PPTO ISCAYCRUZ
CompararJRC MINERIA Y CONSTRUCCION SAC
PRESUPUESTO DE OBRA
PROYECTOEXCAVACION PIQUE INCLINADO - MINA LIMPE
CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ S.A.UBICACINPACHANGARA, OYN,
LIMA.FECHA.Mayo 2002CONTRATA MILSAJRC - MILSA
ITEMDESCRIPCIONUbicacinsecc.METRADOP.U.TOTALP.U.TOTALP.U.TOTALmtrs.US$/mtr.US$US$/mtr.US$US$/mtr.US$
1.00EXCAVACION HORIZONTAL (Acceso a Pique)m2m3AGaleria a camara
de winche (746)Nv. +44 x
45423.222,116.091680431.722,158.60-8.50-42.51CGaleria acceso a
tambor de wincheNv. +44 x
42423.22846.441632431.72863.44-8.50-17.00DCrucero chimenea de
ventilacion (xc 890)Nv. +44 x
48423.223,385.7516128431.723,453.76-8.50-68.01ECrucero construccion
camara de wincheNv. +44 x
410423.224,232.1916160431.724,317.20-8.50-85.01FCrucero
construccion camara de wincheNv. +43.5 x
3.524379.699,112.6112.25294390.679,376.08-10.98-263.47Galeria Nv.
De extraccionNv. 03.5 x
3.5137379.6952,017.8412.251678.25390.6753,521.79-10.98-1,503.95Galeria
Nv. De transferenciaNv. 03.5 x
3.50379.690.0012.250390.670.00-10.980.00Rampa acceso a piqueNv.
-143.5 x
3.5120379.6945,563.0712.251470390.6746,880.40-10.98-1,317.33Crucero
acceso a piqueNv. -143.5 x
3.5125379.6947,461.5312.251531.25390.6748,833.75-10.98-1,372.22Crucero
a chimenea ore pass 526Nv. -83.5 x
3.538379.6914,428.3112.25465.5390.6714,845.46-10.98-417.15Nv. -93.5
x 3.518379.696,834.4612.25220.5390.677,032.06-10.98-197.60Nv.
-103.5 x
3.510379.693,796.9212.25122.5390.673,906.70-10.98-109.78Nv. -113.5
x 3.518379.696,834.4612.25220.5390.677,032.06-10.98-197.60Crucero a
chimenea ore pass 510Nv. -124 x
414379.695,315.6916224431.726,044.08-52.03-728.39529201,945.366626.5208,265.38-6,320.0225%2.00EXCAVACION
VERTICALChimenea descarga Skip (cuadrado)Nv. 44 x
48553.614,428.8616128708.245,665.89-154.63-1,237.03Chimenea tolva
superior (mineral)Nv. 03.5 x
3.532479.3615,339.3712.25392542.2417,351.78-62.89-2,012.41Chimenea
tolva superior (desmonte)Nv. 03.5 x
3.532479.3615,339.3712.25392542.2417,351.78-62.89-2,012.41Chimenea
waste pass 510Nv. -121.7 x
1.712280.823,369.892.8934.68218.302,619.6562.52750.24chimenea ore
pass 526nv. -121.7 x
1.717280.824,774.012.8949.13218.303,711.1762.521,062.84chimenea ore
pass 526nv. -111.7 x
1.721280.825,897.312.8960.69218.304,584.3962.521,312.92chimenea ore
pass 526nv. -101.7 x
1.721280.825,897.312.8960.69218.304,584.3962.521,312.92chimenea ore
pass 526nv. -91.7 x
1.715280.824,212.362.8943.35218.303,274.5662.52937.80chimenea ore
pass 526nv. -81.7 x
1.792280.8225,835.832.89265.88218.3020,083.9862.525,751.8425085,094.311426.4279,227.595,866.7211%
3.00EXCAVACION PIQUE INCLINADOPique Inclinado Nv. 4/ Nv.
0Nv.4/Nv.05.5 x
496785.7775,433.97222112854.85(*)82,065.98-69.08-6,632.01854.85
Costos 01: Precio en LicitacinNv.0/Nv.-55.5 x
4122785.7795,864.00222684854.85104,292.19-69.08-8,428.18Nv.-5/Nv.-115.5
x
4156785.77122,580.20223432854.85133,357.22-69.08-10,777.02Nv..11/Nv.-145.5
x
496785.7775,433.97222112854.8582,065.98-69.08-6,632.01470369,312.1510340401,781.38-32,469.2347%
5.00DESQUINCHECamara de winche (19.5 x 9.8 x 12)Nv.
4M31,52512.9419,739.901,52510.4815,982.002.463,757.90GCamara SSEE
Electrica (17.6 x 6.4 x 4)Nv.
4m345012.945,824.8945010.484,716.002.461,108.89Bresting acceso
tambor wincheNv.
4m321812.942,821.8421810.482,284.642.46537.20Galeria Nv. de
transferencia (gal 700)Nv.
0m342512.945,501.2810.484,454.002.461,047.28Zona de carguioNv.
-12m340012.945,177.6840010.484,192.002.46985.68Echaderos Ore
passTodos los
nvs.m371312.949,229.2171310.487,472.242.461,756.973,73148,294.803,30639,100.889,193.926%7.00SOSTENIMIENTO
PIQUE INCLINADO7.01Colocacin, pernos
helicoidalesUnd.13.980.0021,6999.940.004.040.007.02Colocacin Malla
ElectrosoldadaM212.310.009.110.003.200.007.03Colocacin de
shotcrete, espesor
2"M213.540.006.450.007.090.000.000.000.008.00TRANSPORTE8.01Transporte
de desmonte hasta 1,000 mts, via
rampa(esponjado)M321,6993.5476,897.614.5097,645.14-0.96-20,747.538.02Transporte
de desmonte mayor a 1,000 mts, via
rampa(esponjado)M37,2331.4610,549.193.0021,698.92-1.54-11,149.7387,446.80119,344.06-31,897.2611%
792,093.43847,719.29-55,625.86100%
Ultima Propuesta:1,010,194.01
Diferencia;-218,100.58NOTA : LOS PRECIOS UNITARIOS NO INCLUYEN
EL I.G.V.
(*) Precio segn Licitacin, pero recientemente ha presentado un
nuevo precio 1,053.51 US$/m.
C.I.
ANALISIS : GASTOS GENERALES PROYECTOCLIENTEUBICACINFECHAMAYO -
2002
ItemDescripcinUnidadCantidadMesesTarifaParcial1.0Empleados
Obrajefe de obra700049001190034001.1Jefe de
obrames183,40027,200ing. De
operaciones4500315076502173.29545454541.2Jefes de
Guardiames282,17334,7731.3Ing. de
Seguridadmes0.581,6906,7613500245059501690.34090909091.4Asist.
Seguridadmes0.581,0654,2611.5Administrador de
Obrasmes0.581,0654,2612000175037501065.34090909091.6Asist.
Costosmes0.581,6906,7613500245059501690.34090909091.7Jefe de
Almacenmes0.588243,295150014002900823.86363636361.8Topografomes2896615,455200014003400965.9090909091Sub-total
personal de obra7.5102,768
3.0Equipos y vehiculos3.1Camioneta doble cabina
4x4mes181,50012,0003.2Equipo de
topografames0.08128,0008,0003.3Radio Walkie
Talkmes485002,000Sub-total equipos y vehculos22,000
4.0Equipos y muebles de oficina4.1Computadora +
Impresora211,2002,4004.2Utiles de
oficina/comunicaciones152001,0004.3Parabolica111,1501,1504.4Mtto .
