A--- X X X X 0 GRID HEAD NORTH ARROW ROOM NAME 101 ROOM TAG ELEVATION TAG 1 A101 SIM SECTION HEAD AND TAIL SYMBOLS 5' TURN RADIUS SHEET INDEX A0.0 A1.0 A2.0 A3.0 A4.0 A4.1 A1.1 A1.2 TITLE SHEET FLOOR PLAN FLOOR FINISH PLAN FURNITURE, FIXTURE, & EQUIPMENT PLAN REFLECTED CEILING PLAN ELECTRICAL PLAN INTERIOR ELEVATIONS INTERIOR ELEVATIONS A4.2 INTERIOR ELEVATIONS A5.0 BUILDING SECTIONS A6.0 SCHEDULES A7.0 PERSPECTIVES SHEET DESCRIPTION GENERAL NOTES IMPORTANT: GENERAL CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL GENERAL NOTES ON THIS PAGE AND GENERAL NOTES ON DRAWING SHEETS THAT FOLLOW. NOTIFY DESIGNER WITH ANY QUESTIONS OR DISCREPANCIES PRIOR TO INSTALLATION AND WORK. 1. DO NOT SCALE DRAWINGS. 2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES IN A TIMELY MANNER, PRIOR TO CONSTRUCTION. 3. ALL WORK SHALL CONFORM TO APPLICABLE STATE AND LOCAL CODES. THE CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATIONS OF AND COORDINATION WITH CITY AND STATE AGENCIES, AND PROVIDE REQUIRED PERMITS TO THE OWNER. ALL TESTS AND INSPECTIONS ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL BE PAID TO THE CONTRACTOR. 4. AS INFORMED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO INCLUDE MATERIALS, EQUIPMENT, TRANSPORTATION AND UTILITIES NECESSARY FOR COMPLETION OF THE WORK. BY SUBMITTING A PROPOSAL, THE CONTRACTOR AND ALL OF HIS SUB-CONTRACTORS REPRESENT THAT THEY HAVE MADE THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND LIMITATIONS, AND THAT THEY EACH HAVE EXAMINED THE CONTRACT DOCUMENTS IN COMPLETE DETAIL AND HAVE DETERMINED THAT THE DRAWINGS, SPECIFICATIONS, AND CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR CONSTRUCTION. WHERE MINOR ADJUSTMENTS OF THE WORK ARE NECESSARY FOR PURPOSES OF FABRICATIONS OR INSTALLATION OF ITEMS, OR RESOLUTION OF CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL MAKE ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE SUCH MINOR ADJUSTMENTS AFFECT THE FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY SHALL BE SUBMITTED TO THE DESIGNER FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WITH THE CHANGES. 5. CONTRACTOR IS TO PROVIDE OWNER WITH A CONSTRUCTION SCHEDULE PRIOR TO BEGINNING CONSTRUCTION. 6. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER, INCLUDING AREA FOR WORK, MATERIALS STORAGE, ACCESS TO AND FROM THE WORK, SPECIAL CONDITIONS OR NOISY WORK, TIMING OF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICE AND RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES, FITTINGS, ETC. NOISE OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEAST ONE WEEK IN ADVANCE OF WHEN THE WORK IS TO COMMENCE, DURING HOURS OF THE DAY AS SPECIFIED BY THE OWNER. 7. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF WORKMANSHIP IN GENERAL, AND WITH SUCH STANDARDS AS SPECIFIED HEREIN. 8. MATERIALS, ARTICLES, DEVICES, AND PRODUCTS ARE SPECIFIED IN THIS DOCUMENT BY REFERENCE TO BUILDING STANDARDS, LISTING ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIRING COMPLIANCE WITH REFERENCE STANDARDS, OR BY PERFORMANCE SPECIFICATIONS. FOR APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT A SEPARATE REQUEST FOR APPROVAL OF THE SUBSTITUTE. WHERE BUILDING STANDARD ITEMS ARE SPECIFIED, NO SUBSTITUTE WILL BE ACCEPTED. 