DELHI DEVELOPMENT AUTHORITY SECTOR - 07 SECTOR - 15 SECTOR - 06 SECTOR - 05 SECTOR - 17 SECTOR - 04 SECTOR - 10 SECTOR - 18 SECTOR - 12 SECTOR - 03 SECTOR - 11 SECTOR - 08 SECTOR - 01 SECTOR - 09 SECTOR - 13 SECTOR - 14 SECTOR - 02 SECTOR - 16 BURARI KADI PUR BAKOLI BAKTAWARPUR HIRANKI ALIPUR HAMIDPUR TIGIPUR JINDPUR IBRAHIMPUR SINGHOLA MUKHMALPUR MUKUNDPUR BHALSWA JAHANGIRPUR TAJPUR KALAN LIBAS PUR AKBARPURMAZARA GADI KHASRO KHAM PUR NANGLI PUNA SALEMPUR MAJRA BURARI SAMAYPUR BADLI MOHAMMADPUR RAMJANPUR JHARODA MAJRA BURARI PALLA SEERASPUR FATEHPUR JAT DHIRPUR KAMALPUR MAJRA BURARI BUDPUR BIJAPUR SUNGARPUR - DELHI PALLA AKBARPURMAZARA TIKRI KHURD DUSIB DWG.NO. Date Dy. Dir(Plg.) Zone - PII Director (Plg.) Land Policy/Zone - PII Commissioner(Plg.) Plg. Asstt. Zone - PII Asstt. Dir(Plg.) Zone - PII Asstt. Dir(Plg.) Land Policy UER-I 80 M R/W PROPOSED BUND GT KARNAL ROAD 100 M R/W GT KARNAL ROAD 100 M R/W ROAD 100 M R/W ROAD 90 M R/W HARYANA ROAD 60 M R/W ROAD 60 M R/W ROAD 40 M R/W UER- III 80 M R/W ROAD 30 M R/W ROAD 30 M R/W ROAD 40 M R/W ROAD 40 M R/W ROAD 30 M R/W ROAD 40 M R/W ROAD 30 M R/W ROAD 80 M R/W 220 KV HT LINE 400 KV HT LINE 220 KV HT LINE 220 KV HT LINE 220 KV HT LINE To Ambala Ambala Rly. Line S S SW SW W Drain Drain Drain Drain UER- II 100 M R/W ROAD 60 M R/W ZONE- C ZONE- C ZONE- P-I ZONE- P-I ZONE- O ZONE- O UER-I 80 M R/W UER- II 100 M R/W UER- III 80 M R/W TO ROHINI BHALSWA LAKE DRAIN RIVER YAMUNA UTTAR PRADESH L J N F G E O D H M C P - I P - II K - I B K - II A KEY PLAN 0 1 2 3 4 0.5 Kms SECTOR DELINEATION PLAN- ZONE P-II Legend Green Belt LDRA Laldora/Extended Laldora Existing Housing Scheme/ Other allotment Jhor Drain River Existing Utilities/Schemes Government Land(DDA, Other Govt & Gramsabha) Road Network Existing Physical Features Proposed Road Existing Road HT Lines with buffer ! ! ! DMRC Metro Line Railway Line S W Utility E SW Boundaries Village Zone Forest Land Water Body Sector Sector Total Area in Ha. (Approx) Vacant Area in Ha. (Approx) 1 275 172 2 221 140 3 311 210 4 421 0 5 456 69 6 470 231 7 554 237 8 284 123 9 268 148 10 362 164 11 293 123 12 336 198 13 245 165 14 244 223 15 553 110 16 195 26 17 455 67 18 342 42 I This drawing is specifically prepared only for the purpose of delineation of sector boundaries II Presently NHAI is working on the feasibility of alignment of UER-II and changes based on the finalized alignment will be incorporated in the ZDP as per due procedure III The sector boundaries may require readjustment depending upon ground realities. IV The vacant land is approximate and is based on satellite imagery of 2015 available in ESRI Arc GIS Platform (open source).It is not indicative of the developable area under land pooling and may vary based on actual ground truthing. V Vacant land on either side of existing road/natural features has been considered contiguous for sector delineation. VI ROW of roads are as per Notified ZDP. Notes