Parabolica0.582501,0004.5Equipo de
calefaccin311003004.6Escritorio+sillones+librero31100300Sub-total
equipos y muebles de oficina6,150US $5.0Oficinas, campamentos,
almacen y
talleres3.525.1EquipamientoGlb0.15040,0006,000equipamiento5.2Campamento
supervisinGlb1125006,000Sub-total ofic., camp., almacenes y
talleres6,000containers11500687.5Campamentos5.55002750781.256.0Gastos
FinancierosCamas251203000390.6256.1Costos financieros de
operacinGlb1.50%200,000150frazadas75251875244.1406256.2Seguro de
equiposGlb0.85%500,0004,250sabanas2520500142.04545454556.3Poliza de
responsabilidad
civilGlb0.3%500,0001,500colchones251002500325.52083333336.4Otros
gastos financieros (Pagos dif. 1
mes)Glb0.00%0.00.0almohadas251025071.0227272727Sub-total Gastos
Financieros5,9002642estufas4300339.94334277623407.0Gastos ofic.
Lima29827.1Administracion LimaGlb185,00040,000talleres y
almacenes20007.2Costo apoyo logistico
LimaGlb1811490949827.3Amortizaciones de equipos de
oficinaGlb181421,1367.4Impresos, utiles de escritorio y
afinesGlb18856827.5Gastos legales y notarialesGlb114343Sub-total
Gastos Ofic. Lima42,770 Total Costo Gastos
Generales185,588ERROR:#REF!ggERROR:#REF!
Enseresperf.ayud.perf2cimb.2 ayud.
Cim.2soht3operad.1carril2ayud. Eq.pot.1servicios213339
Presup.1 OK (2)JRC MINERIA Y CONSTRUCCION SAC
PRESUPUESTO DE OBRA
PROYECTOEXCAVACION PIQUE INCLINADO - MINA LIMPE
CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ S.A.UBICACINPACHANGARA, OYN,
LIMA.FECHA.Mayo 2002
ITEMDESCRIPCIONUbicacinsecc.METRADOP.U.TOTALmtrs.US$/mtr.US$
1.00EXCAVACION HORIZONTAL (Acceso a Pique)m2m3AGaleria a camara
de winche (746)Nv. +44 x 45492.772,463.861680CGaleria acceso a
tambor de wincheNv. +44 x 42492.77985.551632DCrucero chimenea de
ventilacion (xc 890)Nv. +44 x 48492.773,942.1816128ECrucero
construccion camara de wincheNv. +44 x
410492.774,927.7316160FCrucero construccion camara de wincheNv.
+43.5 x 3.524442.7210,625.4012.25294Galeria Nv. De extraccionNv.
03.5 x 3.5137442.7260,653.3212.251678.25Galeria Nv. De
transferenciaNv. 03.5 x 3.50442.720.0012.250Rampa acceso a piqueNv.
-143.5 x 3.5120442.7253,127.0012.251470Crucero acceso a piqueNv.
-143.5 x 3.5125442.7255,340.6212.251531.25Crucero a chimenea ore
pass 526Nv. -83.5 x 3.538442.7216,823.5512.25465.5Nv. -93.5 x
3.518442.727,969.0512.25220.5Nv. -103.5 x
3.510442.724,427.2512.25122.5Nv. -113.5 x
3.518442.727,969.0512.25220.5Crucero a chimenea ore pass 510Nv.
-124 x 414492.776,898.8216224529236,153.3827%6626.52.00EXCAVACION
VERTICALChimenea descarga Skip (cuadrado)Nv. 44 x
48662.455,299.5916128Chimenea tolva superior (mineral)Nv. 03.5 x
3.532582.9818,655.4012.25392Chimenea tolva superior (desmonte)Nv.
03.5 x 3.532582.9818,655.4012.25392Chimenea waste pass 510Nv.
-121.7 x 1.712326.383,916.562.8934.68chimenea ore pass 526nv.
-121.7 x 1.717326.385,548.462.8949.13chimenea ore pass 526nv.
-111.7 x 1.721326.386,853.982.8960.69chimenea ore pass 526nv.
-101.7 x 1.721326.386,853.982.8960.69chimenea ore pass 526nv. -91.7
x 1.715326.384,895.702.8943.35chimenea ore pass 526nv. -81.7 x
1.792326.3830,026.972.89265.88250100,706.0411%1426.42
3.00EXCAVACION PIQUE INCLINADOPique Inclinado Nv. 4/ Nv.
0Nv.4/Nv.05.5 x 496785.7775,433.97222112Nv.0/Nv.-55.5 x
4122785.7795,864.00222684Nv.-5/Nv.-115.5 x
4156785.77122,580.20223432Nv..11/Nv.-145.5 x
496785.7775,433.97222112470369,312.1542%10340
5.00DESQUINCHECamara de winche (19.5 x 9.8 x 12)Nv.
4M31,52523.0435,142.551,525GCamara SSEE Electrica (17.6 x 6.4 x
4)Nv. 4m345023.0410,369.93450Bresting acceso tambor wincheNv.
4m321823.045,023.66218Galeria Nv. de transferencia (gal 700)Nv.
0m342523.049,793.83Zona de carguioNv.
-12m340023.049,217.72400Echaderos Ore passTodos los
nvs.m371323.0416,430.587133,73185,978.2710%3,306792,149.847.00SOSTENIMIENTO
PIQUE INCLINADO7.01Colocacin, pernos
helicoidalesUnd.13.980.0021,6997.02Colocacin Malla
ElectrosoldadaM212.310.007.03Colocacin de shotcrete, espesor
2"M213.540.000.008.00TRANSPORTE8.01Transporte de desmonte hasta
1,000 mts, via rampa(esponjado)M321,6993.5476,897.618.02Transporte
de desmonte mayor a 1,000 mts, via
rampa(esponjado)M37,2331.4610,549.1987,446.8010%
879,596.65100%NOTA : LOS PRECIOS UNITARIOS NO INCLUYEN EL
I.G.V.
Mov-desm.ERROR:#REF!
