed area was estimated to be 195 per cent. Maize, paddy and mash are the crops grown during kharif season whereas Toria, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area. Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motor able road connects all the panchayats. Of the total households in the area, 89.90 per cent houses have the toilet facilities. There are sufficient educational facilities available in the area. In addition to these, there is one tailoring center and 5 anganwari centers in the catchment area. Basic Amenities in Sohari Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Sohari Panchayat Panchayat

Primary Middle

High

Sr. Secy

Tailoring Centre

Anganwari Centres

Out Of School Children (6-14 Years)

No. Of Schools Without Water & Toilet Facilities

Total Literate in the village

Sohari 2 0 1 0 1 5 0 0 2236 Source: Directorate of Economics and Statistics, Govt. of HP

Sr. No. Panchayat

No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2

1 Sohari 472 1 525 1 1

Block/Panchayat *CHC *PHC *Dispensary *Sub

Center *Private Clinic

**Dispensary

Sohari 0 1 0 0 0 0

Page 640: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 6

Critical gaps worked out in major crops of Sohari panchayat On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Paddy: Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time

(Nursery) May end- Mid June May end- Mid June N

2. Transplanting time Mid June to End of June Mid June to End of June N 3. Spacing 20 X 15 cm Not done F 4. No. of seedlings/hill 2-3 4-5 P 5. Varieties HYVs’ Local F 6. Seed rate/ha 25-30 kg/ha 40 kg/ha P 7. Seed treatment Bavistin 50WP @2.5

g/kg seed Not done F

6. Organic manures (t/ha) 10 t/ha 15 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

45:40:40 45

- 20

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

Broadcasting Broadcasting

Broadcasting Broadcasting

N N

9. Weed management: Mechanical Chemical herbicides

Puddling Butachlor 35EC

Being done Being done

N N

10. Pest management: As per recommendations Not done

F

11. Disease management

As per recommendations Not done

F

12. Average yield (q/ha) 30-35 q/ha 15.0 q/ha P

Page 641: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 7

Crop: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Mash Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use:

Page 642: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 8

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

Basal (NPK) In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F

Page 643: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 9

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

10. Disease management Late blight

As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Colocasia Farming Situation: Rain fed Sr. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 644: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 10

3. SWOT Analysis

SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. STRENGTHS

Climatic conditions of the district are relatively moderate which offer good scope of rearing wide range of livestock and poultry species.

About 35 per cent of the total geographical area is under pastures/grass lands/waste land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers Although broadcasting is the major method of seed sowing in case of maize and

wheat yet about 30 per cent farmers use kera (broadcasting method). Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which

can be used for the production of variety of value added products. The medicinal plants such as harad, bahera and amla can also be grown successfully

on marginal and sub-marginal lands. Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent

of buffaloes are of improved breeds. The climatic conditions are suitable for rearing of cows and buffaloes successfully.

Page 645: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 11

Good scope of poultry enterprise especially broiler as the population of small ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement.

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

WEAKNESSES

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The sloppy landscape causes quick run-off of rain water due to which ground water

recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Farmers use higher seed rate as compared to the recommendation of the CSK HPKV

which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

The average size of land holding is small (0.6 ha) and scattered. The area is rain fed and erratic rainfall leading to moisture stress during different

stages of crop growth in summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements. Non-availability of basic farm equipments and tools like spray pumps and manually

operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

Page 646: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 12

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits. Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle

yet farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities

Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Diversification is possible in the Kharif season (rainy season) with introduction of

vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

Page 647: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 13

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. New schemes like promotion of export of high value crops and multiplication of HYV

seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace

Page 648: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 14

Issues Emerging out of SWOT Analysis Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 649: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 15

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat. Watershed Development Activities: Existing water bodies villages wise under Sohari Panchayat: Sr. No. Water bodies Sohari Barla Dugyar Ghulera Magnoti 1 Earthen tank - 1 1 - - 2 Any other (well) - 5 2 10 4 Proposed water bodies villages wise under Sohari Panchayat: Water bodies Sohari Barla Dugyar Ghulera Magnoti Total

No. Unit cost

Total cost

Pacca Tank 5mx4mx1m

- - - - 1 01 103774 103774

RWHT(2mx2mx1m)

1 1 1 - 1 04

26909 107636

Well Open Sink type of 2.4 m dia and 3 m deep

- 2 1 1 1 05

18676 93380

Bore well 200mmx150mmat 70m depth

- - - - 2 2 295301 354361+ farmer 40%) share i.e.236241 =590602

Total 659151 + farmer share 236241

List of sites for proposed water structures and expected outcomes in Sohari Panchayat: Water structures Village Location Total

Cost/village IWMP Budget

Convergence Expected outcomes

Pacca Tank 5mx4mx1m

Magnoti On the land of Sh Ram Chand

103774 103774 - For irrigation of 30 kanal area

RWHT(2mx2mx1m) Barla On the land of Sh ram lok

26909 26909 - For irrigation of 3 kanal area

Dugyar On the land of Sh Jagat Ram

26909 26909 - For irrigation

Page 650: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 16

Water structures Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes of 2.5 kanal area

Magnoti On the land of Sh Amar Nath

26909 26909 - For irrigation of 3 kanal area

Sohari On the land of Sh prem Singh ( Pandiri)

26909 26909 - For irrigation of 20 kanal area

Well Open Sink type of 2.4 m dia. and 3 m deep

Barla 1. On the land of Sh Hans raj ( Lohar basti)

18676 18676 For irrigation of 20 kanal area and drinking water for10 families

2. On the land of Sh Babu Ram near babri

18676 18676 For irrigation of 10 kanal area and drinking water for 6 families

Dugyar On the land of Sh SitaRam

18676 18676 For irrigation of 10 kanal area and drinking water for 5 families

Ghulera On the land of Sh Ram lok Khasara no 660

18676 18676 For irrigation of 5 kanal area and drinking water for 8 families

Magnoti On the land of Sh Lekh Ram

18676 18676 For irrigation of 8 kanal area and drinking water for 7 families

Bore well 200mmx150mmat 70m depth

Magnoti 1. On the land of Sh Ajit Ram

295301 295301 For irrigation of 40 kanal area

2.On the land of Sh Mehar Singh

295300 295300 Irrigation of 70 kanal area

Page 651: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 17

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking

water Availability of drinking

water (months)* 1. Ghulera IPH pipeline 8-10 2. Barla IPH pipeline 9-10 3. Dugyar IPH pipeline 9-10 4. Suhari IPH pipeline 8-10 5. Mangnoti IPH pipeline 9-10

Proposed Drinking Water Structures: Sr. No.

Structure Sohari Barla Dugyar Ghulera Magnoti Total Cost

1 Babri ( 3 No.) ( 2mx1.2mx0.9m)

- 2 1 - - 03 No.@ 19353= 58059

List of sites for proposed drinking water structures ( Babri): Village Location Numbers Size (m) Remarks Dugyar Under the Peepal tree 01 1.2m x1.2m x

0.9m For Drinking water for 65 families

Barla Near Samshan Ghat 01 1.2m x1.2mx 0.9m

For Drinking water for 50 families In the Land of Jhidu and

Banta Ram Khasra No. 01

Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 8-10 11-12

Page 652: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 18

6. Soil Conservation Watershed Activities to be undertaken Village wise

Villages Structure/work Activities to be undertaken Check Dam

8mx(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 Khasra no 683 72283 72283 0 Irrigation of 150 kanal area

Total 1 - 72283 72283 0

Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Suhari 1 On the land of Sh Bhagat Ram and Prem singh( Khasra no 607)

54216 54216 0 Irrigation of 50 kanal area

Magnoti 1 On the land of Sh Bhagi Rath

54216 54216 0 Irrigation of 100 kanal area

1 On the land of Smt Bagwanti devi and Annat Ram

54216 54216 0 Irrigation of 50 kanal area

Total 3 162648 162648 0

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Duggyar Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Parun to primary school

10 97750

primary school to Ghori da nala( harijan basti)

5 48875

Chhor to bred ki or 10 97750 Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Guggu nala to danger tak

15 219930

Total 464305 439062 25243 Barla Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Bag wala cho 8 78200 -

Baien wala cho 8 78200 - Garane wale pange

babri tak 8 78200 -

Baroti wala nala 8 78200 - Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Pange se bain nala tak

8 117296 -

Total 430096 350633 79463 Sohari Check dam stone &

wire crated (Spur) Kiliwal cho to Kachwin

8 117296 -

Page 653: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 19

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

3mX1.25mX2.0m Thau te shiv mandir 8 117296 - Harijan basti to

kachwin 10 146620

Tetar to Lahdi ki aur 6 87972 - Gaurav keg hare to

Tangar side 10 146620 -

Total 615804 468192 147612 Magnoti Check dam stone &

wire crated (Spur) 2mX1.25mX2.0m

Pandiri se jamun ke ped tak

5 48875 - -

Boru wala cho- jamun-mandir tak

5 48875 - -

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Gare wali khadi palehra ke pass se bori tak

8 117296 - -

Naya kuan magnoti se bhaged se kiara tak

5 73310 - -

Check dam stone & wire crated (Spur) 6mX1.25mX2.5m

Daguyar se Brahman bhaged se kuan tak

5 183300 - -

Total 471656 289623 182033 Ghulera Fencing Khasra no. 679-82-

83,63-65 Jondu Ram ,Banta Ram ,Lekh Ram ,Jeet Ram, Pritam Chand and Others

1500m 451320 401324 49996

Total 451320 401324 49996 Grand Total

2433181 1948834 484347

Village Wise Budget Allocation Under Soil Conservation Village Particulars Total

Cost IWMP Budget

Convergence(MNREGA)

Duggyar Pacca tank 5mx4mx1m 26909 26909 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Babri 19353 19353 - Check dam stone & wire

crated (Spur 464305 439062 25243

Total 529243 504000 25243 Barla Well Open

Sink type of 2.4 m dia. and 3 m deep

37352 37352 -

RWHT(2mx2mx1m) 26909 26909 - Babri ( 2mx1.2mx0.9m) 38706 38706 Check dam stone & wire

crated (Spur 430096 350633 79463

Total 533063 453600 79463

Page 654: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 20

Village Particulars Total Cost

IWMP Budget

Convergence(MNREGA)

Sohari RWHT(2mx2mx1m) 26909 26909 - Check Dam 8mx(2m+1m)/

2mx2m and No. 72283 72283 -

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216 -

Check dam stone & wire crated (Spur

615804 468192 147612

Total 769212 621600 147612 Magnoti Pacca tank

5mx4mx1m 26909 26909 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Bore well 200mmx150mmat 70m depth

354360 354360

Check Dam 6m(2m+1m)/ 2mx2m and No.

