Top Banner
1 1 3 1 3 2 4 1 5A 1 P No. Group No.
63

Demo Asme Pwht Preheat

Oct 20, 2015

Download

Documents

Walter Trajada

Demo Asme Pwht Preheat
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Sheet1P No.Group No.ASME Section VIII-Division 1, Pressure VesselsASME Section I, Power BoilersASME B31.1, Power PipingASME B31.3, Process PipingPWHTPreheatPWHTPreheatPWHTPreheatPWHTPreheat11ASME Section VIII-Division 1; Requirements for PWHT of Table UCS-56 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal): Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating and Cooling rate: Max. Demo F (Demo C) per hr divided by the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C)/hr; Min. Demo F (Demo C)/hrFor Mandatory & Non-Mandatory thickness conditions of PWHT, See Note (2) of Table UCS-56For PWHT at lower temperatures for longer periods of time, See Note (1) of Table UCS-56ASME Section VIII-Division 1; Preheating from Appendix R (a) Demo F (Demo C) for material which has both a specified maximum carbon contentin excess of 0.30% and a thickness at the joint in excess of 1 in. (25 mm); (b) Demo F (Demo C) for all other materials of P-No. 1 group.ASME Section I; Mandatory Requirements for PWHT of Table PW-39 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal): Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating rate: The weldment shall be heated slowly to the holding temperature, Min. Demo F (Demo C)/hrCooling rate: Cool slowly in a still atmosphere to a temperature not exceeding Demo F (Demo C) For Non-Mandatory conditions of PWHT, See Notes (1), (3) of Table PW-39For PWHT at lower temperatures for longer periods of time, See Note (2) of Table PW-39ASME Section I; Preheating from Appendix A (A-100) (a) Demo F (Demo C) for material which has both a specified maximum carbon contentin excess of 0.30% and a thickness at the joint in excess of 1 in. (25 mm); (b) Demo F (Demo C) for all other materials of P-No. 1 group.ASME B31.1; Requirements for PWHT of Table 132 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended value, See Clause 132.2Heating and Cooling Rate: Demo F (Demo C) per hr divided by 1/2 the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C) per hrHolding Time Based on Nominal Thickness: Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)For Non-Mandatory conditions of PWHT, See Note (A) of Table 132For PWHT at lower temperatures for longer periods of time, See Note (B) of Table 132ASME B31.1; Preheating from Clause 131.4 Demo F (Demo C) for material which has both a specified maximum carbon content in excess of 0.30% and a thickness at the joint in excess of 1 in. (25 mm) for materials of P-No. 1 group.ASME B31.3; Requirements for PWHT of Table 331.1.1 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended valueHolding Time Based on Nominal Thickness: Over 3/4 in. (20 mm); 1 hr/in (2.4 min/mm), 1hr Min. PWHT is not required for thickness up to 3/4 in. (20 mm) for P-No. 1 group.ASME B31.3; Preheating from Table 330.1.1 Preheating is not required for P-No. 1 group.Recommended preheat based on Nominal Wall Thickness: Including and above 1 in. (25 mm): Demo F (Demo C)When Specified Min. Tensile Strength is above 71 ksi (490 MPa): Demo F (Demo C)31ASME Section VIII-Division 1; Requirements for PWHT of Table UCS-56 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating and Cooling rate: Max. Demo F (Demo C) per hr divided by the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C)/hr; Min. Demo F (Demo C)/hrFor Mandatory & Non-Mandatory thickness conditions of PWHT, See Notes (2), (3), (4) of Table UCS-56For PWHT at lower temperatures for longer periods of time, See Note (1) of Table UCS-56ASME Section VIII-Division 1; Preheating from Appendix R (a) Demo F (Demo C) for material which has either a specified minimum tensile strength in excess of 70,000 psi (480 MPa) or a thickness at the joint in excess of 5/8 in. (16 mm); (b) Demo F (Demo C) for all other materials of P-No. 3 group.ASME Section I; Mandatory Requirements for PWHT of Table PW-39 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating rate: The weldment shall be heated slowly to the holding temperature, Min. Demo F (Demo C)/hrCooling rate: Cool slowly in a still atmosphere to a temperature not exceeding Demo F (Demo C) For Non-Mandatory conditions of PWHT, See Notes (1), (3) of Table PW-39For PWHT at lower temperatures for longer periods of time, See Note (2) of Table PW-39ASME Section I; Preheating from Appendix A (A-100) (a) Demo F (Demo C) for material which has either a specified minimum tensile strength in excess of 70,000 psi (Demo MPa) or a thickness at the joint in excess of 5/8 in. (16 mm); (b) Demo F (Demo C) for all other materials of P-No. 3 group.ASME B31.1; Requirements for PWHT of Table 132 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended value, See Clause 132.2Heating and Cooling Rate: Demo F (Demo C) per hr divided by 1/2 