MOVILIZACION Y DESMOVILIZACION
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ItemDescripcinUnidadCantidadMesesTarifaParcial1.0Equipos1.1Jumbo
Electrohidrulicoglb.113,0003,0001.2Scooptrams de 3.5
Yd3glb.113,0003,0001.3Ventiladores 30000 cfmglb.317002,1001.4Winche
de arrastre de 20 HPglb.017000.01.5Dumper de 20
tnglb.113,0003,000Sub-total Equipos11,100
Sub-total Muebles / Inmuebles0.0 Total Costo Moviliz. y
Desmoviliz.11,100
Cx 4 x 4 ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:46.20FECHA.MAYO -
2002Partida Crucero de 4x 4492.77Rendimiento 2.83 mtrs/gd.hh/gdia
:10.0056.63 m3 roto12.24 pp/m3 insituActividadesDesatado, regado,
perforacin, voladura y limpieza de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.884.904.32Operador
Jumbohh0.501.774.137.29Ayud. Operador
Jumbohh0.501.773.816.72Operador Scoophh0.501.774.137.29Cargador /
disparadorhh0.501.773.496.16Ayud. Cargador /
disparadorhh0.501.773.175.59Personal Servicios
Minahh1.003.533.1711.19Ayudante
Topografahh0.250.883.172.80Bodeguerohh0.250.882.782.4653.8253.8211%1.2MATERIALES4.2515.01Aceros
de PerforacinBarra de extensinpp554.40195.780.0510.16Broca de
botonespp542.40191.550.5095.25Adaptador
pilotopp12.004.240.120.50Broca
escariadorapp12.004.240.632.67Manguito de
acoplepp554.40195.780.023.78Shank
adapterpp554.40195.780.059.18Barreno integral 7/8" de 8'
pp12.004.240.220.93122.47Accesorios de Perforacin Manguera de lona
1" 100 psipp554.40195.780.024.22Cancamos agua-aire y
electricidadund0.500.183.430.61Aceite de
perforacingln0.500.188.961.58Copas de
afiladound0.200.0715.751.117.52Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.204.200.460.46100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales
%mo0.052.69133.1427%4 mesesvida3.00meses1.3EQUIPOStramo$$/tramovida
util pies$/pieN0. Disparos270.00Jumbo
electrohidrulicohm3.031.0795.00101.72manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm3.021.0760.0063.98manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.358.002.83piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.357.672.71Aguzadoragdia.1.000.352.670.94 Camion
Utilitariohm1.500.537.073.74175.91175.9136%
TOTAL COSTO DIRECTO362.872.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.710.0790.06Fulminante #
8und2.000.710.0810.06Fulminante fanelund4515.961.03416.50Cordn
detonantem30.0010.590.1201.27Conectoresund2.000.710.1350.10Examon
"P"kgr.158.5856.000.47026.32Dinamita Semexa
65%und45.2015.960.1342.1446.4446.449%2.2GASTOS GENERALES y
UTILID.23%83.4683.4617%
TOTAL COSTO INDIRECTO129.90
3.0COSTO TOTAL492.77100%Los precios unitarios no incluyen
IGV
anday3.5 x 3.5443$/ml
0.3048L.barraV. UtilV. Utillong- perf.L.avancerelacionNo. De mt
perf.xrend.piesPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.ml.ml/unid.US$US$/pie12.00Barra de
extensinund8,0002,4383.002.801.0746.2049.500.02415.000.0512.00554.4028.76Broca
de botonesund198.2
Costos 01:
198.260.413.002.801.0745.2048.430.8098.560.5012.00542.40269.72Adaptador
pilotound2,000609.603.002.801.071.001.070.00235.200.1212.0012.001.41Broca
escariadoraund400121.923.002.801.071.001.070.01252.000.6312.0012.007.56Manguito
de
acopleund4,0001,2193.002.801.0746.2049.500.0477.280.0212.00554.4010.71Shank
adapterund8,0002,4383.002.801.0746.2049.500.02375.000.0512.00554.4025.99Barreno
integral 7/8" de 8'
und750228.600.460.461.000.460.00165.150.2212.0012.002.641.58duracionavancevida
utilincidenciaAccesorios de Perforacincant.diasdia (m)m.
Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
PiesTotalveloc.veloc.EQUIPOSNo. TaldPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico46.2010.00462.00160.002.672.89distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
TunelAreavelocidadlongitudVolumenEsponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga40%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.684.004.0016.006.007.002.8345.3163.432.2727.89100.00116.67100.000.751.000.50.861.504.61128.472.570.453.02
Rend. Segn catalogoTn/hr.Tealm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"45.2045.313.50158.58
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEm2.6Datos GeneralesN taladros = (P/dt) +
(c+s)46TIPO DE ROCAP = V s x 520.00ANCHO FRENTEm4.0dt = dist.
Taladros (m)ALTURA FRENTEm4.0rocas tenaces y duras0.50.55AREA DEL
FRENTEm216.0rocas intermedias0.60.65LONGITUD DE
BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.7c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.29rocas tenaces
y duras2.0AVANCE ESTIMADOm86%2.83rocas intermedias1.5DIAMETRO DE
TALADROmm33.0rocas friables1.0N TALADRO DE ALIVIOund.1.0s = dimen.
de la secc. Tunel m216TALADROS DISPARADOSund.45ancho (m)4.0TALADROS
PERFORADOSund.46altura (m)4.0LONGITUD DE PERFORACIONm72.4
&A
Cx 4 x 4 ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:45.00FECHA.MAYO -
2002Partida Crucero de 4x 4423.22Rendimiento 2.83 mtrs/gd.hh/gdia
:10.0056.63 m3 roto10.97 pp/m3 insituActividadesDesatado, regado,
perforacin, voladura y limpieza de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.884.904.32Operador
Jumbohh0.501.774.137.29Ayud. Operador
Jumbohh0.501.773.816.72Operador Scoophh0.501.774.137.29Cargador /
disparadorhh0.501.773.496.16Ayud. Cargador /
disparadorhh0.501.773.175.59Personal Servicios
Minahh0.250.883.172.80Ayudante
Topografahh0.250.883.172.80Bodeguerohh0.250.882.782.4645.4345.4311%1.2MATERIALES3.50Aceros
de PerforacinBarra de extensinpp496.80175.440.059.10Broca de
botonespp485.76171.540.5085.30Adaptador
pilotopp11.043.900.120.46Broca
escariadorapp11.043.900.632.46Manguito de
acoplepp496.80175.440.023.39Shank
adapterpp496.80175.440.058.22Barreno integral 7/8" de 8'
pp11.043.900.220.86109.79Accesorios de Perforacin Manguera de lona
1" 100 psipp496.80175.440.023.78Cancamos agua-aire y
electricidadund0.500.183.430.61Aceite de
perforacingln0.500.188.961.58Copas de
afiladound0.200.0715.751.117.08Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.204.200.460.46100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales
%mo0.052.27119.6028%4 mesesvida3.00meses1.3EQUIPOStramo$$/tramovida
util pies$/pieN0. Disparos270.00Jumbo
electrohidrulicohm3.261.1562.0071.38manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.841.0060.0060.09manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.358.002.83piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.357.672.71Aguzadoragdia.1.000.352.670.94 Camion
Utilitariohm1.500.537.073.74141.69141.6933%
TOTAL COSTO DIRECTO306.722.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.710.0790.06Fulminante #
8und2.000.710.0810.06Fulminante fanelund4415.541.03416.07Cordn
detonantem30.0010.590.1201.27Conectoresund2.000.710.1350.10Examon
"P"kgr.158.5856.000.47026.32Dinamita Semexa
65%und44.0015.540.1342.0845.9545.9511%2.2GASTOS GENERALES y
UTILID.23%70.5570.5517%
TOTAL COSTO INDIRECTO116.49
3.0COSTO TOTAL423.22100%Los precios unitarios no incluyen
IGVpropuesta:492.77
anday3.5 x 3.5443$/ml
0.3048L.barraV. UtilV. Utillong- perf.L.avancerelacionNo. De mt
perf.xrend.piesEffPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.ml.ml/unid.US$US$/pie12.00PerfBarra
de
extensinund8,0002,4383.002.801.0745.0048.210.02415.000.0512.000.92496.8025.77Broca
de botonesund198.2
Costos 01:
198.260.413.002.801.0744.0047.140.7898.560.5012.000.92485.76241.56Adaptador
pilotound2,000609.603.002.801.071.001.070.00235.200.1212.000.9211.041.30Broca
escariadoraund400121.923.002.801.071.001.070.01252.000.6312.000.9211.046.96Manguito
de
acopleund4,0001,2193.002.801.0745.0048.210.0477.280.0212.000.92496.809.60Shank
adapterund8,0002,4383.002.801.0745.0048.210.02375.000.0512.000.92496.8023.29Barreno
integral 7/8" de 8'
und750228.600.460.461.000.460.00165.150.2212.000.9211.042.431.58duracionavancevida
utilincidencia11.04Accesorios de Perforacincant.diasdia (m)m.
Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
PiesTotalveloc.veloc.EQUIPOSNo. TaldPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico45.0011.04496.80160.002.673.11distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
TunelAreavelocidadlongitudVolumenEsponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.684.004.0016.006.007.002.8345.3158.902.2725.89100.00116.67100.000.751.000.50.861.504.61119.292.390.452.84
Rend. Segn catalogoTn/hr.Tealm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"44.0045.313.50158.58
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEm2.6Igual a MilsaFormulaDatos GeneralesN
taladros = (P/dt) + (c+s)4546TIPO DE ROCAP = V s x 520.00ANCHO
FRENTEm4.0dt = dist. Taladros (m)ALTURA FRENTEm4.0rocas tenaces y
duras0.50.55AREA DEL FRENTEm216.0rocas intermedias0.60.65LONGITUD
DE BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.7c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.29rocas tenaces
y duras2.0AVANCE ESTIMADOm86%2.83rocas intermedias1.5DIAMETRO DE
TALADROmm33.0rocas friables1.0N TALADRO DE ALIVIOund.1.0s = dimen.
de la secc. Tunel m216TALADROS DISPARADOSund.44ancho (m)4.0TALADROS
PERFORADOSund.45altura (m)4.0LONGITUD DE PERFORACIONm72.4
&A
Cx 3.5X3.5ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:37.06FECHA.MAYO
2002Partida Crucero de 3.5 X 3.5442.72Rendimiento 2.80
mtrs/gd.hh/gdia :10.0042.88 m3 roto12.96 pp/m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.894.904.37Operador
Jumbohh0.501.794.137.37Ayud. Operador
Jumbohh0.501.793.816.80Operador Scoophh0.501.794.137.37Cargador /
disparadorhh0.501.793.496.23Ayud. Cargador /
disparadorhh0.501.793.175.66Personal Servicios
Minahh1.003.573.1711.31Ayudante
Topografahh0.250.893.172.83Bodeguerohh0.250.892.782.4954.4354.4312%16%78.131.2MATERIALESAceros
de PerforacinBarra de extensinpp444.67158.810.058.24Broca de
botonespp432.67154.520.5381.88Adaptador
pilotopp12.004.290.120.50Broca
escariadorapp12.004.290.632.70Manguito de
acoplepp444.67158.810.023.07Shank
adapterpp444.67158.810.057.44Barreno integral 7/8" de 8'
pp12.004.290.220.94104.78Accesorios de Perforacin Manguera de lona
1" 100 psipp444.67158.810.023.42Cancamos agua-aire y
electricidadund0.500.183.430.61Aceite de
perforacingln0.500.188.961.60Copas de
afiladound0.200.0715.751.136.76Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.204.200.460.46100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales
%mo0.052.72114.7226%4 mesesvida3.00meses1.3EQUIPOStramo$$/tramovida
util pies$/pieN0. Disparos270.00Jumbo
electrohidrulicohm2.660.9595.0090.36manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.811.0060.0060.26manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.368.002.86piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.367.672.74Aguzadoragdia.1.000.362.670.95Camion
Utilitariohm1.500.547.073.79160.95160.9536%
TOTAL COSTO DIRECTO330.112.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.710.0790.06Fulminante #
8und2.000.710.0810.06Fulminante fanelund3612.881.03413.31Cordn
detonantem30.0010.710.1201.29Conectoresund2.000.710.1350.10Examon
"P"kgr.120.0542.880.47020.15Dinamita Semexa
65%und3612.880.1341.7336.6936.698%2.2GASTOS GENERALES y
UTILID.23%75.9375.9317%
TOTAL COSTO INDIRECTO112.61
3.0COSTO TOTAL442.72100%Los precios unitarios no incluyen
IGV
anday3.5 x 3.5443$/ml0.3048L.barrav.utiliv.utililong-
perf.l.avancerelacionNo. De mt perf.xrend.piesPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.ml.ml/unid.US}$US$/pie12.00Barra de
extensinund8,0002,4383.002.801.0737.0639.700.02415.000.0512.00444.6723.07Broca
de botonesund186
Costos 01: antes
18656.693.002.801.0736.0638.630.6898.560.5312.00432.67229.27Adaptador
pilotound2,000609.603.002.801.071.001.070.00235.200.1212.0012.001.41Broca
escariadoraund400121.923.002.801.071.001.070.01252.000.6312.0012.007.56Manguito
de
acopleund4,0001,2193.002.801.073739.700.0377.280.0212.00444.678.59Shank
adapterund8,0002,4383.002.801.073739.700.02375.000.0512.00444.6720.84Barreno
integral 7/8" de 8'
und750228.600.460.461.000.460.00165.150.2212.0012.002.641.62duracionavancevida
utilincidenciaAccesorios de Perforacincant.diasdia (m)m.
Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
PiesTotalveloc.veloc.EQUIPOSNo. TaldPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico37.0610.00370.56160.002.672.32distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga40%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.683.503.5012.256.007.002.8034.3048.022.2721.11100.00116.67100.000.751.000.50.861.504.6197.261.950.502.45
Rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00
No. Talad.m3f.pot. Kg/m3Examon "P"36.0634.303.50120.05
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)37TIPO DE ROCAP = V s x 517.50ANCHO FRENTEm3.5dt = dist.
Taladros (m)ALTURA FRENTEm3.5rocas tenaces y duras0.50.55AREA DEL
FRENTEm212.3rocas intermedias0.60.65LONGITUD DE
BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.7c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.29rocas tenaces
y duras2.0AVANCE ESTIMADOm86%2.83rocas intermedias1.5DIAMETRO DE
TALADROmm33.0rocas friables1.0N TALADRO DE ALIVIOund.1.0s = dimen.