108432 108432 -

Check dam stone & wire crated (Spur

471656 289623 182033

Total 980033 798000 182033 Ghulera Well Open

Sink type of 2.4 m dia and 3 m deep

18676 18676 -

Fencing 451320 401324 49996 Total 469996 420000 49996 Grand Total 3281547 2797200 484347

Page 655: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 21

7. Agriculture  Institutional and capacity building:

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Sohari Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Magnoti Provision of improved

inputs (viz., seeds, fertilizers, pesticides

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Intervention Strategy /Issues Activity Programme cost Unit Size No. of

Units Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

1 43450 43450

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Backyard poultry One day Training to

the farmers with regard to management of poultry farm

1(25 farmers)

2 14450 28900

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Total 249750

Page 656: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 22

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

and tools ) for demonstration in cereals, pulses and oilseeds Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Ghulera Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Barla Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Dugyar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Grand Total

312500 20000 112500 - - -

Page 657: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 23

8. Horticulture Village Intervention Area/no. Cost

involved (Rs) I II III IV V

Sohari Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Magnoti Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Ghulera Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Barla Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Dugyar Diversification towards

drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Grand Total

2.5 ha 100000 - - 100000 - -

Page 658: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 24

9. Animal Husbandry

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Sohari Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Magnoti Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Ghulera Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Barla Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Dugyar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

100 animals

7400 - 7400

Total 17400 - 17400 Grand Total

87000 87000

Page 659: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 25

Total Budget under production system and micro enterprises S. No. Activity Total budget 1. Agriculture 312500 2. Horticulture 100000 3. Animal husbandry 87000 Grand Total 499500 Expected outcomes from agricultural crops in sohari Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 126.9 18.4 200 25.0 2. Paddy 1.2 15 10 18.0 3. Mash 2.0 6.0 5 8.0 4. Wheat 130.0 15.6 210 18.0 5. Toria 45.0 7.0 100 8.0 6. Gram 0.5 6 10 7.0 7. Vegetables 3.0 333.3 10 400

*additional area (cultivable wasteland) will be brought under cultivation Expected outcomes from Horticultural crops in Sohari Panchyat Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Harad - - 1 10 2. Aonla - - 1 8 3. Mango - - 1 80.00 4. Citrus - - 1 150.00

Page 660: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 26

10. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the

fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 661: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 27

11. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed programme like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programmes for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project: Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various schemes in consultation with the implementation department/ agency 2 National Organic Farming Project Distribution of earth

worms and vermicompost unit

3 Horticulture Technology Mission 4 Pt. Deen Dayal Upadhyay Kisan

Bagwan Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nurseries: Distribution of silk worm, disinfection of private rearing houses, technical assistance and guidance and marketing of cocoons

Department of industries

Page 662: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 28

12. Livelihood

Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Sohari Mushroom Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 - Total 85500 25000 - 40500 20000 - Magnoti Income generation I no.

(Tailoring Unit)

144000 144000

Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 199000

25000 144000 10000 20000 -

Ghulera Mushroom Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Barla Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Dugyar Mushroom

Cultivation 1 (50 bags) 10000 10000

Bee-keeping 1 no.(10Boxesper unit)

20000 - - - 20000 -

VermicultureUnit 3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 55000 25000 - 10000 20000 - Grand Total

449500 125000 144000 80500 100000

Page 663: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 29

13. Monitoring System

A Web-based GIS System should be developed for monitoring and evaluating the project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database, which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.

Evaluation During the works phase, any progress in the treatment areas should be reported by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind whil evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products Increased household incomes of landless and marginal farmers etc

Page 664: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 30

14. Capacity Building For effective implementation of the watershed activities, capacity building and skill development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programmer Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat

Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

PIAs, WDTs members 10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups ctc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 years II Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR

Page 665: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 31

During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalisd so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieing sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 666: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 32

15. Project Withdrawal and Consolidation

The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works

o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects:

• Participatory planning, implementation and marketing of activities to be carried out during consolidation phase

• Terminal evolution of project as per the expected and aims

Page 667: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 33

Annexures

Page 668: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Sohari Page 34

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organizer and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450Cost Estimate for awareness camp Sr. No. Particular Cost (Rs) 1. Working lunch @ 25/participant 1750 2. Literature & stationary @ 25/participant 2500 3. Honorarium for technical lectures @ Rs. 250/ per lecture for 5

lectures 1250

4. POL 2000 5. Inputs @ 25/participant 3500 6. TA/DA for resource personnel & other staff 1000

Total 12000 Cost Estimate for Training programme on Tailoring / soft toy making /mango processing for ten days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

65000

2. Literature / stationary @ 100/participant for 25 participants 2500 3. Material @ Rs 150 for 25 participants 3750 4. Honorarium @ Rs. 250/ per lecture for 20 lectures 5000 5. TA for participants @ 300 to and fro 75006. Organizer and Secretarial assistance 15007. Misc. Expenses 1000 8. Institutional charges 10 % 8625 Total 94875 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 15007. Misc. Expenses 10008. Institutional charges @ 10 % 7050

Total 77550

Page 669: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Usnar Kalan  

Detailed Project Report Department of Rural Development

Government of Himachal Pradesh under

Integrated Watershed Management Programme for

IWMP Hamirpur-II: Bijhari (Usnar Kalan)

Prepared by:

CSK Himachal Pradesh Krishi Vishvavidyalaya Palampur-176 062 (Himachal Pradesh)

Page 670: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Usnar Kalan  

Contents S.

No. Particulars Page No.

1. Introduction 1

2. General Description of Project Area 5

3. SWOT Analysis 11

4. Entry Point Activities 18

5. Drinking Water 21

6. Soil Conservation 23

7. Agriculture 28

8. Horticulture 31

9. Animal Husbandry 32

10. Pisciculture 34

11. Convergence 35

12. Livelihood Concerns 36

13. Monitoring System 38

14. Capacity Building 39

15. Project Withdrawal and Consolidation 41

16. Annexures 42  

 

 

 

 

 

 

Page 671: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP‐Hamirpur‐II Panchyat Usnar Kalan  

 

PROJECT AT A GLANCE

Name of the Project : IWMP

Block : Bijhari

District : Hamirpur

Agro- climatic zone : I (sub-humid sub-tropical zone)

Name of the Panchayat : Usnarkalan

PIA : BDO, Bijhar

Location : 76o 29’ 22.56” E - 31o 29’ 22.56” N

Total geographical area : 514 ha

Treatable area : 496ha

Irrigated area : nil

Total No. of families : 319

BPL families : 63

Total Population : 1762

Male : 840

Female : 922

Sex ratio : 1.09

Schedule Caste

Male

Female

: 265

133

132

Literacy

Male:

Female:

:

:

:

1216

615

601

 

Page 672: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 1

1. Introduction Usnar kalan Micro watershed lies in Bijhari block of district Hamirpur situated

between 76o 29’ 22.56” E - 31o 29’ 22.56” N . The elevation of the block varies from 650– 850 metres above mean sea level. The area falls in the middle Shivalik ranges having a fragile ecosystem. Agro-climatically the area falls in the sub-montane low hill zone (Zone-I) of Himachal Pradesh having an undulating topography.

Boundaries, Location and Extent The area bounded by Hamirpur-Una road in north, Barsar Panchayat in north- west,

Solaha Sighi dhar in west, Bilaspur district in south and Bhalath area of tehsil Barsar in east. The total geographical area of the watershed is approximately 1369hactares. There are 18 villages under 4 panchayats in the watershed.

Physiographic Features

The area is characterised by low hill ranges, intermingled with rivulets and streams. Cultivation is on terraces across the slopes. The width of terrace varies from 5 to 20 meters. Due to steep slopes in the watershed, area results in enormous runoff during severe rains, which causes soil erosion and land sliding in the area. Crops experience long dry spell during winters and consequently the crop yields affected adversely. The magnitude of the slope is very high, varies between 10-80 per cent.