the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C) per hrHolding Time Based on Nominal Thickness: Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)For Non-Mandatory conditions of PWHT, See Note (A) of Table 132For PWHT at lower temperatures for longer periods of time, See Note (B) of Table 132ASME B31.1; Preheating from Clause 131.4Demo F (Demo C) for material which has either a specified minimum tensile strengthin excess of 60,000 psi (410 MPa) or a thickness at the joint in excess of 1/2 in. (13 mm) for materials of P-No. 3 group.ASME B31.3; Requirements for PWHT of Table 331.1.1 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended valueHolding Time Based on Nominal Thickness: Over 3/4 in. (20 mm); 1 hr/in (2.4 min/mm), 1hr Min.Up to 3/4 in. (20 mm), if Min. T. S. is greater than 71 ksi (490 MPa):1 hr/in (2.4 min/mm), 1hr Min.PWHT for thickness up to 3/4 in. (20 mm) is not required, when Min. Tensile Strength is up to 71 ksi (490 MPa) for P-No. 3 group.ASME B31.3; Preheating from Table 330.1.1 Preheating is not required for P-No. 3 group.Recommended preheat based on Nominal Wall Thickness: Including and above 1/2 in. (13 mm): Demo F (Demo C)When Specified Min. Tensile Strength is above 71 ksi (490 MPa): Demo F (Demo C)32ASME Section VIII-Division 1; Requirements for PWHT of Table UCS-56 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating and Cooling rate: Max. Demo F (Demo C) per hr divided by the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C)/hr; Min. Demo F (Demo C)/hrFor Mandatory & Non-Mandatory thickness conditions of PWHT, See Notes (2), (3), (4) of Table UCS-56For PWHT at lower temperatures for longer periods of time, See Note (1) of Table UCS-56ASME Section VIII-Division 1; Preheating from Appendix R (a) Demo F (Demo C) for material which has either a specified minimum tensile strength in excess of 70,000 psi (480 MPa) or a thickness at the joint in excess of 5/8 in. (16 mm); (b) Demo F (Demo C) for all other materials of P-No. 3 group.ASME Section I; Mandatory Requirements for PWHT of Table PW-39 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)Heating rate: The weldment shall be heated slowly to the holding temperature, Min. Demo F (Demo C)/hrCooling rate: Cool slowly in a still atmosphere to a temperature not exceeding Demo F (Demo C) For Non-Mandatory conditions of PWHT, See Notes (1), (3) of Table PW-39For PWHT at lower temperatures for longer periods of time, See Note (2) of Table PW-39ASME Section I; Preheating from Appendix A (A-100) (a) Demo F (Demo C) for material which has either a specified minimum tensile strength in excess of 70,000 psi (Demo MPa) or a thickness at the joint in excess of 5/8 in. (16 mm); (b) Demo F (Demo C) for all other materials of P-No. 3 group.ASME B31.1; Requirements for PWHT of Table 132 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended value, See Clause 132.2Heating and Cooling Rate: Demo F (Demo C) per hr divided by 1/2 the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C) per hrHolding Time Based on Nominal Thickness: Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)For Non-Mandatory conditions of PWHT, See Note (A) of Table 132For PWHT at lower temperatures for longer periods of time, See Note (B) of Table 132ASME B31.1; Preheating from Clause 131.4Demo F (Demo C) for material which has either a specified minimum tensile strengthin excess of 60,000 psi (410 MPa) or a thickness at the joint in excess of 1/2 in. (13 mm) for materials of P-No. 3 group.ASME B31.3; Requirements for PWHT of Table 331.1.1 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended valueHolding Time Based on Nominal Thickness: Over 3/4 in. (20 mm); 1 hr/in (2.4 min/mm), 1hr Min.Up to 3/4 in. (20 mm), if Min. T. S. is greater than 71 ksi (490 MPa):1 hr/in (2.4 min/mm), 1hr Min.PWHT for thickness up to 3/4 in. (20 mm) is not required, when Min. Tensile Strength is up to 71 ksi (490 MPa) for P-No. 3 group.ASME B31.3; Preheating from Table 330.1.1 Preheating is not required for P-No. 3 group.Recommended preheat based on Nominal Wall Thickness: Including and above 1/2 in. (13 mm): Demo F (Demo C)When Specified Min. Tensile Strength is above 71 ksi (490 MPa): Demo F (Demo C)41ASME Section VIII-Division 1; Requirements for PWHT of Table UCS-56 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm) to 5 in. (125 mm); 1 hr/in. (2 min/mm)Over 5 in. (125 mm); 5 hr plus 15 min for each additional inch over 5 in. (125 mm)Heating and Cooling rate: Max. Demo F (Demo C) per hr divided by the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C)/hr; Min. Demo F (Demo C)/hrFor Mandatory & Non-Mandatory conditions of PWHT, See Notes (1), (2) of Table UCS-56ASME Section VIII-Division 1; Preheating from Appendix R (a) Demo F (Demo C) for material which has either a specified minimum tensile strength inexcess of 60,000 psi (410 MPa) or a thickness at the joint in excess of 1/2 in. (13 mm);(b) Demo F (Demo C) for all other materials of P-No. 4 group.ASME