Page 1: CST 2307_Dinesh Adhikari_FINAL PROJECT

FINAL PROJECT

FALL 2014

Dinesh Adhikari

Class: CS2307 Networking Fundamentals

FALL 2014Prof. Steven Sebili

Page 2: CST 2307_Dinesh Adhikari_FINAL PROJECT

Inventory List: 1

Page 3: CST 2307_Dinesh Adhikari_FINAL PROJECT

Inventory List: 2

Page 4: CST 2307_Dinesh Adhikari_FINAL PROJECT

Building Architecture

Page 5: CST 2307_Dinesh Adhikari_FINAL PROJECT

Network Layout

Page 6: CST 2307_Dinesh Adhikari_FINAL PROJECT

Floor Plan 1

Page 7: CST 2307_Dinesh Adhikari_FINAL PROJECT

Floor Plan 2

Page 8: CST 2307_Dinesh Adhikari_FINAL PROJECT

Floor Plan 3

Page 9: CST 2307_Dinesh Adhikari_FINAL PROJECT

Server Room

Page 10: CST 2307_Dinesh Adhikari_FINAL PROJECT

IP Sub-netting

• FIRST: Printer, Servers, Router and Switches (Static)• Usable: 131.12.0.1 - 131.12.63.254• Broadcast: 131.12.63.255•

• SECOND: B#1 2nd Floor 30 users (DHCP)• Usable: 131.12.64.1 - 131.12.127.254• Broadcast: 131.12.127.255•

• THIRD: B#2 25th Floor 55 users (DHCP)• Usable: 131.12.128.1 - 131.12.191.254• Broadcast: 131.12.191.255•

• FOURTH: B#2 32nd Floor 15 users (DHCP)• Usable: 131.12.192.1 - 131.12.254.254• Broadcast: 131.12.254.255

Page 11: CST 2307_Dinesh Adhikari_FINAL PROJECT

Hardware and Accessories

APC Power Back Up

6 Port Fiber Switch

48 Port Cisco L3 Switch

SC Multimode Fiber Cable

RJ-45

Fiber Connector CAT6 Cable

Cisco EN RouterXerox 4150 xf Printer

Wall plate