9. DRAWINGS ARE DIMENSIONED TO CENTERLINE OF COLUMNS; NEW CONSTRUCTION IS DIMENSIONED TO FACE OF NEW FRAMING FROM THE EXTERIOR WALLS. ABBREVIATIONS AFF TYP. U.N.O. ABOVE FINISHED FLOOR TYPICAL UNLESS NOTED OTHERWISE EQUIP. EQUIPMENT ELEV. ELEVATOR MECH. MECHANICAL R RADIUS CODE REQUIREMENTS USE AND OCCUPANCY - CH. 3 SECTION 304.1 OCCUPANCY CLASSIFICATION: 1. BUSINESS - GROUP B 2. 4th FLOOR: 6,808 sf 3. OCCUPANT LOAD: 68 MAXIMUM 4. 100 sf PER PERSON CONSTRUCTION TYPE - CH. 6 TABLE 601 1. TYPE III 2. FIRE RESISTANCE RATING: 2 HOURS INTERIOR FINISHES - CH. 8 1. EXITS: A, B, C 2. EXIT ACCESS: A, B, C 3. FLAME SPREAD: 26-75 FIRE PROTECTION SYSTEM - CH. 9 1. BUILDING IS SPRINKLERED. 2. MANUAL FIRE ALARM SYSTEM REQUIRED. 3. SMOKE DETECTORS REQUIRED. MEANS OF EGRESS - CH. 10 1. REQUIRED EXITS: 2 2. EGRESS TRAVEL DISTANCE: 300' MAXIMUM 3. EGRESS STAIR WIDTH: 48" MINIMUM BETWEEN HANDRAILS AND 1 HOUR MINIMUM FIRE RATING. 4. EGRESS DOOR WIDTH: 36" MINIMUM 5. EGRESS CORRIDOR WIDTH: 44" MINIMUM WITH 1 HOUR FIRE RATING. PLUMBING FACILITIES - CH. 29 1. THE REQUIRED NUMBER OF WATER CLOSETS IS 1 PER THE FIRST 25 OCCUPANTS, 1 PER 50 THEREAFTER. 2 MEN'S TOILETS, 2 WOMEN'S TOILETS TOTAL FOR THIS PROJECT. 2. THE REQUIRED NUMBER OF LAVATORIES IS 1 PER 40 OCCUPANTS. 1 MEN'S LAVATORY, 1 WOMEN'S LAVATORY TOTAL FOR THIS PROJECT. 3. THE REQUIRED NUMBER OF DRINKING FOUNTAINS IS 1 PER 100 PEOPLE. 1 DRINKING FOUNTAIN, MUST MEET ADA REQUIREMENTS. 4. THE TRAVEL DISTANCES TO THE REQUIRED TOILETS SHOULD NOT EXCEED 500 FEET. Scale Project number Date Drawn by Checked by 1 2 3 4 5 6 PRELIMINARY SUBMITTAL 03-23-2012 PRELIMINARY SUBMITTAL 03-30-2012 PRELIMINARY SUBMITTAL 04-06-2012 PRELIMINARY SUBMITTAL 04-13-2012 PRELIMINARY SUBMITTAL FINAL SUBMITTAL 04-25-2012 04-30-2012 As indicated 4/30/2012 12:15:19 PM 115 E Desmet, Spokane, WA 99204 A 0.0 TITLE SHEET ID333 DesignCloud Work Place Design 4/30/2012 Susan Homan Talieh Ghane No. Description Date VICINITY MAP DESIGN CLOUD WORKSPACE
11
Embed
DesignCloud TITLE SHEET · 2012. 7. 6. · a---x x x 0 grid head north arrow room name 101 room tag elevation tag 1 a101 sim section head and tail symbols 5' turn radius sheet index
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A---
X
X
X
X 0
GRID HEAD
NORTH ARROW
ROOM NAME
101
ROOM TAG
ELEVATION TAG
1A101
SIM
SECTION HEAD AND TAIL
SYMBOLS
5' TURN RADIUS
SHEET INDEX
A0.0
A1.0
A2.0
A3.0
A4.0
A4.1
A1.1
A1.2
TITLE SHEET
FLOOR PLAN
FLOOR FINISH PLAN
FURNITURE, FIXTURE, & EQUIPMENT PLAN
REFLECTED CEILING PLAN
ELECTRICAL PLAN
INTERIOR ELEVATIONS
INTERIOR ELEVATIONSA4.2
INTERIOR ELEVATIONS
A5.0 BUILDING SECTIONS
A6.0 SCHEDULES
A7.0 PERSPECTIVES
SHEET DESCRIPTION
GENERAL NOTESIMPORTANT: GENERAL CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL GENERAL NOTES ON THIS PAGE AND GENERAL NOTES ON DRAWING SHEETS THAT FOLLOW. NOTIFY DESIGNER WITH ANYQUESTIONS OR DISCREPANCIES PRIOR TO INSTALLATION AND WORK.