de la secc. Tunel m212.25TALADROS DISPARADOSund.36ancho
(m)3.5TALADROS PERFORADOSund.37altura (m)3.5LONGITUD DE
PERFORACIONm72.4
&A
Cx 3.5X3.5 ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:36.00FECHA.MAYO
2002Partida Crucero de 3.5 X 3.5379.69Rendimiento 2.80
mtrs/gd.hh/gdia :10.0042.88 m3 roto11.59 pp/m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.894.904.37Operador
Jumbohh0.501.794.137.37Ayud. Operador
Jumbohh0.501.793.816.80Operador Scoophh0.501.794.137.37Cargador /
disparadorhh0.501.793.496.23Ayud. Cargador /
disparadorhh0.501.793.175.66Personal Servicios
Minahh0.250.893.172.83Ayudante
Topografahh0.250.893.172.83Bodeguerohh0.250.892.782.4945.9545.9512%16%78.131.2MATERIALES3.50Aceros
de PerforacinBarra de extensinpp397.44141.940.057.36Broca de
botonespp386.40138.000.5373.13Adaptador
pilotopp11.043.940.120.46Broca
escariadorapp11.043.940.632.48Manguito de
acoplepp397.44141.940.022.74Shank
adapterpp397.44141.940.056.65Barreno integral 7/8" de 8'
pp11.043.940.220.8793.70Accesorios de Perforacin Manguera de lona
1" 100 psipp397.44141.940.023.06Cancamos agua-aire y
electricidadund0.500.183.430.61Aceite de
perforacingln0.500.188.961.60Copas de
afiladound0.200.0715.751.136.40Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.204.200.460.46100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales
%mo0.052.30102.8627%4 mesesvida3.00meses1.3EQUIPOStramo$$/tramovida
util pies$/pieN0. Disparos270.00Jumbo
electrohidrulicohm2.861.0262.0063.25manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.650.9560.0056.83manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.368.002.86piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.367.672.74Aguzadoragdia.1.000.362.670.95Camion
Utilitariohm1.500.547.073.79130.42130.4234%
TOTAL COSTO DIRECTO279.222.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.710.0790.06Fulminante #
8und2.000.710.0810.06Fulminante fanelund3512.501.03412.93Cordn
detonantem30.0010.710.1201.29Conectoresund2.000.710.1350.10Examon
"P"kgr.120.0542.880.47020.15Dinamita Semexa
65%und3512.500.1341.6836.2536.2510%2.2GASTOS GENERALES y
UTILID.23%64.2264.2217%
TOTAL COSTO INDIRECTO100.47
3.0COSTO TOTAL379.69100%Los precios unitarios no incluyen
IGVpropuesta:442.72Diferencia:-63.03
anday3.5 x 3.5443$/ml0.3048L.barrav.utiliv.utililong-
perf.l.avancerelacionNo. De mt perf.xrend.piesEffPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.ml.ml/unid.US}$US$/pie12.00PerfBarra
de
extensinund8,0002,4383.002.801.0736.0038.570.02415.000.0512.000.92397.4420.62Broca
de botonesund186
Costos 01: antes
18656.693.002.801.0735.0037.500.6698.560.5312.000.92386.40204.75Adaptador
pilotound2,000609.603.002.801.071.001.070.00235.200.1212.000.9211.041.30Broca
escariadoraund400121.923.002.801.071.001.070.01252.000.6312.000.9211.046.96Manguito
de
acopleund4,0001,2193.002.801.073638.570.0377.280.0212.000.92397.447.68Shank
adapterund8,0002,4383.002.801.073638.570.02375.000.0512.000.92397.4418.63Barreno
integral 7/8" de 8'
und750228.600.460.461.000.460.00165.150.2212.000.9211.042.431.6211.04duracionavancevida
utilincidenciaAccesorios de Perforacincant.diasdia (m)m.
Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
PiesTotalveloc.veloc.EQUIPOSNo. TaldPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico36.0011.04397.44160.002.672.48distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.683.503.5012.256.007.002.8034.3044.592.2719.60100.00116.67100.000.751.000.50.861.504.6190.311.810.502.31
Rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00
No. Talad.m3f.pot. Kg/m3Examon "P"35.0034.303.50120.05
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)36TIPO DE ROCAP = V s x 517.50ANCHO FRENTEm3.5dt = dist.
Taladros (m)ALTURA FRENTEm3.5rocas tenaces y duras0.50.55AREA DEL
FRENTEm212.3rocas intermedias0.60.65LONGITUD DE
BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.7c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.29rocas tenaces
y duras2.0AVANCE ESTIMADOm86%2.83rocas intermedias1.5DIAMETRO DE
TALADROmm33.0rocas friables1.0N TALADRO DE ALIVIOund.1.0s = dimen.
de la secc. Tunel m212.25TALADROS DISPARADOSund.35ancho
(m)3.5TALADROS PERFORADOSund.36altura (m)3.5LONGITUD DE
PERFORACIONm72.4
&A
ch. 4 x 4ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:58.00FECHA.MAYO
2002Partida Chimenea de 4 x 4 m.662.45Rendimiento 1.5
mtrs/gd.hh/gdia :10.0030.00 m3 rotos14.5 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.674.908.16Perforistahh2.0013.334.1355.05Ayud.
Perforistahh2.0013.333.8150.78Operador
Scoophh0.503.334.1313.76Personal Servicios
Minahh2.0013.333.1742.24Ayudante
Topografahh0.503.333.1710.56Bodeguerohh0.251.672.784.64185.19185.1928%39%78.131.2MATERIALESAceros
de PerforacinBarrenos exagonales de
4'pp348.00232.000.0817.52Barrenos exagonales de
6'pp348.00232.000.0921.82Brocas de 36
mmpp348.00232.000.3684.04123.3842.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp348.00232.000.023.77Manguera de lona
1/2" 100 psipp348.00232.000.012.22Aceite de
perforacingln1.000.678.965.97Copas de
afiladound0.500.3315.755.2517.224.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.374.200.860.860.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.059.26150.7223%32%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticahm10.006.674.6731.13manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.271.5260.0090.93manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.678.005.33piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.677.675.11Aguzadoragdia.1.000.672.671.78 Camion
Utilitariohm1.501.007.077.07141.36141.3621%30%197.53
TOTAL COSTO DIRECTO477.27100%72%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.330.0790.11Fulminante
# 8und2.001.330.0810.11Fulminante fanelund5838.671.03439.98Cordn
detonantem30.0020.000.1202.40Conectoresund2.001.330.1350.18Examon
"P"kgr.87.6058.400.47027.45Dinamita Semexa
65%und5838.670.1345.1875.4075.4011%41%51.0016.002.2GASTOS GENERALES
y UTILID.23%109.77109.7717%59%43.0013.49
TOTAL COSTO INDIRECTO185.18100%28%113.88
3.0COSTO TOTAL662.45100%5356%Los precios unitarios no incluyen
IGV
0.3048L.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
piesPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.us$/unid.$/pie6.00Barrenos
exagonales de
4'und7002131.201.201.0058.0052.870.086.00348.0026.28Barrenos
exagonales de
6'und700213.361.801.201.5058.0065.840.096.00348.0032.73Brocas de 36
mmund4614.021.802.800.6458.0016.660.366.00348.00126.06185.081.20154.23
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacinglnmts.Copas de afiladound1.00100.00
EQUIPOSNo. Taldpies perf.total piesveloc. Pie/hr.hrs Jumbo
electrohidrulico58.0011.00638.00160.003.99distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.684.004.0016.006.007.001.5024.0031.202.2713.72100.00116.67200.000.752.000.51.711.506.4688.671.770.502.27
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19EXPLOSIVOSCordn
detonante3.504.007.5015.00No. Talad.m3f.pot. Kg/m3Examon
"P"58.0024.003.6587.60
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)58TIPO DE ROCAP = V s x 520.00ANCHO FRENTEm4.0dt = dist.
Taladros (m)ALTURA FRENTEm4.0rocas tenaces y duras0.50.55AREA DEL
FRENTEm216.0rocas intermedias0.60.65LONGITUD DE BARRENOpies6.0rocas
friables0.70.75LONGITUD DE BARRENOm1.8c = coeficiente factor de
rocaLONGITUD DE TALADROm90%1.65rocas tenaces y duras2.0AVANCE
ESTIMADOm85%1.40rocas intermedias1.5DIAMETRO DE TALADROmm33.0rocas
friables1.0N TALADRO DE ALIVIOund.1.0s = dimen. de la secc. Tunel
m216TALADROS DISPARADOSund.57ancho (m)4.0TALADROS
PERFORADOSund.58altura (m)4.0LONGITUD DE PERFORACIONm72.4
&A
ch. 4 x 4 ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:58.00FECHA.MAYO
2002Partida Chimenea de 4 x 4 m.553.61Rendimiento 1.5
mtrs/gd.hh/gdia :10.0030.00 m3 rotos13.1 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.674.908.16Perforistahh2.0013.334.1355.05Ayud.