Section I; Mandatory Requirements for PWHT of Table PW-39 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal):Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm) to 5 in. (125 mm); 1 hr/in. (2 min/mm)Over 5 in. (125 mm); 5 hr plus 15 min for each additional inch over 5 in. (125 mm)Heating rate: The weldment shall be heated slowly to the holding temperature, Min. Demo F (Demo C)/hrCooling rate: Cool slowly in a still atmosphere to a temperature not exceeding Demo F (Demo C) For Non-Mandatory conditions of PWHT, See Notes (1), (2) of Table PW-39ASME Section I; Preheating from Appendix A (A-100) (a) Demo F (Demo C) for material which has either a specified minimum tensile strength inexcess of 60,000 psi (410 MPa) or a thickness at the joint in excess of 1/2 in. (13 mm);(b) Demo F (Demo C) for all other materials of P-No. 4 group.ASME B31.1; Requirements for PWHT of Table 132 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended value, See Clause 132.2Heating and Cooling Rate: Demo F (Demo C) per hr divided by 1/2 the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C) per hrHolding Time Based on Nominal Thickness: Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)For Non-Mandatory conditions of PWHT, See Note (A) of Table 132ASME B31.1; Preheating from Clause 131.42Demo F (Demo C) for materials of P-No. 4 group.ASME B31.3; Requirements for PWHT of Table 331.1.1 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended valueHolding Time Based on Nominal Thickness: Over 1/2 in. (13 mm); 1 hr/in (2.4 min/mm), 2 hr Min.Up to 1/2 in. (13 mm), if Min. T. S. is greater than 71 ksi (490 MPa):1 hr/in (2.4 min/mm), 2 hr Min.PWHT for thickness up to 1/2 in. (13 mm) is not required, when Min. Tensile Strength is up to 71 ksi (490 MPa) for P-No. 4 group.ASME B31.3; Preheating from Table 330.1.1 Demo F (Demo C) for P-No. 4 group.5A1ASME Section VIII-Division 1; Requirements for PWHT of Table UCS-56 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal): Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm) to 5 in. (125 mm); 1 hr/in. (2 min/mm)Over 5 in. (125 mm); 5 hr plus 15 min for each additional inch over 5 in. (125 mm)Heating and Cooling rate: Max. Demo F (Demo C) per hr divided by the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C)/hr; Min. Demo F (Demo C)/hrFor Non-Mandatory conditions of PWHT, See Notes (1), (2) of Table UCS-56For PWHT at lower temperatures for longer periods of time, See Note (3) of Table UCS-56ASME Section VIII-Division 1; Preheating from Appendix R(a) Demo F (Demo C) for material which has either a specified minimum tensile strength inexcess of 60,000 psi (410 MPa) or has both a specified minimum chromium content above 6.0% and a thickness at the joint in excess of 1/2 in. (13 mm); (b) Demo F (Demo C) for all other materials of P-No. 5A group.ASME Section I; Mandatory Requirements for PWHT of Table PW-39 Min. Holding Temperature; Demo F (Demo C) Min. Holding Time for Weld Thickness (Nominal): Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm) to 5 in. (125 mm); 1 hr/in. (2 min/mm)Over 5 in. (125 mm); 5 hr plus 15 min for each additional inch over 5 in. (125 mm)Heating rate: The weldment shall be heated slowly to the holding temperature, Min. Demo F (Demo C)/hrCooling rate: Cool slowly in a still atmosphere to a temperature not exceeding Demo F (Demo C) For Non-Mandatory conditions of PWHT, See Notes (1), (2), (3) of Table PW-39ASME Section I; Preheating from Appendix A (A-100) (a) Demo F (Demo C) for material which has either a specified minimum tensile strength inexcess of 60,000 psi (410 MPa) or has both a specified minimum chromium content above 6.0% and a thickness at the joint in excess of 1/2 in. (13 mm); (b) Demo F (Demo C) for all other materials of P-No. 5A group.ASME B31.1; Requirements for PWHT of Table 132 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended value, See Clause 132.2Heating and Cooling Rate: Demo F (Demo C) per hr divided by 1/2 the maximum thicknessof material in inches at the weld, but no more than Demo F (Demo C) per hrHolding Time Based on Nominal Thickness: Up to 2 in. (50 mm); 1 hr/in. (2 min/mm), 15 min Min.Over 2 in. (50 mm); 2 hr plus 15 min for each additional inch over 2 in. (50 mm)For Non-Mandatory conditions of PWHT, See Note (A) of Table 132ASME B31.1; Preheating from Clause 131.4(a) Demo F (Demo C) for material which has either a specified minimum tensile strength inexcess of 60,000 psi (410 MPa) or has both a specified minimum chromium content above 6.0% and a thickness at the joint in excess of 1/2 in. (13 mm); (b) Demo F (Demo C) for all other materials of P-No. 5A group.ASME B31.3; Requirements for PWHT of Table 331.1.1 Holding Temperature Range; Demo F (Demo C) to Demo F (Demo C)Upper limit temperature range is a recommended valueHolding Time Based on Nominal Thickness: For all Nominal Thickness sizes, if > 3% Cr and > 0.15% C:1 hr/in (2.4 min/mm), 2 hr Min.Over 1/2 in. (13 mm), if