1. DO NOT SCALE DRAWINGS.
2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES IN A TIMELY MANNER, PRIOR TO CONSTRUCTION.
3. ALL WORK SHALL CONFORM TO APPLICABLE STATE AND LOCAL CODES. THE CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATIONS OF AND COORDINATION WITH CITY AND STATE AGENCIES, ANDPROVIDE REQUIRED PERMITS TO THE OWNER. ALL TESTS AND INSPECTIONS ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL BE PAID TO THE CONTRACTOR.
4. AS INFORMED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO INCLUDE MATERIALS, EQUIPMENT, TRANSPORTATION AND UTILITIES NECESSARY FOR COMPLETION OF THE WORK. BY SUBMITTING A PROPOSAL,THE CONTRACTOR AND ALL OF HIS SUB-CONTRACTORS REPRESENT THAT THEY HAVE MADE THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND LIMITATIONS, AND THAT THEY EACH HAVEEXAMINED THE CONTRACT DOCUMENTS IN COMPLETE DETAIL AND HAVE DETERMINED THAT THE DRAWINGS, SPECIFICATIONS, AND CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR CONSTRUCTION.WHERE MINOR ADJUSTMENTS OF THE WORK ARE NECESSARY FOR PURPOSES OF FABRICATIONS OR INSTALLATION OF ITEMS, OR RESOLUTION OF CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACTDOCUMENTS, THE CONTRACTOR SHALL MAKE ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE SUCH MINOR ADJUSTMENTS AFFECT THE FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY SHALL BESUBMITTED TO THE DESIGNER FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WITH THE CHANGES.
5. CONTRACTOR IS TO PROVIDE OWNER WITH A CONSTRUCTION SCHEDULE PRIOR TO BEGINNING CONSTRUCTION.
6. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER, INCLUDING AREA FOR WORK, MATERIALS STORAGE, ACCESS TO AND FROM THE WORK, SPECIAL CONDITIONS OR NOISY WORK, TIMINGOF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICE AND RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES, FITTINGS, ETC. NOISE OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEASTONE WEEK IN ADVANCE OF WHEN THE WORK IS TO COMMENCE, DURING HOURS OF THE DAY AS SPECIFIED BY THE OWNER.
7. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF WORKMANSHIP IN GENERAL, AND WITH SUCH STANDARDS AS SPECIFIED HEREIN.
8. MATERIALS, ARTICLES, DEVICES, AND PRODUCTS ARE SPECIFIED IN THIS DOCUMENT BY REFERENCE TO BUILDING STANDARDS, LISTING ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIRING COMPLIANCEWITH REFERENCE STANDARDS, OR BY PERFORMANCE SPECIFICATIONS. FOR APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT A SEPARATE REQUEST FOR APPROVAL OF THE SUBSTITUTE. WHERE BUILDING STANDARD ITEMSARE SPECIFIED, NO SUBSTITUTE WILL BE ACCEPTED.
9. DRAWINGS ARE DIMENSIONED TO CENTERLINE OF COLUMNS; NEW CONSTRUCTION IS DIMENSIONED TO FACE OF NEW FRAMING FROM THE EXTERIOR WALLS.
ABBREVIATIONSAFF
TYP.
U.N.O.
ABOVE FINISHED FLOOR
TYPICAL
UNLESS NOTED OTHERWISE
EQUIP. EQUIPMENT
ELEV. ELEVATOR
MECH. MECHANICAL
R RADIUS
CODE REQUIREMENTSUSE AND OCCUPANCY - CH. 3 SECTION 304.1OCCUPANCY CLASSIFICATION:1. BUSINESS - GROUP B2. 4th FLOOR: 6,808 sf3. OCCUPANT LOAD: 68 MAXIMUM4. 100 sf PER PERSON
CONSTRUCTION TYPE - CH. 6 TABLE 6011. TYPE III2. FIRE RESISTANCE RATING: 2 HOURS
INTERIOR FINISHES - CH. 81. EXITS: A, B, C2. EXIT ACCESS: A, B, C3. FLAME SPREAD: 26-75
FIRE PROTECTION SYSTEM - CH. 91. BUILDING IS SPRINKLERED.2. MANUAL FIRE ALARM SYSTEM REQUIRED.3. SMOKE DETECTORS REQUIRED.