Seasons and Climate The watershed falls in the sub-humid sub-tropical zone having a relatively mild

climate during the year. The winter season lengthens from November to February, spring from March to April, and summer from May to June and the rainy season extends from July to September. The autumn extends from October to November. May and June are the hottest months of the year when the mercury level usually rises to more than 30o C and December and January are coldest months where the nights experience a temperature of around 8-10o

C. In the months of December/January, there is occurrence of severe frosts which cause injuries to a number of field as well as fruit crops e.g. mango, papaya, etc. In general, the minimum temperature in the winters goes to 4o C and rises to the maximum limit of 34o C in summer. Except these months of the year, the general, climate in the district is mild as it receives a good quantum of monsoon rains, which support the population in the forests, pastures and inhabited areas with lush green grasses and vegetation.

Page 673: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 2

Rainfall District Hamirpur receives sufficient annual rainfall. There are two seasons of rainfall

during the year, one from December to March, associated with the passage of western disturbances and the other, which is the main one, extending from middle of June to middle of September, caused by the southwest monsoon. The trend of number of rainy days and the total annual rainfall received in the district has been presented in Table 1. It can be observed from the table that the pattern of rainfall over the period has been erratic. Highest total rainfall of 2,144 mm was received during 1990-91 and lowest of 775 mm during 2010. The total number of highest rainy days in a year was 110 during 1992-93 followed by 107 during 1994-95. Despite good number of rainy days and total annual rainfall, usually Rabi crops and Kharif crops in some cases face the moisture stress conditions at the critical growth periods, which reduce the yield levels to greater extent. This is mainly due to the uneven distribution to rainfall during the years. Out of the total rainfall 70 percent receive in the month of July -August and September only.

Soils Physiographic ally, the district can be divided into two tracts i.e rainfed hilly tract and

rainfed and irrigated valley tract. The majority of the soils of rainfed hilly tract fall under the antisol and the inception orders. The soils of this tract are shallow and moderately deep with incipient profile development. The texture varies from loamy sand to sandy loam having stony surface. Soils are neutral in reaction (6.5-7.0), available N & P are low and K is medium. Soils have low water holding capacity and susceptible to soil erosion.

Usnarkalan panchayat is located in Bijhari Block of Hamirpur district. The panchayat consists of nine revenue villages viz.. The altitude varied from 650 to 850 meter above mean sea level. Total geographical area of the panchayat is 514 ha and the treatable area is 496 The Usnar panchayats covering 9 villages. The total number of households in this watershed is 319. The total population is 1762, of which 840 are males and 922 are females. The total scheduled caste (SC) population is 265.

The dominant cropping pattern in the entire Panchayat is Maize in kharif and wheat in rabi. Black gram and Gram are also grown but the acreage is very less. Ploughing is done only by tractor and there is no other mechanization. No plant protection measures are taken up. Marketing is not done as there is no marketable surplus and crop failures due to drought are frequent.

The objectives of the watershed development project will be:

o Conservation, development and sustainable management of natural resources. o Enhancement of agricultural productivity and production in a sustainable

manner. o Restoration of ecological balance in the degraded and fragile rain fed eco-

system Through the introduction of multipurpose trees, shrubs and grasses.

o More production from the rainfed areas. O Creation of sustained employment opportunities for the rural population

Page 674: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 3

Micro Watersheds in the Project Area Name of the Panchayat Village Code Usnar Kalan Jajal 01061600 Narkar 01062700 GataPanga 01062300 Usnar Khurd 01062500 Usnar Kalan 01062600 Chukhiniar 01066000 Gurya Khurd 01066100 Gurya Kalan 01062200 Nara 01062400

Executive Summary of the budget:

Budget Component Percent of Budget Amount (lacs) Administrative Cost 10 744000 Monitoring 1 74400 Evaluation 1 74400 Preparatory Phase: Entry point activities 4 297600 Institution & capacity building 5 372000 Detailed project report (DPR) 1 74400 Watershed Works Phase: Watershed development works 56 4166400 Livelihood activities 9 669600 Production system & microenterprises 10 744000 Consolidation phase: 3 223200 Total 100 7440000

Methodology

A questionnaire was developed and supplied by the experts of CSKHPKV Palampur according to the guidelines provided by Department of Rural development, in consultation with stake holders and line departments for collecting primary and secondary data. By using different PRA tools and discussions, the probable interventions were listed. Participatory Rural Appraisal (PRA)

In order to understand the socio-economic aspects of watershed area, we conducted Participatory Rural Appraisal (PRA) exercise with the help of the villagers and gram panchayat representatives to obtain the required information about the watershed area.

Page 675: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 4

The secondary data were obtained from revenue department of the district. Data were collected on the following aspects. 1. Demographic features 2. Land holding 3. Water availability 4. Water source details within the panchayat 5. Community engagement 6. Livelihood 7. Awareness about Specific programme: Watershed 8. Desire to do more activities related to occupation 9. Productivity of farms 10. Fodder availability etc.

Secondary data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Block Development Officer, District Statistical Office, and District Rural development Agency etc. Transact walk:

The technical teams did the transect walk through various drainage courses and streams along with locals to analyze the problems and to suggest remedies. The team also proposed the structures and did the survey work with GPS required for the designing.

The collected data were analyzed and compiled panchayat wise. SWOT analysis for

the project area was done. Actual designing and estimation of budget for the natural resource management for the next five years were prepared. The rates for civil works were applied as directed by the Department of Agricultural Engineering, COAS, CSKHPKV Palampur. Standard estimates were prepared for other units and activities, taking in to consideration the local conditions.

The maps have been prepared using the GPS survey and ground truthing of the terrain. Different types of maps e.g. Land Use land cover maps, Drainage maps, Village boundaries, Assets maps for the proposed structures have been generated. This map depicts detailed features for the study area. These maps area interoperable on Google earth plug-in which are available at http://hillagric.ernet.in under WEB GIS section as (sample DPR). These maps on web portal will serve the purpose of ready reference and for monitoring after the implementation of the DPR in the later stages. GPS locations of various activities were taken, GIS based action plans were then prepared at Palampur. Budget estimates and drawings were finalized and the report compiled.

Page 676: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 5

2. General Description of Project Area The general demographic features of the Usnar Kalan Watershed are given in Table 2.

The watershed is spread over 9 villages. The total number of households in this watershed is 319. The total population is 1762 of which 840 are males and 922 are females. The average family size comes around five members per household. The total scheduled caste (SC) population is 265. The sex ratio stands at 1098 females for every 1000 males for watershed area. Villages No. of

House-Holds

Total Population

Male female Male SC

Female SC

Male ST

Female ST

Literate male

Literate female

Jajal 40 215 101 114 0 0 0 0 68 72 Narkar 31 187 80 107 0 0 0 0 54 64 Gata Panga 15 80 42 38 0 0 0 0 31 22 Usnad Khurd 29 157 67 90 0 0 0 0 54 56 Usnar Kalan 47 228 116 112 11 8 0 0 94 73 Chukhiniar 7 28 18 10 17 9 0 0 15 8 Guria (Kuryan) Khurd

3 26 13 13 0 0 0 0 11 7

Guria (Kuryan) Kalan

59 328 160 168 50 43 0 0 111 116

Nara 88 513 243 270 55 72 0 0 177 183 Total 319 1762 840 922 133 132 0 0 615 601 Source: Census, 2001 Description of Poverty Programmes in Usnar Panchayat Panchayats BPL

families BPL SC families

BPL ST families

Population under poverty allevation programme

Fair price shop

HH’s purchases food grain through PDS

Houses constructed for houseless hamilies

Usnar Kalan

63 16 0 345 1 460 2

Land use: Usnar Kalan Panchyat extends over an area of 514 ha. Out of total land in the

watershed, cultivated land stood at 146 ha which is totally rain fed. The area under forests on the other hand was 18 ha. The area under horticulture is negligible in the watershed area. Panchayat/Villages Total

Area Land under Forests

Total cultivated area

Area under Non Agril. Uses

Total Irrigated

Total Un-irrigated

Area proposed for treatment (ha)

Jajal 29 0 8 21 0 8 29 Narkar 45 0 13 32 0 13 45 Gata Panga 25 0 6 19 0 6 25 Usnad Khurd 28 0 15 13 0 15 28 Usnar Kalan 66 0 23 42 0 23 66 Chukhiniar 46 14 2 43 0 2 32 Guria (Kuryan) Khurd

28 4 8 20 0 8 24

Guria (Kuryan) Kalan

113 0 24 89 0 24 113

Nara 134 0 47 88 0 47 134 Total 514 18 146 367 0 146 496 Source: Revenue Department, District Hamirpur

Page 677: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 6

The major proportion (about 95 per cent) of total cropped area in Bijhari block is

under food grain only. Among the different crops, wheat occupied maximum share of total cropped area followed by maize. The percentage of area under paddy, barley and pulses declined continuously. The cropping intensity in the watershed area was estimated to be 184 per cent. Maize, paddy, mash, cowpea, sesamum are the crops grown during kharif season whereas Toria, sarson, wheat and gram are grown during Rabi season. Primarily, the maize-wheat system is predominant in the area. Some of the progressive farmers have taken up vegetable cultivation in the watershed area. Cultivation of mash and gram as pure crops are mostly on marginal lands. Area under fruit crop is negligible; however, scattered plantation of improved mango and citrus can be seen in the watershed area. Basic Amenities:

All the villages in the watershed area have basic facilities. As far as the provision of lighting and potable water is concerned, almost all the households in the catchment area had these basic facilities. The motorable road connects all the 15 panchayats. Of the total households in the area, 69.91 per cent houses have the toilet facilities. As regards the health facilities, there is one private clinics and one sub-centre available in the area. Resultantly, the infant mortality is very low in the area. There are sufficient educational facilities available in the area. There are two primary and 1middle schools. The literacy was quite high at 80 per cent in the watershed. In addition to these, there are 1 tailoring centers and 5 anganwari centers in the catchment area.

