    Developing Engineering Procur

    Construction (EPC) Company in

    Indonesia

    The Opportunities, Challenges and Rol

    EPC

    Fendi Liem, PT Selaras Daya Utama – 

    2016

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    2/27

    SEDAYU

    Indonesia’s leading Solar

    EPC▪ Jakarta-based Solar EPC▪ Distributor of world’s leading solar

    technology/products▪ ISO 9001:2004 certified EPC

    ▪ OHSAS 18001:2007 certified EPC

    ▪ SBUJK certified in Renewable Energy▪ Licensed General Importer (API)

    ▪ Authorized distributor of world’s leading solar

    modules

    ▪ Authorized distributor of industry-leader inverter

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    3/27

    PT Selaras Daya Utama

    establishe

    d

    RE EPC O

    1

    2004 2009

    RE

    2010

    2011

    PLTS

    PLN

    2012

    ISO 9001

    2013

    PLTS

    ESDM

    2

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    4/27

    LTS ONGRID

    PLTS PLN Tahuna 50 kWp (2012) – Indonesia’s First Zero NBuilding

    PLTS PLN Gorontalo 45 kWp (2013) – Rooftop PLTS for Indusneeds

    PLTS PLN Kapuas 5 kWp (2014)

    PLTS Bank Indonesia 90 kWp, Jakarta (2015)

    PLTS Menteng Residence 10 kWp, Jakarta (2015)

    and many other residential rooftop PLTS… 

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    5/27

    LTS OFFGRID

    PLTS Karimunting 75 kWp, Kalimantan Barat (2015)PLTS Semunying Jaya 50 kWp, Bengkayang (2015)

    PLTS Tempapan 50 kWp, Bengkayang (2015)PLTS Aris 50 kWp, Bengkayang, Kalimantan Barat (2015)

    PLTS Sinar Baru 20 kWp, Bengkayang, Kalimantan Barat (201

    PLTS Kaimana, Papua Barat (2013)

    PLTS Bumi Ratu, Lampung Barat (2013)

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    6/27

    LTS HYBRID

    PLTS 350 kWp Daruba, Morotai, Maluku Utara (2015)

    PLTS 100 kWp Pembeliangan, Nunukan, Kalimantan Utara (201

    PLTS 100 kWp Tabur Lestari, Nunukan, Kalimantan Utara (20PLTS 100 kWp Sukamaju, Nunukan, Kalimantan Utara (2015)

    PLTS 200 kWp Sei Limau, Nunukan, Kalimantan Utara (2015)

    PLTS 150 kWp Sekikilan, Nunukan, Kalimantan Utara (2015)

    PLTS 100 kWp Netemnanu, Kupang, Nusa Tenggara Timur (2015

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    7/27

    “ 

    To be a leading vertically- 

    integrated Renewable Energy

    company in Indonesia.

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    8/27

    SEDAYU Solar Project

    References

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    9/27

    10+

    years

    1000+

    MWh produced

    100+

    projects

    100%

    success rat

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    10/27

    1.

    The Opportunities and

    Challenges

    For Solar Engineering Procurement Construction (EPC) com

    Indonesia

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    11/27

    Irradiation Opportunities*

    With a consistently high

    solar irradiation 4.5-5.1

    kWh/m2/day

    Location Opportunities

    Lies along equatorial line

    doesn’t require tracker 

    Indonesia’s Geographic

     

    Tropical country along equatorial

    line

    Durability Challenges

    Tropical, remote and

    isolated places requires

    high quality

    Location Challenges

    Remote and isolated places

    Land Ownership Dispute

    * source: ESDM website  

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    12/27

    Government Opportunities

    MEMR regularly release

    PLTS tenders from state-

    budget

    Future opportunities

    Indonesia has set

    ambitious target toharvest solar energy

    Indonesia’s Target nergy Mix

     

    5% out of target of 20%

    Sustainability Challenges

    The current industry is

    based mainly on MEMR

    tenders

    Regulation Challenges

    Still waiting for Solar

    FIT for both utility andresidential scale

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    13/27

    Target market

    Opportunities

    Distributed Solar Off-grid

    system suits sparse

    population

    Financial Opportunities

    Cost-effective DieselReplacement solutions

    Indonesia is an archipelago country

    Indonesia consists of more than 17,000

    islands

    Logistic Challenges

    High-cost and challenging

    routes require suitable

    product

    Financial Challenges

    Project Bankability

    Awareness of localfinancial institutions

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    14/27

    Financial Opportunity

    Good BEP and ROI for off-

    grid & remote areas 

    Solar module Opportunity

    Local Content RegulationDemand > Supply

    Battery Opportunity

    Local Content Regulation

    Off-grid Solar for remote

    areas

    Supporting industries in Solar

    development

    Financial, Solar Module and Battery

    industries

    Financial Challenges

    Minimum awareness among

    Indonesia’s financial

    institutions 

    Solar Module Challenges

    Project bankability

    Higher price than market p

    Battery Challenges

    Limited local battery

    manufacturers-

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    15/27

    3.