Perforistahh2.0013.333.8150.78Operador
Scoophh0.402.674.1311.01Personal Servicios
Minahh0.251.673.175.28Ayudante
Topografahh0.251.673.175.28Bodeguerohh0.251.672.784.64140.20140.2025%36%78.131.2MATERIALES5.40Aceros
de PerforacinBarrenos exagonales de
4'pp208.80139.200.0810.51Barrenos exagonales de
6'pp104.4069.600.096.55Brocas de 36
mmpp313.20208.800.3675.6492.7042.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp208.80139.200.022.26Manguera de lona
1/2" 100 psipp208.80139.200.011.33Aceite de
perforacingln1.000.678.965.97Copas de
afiladound0.500.3315.755.2514.824.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.374.200.860.860.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.057.01115.3921%30%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
NeumaticaPP313.20208.800.1122.97manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.271.5260.0090.93manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.678.005.33piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.677.675.11Aguzadoragdia.1.000.672.671.78 Camion
Utilitariohm1.501.007.077.07133.19133.1924%34%197.53
TOTAL COSTO DIRECTO388.78100%70%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.330.0790.11Fulminante
# 8und2.001.330.0810.11Fulminante fanelund5838.671.03439.98Cordn
detonantem30.0020.000.1202.40Conectoresund2.001.330.1350.18Examon
"P"kgr.87.6058.400.47027.45Dinamita Semexa
65%und5838.670.1345.1875.4075.4014%46%51.0016.002.2GASTOS GENERALES
y UTILID.23%89.4289.4216%54%43.0013.49
TOTAL COSTO INDIRECTO164.82100%30%113.88
3.0COSTO TOTAL553.61100%5356%Los precios unitarios no incluyen
IGVpropuesta:662.45Diferencia:-108.84
0.3048L.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
piesEffPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.us$/unid.$/pie6.00PerfBarrenos
exagonales de
4'und7002131.201.201.0058.0052.870.0764.0090.0%208.8015.77Barrenos
exagonales de
6'und700213.361.801.201.5058.0065.840.0942.0090.0%104.409.82Brocas
de 36
mmund4614.021.802.800.6458.0016.660.3626.0090.0%313.20113.46139.051.20115.870.532
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacinglnmts.Copas de afiladound1.00100.00
EQUIPOSNo. Taldpies perf.total piesveloc. Pie/hr.hrs Jumbo
electrohidrulico58.0011.00638.00160.003.99distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.684.004.0016.006.007.001.5024.0031.202.2713.72100.00116.67200.000.752.000.51.711.506.4688.671.770.502.27
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19EXPLOSIVOSCordn
detonante3.504.007.5015.00No. Talad.m3f.pot. Kg/m3Examon
"P"58.0024.003.6587.60
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)58TIPO DE ROCAP = V s x 520.00ANCHO FRENTEm4.0dt = dist.
Taladros (m)ALTURA FRENTEm4.0rocas tenaces y duras0.50.55AREA DEL
FRENTEm216.0rocas intermedias0.60.65LONGITUD DE BARRENOpies6.0rocas
friables0.70.75LONGITUD DE BARRENOm1.8c = coeficiente factor de
rocaLONGITUD DE TALADROm90%1.65rocas tenaces y duras2.0AVANCE
ESTIMADOm85%1.40rocas intermedias1.5DIAMETRO DE TALADROmm33.0rocas
friables1.0N TALADRO DE ALIVIOund.1.0s = dimen. de la secc. Tunel
m216TALADROS DISPARADOSund.57ancho (m)4.0TALADROS
PERFORADOSund.58altura (m)4.0LONGITUD DE PERFORACIONm72.4
&A
ch. 3.5x3.5ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:43.42FECHA.MAYO
20024.005.0020.00794.16Partida Chimenea de 3.5 x 3.5
m.582.984.004.0016.00772.90Rendimiento 1.5 mtrs/gd.hh/gdia
:10.003.503.5012.25591.75486.4222.97 m3 rotos14.2 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.1.701.702.89139.61Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.674.908.16Perforistahh2.0013.334.1355.05Ayud.
Perforistahh2.0013.333.8150.78Operador
Scoophh0.503.334.1313.76Personal Servicios
Minahh2.0013.333.1742.24Ayudante
Topografahh0.503.333.1710.56Bodeguerohh0.251.672.784.64185.19185.1932%43%78.131.2MATERIALESAceros
de PerforacinBarrenos exagonales de
4'pp260.50173.670.0813.12Barrenos exagonales de
6'pp260.50173.670.0916.33Brocas de 36
mmpp260.50173.670.3662.9192.3642.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp260.50173.670.022.82Manguera de lona
1/2" 100 psipp260.50173.670.011.66Aceite de
perforacingln0.750.508.964.48Copas de
afiladound0.500.3315.755.2514.224.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.374.200.860.860.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.059.26116.7020%27%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticahm8.005.334.6724.91manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.041.3660.0081.74manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.678.005.33piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.677.675.11Aguzadoragdia.1.000.672.671.78 Camion
Utilitariohm1.501.007.077.07125.93125.9322%29%197.53
TOTAL COSTO DIRECTO427.83100%73%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.330.0790.11Fulminante
# 8und2.001.330.0810.11Fulminante
fanelund4328.941.03429.9351.00Cordn
detonantem30.0020.000.1202.40Conectoresund2.001.330.1350.18Examon
"P"kgr.64.3142.880.47020.15Dinamita Semexa
65%und4328.940.1343.8856.7556.7510%37%2.2GASTOS GENERALES y
UTILID.23%98.4098.4017%63%
TOTAL COSTO INDIRECTO155.15100%27%113.88
3.0COSTO TOTAL582.98100%5356%442.10Los precios unitarios no
incluyen IGV
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
$/unid.piesppUS$Aceros de
Perforacinpiesm./unid.m.m.talad.$/pie6.00Barrenos exagonales de
4'und7002131.201.201.0043.4252.870.086.00260.5019.67Barrenos
exagonales de
6'und700213.361.801.201.5043.4265.840.096.00260.5024.50Brocas de 36
mmund4614.021.802.800.6443.4216.660.366.00260.5094.37138.541.20115.45
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacinglnmts.piedra afilar3,600Copas de
afiladound1.00100.00
EQUIPOSNo. Taldpies perf.total piesveloc. Pie/hr.hrs Jumbo
electrohidrulico43.4211.00477.58160.002.98distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.683.503.5012.256.007.001.5018.3823.892.2710.50100.00116.67200.000.752.000.51.711.506.4667.881.360.501.86
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"0.0018.383.5064.31
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 3.5 x 3.5Calculo del N
taladros43LONGITUD DE AVANCEm17.50Datos GeneralesN taladros =
(P/dt) + (c+s)TIPO DE ROCAP = V s x 50.50.55ANCHO FRENTEm3.5dt =
dist. Taladros (m)0.60.65ALTURA FRENTEm3.5rocas tenaces y
duras0.70.75AREA DEL FRENTEm212.3rocas intermediasLONGITUD DE
BARRENOpies6.0rocas friables2.0LONGITUD DE BARRENOm1.8c =
coeficiente factor de roca1.5LONGITUD DE TALADROm90%1.65rocas
tenaces y duras1.0AVANCE ESTIMADOm85%1.40rocas
intermedias12.25DIAMETRO DE TALADROmm33.0rocas friables3.5N TALADRO
DE ALIVIOund.1.0s = dimen. de la secc. Tunel m23.5TALADROS
DISPARADOSund.42ancho (m)TALADROS PERFORADOSund.43altura
(m)LONGITUD DE PERFORACIONm72.4
&A
ch. 3.5x3.5 ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:43.42FECHA.MAYO
20024.005.0020.00794.16Partida Chimenea de 3.5 x 3.5
m.479.364.004.0016.00772.90Rendimiento 1.5 mtrs/gd.hh/gdia
:10.003.503.5012.25591.75486.4222.97 m3 rotos12.8 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.1.701.702.89139.61Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.674.908.16Perforistahh2.0013.334.1355.05Ayud.