Source: Directorate of Economics and Statistics, Govt. of HP Description of Health Facilities in Usnar Panchayat

Source: Directorate of Economics and Statistics, Govt. of HP Description of Education Facilities in Usnar Micro Watershed Panchayat Primary Middle High Sr.

Secy Tailoring

Centre Aganwari Centre’s

Total Literate in the village

Usnar Kalan 2 1 0 0 1 5 1837 Source: Directorate of Economics and Statistics, Govt. of HP

Block/Panchayat No. of Houses With Toilets

Electricity HHS with Tap Water

Water Supply Scheme

Motor able Road

Yes-1; No.-2 Yes-1; No.-2 Yes-1; No.-2 Usnar Kalan 323 1 462 1 1

Sr. No. Block/Panchayat *CHC *PHC *Dispensary *Sub Center

*Private Clinic

**Dispensary

14 Usnar Kalan 0 0 0 1 1 0

Page 678: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 7

Existing area, production and productivity of different crops in Usnarkalan panchayat. Crops Area (ha) Production (q) Productivity (q/ha) Maize 128 2355 18.4 Mash 0.5 3 6 Wheat 131 2253 17.2 Toria 2 14 7 Gram 0.5 3 6 Vegetables 1 310 310 Source: On the basis of PRA done in the panchyat. Critical gaps worked out in major crops of Usnar kalan panchayat

On the basis of PRA exercise and survey in different watershed areas, production and technological gaps were worked in the major agricultural crops, which are as under Crop: Maize Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time May-June May-June N 2. Sowing method Line sowing Broadcast F 3. Varieties Hybrid/Composites Local (Mixture) F 4. Seed rate/ha 20 kg/ha 50 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10-15 t/ha 22.5 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

40:60:40 40+40=80

- 23

F P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Spot/Band application

- Spot application

F N

9. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Atrazine 50 WP

Being done Not done

N F

10. Pest management: Cutworms

Chlorpyriphos

Not done

F

11. Disease management

Seed treatment (Bavistin 50WP @2.5 g/kg seed)

Not done

F

12. Average yield (q/ha) 40-45 q/ha 18.4 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Wheat Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time Mid October-Mid

November Mid October-Mid November

N

2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local/availability F 4. Seed rate/ha 100 kg/ha 100 kg/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic manures (t/ha) 10 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Page 679: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 8

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

Basal (NPK) Top dress (N)

60:60:30 30+30=60

18:48:24 25

P P

8. Method of fertilizer use: Basal (NPK) Top dress (N)

In rows Broadcasting

Broadcasting Broadcasting

F N

9. Weed management: Chemical herbicides

Isoproturon 50WP 2,4-D 50 WP

Not done Not done

F F

10. Pest management: As per recommendations Not done F 11. Disease management As per recommendations Not done F 12. Average yield (q/ha) 25-30 q/ha 15.6 q/ha P Crop: Mash Farming Situation: Rainfed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June end – 10 July June end – 10 July N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ Local F 4. Seed rate/ha 20 kg/ha 25 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:40:20

Not done

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Blister Beetle

As per recommendation

Not done

F

10. Disease management As per recommendation Not done F 11. Average yield (q/ha) 8-10 q/ha 6.0 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Peas Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time October-November October-November N 2. Sowing method Line sowing Broadcast F 3. Varieties HYVs’ HYVs’ N 4. Seed rate/ha 75 kg/ha 100 kg/ha P 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Fertilizers (kg/ha): Basal (NPK)

20:60:30

18:48:24

F

7. Method of fertilizer use: Basal (NPK)

In rows

Not done

F

8. Weed management: Mechanical Chemical herbicides

Weeding/hoeing Pendimethalin 35 EC

Being done Not done

N F

9. Pest management: Leaf Miner

As per recommendation

Not done

F

10. Disease management Powdery mildew

As per recommendation

Not done

F

Page 680: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 9

Sl. No. Items of package Recommended practice Existing practice Gap in adoption (F/P/N)*

11. Average yield (q/ha) 100-150 q/ha 100 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Cauliflower Farming Situation: Irrigated Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap. Crop: Ginger Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time September-October September-October N 2. Sowing method Line sowing Line sowing N 3. Varieties Hybrids/HYVs’ Hybrids/HYVs’ N 4. Seed rate/ha 500-750 g/ha 500 g/ha N 5. Seed treatment Bavistin 50WP @2.5 g/kg

seed Not done F

6. Organic Manure (t/ha) 25 t/ha 20 t/ha P 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

70:100:55 70

40:60:30 30

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical Chemical herbicides

As per recommendation As per recommendation

Being done Not done

N F

9. Pest management As per recommendation Not done F 10. Disease management

Late blight As per recommendation

Not done

F

11. Average yield (q/ha) 100-150 q/ha 70-80 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 681: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 10

Crop: Colocasia Farming Situation: Rain fed Sl. No. Items of package Recommended practice Existing practice Gap in adoption

(F/P/N)* 1. Sowing time June July June July N 2. Sowing method Line sowing Not done P 3. Varieties Local selection Local N 4. Seed rate/ha 20 q/ha 25 q/ha N 5. Seed treatment Mancozeb 2.5 g+Bavistin

50WP @1.0 g/kg seed Not done F

6. Organic Manure (t/ha) 20 t/ha 20 t/ha N 7. Fertilizers (kg/ha):

Basal (NPK) Top dress (N)

50:50:50 50

60:30:30 -

P P

8. Method of fertilizer use: Basal (NPK)

Band application

Band application

N

8. Weed management: Mechanical

As per recommendation

Being done

N

9. Disease management Late blight

As per recommendation

Not done

F

10. Average yield (q/ha) 200-225 q/ha 120-130 q/ha P *F= Full gap; P= Partial gap; N= No gap.

Page 682: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 11

3. SWOT Analysis SWOT (Strength, Weakness, Opportunities and Threats) analysis is an ideal tool for

taking rational decisions about an enterprise under given set of situations. The decisions regarding the selection of agricultural enterprises, use of production technology and post-management are complex and risky. The risk and uncertainty can be minimized if strengths, weaknesses, opportunities and threats of an enterprise/activity are analysed properly and carefully prior to the execution. This section deals with the SWOT analysis with respect to the existing agricultural enterprises as well as the new/potential enterprises of the area. STRENGTHS

Natural Resources

Area receives a good quantum of annual rainfall i.e. 900-1,400 mm. The topography of area is moderately hilly and undulating which makes the soil of the

district well drained Soil conservation and rainwater harvesting activities have been undertaken by the

Department of Agriculture in some parts. Climatic conditions of the district are relatively moderate which offer good scope of

rearing wide range of livestock and poultry species. About 35 per cent of the total geographical area is under pastures/grass lands/waste

land etc which can be improved through introduction of improved grasses and multiple tree species. This will provide support to livestock component and wild life.

The forest areas, common lands, river beds and neglected pieces of private lands are full of obnoxious weeds which can be utilized for the production of vermi-compost by the farmers. Agriculture

Land use system of the area indicates ample scope for diversification. The agro-climatic situations are suitable for the cultivation of cereals, pulses, oilseeds

and number of vegetable crops as well as fruit crops like ber, aonla, citrus, mango, guava and papaya. Vegetables like tomato, cucurbits, brinjal, chillies, capsicum etc. can also grow successfully during kharif under rainfed situations.

More than 95 per cent of the total cropped area is occupied by cereals in which the use of plant protection chemicals like herbicides, insecticides/pesticides is limited, thus, offering great potential for promoting organic farming.

In case of wheat, almost 100 per cent farmers have adopted improved varieties, whereas, about 70 per cent of the farmers are using the seeds of hybrids in case of maize.

Farm yard manure is being used in case of maize cultivation. Scientific weed management practices in maize, paddy and wheat are being followed

by about 40 per cent of the farmers

Page 683: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 12

Although broadcasting is the major method of seed sowing in case of maize and wheat yet about 30 per cent farmers use kera (broadcasting method). Horticulture

The mushroom growing activities can be undertaken throughout the year due to availability of raw material and high demand in the market

Area has wide range of local germplasm of fruits like ber, aonla, mango, citrus which can be used for the production of variety of value added products.

The medicinal plants such as harad, bahera and amla can also be grown successfully on marginal and sub-marginal lands.

Animal Husbandry

Among the milch animals, about 60 per cent cattle are crossbred and about 30 per cent of buffaloes are of improved breeds.

Sufficient green grasses and tree litter are available for 6-7 months in a year. Crop residues, weeds and fodder crops supply the dry/green fodder for rest of the year.

Improved sticks of grasses and nursery of fodder trees are available with many departments like SAUs/KVK/Farmers for improvement of grass lands and pastures.

The climatic conditions are suitable for rearing of cows and buffaloes successfully. Veterinary clinical services are available within 10 km distance in the district. Markets for milk and milk products are available in the local areas. The procurement

of milk from rural areas is also being done by the milk federation. Intensive Dairy Development Project is in operation in the district for breed

improvement, dissemination of better management practices and commercialization of the activities.

Credit facilities are available in the district under different departmental and credit institutional schemes.