MEANS OF EGRESS - CH. 101. REQUIRED EXITS: 22. EGRESS TRAVEL DISTANCE: 300' MAXIMUM3. EGRESS STAIR WIDTH: 48" MINIMUM BETWEENHANDRAILS AND 1 HOUR MINIMUM FIRE RATING.4. EGRESS DOOR WIDTH: 36" MINIMUM5. EGRESS CORRIDOR WIDTH: 44" MINIMUMWITH 1 HOUR FIRE RATING.
PLUMBING FACILITIES - CH. 291. THE REQUIRED NUMBER OF WATER CLOSETS IS1 PER THE FIRST 25 OCCUPANTS, 1 PER 50THEREAFTER. 2 MEN'S TOILETS, 2 WOMEN'STOILETS TOTAL FOR THIS PROJECT.2. THE REQUIRED NUMBER OF LAVATORIES IS 1PER 40 OCCUPANTS. 1 MEN'S LAVATORY, 1WOMEN'S LAVATORY TOTAL FOR THIS PROJECT.3. THE REQUIRED NUMBER OF DRINKINGFOUNTAINS IS 1 PER 100 PEOPLE. 1 DRINKINGFOUNTAIN, MUST MEET ADA REQUIREMENTS.4. THE TRAVEL DISTANCES TO THE REQUIREDTOILETS SHOULD NOT EXCEED 500 FEET.
5/8" FIRE RATED GYPSUM WALL BOARDINSULATED METAL STUD5/8" FIRE RATED GYPSUM WALL BOARD
1" GLASSALUMINUM MULLION
5/8" GYPSUM WALL BOARDINSULATED METAL STUD5/8" GYPSUM WALL BOARD
5/8" GYPSUM WALL BOARDINSULATED METAL STUD5/8" GYPSUM WALL BOARD
SYMBOL DESCRIPTION
SC-1 EXISTING STRUCTURAL COLUMN
CW-1 CASEWORK
GENERAL NOTES1. ALL DOORS DIMENSIONED TO CENTERLINE U.N.O.2. ALL EXTERIOR WALLS ARE 6" PRECAST CONCRETE U.N.O.3. ALL INTERIOR WALLS ARE 6" GYPSUM WALLBOARD WALLS U.N.O.4. PLUMBING DIMENSIONS AND ADA CLEARANCES SHOWN ON FURNITURE , FIXTURE AND EQUIPMENT PLAN.
R 14'-0" R 9'-0"
R 11'-3"
R 11'-3"
WALL TYPE
Scale
Project numberDateDrawn byChecked by
1
2
3
4
5
6
PRELIMINARY SUBMITTAL 03-23-2012
PRELIMINARY SUBMITTAL 03-30-2012
PRELIMINARY SUBMITTAL 04-06-2012
PRELIMINARY SUBMITTAL 04-13-2012
PRELIMINARY SUBMITTAL
FINAL SUBMITTAL
04-25-2012
04-30-2012 3/32" = 1'-0"
4/30
/201
2 2:
56:5
5 PM
115 E Desmet, Spokane, WA 99204A 1.0
FLOOR PLANID333
DesignCloudWork Place Design 4/30/2012
Susan HomanTalieh Ghane
3/32" = 1'-0"1 FLOOR PLAN
No. Description Date
DNUPDN
1 2 3 4 5 6 7 9 10
A
B
C
D
1A 5.0
2A 5.0
PRIVATE OFFICE
404
CONFERENCE
405
JANITOR
410
KITCHEN
409ELEV.
CURTAIN WALL
FLOORING TRANSITIONS AT OPENING
NO CHANGE IN HEIGHT
FLOORING TRANSITION
MECH.
SYMBOL DESCRIPTION
CP-1 CARPET TILE
TZ-1 TERRAZZO
CN-1 SEALED CONCRETE
PT-1 WHITE PAINT
PT-2 CLOUDLESS BLUE PAINT
CP-1
CP-1TZ-1
TZ-1 TZ-1
TZ-1
TZ-1
QZ-1CN-1 CN-1 CN-1
CN-1 CN-1
HATCH
8
FILE
406CP-1
OPEN CONFERENCE
407
RECEPTION
400
WORK SPACE
408
PT-3 DAISY YELLOW PAINT
PT-2 U.N.O.
PT-3 MULLIONSONLY
PT-1U.N.O.
PT-1U.N.O.
PT-2U.N.O. U.N.O.
PT-2
U.N.O.
WP-1 U.N.O.
PT-2
PT-1U.N.O.
PT-1U.N.O.
PT-1U.N.O.
PT-2 U.N.O.
WP-1 U.N.O.
