Water

Rebuilding an urban water culture

Shubha RamachandranBiome Environmental Trust

Page 2: Dakshin Pinakini River revival project

COMMUNITY : HOW SHOULD WE MANAGE OUR WATER?

Page 3: Dakshin Pinakini River revival project

RAINBOW DRIVE

Location Sarjapur Road, Bangalore – Ground water stressed area

Size 34 acres, approx 350 plots, 258 occupied

Details Currently governed by Plot owners association (Society) since 2002.No BWSSB connectionDependent on Ground water ( owned bore wells)

Page 4: Dakshin Pinakini River revival project

Entrance:Prone to FlashFloods during

Rain

Page 5: Dakshin Pinakini River revival project

ONLY Community Borewells

Page 6: Dakshin Pinakini River revival project

Every household connection

METERED !!!!

Page 7: Dakshin Pinakini River revival project

Production Cost of Water and Water Tariff

Slab Tariff

Upto 15KL Rs 30/- per KL

15KL to 25KL Rs 50/- per KL

Above 25KL Rs 120/- per KL

Page 8: Dakshin Pinakini River revival project

RECHARGE WELLS – THREE TYPES

Wells in Storm water drains

invested in by RWA (Collective

Investment)

Wells in Storm water drains

invested in by House hold

(Just outside the house - individual

Investment)

Wells inside the House(individual

Investment)

Page 9: Dakshin Pinakini River revival project

Re-investment in Waste water reuse

Page 10: Dakshin Pinakini River revival project

Phytorid STP and Community

Page 11: Dakshin Pinakini River revival project

EXCESS WASTE WATER SOLD TO A FARMER

Page 12: Dakshin Pinakini River revival project

Classic Orchards – Off Bannerghatta Road

Page 13: Dakshin Pinakini River revival project
Page 14: Dakshin Pinakini River revival project

Jakkur Lake

● 10 MLD design● 8.45 MLD inflow

from Yelahanka and Jakkur

● WETLAND● STP open for

viewing

Page 15: Dakshin Pinakini River revival project
Page 16: Dakshin Pinakini River revival project

Treatment Plant and Jakkur Lake

Page 17: Dakshin Pinakini River revival project

Treated Wastewater entering the wet Land System of Jakkur Lake

Page 18: Dakshin Pinakini River revival project

Nature as further treatment

Page 19: Dakshin Pinakini River revival project

Lake ecosystem

Page 20: Dakshin Pinakini River revival project

Fisheries

Page 21: Dakshin Pinakini River revival project

Sludge as Compost

Page 22: Dakshin Pinakini River revival project

Groundwater

Page 23: Dakshin Pinakini River revival project
Page 24: Dakshin Pinakini River revival project

Community – Jala Poshan

Page 25: Dakshin Pinakini River revival project

Puttenahalli – JP Nagar

● 13 acres● 5-8 MLD from

private STP● Provision for

WETLAND● New Idea/Hope

Page 26: Dakshin Pinakini River revival project

Puttenahalli – JP Nagar

Page 27: Dakshin Pinakini River revival project

Kaikondrahalli

Page 28: Dakshin Pinakini River revival project
Page 29: Dakshin Pinakini River revival project
Page 30: Dakshin Pinakini River revival project

Participatory Aquifer Mapping

Page 31: Dakshin Pinakini River revival project