Good scope of poultry enterprise especially broiler as the population of small ruminants (sheep & goat) is low in the district. Moreover, maize is the major crop of the district and the same is the chief ingredient of poultry feed.

Good coverage of artificial insemination programme in the district for breed improvement. Others

The availability of vast pasture lands, wide spread reasonable network of veterinary health services, disease resistance of non-descript cattle and other livestock, rich biodiversity both in domestic and wild animals provide inherent strength to the district to develop integrated crop livestock production systems particularly of sheep and goats based farming.

Page 684: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 13

The literacy level in the district is higher as compared to other parts of the statehelping in the general awareness and acceptability of the improved technologies responsive.

Retired military personnel and educated un-employed youth having entrepreneurial ability are available.

Fertilizer sale outlets are available near the villages. Weaknesses

Natural Resources

The annual rainfall is not evenly distributed. About 70 per cent of total rainfall is received during rainy season (June-September).

The soils are generally shallow with poor water holding capacity. The soils in the development block Bijhari is gravely.

The sloppy landscape causes quick run-off of rain water due to which ground water recharging is limited. Soils are susceptible to erosion, as a result, the fertile layer of soil run away with water

Poor management of natural resources by the beneficiaries. Scanty/poor vegetative cover on the forest/common lands.

Agriculture

Farmers use higher seed rate as compared to the recommendation of the CSK HPKV which results into higher plant density. This leads to competition for nutrients, thus, affecting the overall growth and productivity.

More than 90 per cent of the farmers follow broadcasting method of sowing in case of wheat, pulses and oilseeds and more than 50 per cent in case of maize. This leads to improper distribution of seed and placement of seed in the soil at varying depths leading to poor germination and low yields.

Lack of awareness among the farmers about the integrated crop management practices.

More than 95 per cent of net area sown is rain fed. The average size of land holding is small (0.6 ha) and scattered. Erratic rainfall leading to moisture stress during different stages of crop growth in

summer and winter months Method of preparation and application of FYM is unscientific. The available bio-mass

in form of obnoxious weeds and crop wastes are burnt rather than used for composting. A few farmers still use animals dung as fuel.

Imbalanced use of plant nutrients i.e. Nitrogen, Phosphorus and Potassium (NPK) is skewed towards Nitrogen (N). Majority of the farmers are not using the basal dose of NPK.

The fields are small which restrict the proper use of mechanized farm implements.

Page 685: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 14

Non-availability of basic farm equipments and tools like spray pumps and manually operated line sowing tools etc. with farming community. However, these equipments and tools are available with the state department of agriculture on subsidized rates.

Horticulture Farmers ignore the proper layouts as per specific requirements of crops due to small size of individual farmer’s holding.

The pit size is not as per the recommendations i.e. 1x1x1 meter. Time of pit digging and its filling is not as per scientific recommendations.

Lack of grafting, training and pruning skills of different fruits plants among the farming community.

The fruit plants are generally planted on the field bunds for which proper basins are not prepared and maintained. The fields are terraced due to which the root distribution of the plants is not uniform.

Lack of awareness about the proper application schedules of fertilizers and other nutrients among the farmers.

Lack of knowledge about the insect, pest and disease management in fruit crops. Lack of knowledge about the grading and proper packing of fruits.

Animal Husbandry

Non availability of green fodder throughout the year. Preference of natural service with local bulls in case of buffaloes as success rate of

artificial insemination is low. A large proportion of cattle and buffaloes in the district are non-descriptive and low

yielders. Although the maintenance and per unit milk production cost is lower in case of cattle

yet farmers prefer rearing buffaloes over cows. Farmers use local/indigenous wisdom for cure of diseases rather than seeking proper

clinical diagnosis and treatment. Traditional/unscientific method of feeding (low adoption of chaffing) and

management of livestock. There is a general lack of awareness among the farmers about the feeding of mineral mixture and other supplements.

Non-adoption of deworming and vaccination schedule. Lack of awareness about the scientific storage/preservation methods of green fodder

and storage for lean periods. Inability/unwillingness of farmers to transport their diseased animals to

hospital/dispensary due to hilly tract in some parts of the district.

Page 686: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 15

Others

Migration of rural youth to urban areas and preference to jobs other than agriculture Low level of marketable surplus of cereals, vegetables, milk, egg and seasonal fruits

with farmers which influences the marketing efficiency. Market facility are not adequate

Opportunities

Natural Resources Area is suitable for planting improved grasses, fodder and timber trees Availability of drought tolerant wild fruit species like aonla, wild ber and wild pear

etc. Soils are suitable for raising khair, aonla, bamboo, bael, fig and soap nut etc. Plenty of scope for rain water harvesting during rainy season which can be used as

life saving irrigation for plantation and high value cash crops. Broad leaved fodder/timber trees plantation can replace the pine trees to augment

fodder supply and reduce fire hazards Agriculture

Diversification is possible in the Kharif season (rainy season) with introduction of vegetables like tomato, okra, brinjal, cucurbits capsicum/chillies under rainfed situations.

Diversification towards cash crops is also possible through the utilization of created irrigation potential and rain water harvesting sites.

The seeds of improved varieties as well as hybrids in case of wheat, maize, oilseeds, pulses and vegetables are available which can be made available to the farmers.

Recommendations available for the control of major insect, pest and diseases. Intensive crop production is possible in lower portions of the district

Horticulture

The local germplasm of mango, citrus, amla, harar and other fruits can be multiplied and upgraded for more productivity.

The climatic conditions of area are congenial for the production of mushroom throughout the year under natural climatic conditions i.e. button mushroom during winters and dhingri and milky mushroom during summer.

The maturity time of fruit crops in the district is different from that of plains, which may provide opportunity to get attractive prices in the major markets of the country.

Page 687: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 16

Animal Husbandry

Huge demand of milk, meat and eggs in local and distant markets. Incentives for establishment of dairy, poultry and fishery units are available. The abundant availability of green fodder in kharif/rainy season can be utilized to

address scarcity of green fodder experienced during winter and summer months through scientific preservation such as silage and hay making.

Scope for improving pastures through planting of quality grasses and fodder plants. Others

New schemes like promotion of export of high value crops and multiplication of HYV seed through seed village concept through different incentives are being implemented by central/state governments for upliftment of farmers.

Selective herbicides are available and recommended for the control of weeds in arable and non-arable lands.

Scope of organic farming of cereals and pulses. Setting up of agro processing units (fruit and vegetable processing and canning units)

for value addition. Threats

Due to the hilly and sloppy topography and high intensity rains and lack of proper soil and water conservation measures at individual and community level, a sizeable amount of fertile soils is eroding from the forests and arable lands every year which is causing degradation of land resources.

Occurrence of severe frost at every 4-5 years interval causing damage to fruits like mango, papaya, banana.

There are wild animals especially Monkeys, Sambars and Pigs, causes havoc hazards to the cultivated crops.

Infestation of forest areas and other common land resources with obnoxious weeds (Lantana, Parthenium and Ageratum) which are acting as seed banks for infecting the adjoining areas (culturable lands, pastures, road sides, river banks etc.)

Poor management of forest and common lands poses environmental threats for inhabited flora and fauna.

Un-scientific use of inorganic fertilizers and plant protection materials adversely affecting the human as well as soil health which may lead to loss of bio-diversity.

Preference for natural service with inferior/local bulls may result in inferior off-springs or cause genetic inbreeding, which may reduce milk production in the future.

Increasing cases of infertility in cattle causing stray animal menace

Page 688: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 17

Issues Emerging out of SWOT Analysis

Preference of white collar jobs among educated rural youth. The productivity of existing crops and livestock need to be improved. Need for strengthening the soil and water conservation activities at farmers as well as

public level. Improper and non-judicious use of irrigation with respect to water use efficiency and

crop selection. Improvement of local germ-plasm of maize to make it resistant to lodging. Low investment in agriculture sector despite availability of huge subsidies in critical

inputs and implements by the government. Improver spacing, pit size, fertilization in fruit plantations. Motivation of un-employed educated rural youth to adopt high income generating

agricultural enterprises (mushroom, vegetable, poultry, processing and value addition) to check their migration to urban areas.

Eradication of obnoxious weeds such as Ageratum, Parthenium and Lantana on arable and non-arable lands.

Lack of awareness of the latest agricultural and allied technologies. Development of improved varieties of fodders for pastures and field crops like

berseem, sorghum, oats etc. suitable to Hamirpur conditions. Prevalence of malpractices by traders in marketing of produce. Preference for rearing of buffaloes over cattle due to taste factor. Low yield of livestock due to non-availability of green fodder round the year and

imbalanced feeding of concentrates and other minerals. Prevalence of infertility and mastitis in livestock due to poor hygienic conditions. Preference of natural service by local bull over artificial insemination.

Page 689: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 18

4. Entry Point Activities Entry point activities are integral part of the project to orient the community members

towards thrift and credit activities of the project. Success of government-initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of the entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget (i.e.199800 rupees) outlay and the amount plays vital role in involving more people in different project developmental activities. The project implementing agency with the consultation of farmers of the micro watershed panchayat shall decide to undertake the works approved by the Gram Sabha of concerned panchayat.