QZ-1 WHITE QUARTZ COUNTERTOP
WP-1 GREY DAMIER WALLPAPER
SYMBOL DESCRIPTION GENERAL NOTES1. RUBBER COVE BASE ALONG ALL WALLS U.N.O.2. NO CHANGE IN HEIGHT AT FLOORING TRANSITIONS.3. ALL MULLIONS ARE FINISHED WITH SHERWIN WILLIAM'S DAISY YELLOW PAINT.
PT-2 U.N.O.
Scale
Project numberDateDrawn byChecked by
1
2
3
4
5
6
PRELIMINARY SUBMITTAL 03-23-2012
PRELIMINARY SUBMITTAL 03-30-2012
PRELIMINARY SUBMITTAL 04-06-2012
PRELIMINARY SUBMITTAL 04-13-2012
PRELIMINARY SUBMITTAL
FINAL SUBMITTAL
04-25-2012
04-30-2012 3/32" = 1'-0"
4/30
/201
2 2:
57:0
4 PM
115 E Desmet, Spokane, WA 99204A 1.1
FLOOR FINISH PLANID333
DesignCloudWork Place Design 4/30/2012
Susan HomanTalieh Ghane
3/32" = 1'-0"1 FLOOR FINISH PLAN
No. Description Date
DNUPDN
1 2 3 4 5 6 7 9 10
A
B
C
D
1A 5.0
2A 5.0
SYMBOL DESCRIPTION
CH-1 STEELCASE JOEL LOUNGE CHAIR
PRIVATE OFFICE
404
CONFERENCE
405
JANITOR
410
KITCHEN
409ELEV.
CH-1
CH-2
CH-2 STEELCASE CHORD MIDBACK SEATING CHAIR
CH-3 STEELCASE CHORD HIGHBACK SEATING CHAIR
CH-3
CH-4
CH-4 STEELCASE COALESSE TOPO LOUNGE CHAIR
CH-5 STEELCASE EMU LOUNGE CHAIR
CH-5
CH-6
CH-7 CH-7
CH-7
CH-4
CH-8
CH-9
CH-11
SYMBOL DESCRIPTION
CH-13 STEELCASE CIRCA STRAIGHT BENCH
TB-1 STEELCASE CIRCA TABLE HIGH STRAIGHT
TB-2 STEELCASE CIRCA ROUND TABLE
CH-9
CH-10
TB-1
TB-1 TB-1
CH-12
CH-13
TB-2
TB-2
TB-3
TB-4
TB-5TB-6
TB-7
SYMBOL DESCRIPTION
STEELCASE COALESSE TOPO TALL CREDENZA
ST-2 STEELCASE COALESSE TOPO LEFT PEDESTAL TOWER
ST-3 STEELCASE COALESSE TOPO CREDENZA
ST-4 STEELCASE HOST LOW CREDENZA
ST-5 STEELCASE HOST TALL CREDENZA
ST-1ST-2
ST-3
ST-2
ST-4
ST-5
ST-5
DF-2DF-1
WC-2
WC-1
WC-2
WC-1
2' - 3"
2' -
3"
3' - 11"3' - 8"
2' - 5"2' - 1"
2' -
5"2'
- 11
"5'
- 9"3' - 8"
2' - 4"
6' - 5"
1' - 4" 10' - 8"
7' -
3" 5' -
0"
2' -
7"
2' - 9"
3' -
6"
4' -
11"
2' -
5"
4' - 1"
3' -
6"
5' - 0" TYP.
4' -
8"
MECH.
11' - 10"
6' -
4"6'
- 1"
SYMBOL DESCRIPTION
CH-7
CH-8
CH-9
CH-10
STEELCASE TOGETHER BENCH RIGHT CORNER
STEELCASE AMIA 482 CHAIR
STEELCASE CIRCA WEDGE LOVE SEAT 60 DEG. INSIDE
STEELCASE CIRCA STRAIGHT LOVE SEAT
SYMBOL DESCRIPTION
STEELCASE COALESSE ANDO DINING TABLE
TB-6 STEELCASE ANSWER SOLUTION UNIVERSAL SYSTEM WORK SURFACE
TB-7 STEELCASE COALESSE ENEA TABLE
CH-6 STEELCASE TOGETHER BENCH LEFT CORNER
CH-11 STEELCASE COALESSE ENEA CAFE STOOL
CH-12 STEELCASE TOGETHER BENCH LEFT CORNER LG.