    The Roles of EPC

    Engineering Procurement Construction (EPC) Company in So

    Development

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    16/27

    Solar

    Development

    stakeholders

    Governmen

    Off-taker

    EPC

    EPC

    IPP

    Ministry of Energy

    Ministry of Environment

    Foreign Investment

    Board

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    17/27

    Together with the government, EPC needs to educate the mthe benefits of solar energy especially for remote and i

    areas without grid connectivity or using diesel generato

    To educate the market on

    the competitive advantages of

    Solar

    People of Desa Bumi Ratu in Lampung used to spend around USD 2/day for d

    before the Ministry of Energy and Mineral Resources together with PT INT

    Selaras Daya Utama commissioned the Off-grid Solar Power Plant. Now, eve

    need to contribute only USD 2/month for the Operation and Maintenance ofPower Plant.

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    18/27

    AS with other technology-driven industry, Solar technolobeen advancing exponentially in the last couple of years

    it more efficient and more affordable solution.

    To implement the best and the latest

    technologies

    working with world’s leading R compa

    As authorized distributor of world’s leading Solar technologies and pro

    SEDAYU works closely with its principal, including REC Group and ABB, to

    Solar Power Plants with their latest and best technology to date.

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    19/27

    In ensuring the good acceptance in the market, EPC needsintroduce affordable Solar solution to suite Indonesian

    including its buying power, tropical climate, geographiclocation and its existing electricity grid.

    To implement the affordable solution

    to suit the Indonesian market

    Despite consistent and high irradiation level, the Indonesian climate re

    durable component to withstand its harsh and unique conditions, for exam

    ensures the solar modules installed in islands are certified with ISO 61

    Mist Corrosion test to cope with the seafront installations.

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    20/27

    1. Efficient Business Model

    With no consistent market demand due to non-existing

    Solar EPC must operate efficiently by minimizing sunk

    maximizing strategic alliances/partnership

    2. Strong Financial SupportWith the current low-appetite from local financial

    institutions to support Solar projects, most projectsbased on ‘Corporate Finance’; hence this requires E

    have strong Financial Support.

    Summary

    Developing Solar EPC in Indonesia

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    21/27

    3. Good & Cost-efficient products to suit the market

    During its infancy stage, its important for EPC to us

    quality and cost-efficient products/technology to gai

    acceptance

    4. Global PartnershipLearning from best-practices from more mature market

    participating in the international effort to meet shaglobal challenges.

    Summary

    Developing Solar EPC in Indonesia

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    22/27

    P

    g

    B

    I

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    23/27

    P

    g

    B

    L

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    24/27

    PLTS Jeret 50 kWp

    North Maluku

    PLTS Jeret 50 kWp in North

    Maluku is the project of

    Ministry of Energy and MineralResources (ESDM) and

    commissioned by PT INTI

    together with PT Selaras Daya

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    25/27

    P

    g

    P

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    26/27

    Thanks

    Fendi LiemCEO, PT Selaras Daya UtamaCertified Expert in Climate & Renewable Ene

    Finance – Frankfurt School of Finance & Ma

    GmbH,UNEP Collaborating Center for Climate & Su

    Energy

  • 8/18/2019 Day2 Solar1 Developing Engineering Procurement Fendi Lim

    27/27

    Presentation

    Disclaimer

    This presentation is prepared by Fendi G Liem of PT Selaras Daya Utama (SEDAYU) forBali Clean Energy Forum (BCEF) 2016

    FENDI G LIEM

    CEO, PT Selaras Daya Utama

    Mobile: +62 811 999 166Email: [email protected] 

    PT Selaras Daya Utama (SEDAYU)

    Indonesia’s leading Solar EPC compan

    TOTAL Building 5th Fl.Jalan Letjen S Parman kav. 106A

    Jakarta 11440

    Email: [email protected]

    Phone: +62 21 5695 0755Fax: +62 21 5695 0735

    More information on PT Selaras Daya Utama (SEDAYU) at www.sedayu.com 