VILLAGE WISE PRA OF USNAR KALAN: General Information: Disciplines Crops Remarks Agricultural crops (Cereal Crops)

Wheat, Maize & Sugarcane Satisfactory with production & yield

Pulses Mash, Moongi, Masur and Black Gram Growth satisfactory during favorable conditions

Oil seed crops Sarson, Toria, til & soyabean Satisfactory with production & yield Vegetables Onion, cauliflower, Brinjal, tomato,

Garlic, Coriander, Potato, Cucurbits, Turmeric and cabbage

Wish to grow on facilitating sure Irrigation. Also needs assure marketing

Horticulture and MAPs Amla, Mango, papaya, banana, harad, bahera, pomegranate, Citrus and under floriculture Carnation.

Needs of improved varieties provided suitable for these locations.

Interventions Needed - Soil testing, seed drill, Power tiller and Demonstrations on Fertilizer application and varietal evaluation.

Livestock Animals Per cent Buffaloes 94

Local-60 Crossbred-40

Local breeds give 3 liter and crossbred 5-6 liter Milk yield during favorable conditions

Cows 6 Jersey’s 6-7 liter Milk yield during favorable conditions.

Ox 23 pairs In whole panchayat Goats 10 01 liter Milk yield during favorable conditions Sheep nil - Equines - Poultry - -

WATER HARVESTING Existing water bodies villages wise under Usnar Kalan Panchayat: Sr. No. Water bodies 1. Earthen tank (Talai) 8 2. Dam 1 3. Tube well 1

Page 690: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 19

Proposed water bodies villages wise under Usnar Kalan Panchayat: Water bodies

Narkar Usnad Khurd

Usnar Kalan

Kuryah Kalan

Nara Total No. Unit cost Total cost

Pacca Tank 5mx4mx1m

2 2 3 3 10 103774 1037740

Well Open Sink type of 2.4 m dia and 3 m deep

1 2 1 4 7 18676 149408

Total 1187148 List of sites for proposed water structures and expected outcomes in Panchayat: Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Pacca Tank 5mx4mx1m

Narkar In the Land of Sh. Lekh raj

103774 103774 - For the irrigation of 08 kanal land area

In the Land of Sh.Kuldeep

103774 103774 - For the irrigation of 10 kanal land area

Usnad kalan

In the Land of Sh. Khyali Ram

103774 103774 - For the irrigation of 10 kanal land area

In the Land of Sh. Sukhdev

103774 103774 - For the irrigation of 60 kanal land area

In the Land of Sh. Chint Ram

103774 103774 - For the irrigation of 08 kanal land area

Usnad khurd

In the Land of Sh. Basu dev

103774 103774 - For the irrigation of 10 kanal land area

In the Land of Sh. Gorakh Ram

103774 103774 - For the irrigation of 42 kanal land area

Kuryah Kalan

In the Land of Sh. Man Singh

103774 103774 - For the irrigation of 10 kanal land area

In the Land of Sh. Hans Raj

103774 103774 - For the irrigation of 10 kanal land area

In the Land of Sh. Dhian Chand

103774 103774 - For the irrigation of 15 kanal land area

Well Open Sink type of 2.4 m dia and 3 m deep

Usnad kalan

In the Land of Sh. Baldev Dass

18676 18676 - For the irrigation of 30 kanal land area

In the Land of Sh. Brij Lal

18676 18676 - For the irrigation of 25 kanal land area

Page 691: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 20

Water structures

Village Location Total Cost/village

IWMP Budget

Convergence Expected outcomes

Nara In the Land of Sh. Jyoti

18676 18676 - For the irrigation of 100 kanal land area

In the Land of Smt Vyasa devi

18676 18676 - For the irrigation of 35 kanal land area

In the Land of Sh Kulwant

18676 18676 - For the irrigation of 20 kanal land area

In the Land of Smt Shurasti devi

18676 18676 - For the irrigation of 20 kanal land area

Usnad khurd

In the Land of Smt. Leela Devi

18676 18676 - For the irrigation of 15 kanal land area

Kuryah Kalan

In the Land of Smt Vyasa devi

18676 18676 - For the irrigation of 10 kanal land area

Total

875826 875826 875826

Page 692: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 21

5. Drinking Water

Existing status of drinking water Sr. No. Villages Source of drinking water Availability of drinking water

(months) 1. Jajal IPH pipeline 10* 2. Narkar IPH pipeline 10 3. GataPanga IPH pipeline 10 4. Usnar Khurd IPH pipeline 10 5. Usnar Kalan IPH pipeline 10 6. Chukhiniar IPH pipeline 10 7 Gurya Khurd IPH pipeline 10 8 Gurya Kalan IPH pipeline 10 9 Nara IPH pipeline 10 Proposed drinking water structures villages wise under Usnar Kalan Panchayat:

Water bodies

Usnar Kalan

Kuryah Khurd

Kuryah Kalan

Chukhniar Nara Total No. Unit cost Total cost

Handpump 1 2 1 1 5 101541 507705 Total 101541 507705 List of sites for proposed drinking water structures: Village Structure Location Numbers Size

(m) Total Cost/village

IWMP Budget

Convergence Beneficiaries

Nara Handpump In the Land of Sh. Kashmir Singh

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 7 families

Kurya Kalan

Handpump In the land of Sh. Punnu Ram and Smt Bishambri Devi.

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 15 families

In the land of Sh. Mansha Ram and Prabhu Ram.

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 10 families

Kurya Khurad

Handpump In the Land of Sh. Polo Ram

1 90mm dia HDPE pipeline with 63mm dia outlet

101541 101541 - For drinking of 15 families

Chukhniar Handpump In the Land of

1 90mm dia

101541 101541 - For drinking of 15 families

Page 693: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 22

Village Structure Location Numbers Size (m)

Total Cost/village

IWMP Budget

Convergence Beneficiaries

Smt Bishambri devi/ punnu Ram

HDPE pipeline with 63mm dia outlet

Total 507705 507705 - -

Expected outcome from availability of drinking water Sr. No. Availability of drinking water

(No. of months in a year) Pre Project Expected Post Project

1. 8-10 11-12

Page 694: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 23

6. Soil Conservation Watershed Activities to be undertaken Village wise Villages Structure/work Activities to be undertaken Check Dam

6m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Usnar Kalan

1 In the land of Sh Rattan Chand /Sanjay Kumar

54216 For Irrigation of 30 kanal area

Nara 1 In the land of Sh Madan Lal and Lachman Dass

54216 For Irrigation of 100 kanal area

Villages Structure/work Activities to be undertaken Check Dam

10m(2m+1m)/ 2mx2m and No.

Khasra No/GPS reading/identifiction

Actual budget

Budget from IWMP

Proposed Convergence

Expected outcomes

Usnar Kalan

1 In the land of Sh Puran Chand

90676 For Irrigation of 50 kanal area

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Jajal Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Dhian Singh Land to Sarwan Land

2 29324

Ram Singh to Madal Lal/Tara Chand Land

2 29324

Dewan Phatt Amar Nath- Balwant Rai

2 29324

Garne di Kwali 2 29324 Balwant Rai

Land 3 43986

Tara Chand Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Amar Nath Land

2 39100

Dhian Chand Land

2 39100

Total 17 268806 243600 25206 Ghatta Panga Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Ajudhya devi house to Madan Lal Land

3 43986

Balwant Rai to Subash Chand

4 58648

Babu Ram – 3 43986

Page 695: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 24

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Jeet Ram Land to Khadd

Total 10 227347 210000 17347 Narkar

Check dam stone & wire crated (Spur) 2mX1.25mX2.0m

Panchayat Ghar to Harnam Dass Land

4 39100

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans Raj house to Hari Ram Land

2 29324

Hari Ram land to Lihar

5 73310

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Baina to Dug (Harnam Dass to Udo ram land)

4 78200

Total 15 219934

170452 49482

Usnar Khurd Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Anant Ram Land to Saryali Khadd

2 29244

Total 2 29244 8776 20468 Usnar Kalan Check dam stone &

wire crated (Spur) 3mX1.25mX2.0m

Dina Nath Suresh Kumar Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Puran Chand to Saryali Khadd

2 39100

Total 4 68424

23484 44940

Chukhiniar Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans Raj Land to Khadd

2 29324

Raj Kumar Land to Saryali Khadd

4 58648

Suhru Ram house to Rikhi Ram land

2 29324

Raju/ Bishambari Land to Khadd

2 29324

Vyasan Devi Land

2 29324

Manbhari Land 2 29324 Total 205268

167259 38009

Gurya Khurd Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Prabhu ram/ chotu ram land

2 29324

Bhandari Ram parkash Chand

2 29324

Gian Chand Land

2 29324

Chotu ram land 2 29324 Total 8 117296 100059 17237 Gurya Kalan Check dam stone & Dhannu 2 19550

Page 696: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 25

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

wire crated (Spur) 2mX1.25mX2.0m

Ram/Shyam lal Land

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Hans Raj (Road) to Bishambhari Devi

3 43986

Hari Kishan to Beli Ram Land

5 73310

Thanedar Kotha to Bhandari Ram Land

2 29324

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Desh Raj/Beli ram land to main khadd

4 78200

Hem Raj land to Saryali Khadd

4 78200

Punnu ram land to Saryali Khadd

4 78200

Dhannu Ram land to Saryali Khadd

2 39100

Total 439870

416120 23750

Nara Check dam stone & wire crated (Spur) 10mX1.25mX2.5m

Vasu Dev Land

3 179301

Check dam stone & wire crated (Spur) 3mX1.25mX2.0m

Banku Ram/Sukh Ram House to Basudev Tank

2 43986

Main Road to Basu Dev Tank

2 29324

Hans Raj land to Lachman Dass Land

2 29324

Primary School (Nara) to Jyoti House to Khill

6 87972

Dharam Dei Land to Saryali Khadd

4 58648

Madan Lal Land

4 58648

Road (Jubbali) to Darjian di balli

5 73310

Parkash Chand Kartar Chand Land

3 43986

Garib Dass land to Khadd

2 29324

Bhagg singh Land

4 58648

Gugga (Jol) to 4 58648

Page 697: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 26

Village Structures Location No. Actual Budget

IWMP Budget

Convergence (MNREGA)