Perforistahh2.0013.333.8150.78Operador
Scoophh0.402.674.1311.01Personal Servicios
Minahh0.251.673.175.28Ayudante
Topografahh0.251.673.175.28Bodeguerohh0.251.672.784.64140.20140.2029%41%78.131.2MATERIALESAceros
de PerforacinBarrenos exagonales de
4'pp156.30104.200.087.87Barrenos exagonales de
6'pp78.1552.100.094.90Brocas de 36
mmpp234.45156.300.3352.0964.8642.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp156.30104.200.021.69Manguera de lona
1/2" 100 psipp156.30104.200.011.00Aceite de
perforacingln0.750.508.964.48Copas de
afiladound0.500.3315.755.2512.424.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.374.200.860.860.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.057.0185.1518%25%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
NeumaticaPP234.45156.300.1117.19manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.041.3660.0081.74manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.678.005.33piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.677.675.11Aguzadoragdia.1.000.672.671.78 Camion
Utilitariohm1.501.007.077.07118.22118.2225%34%197.53
TOTAL COSTO DIRECTO343.58100%72%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.330.0790.11Fulminante
# 8und2.001.330.0810.11Fulminante
fanelund4328.941.03429.9351.00Cordn
detonantem30.0020.000.1202.40Conectoresund2.001.330.1350.18Examon
"P"kgr.64.3142.880.47020.15Dinamita Semexa
65%und4328.940.1343.8856.7556.7512%42%2.2GASTOS GENERALES y
UTILID.23%79.0279.0216%58%
TOTAL COSTO INDIRECTO135.78100%28%113.88
3.0COSTO TOTAL479.36100%5356%442.10Los precios unitarios no
incluyen
IGVpropuesta:0.00Diferencia:479.360.3048l.barrav.utiliv.utililong-
perf.l.avancerelacionNo. De $/unid.piesEffppUS$Aceros de
Perforacinpiesm./unid.m.m.talad.$/pie6.00PPBarrenos exagonales de
4'und7002131.201.201.0043.4252.870.0764.000.90156.3011.80Barrenos
exagonales de
6'und700213.361.801.201.5043.4265.840.0942.000.9078.157.35Brocas de
36
mmund5015.241.802.800.6443.4216.660.3336.000.90234.4578.1497.291.2081.070.503
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacinglnmts.piedra afilar3,600Copas de
afiladound1.00100.00
EQUIPOSNo. Taldpies perf.total piesveloc. Pie/hr.hrs Jumbo
electrohidrulico43.4211.00477.58160.002.98distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.683.503.5012.256.007.001.5018.3823.892.2710.50100.00116.67200.000.752.000.51.711.506.4667.881.360.501.86
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"0.0018.383.5064.31
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 3.5 x 3.5Calculo del N
taladros43LONGITUD DE AVANCEm17.50Datos GeneralesN taladros =
(P/dt) + (c+s)TIPO DE ROCAP = V s x 50.50.55ANCHO FRENTEm3.5dt =
dist. Taladros (m)0.60.65ALTURA FRENTEm3.5rocas tenaces y
duras0.70.75AREA DEL FRENTEm212.3rocas intermediasLONGITUD DE
BARRENOpies6.0rocas friables2.0LONGITUD DE BARRENOm1.8c =
coeficiente factor de roca1.5LONGITUD DE TALADROm90%1.65rocas
tenaces y duras1.0AVANCE ESTIMADOm85%1.40rocas
intermedias12.25DIAMETRO DE TALADROmm33.0rocas friables3.5N TALADRO
DE ALIVIOund.1.0s = dimen. de la secc. Tunel m23.5TALADROS
DISPARADOSund.42ancho (m)TALADROS PERFORADOSund.43altura
(m)LONGITUD DE PERFORACIONm72.4
&A
ch. 1.7x1.7ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:21.89FECHA.MAYO
2002Partida Chimenea de 1.7 x 1.7 m.326.38Rendimiento 1.40
mtrs/gd.hh/gdia :10.005.06 m3 rotos32.5 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.794.908.751.501.502.25270.03Perforistahh1.007.144.1329.491.701.702.89346.84Ayud.
Perforistahh1.007.143.8127.20Operador
Scoophh0.503.574.1314.75Personal Servicios
Minahh1.007.143.1722.63Ayudante
Topografahh0.503.573.1711.31Bodeguerohh0.251.792.784.97119.10119.1036%49%78.131.2MATERIALES4.50Aceros
de PerforacinBarrenos exagonales de 4'pp131.3493.810.087.09Barrenos
exagonales de 6'pp131.3493.810.098.82Brocas de 36
mmpp131.3493.810.3633.9849.8942.30Accesorios de Perforacin Manguera
de lona 1" 100 psipp131.3493.810.021.53Manguera de lona 1/2" 100
psipp131.3493.810.010.90Aceite de
perforacingln0.750.548.964.80Copas de
afiladound0.500.3615.755.6312.854.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.404.200.930.930.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.055.9569.6221%29%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticahm1.751.254.675.84manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm0.800.5760.0034.24manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.718.005.71piedra afilar3,600vida pies165,240Cargador
de Anfogdia.0.500.367.672.74Aguzadoragdia.1.000.712.671.90 Camion
Utilitariohm1.000.717.075.0555.4855.4817%23%197.53
TOTAL COSTO DIRECTO244.20100%75%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.430.0790.11Fulminante
# 8und2.001.430.0810.12Fulminante
fanelund21.8915.641.03416.1751.00Cordn
detonantem30.0021.430.1202.57Conectoresund2.001.430.1350.19Examon
"P"kgr.14.1610.120.4704.75Dinamita Semexa
65%und21.8915.640.1342.1026.0126.018%32%2.2GASTOS GENERALES y
UTILID.23%56.1756.1717%68%
TOTAL COSTO INDIRECTO82.18100%25%113.88
3.0COSTO TOTAL326.38100%5356%442.10Los precios unitarios no
incluyen IGV
anday3.5 x 3.5443$/ml
0.3048L.barrav.utiliv.utililong- perf.L.avancerelacionNo. De
piesPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.$/unid.$/pie6.00Barrenos exagonales
de 4'und700213.361.201.201.0021.8952.870.0766.00131.349.92Barrenos
exagonales de
6'und700213.361.801.201.5021.8965.840.0946.00131.3412.35Brocas de
36 mmund46
Costos 01: was
46.0014.021.802.800.6421.8916.660.3626.00131.3447.5869.851.2058.21
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies Avancemang/pp$/m$/tramo$/pp4
mesesManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02tramo$$/tramovida
util pies$/pieManguera de lona 1/2" 100
psiml100.0090.00424.0038,1600.000033.65365.400.01manguera de
1100.000.000.0028,8000.00Aceite de perforacinglnmanguera de
1/225.000.000.0028,8000.00mts.piedra afilar3,600Copas de
afiladound1.00100.00
EQUIPOSNo. TaldPPtotal piesveloc. Pie/hr.hrs Jumbo
electrohidrulico21.8911.00240.79160.001.50distanciacarguiotransp.descarg.retornimprev.Total
CicloTiempo deTiempo deTrasladosTotalcapc. Cuch.secc.