TB-3 STEELCASE TOPO DESKTOP WITH STORAGE
TB-4 STEELCASE COALESSE HOST BOAT 14'
TB-5
ST-1
DF-1
DF-2
DRINKING FOUNTAIN
ADA DRINKING FOUNTAIN
WC-1 WATER CLOSET
WC-2 ADA WATER CLOSET
LP-1
LP-1 FLOOR LAMP
7' -
1"
5' - 2"
3' -
6"
4' - 1
"
3' -
5"
4' - 3"
5' - 9"
2' -
4"
3' -
6"
3' - 5"
5' - 9"
4' - 11"
6' - 3"
4' -
0"
2' - 11"
2' -
2"
1' -
10"
3' - 9"
A 4.01
A 4.1 3
SYMBOL DESCRIPTION
LV-1 LAVATORY
RF-1
CT-1
CW-1
AV-1
AV-2
2
3
4
4
1
2
A 4.2
2
4
1 3
REFRIGERATOR
COOK TOP
CASEWORK
INTERACTIVE WHITEBOARD
MONITOR
CW-1
CT-1
LV-1
RF-1
AV-2
AV-2
AV-2
AV-1
AV-1
8
SYMBOL DESCRIPTION
GB-1 GRAB BAR
HR-1 HANDRAIL
HR-1GB-1GB-1
RECEPTION
400
OPEN CONFERENCE
407
FILE
406
WORK SPACE
408
1' -
9"3'
- 8"0'
- 11
"1'
- 2"
2' -
8" 2' -
6"
GENERAL NOTES1. SEE SHEET A 6.0 FOR FURNITURE SCHEDULE.
GENERAL NOTES1. ALL CEILINGS ARE EXPOSED U.N.O.2. EXPOSED CEILING SLOPES FROM 9'-2'' TO 13'-2'' FROM GRIDLINE A TO B.3. EXPOSED CEILING SLOPES FROM 9'-2'' TO 13'-2'' FROM GRIDLINE C TO D.4. ALL GYPSUM CEILING CLOUDS ARE FINISHED WITH SHERWIN WILLIAM'S CLOUDLESS BLUE PAINT U.N.O.
NORTH SOUTH EAST WEST BASE FLOOR CEILING400 RECEPTION 1034 SF PT-2 GZ-1 GZ-1 WP-1 BA-1 TZ-1 EXPOSED NO FINISH ON EXPOSED CEILING, PT-3 ON WINDOW MULLIONS401 WC 101 SF PT-2 PT-2 PT-2 PT-2 TZ-1 TZ-1 EXPOSED NO FINISH ON EXPOSED CEILING402 WC 101 SF PT-2 PT-2 PT-2 PT-2 TZ-1 TZ-1 EXPOSED NO FINISH ON EXPOSED CEILING403 UTILITY 47 SF PT-1 PT-1 PT-1 PT-1 BA-1 CN-1 EXPOSED NO FINISH ON EXPOSED CEILING404 PRIVATE OFFICE 250 SF PT-2 PT-2 PT-2 PT-2 BA-1 CP-1 EXPOSED PT-3 ON WINDOW MULLIONS405 CONFERENCE 388 SF WP-1 GZ-1 GZ-1 WP-1 BA-1 CP-1 PT-1 ON GYPSUM PT-3 ON WINDOW MULLIONS406 FILE 715 SF WP-1 WP-1 WP-1 WP-1 BA-1 CP-1 EXPOSED NO FINISH ON EXPOSED CEILING, PT-3 ON WINDOW MULLIONS407 OPEN CONFERENCE 449 SF WP-1 WP-1 WP-1 WP-1 BA-1 CP-1 EXPOSED NO FINISH ON EXPOSED CEILING, PT-3 ON WINDOW MULLIONS408 WORK SPACE 2417 SF WP-1 WP-1 WP-1 WP-1 BA-1 CP-1 EXPOSED NO FINISH ON EXPOSED CEILING, PT-3 ON WINDOW MULLIONS409 KITCHEN 386 SF PT-2 PT-2 GZ-1 PT-2 TZ-1 TZ-1 EXPOSED NO FINISH ON EXPOSED CEILING, PT-3 ON WINDOW MULLIONS410 JANITOR 97 SF PT-1 PT-1 PT-1 PT-1 BA-1 CN-1 EXPOSED NO FINISH ON EXPOSED CEILING411 MECHANICAL 109 SF PT-1 PT-1 PT-1 PT-1 BA-1 CN-1 EXPOSED NO FINISH ON EXPOSED CEILINGGrand total 6095 SF