Chaproh boundary

Baroli (Shakti chand land) to Khadd

6 87972

Sandesh / Bhag Singh Land to Khadd

10 146620

Check dam stone & wire crated (Spur) 4mX1.25mX2.0m

Leela Devi land to Saryali Devi

4 78200

Total 61 1063911 855139 168772

Village Wise Budget Allocation under Soil Conservation

Village Particulars Total Cost

IWMP Budget

Convergence (MNREGA)

Jajal Check dam stone & wire crated (Spur

268806 243600 25206

Total 268806 243600 25206 Ghatta Panga Check dam stone & wire crated

(Spur 227347 210000 17347

Total 227347 210000 17347 Narkar Pacca tank

5mx4mx1m 207548 207548

Check dam stone & wire crated (Spur)

219934

170452 49482

Total 427482 378000 49482 Usnar Khurd Pacca tank

5mx4mx1m 207548 207548

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Check dam stone & wire crated (Spur)

29244 8776 20468

Total 255468 235000 20468 Usnar Kalan Pacca tank

5mx4mx1m 311322 311322

Well Open Sink type of 2.4 m dia and 3 m deep

74704 74704 -

Check Dam 10mx(2m+1m)/ 2mx2m and No.

90677 90677

Check Dam 6m(2m+1m)/ 2mx2m and No.

54210 54210

Check dam stone & wire crated (Spur)

68424

23484 44940

Total 599337 554397 44940 Chukhiniar Handpump 101541 101541 Check dam stone & wire crated

(Spur) 205268

167259 38009

Total 306809 268800 38009 Gurya Khurd Handpump 101541 101541

Page 698: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 27

Check dam stone & wire crated (Spur)

117296 100059 17237

Total 218837 201600 17237 Gurya Kalan Pacca tank

5mx4mx1m 311322 311322 -

Well Open Sink type of 2.4 m dia and 3 m deep

18676 18676

Handpump 203082 203082 Check dam stone & wire crated

(Spur) 439870

416120 23750

Total 972950 949200 23750 Nara Handpump 101541 101541 Well Open

Sink type of 2.4 m dia and 3 m deep

74704 74704

Check Dam 6m(2m+1m)/ 2mx2m and No.

54216 54216

Check dam stone & wire crated (Spur)

1063911 835139 168772

Total 1294372 1125600 168772 Grand Total 4571408 4166197 405211

Page 699: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 28

7. Agriculture

Institutional and capacity building:

Intervention Strategy /Issues

Activity Programme cost

Unit Size No. of Units

Unit cost(Rs)

Total cost(Rs)

1 2 3 4 5 6 7 Agriculture Polyhouse Commercial

cultivation under polyhouses

Three days Training to the farmers on protected cultivation technology

1no. (25 farmers)

2 43450 86900

Water Conservation

One days Training to the farmers on water conservation

1 no. (20 farmers0

1 12950 12950

Organic farming

Popularization of Vermicompost

One day Training to the farmers on method of preparation and application of vermicompost.

1(25farmers) 2 24850 49700

Horticulture Diversification Diversification

towards drought/frost tolerant fruit plants

Three days Training to the farmers on plantation of fruit crops

1no (25 farmers)

1 43450 43450

Animals husbandry Poultry Poultry

Farming Three day Training to the farmers with regard to management of poultry farm

1(25 farmers)

1 43550 43550

Mushroom Cultivation/Bee keeping/Micro enterpriseMushroom Cultivation

Popularization of Mushroom cultivation

Training to the farmers on mushroom cultivation

1no of seven days (25 farmers)

1 77550 77550

Micro enterprise on Soft toy making

Income generation

Three days Training to the farm women

1no (25 farmers)

1 43450 43450

Micro enterprise on value addition

Income generation

Three days Training to the farm women

1no (25 farmers)

1 14450 14450

Total 372000

Page 700: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 29

Proposed Interventions to Increase Production system (Farm Based Micro Enterprises): Agriculture: Village Intervention Area/no. Cost involved

(Rs) I II III IV V

Jajal Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 20000 20000 - - - Narkar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 Gatta panga

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Total 20000 20000 - - - Usnad khurd

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

0.5 ha 20000 @ Rs. 40000/ha

20000 - - -

- -

Total 20000 20000 - - - Usnad kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

0.5 ha 22500/- @ Rs.45000/ha

- 22500 - - -

Total 62500 40000 22500 - - - Chukiniar Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Total 40000 40000 - - - - Kuryh Khurd

Provision of improved inputs (viz., seeds,

0.5 ha 40000 @ Rs. 20000/ha

20000 - - -

Page 701: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 30

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

Total 20000 20000 Kuryah kalan

Provision of improved inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

1 ha 40000 @ Rs. 40000/ha

40000 - - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 85000 62500 22500 - - - Nara Provision of improved

inputs (viz., seeds, fertilizers, pesticides and tools ) for demonstration in cereals, pulses and oilseeds

2 ha 80000 @ Rs. 40000/ha

40000 40000 - - -

Diversification towards cash crops like tomato, capsicum, cauliflower, cabbage, brinjal, ginger, turmeric etc.

1 ha 45000/- @ Rs.45000/ha

22500 22500 - - -

Total 125000 62500 62500 - - - Grand Total

412500 305000 107500 0 0 0

Page 702: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 31

8. Horticulture:

Village Intervention Area/no. Cost involved

(Rs)

I II III IV V

Narkar Diversification towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Usnarkalan Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Kuryah kalan

Diversification towards drought/frost tolerant fruit plants

1.0ha 40000 - - 40000 - -

Total 40000 - - 40000 - - Chukiniar Diversification

towards drought/frost tolerant fruit plants

0.5ha 20000 - - 20000 - -

Total 0.5ha 20000 20000 Nara Diversification

towards drought/frost tolerant fruit plants

1 ha 40000 - - 40000 - -

Total 40000 - - 40000 - - Grand Total

140000 0 0 140000 0 0

Page 703: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 32

9. Animal Husbandry Village Intervention Area/no. Cost

involved (Rs)

I II III IV V

Jajal Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

160 animals

11960 - 11963

Total 21963 21963 Narkar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 10000 10000

Control of endo and ecto parasites

70 animals

5115 5115

Total 25115 25115 15115 10000 Gatapanga Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

85 animals

6200 6200

Total 16200 - 16200 Usnad khurd

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

140 animals

10544 - 10544

Total 20544 20544 Usnarkalan Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

40 animals

3002 - 3002

Total 13002 - 13002 Chukhiniar Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Control of endo and ecto parasites

90animals 6562 - 6562

Total 16560 - 16562 - - - Kuryh Khurd

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

5 10000 - 10000

Total 10000 - 10000

Page 704: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 33

Village Intervention Area/no. Cost involved (Rs)

I II III IV V

Kuryah kalan

Demonstration to the farmers on balanced feeding and disease management to improve milk yield

15 30000 - 30000

Control of endo and ecto parasites

120 animals

9218 - 9218

Total 39218 39218 - - -Nara Demonstration to the

farmers on balanced feeding and disease management to improve milk yield

10 20000 - 20000

Control of endo and ecto parasites

120 animals

8898 - 8898

Total 28898 - 28898 Grand Total

191500 25115 181502 10000 0 0

Total Budget under production system and micro enterprises Sr. No. Activity Total budget 1. Agriculture 412500 2. Horticulture 140000 3. Animal husbandry 191500 4. Grand Total 744000 Expected outcomes Agricultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha)

Area (ha) Av. Yield (q/ha)

1. Maize 128 18.4 150 25.0 2. Mash 0.5 6 10 8.0 3. Wheat 131 17.2 150 18.0 4. Toria 2 7 50 8.0 5. Gram 0.5 6 5 7.0 6. Vegetables 1 310 4 400

*additional area (cultivable wasteland) will be brought under cultivation Horticultural crops Sr. No. Crop Pre project Expected post project

Area (ha) Av. Yield (q/ha) Area (ha) Av. Yield (q/ha) 1. Harad - - 1 10 2. Aonla - - 1 8

Page 705: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 34

10. Pisciculture

No activity has been proposed in the panchayat due to lack of interest, however the

fishery department should organize some awareness camps in the panchayat as there is scope for Pisciculture in some areas.

Page 706: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 35

11. Convergence

Watershed management is a single window, integrated area development programme. Integrated watershed management cannot perhaps be achieved just by following integration of resources using multidisciplinary approach with the funding or support provided alone under any watershed program me like NWDPRA. This may also involve harmonized use of resources available from other ongoing/ existing sectoral and developmental schemes in the area/ district. Such resources can be dovetailed with the convergence of various schemes and programme for overall development of the area but also in effective monitoring. The following ongoing schemes can be dovetailed with this project:

Sr. No.

Name of Scheme Components Remarks

1 MNREGA Construction/ repair of spur, check dam, bawri etc.

The allocation of funds may be worked out in accordance with the availability of funds under various shemes in consultation with the implementation department/ agency

2 National Organic Farming Project Distribution of earth worms and vermicompost unit

3 Horticulture Technology Mission4 Pt. Deen Dayal Upadhyay Kisan Bagwan

Samridhi Yojna Polyhouses, Microirrigation and capacity building

5 Doodh Ganga Pariyojna ( Animal Husbandry Deptt)

Dairy development,

6 Cultivation of medicinal plant (Dept. of Environment, Science and Technology, Department of forest conservation and ayurveda)

Cultivation of medicinal herbs/ plants

7 Maintenance of Departmental Mulberry farms and Nueseries: Distribution of silk worm, disinfection of private rearing houses, technichal assistance and guidanceand marketing of cocoons

Department of industies

Page 707: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 36

12. Livelihood Concerns Proposed Interventions to Increase Livelihood Activities: Village Intervention Area/no. Cost

involved

(Rs)

I II III IV V

jajal VermicultureUnit

3mx1m( Low cost)

7 no. 35000 35000 - - - -

Total 35000 35000 - - - -

Narkar Bee-keeping 1

no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit

3mx1m( Low cost)

8 no. 40000 40000 - - - -

Total - 60000 40000 - - 20000 -

Gatapanga Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1

no.(10Boxes

per unit)

20000 - - - 20000 -

Total 30000 - - 10000 20000 -

Usnarkhurd Bee-keeping 1

no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit

3mx1m( Low cost)

4 no. 20000 20000 - - - -

Total 40000 20000 - - -

Usnarkalan Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 1

no.(10Boxes

per unit)

20000 - - - 20000 -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Backyard poultry 200 chicks 30500 - - 30500 -

Total 85500 25000 - 40500 20000 -

Chukhniar Mushroom

Cultivation

1 (50 bags) 10000 10000

Bee-keeping 1 20000 - - - 20000 -

Page 708: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 37

Village Intervention Area/no. Cost

involved

(Rs)

I II III IV V

no.(10Boxes

per unit)

VermicultureUnit

3mx1m( Low cost)

6 no. 30000 30000 - - - -

Total 60000 30000 - 10000 20000 -

Kuryah

khurd

Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

VermicultureUnit

3mx1m( Low cost)

5 no. 25000 25000 - - - -

Total 35000 25000 - 10000 - -

Kuryah

kalan

Mushroom

Cultivation

1 (50 bags) 10000 - - 10000 - -

Bee-keeping 2

no.(10Boxes

per unit)

40000 - - - 40000 -

VermicultureUnit

3mx1m( Low cost)

15 no. 75000 50000 25000 - - -

Backyard poultry 160 chicks 24360 - - 24360 -

Total 149360 50000 25000 34360 40000 0

Nara Income generation I no.

(Tailoring

Unit)

144000 - 144000 - - -

VermicultureUnit

3mx1m( Low cost)

4 no. 20000 20000 - - - -

Backyard poultry 70 chicks 10740 - - 10740 -

Total 174740 20000 144000 10740 0 0

Grand Total 669600 245000 169000 115600 120000 0

Page 709: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 38

13. Monitoring System A Web-based GIS System should be developed for monitoring and evaluating the

project in its planning & implementation phases. The system could be made available on a public domain and can be accessed by all the stakeholders of the project. In other words, the DPR should be made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and planning. The system should also show the satellite imageries of various years from the project inception stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. Evaluation

During the works phase, any progress in the treatment areas should be reported by the

WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time. The following key performance indicators should be kept in mind while evaluating the project. • Increased surface and ground water • Reduced un-off and soil erosion • Improved vegetative cover • Improved forest conditions in the fragile upper slopes of watershed • Increased availability of fodder and fuel • Increased crop yields, milk production and horticultural products • Increased household incomes of landless and marginal farmers etc.

Page 710: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 39

14. Capacity Building For effective implementation of the watershed activities, capacity building and skill

development at watershed level are one of the important components. The activities proposed for the purpose in the present project are as under:

• Awareness camps at Panchayat level • Trainings at block, DRDA and Institutional level • Exposure visits at university/ Institutions • Specialized trainings in the professional institutes

Target group and location of the programme Target group No. of

participants Activity Location

Member of Gram Shabha

All Awareness camps Panchayat level

PRI/VLI members 10 Watershed implementation and management Block level SHGs, User groups and beneficiary groups

3-5/ panchayat Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.

Block level

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Exposure visits (university/ professional institute/ field visits)

State/ outside state

SHGs, User groups and beneficiary groups

1-2/ward/ panchayat

Kisan Melas/ Pradarshnis

State/ outside state

SHGs, User groups and beneficiary groups

2-3/ward/ panchayat

Specialized trainings (mushroom production, apiculture, floriculture, nursery raising, dairy development, IPM/IDM etc.)

Professional institutes/ university

PIAs, WDTs members

10 Project implementation and management trainings, reports writing and accounts maintenance

DRDA level

Project Implementation Participatory approach for implementation of project For the implementation of this project plan, participatory approach is more pertinent because it is the people’s pogramme and the intervention of the government agency should be facilitator. Therefore it is necessary to organize all stake holders into different internal groups, self help groups, user groups etc. According to their interests and use of resources being created during the implementation phase. The duration of the project is five year and divided in three different phases: Phase Name Duration I Preparatory phase 1-2 yearsII Watershed works phase 2-3 years III Consolidation and withdrawal phase 1-2 years

The major objective of the preparatory phase is to build approaches mechanism for implementation of the project adopting the participatory approach and empowerment of

Page 711: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 40

social groups (watershed committee, interest groups, self help groups and user groups). The watershed development team (WDT) assumes the role of a facilitating agency during this phase. In this phase the main activities will include:

• Taking up entry point activities to establish credibility of the watershed Development team (WDT and create a rapport with the village communities.

• Initiating the development of village level institutions as watershed committee(WC), help groups and user groups and capacity building of different stake holders on institutional and work related aspects.

• Environment building, awareness generation, creating innovations and participatory responses.

• Preparation of DPR During implementation phase of the DPR, It is proposed that all works envisaged in production System, Development of Works and Livelihood programmes should be implemented through different farmers groups. These groups should be institutionalized so that they whole heartedly contribute socially as well as financially and harvest the full benefits of the resources created during this phase. Integration of Social Resource Management (SRM) with Natural Resource Management (NRM) is crucial for achieving sustainable results. Such integration would become easier if action plans of all components developed separately within and for each SHG/UG as per their needs. Respective groups carry implementation of above plans. Adequate emphasis is given to production enhancement and livelihood support activities apart from protection and conservation activities, combining short term, medium term and long-term gains to watershed community.

Page 712: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 41

15. Project Withdrawal and Consolidation The last phase of watershed management is withdrawal phase, which will start when the project implementation is about to be completed. In this phase the resources augmented and economic plans developed in phase II (works Phase) are made the foundation to create new nature based, sustainable livelihood and raised productivity levels. The main objectives are:

• Consolidation and completion of various works • Building the capacity of the community based organization to carry out the

new agenda items during post project period. • Sustainable management of developed natural resources regarding farm

production system and off-farm livelihoods The following activities are to be taken up during this phase.

Consolidation of various works o Preparation of Project report with details about status of each intervention o Documentation of successful experiences as well as lesson learnt for future

use. o Management of developed natural resource o Involving the sustainability of various interventions under the project o Formal allocation of user rights over common property resources(CPRs) o Repair, maintenance and protection of CPRs o Sustainable utilization of developed natural resources o Involvement of gram panchayats or forming of Village Resource Management

Society or the Watershed Committee is made responsible to generate revenue, manage the resources and look after repair and maintenance of the structures raised during implementation phase

Implementation of Farm Production System / off- farm livelihoods: • Up scaling of successful experiences related to above aspects through

revolving fund under the project as well as credit and technical support from external institutions.

• Promotion of agro-processing , marketing arrangements of produce and similar off-farm and informal sector enterprises

• Farmers may also be encouraged to develop pesticide free management, low cost organic inputs, seed farms links with wider markets to fetch competitive price

Post –withdrawal project management related aspects: • Participatory planning, implementation and marketing of activities to

be carried out during consolidation phase • Terminal evolution of project as per the expected and aims

Page 713: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 42

Annexures

Page 714: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme

IWMP-Hamirpur-II Panchyat Usnar Kalan Page 43

Cost Estimate for Training programme of three days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for three days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

19500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 12 lectures 3000 4. POL for field visit 3500 5. TA for participants @ 300 to and fro 7500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 2000 8. Institutional charges@ 10% 3950 Total 43450 Cost Estimate for Training programme on bee keeping for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 500 to and fro 12500 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7300 Total 80300 Cost Estimate for Training programme on Mushroom cultivation for seven days duration Sr. No. Particular Cost (Rs) 1. Boarding & lodging for 25 participants @ 260/participant/day

for seven days( Lunch and dinner @ Rs 80 each and breakfast @ 30 Tea with snacks@15 Evening tea @5/cup and lodging charges @ 50/participants)

45500

2. Literature & stationary @ 100/participant 2500 3. Honorarium @ Rs. 250/ per lecture for 28 lectures 7000 4. POL for field visit 3000 5. TA for participants @ 400 to and fro 10000 6. Organiser and Secretarial assistance 1500 7. Misc. Expenses 1000 8. Institutional charges @ 10 % 7050 Total 77550

Page 715: Detailed Project Report - Rural Development …Detailed Project Report Department of Rural Development Government of Himachal Pradesh under Integrated Watershed Management Programme