TunelAreavelocidadlongitudvolumenEsponj.capac.No.m/minm/minm.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesc/cargas/cargamin.hr.Scooptram de 3.5
yd32.681.701.702.896.007.001.404.055.262.272.31100.00116.67200.000.752.000.51.711.506.4614.950.300.500.80
Rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"ERROR:#REF!4.053.5014.16
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 1.7 x 1.7Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)22TIPO DE ROCAP = V s x 58.50ANCHO FRENTEm1.7dt = dist.
Taladros (m)ALTURA FRENTEm1.7rocas tenaces y duras0.50.55AREA DEL
FRENTEm22.9rocas intermedias0.60.65LONGITUD DE BARRENOpies6.0rocas
friables0.70.75LONGITUD DE BARRENOm1.8c = coeficiente factor de
rocaLONGITUD DE TALADROm90%1.65rocas tenaces y duras2.0AVANCE
ESTIMADOm85%1.40rocas intermedias1.5DIAMETRO DE TALADROmm33.0rocas
friables1.0N TALADRO DE ALIVIOund.1.0s = dimen. de la secc. Tunel
m22.89TALADROS DISPARADOSund.21ancho (m)1.7TALADROS
PERFORADOSund.22altura (m)1.7LONGITUD DE PERFORACIONm72.4
&A&D
ch. 1.7x1.7 ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:21.89FECHA.MAYO
2002Partida Chimenea de 1.7 x 1.7 m.280.82Rendimiento 1.40
mtrs/gd.hh/gdia :10.005.06 m3 rotos% esp :25.00%29.2 pp / m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.794.908.751.501.502.25270.03Perforistahh1.007.144.1329.491.701.702.89346.84Ayud.
Perforistahh1.007.143.8127.20Operador
Scoop0.50hh0.201.434.135.90Personal Servicios
Mina1.00hh0.503.573.1711.31Ayudante
Topografa0.50hh0.251.793.175.66Bodeguerohh0.251.792.784.9793.2893.2833%45%78.131.2MATERIALESAceros
de PerforacinBarrenos exagonales de 4'pp78.8056.290.084.25Barrenos
exagonales de 6'pp39.4028.140.092.65Brocas de 36
mmpp118.2184.430.3630.5937.4842.30Accesorios de Perforacin Manguera
de lona 1" 100 psipp78.8056.290.020.92Manguera de lona 1/2" 100
psipp78.8056.290.010.54Aceite de perforacingln0.750.548.964.80Copas
de afiladound0.500.3615.755.6311.884.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.404.200.930.930.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.054.6654.9520%27%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticapp118.2184.430.119.29manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm0.800.5760.0034.24manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.718.005.71piedra afilar3,600vida pies165,240Cargador
de Anfogdia.0.500.367.672.74Aguzadoragdia.1.000.712.671.90 Camion
Utilitariohm1.000.717.075.0558.9358.9321%28%197.53
TOTAL COSTO DIRECTO207.17100%74%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.430.0790.11Fulminante
# 8und2.001.430.0810.12Fulminante
fanelund21.8915.641.03416.1751.00Cordn
detonantem30.0021.430.1202.57Conectoresund2.001.430.1350.19Examon
"P"kgr.14.1610.120.4704.75Dinamita Semexa
65%und21.8915.640.1342.1026.0126.019%35%2.2GASTOS GENERALES y
UTILID.23%47.6547.6517%65%
TOTAL COSTO INDIRECTO73.66100%26%113.88
3.0COSTO TOTAL280.82100%5356%442.10Los precios unitarios no
incluyen IGVpropuesta:326.38Diferencia:-45.56
anday3.5 x 3.5443$/ml
0.3048L.barrav.utiliv.utililong- perf.L.avancerelacionNo. De
piesEffPPUS$Aceros de
Perforacinpiesm./unid.m.m.talad.$/unid.$/pie6.00PerfBarrenos
exagonales de
4'und700213.361.201.201.0021.8952.870.0764.0090.0%78.805.95Barrenos
exagonales de
6'und700213.361.801.201.5021.8965.840.0942.0090.0%39.403.71Brocas
de 36 mmund46
Costos 01: was
46.0014.021.802.800.6421.8916.660.3626.0090.0%118.2142.8252.481.2043.735.40
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies Avancemang/pp$/m$/tramo$/pp4
mesesManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02tramo$$/tramovida
util pies$/pieManguera de lona 1/2" 100
psiml100.0090.00424.0038,1600.000033.65365.400.01manguera de
1100.000.000.0028,8000.00Aceite de perforacinglnmanguera de
1/225.000.000.0028,8000.00mts.piedra afilar3,600Copas de
afiladound1.00100.00
EQUIPOSNo. TaldPPtotal piesveloc. Pie/hr.hrs Jumbo
electrohidrulico21.896.00118.21160.000.74distanciacarguiotransp.descarg.retornimprev.Total
CicloTiempo deTiempo deTrasladosTotalcapc. Cuch.secc.
TunelAreavelocidadlongitudvolumenEsponj.capac.No.m/minm/minm.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesc/cargas/cargamin.hr.Scooptram de 3.5
yd32.681.701.702.896.007.001.404.055.262.272.31100.00116.67200.000.752.000.51.711.506.4614.950.300.500.80
Rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.007.7317.5935.19
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"ERROR:#REF!4.053.5014.16
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 1.7 x 1.7Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)22TIPO DE ROCAP = V s x 58.50ANCHO FRENTEm1.7dt = dist.
Taladros (m)ALTURA FRENTEm1.7rocas tenaces y duras0.50.55AREA DEL
FRENTEm22.9rocas intermedias0.60.65LONGITUD DE BARRENOpies6.0rocas
friables0.70.75LONGITUD DE BARRENOm1.8c = coeficiente factor de
rocaLONGITUD DE TALADROm90%1.65rocas tenaces y duras2.0AVANCE
ESTIMADOm85%1.40rocas intermedias1.5DIAMETRO DE TALADROmm33.0rocas
friables1.0N TALADRO DE ALIVIOund.1.0s = dimen. de la secc. Tunel
m22.89TALADROS DISPARADOSund.21ancho (m)1.7TALADROS
PERFORADOSund.22altura (m)1.7LONGITUD DE PERFORACIONm72.4
&A&D
PiqueJRC MINERIA Y CONSTRUCCION SAC
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:76.12FECHA.MAYO
2002Partida Pique inclinado de 4 x 5.5 - 36989.80Rendimiento 1.5
mtrs/gd.hh/gdia :10.0031.9 m3 insitu14.3 pp/m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE
OBRACapatazhh0.251.724.908.44Perforistahh2.0013.794.1356.95Ayud.
Perforistahh2.0013.793.8152.53Operador
Winchehh1.006.904.1328.484.005.0020.00794.16Operador
Scoophh0.503.454.1314.244.005.5022.00873.58Personal Servicios
Minahh1.006.903.1721.85Ayudante
Topografahh0.503.453.1710.92Bodeguerohh0.251.722.784.80198.21198.2120%27%78.131.2MATERIALES7.50Aceros
de PerforacinBarrenos exagonales de
4'pp456.69314.960.1341.63Barrenos exagonales de
6'pp456.69314.960.1651.84Brocas de 36
mmpp456.69314.960.41128.01221.4842.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp456.69314.960.025.12Manguera de lona
1/2" 100 psipp456.69314.960.013.02Aceite de
perforacingln1.000.698.966.18Copas de
afiladound1.000.6915.7510.8625.184.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml1.501.034.206.526.520.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.059.91263.0827%36%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticahm16.0011.034.6751.53manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm3.142.1760.00130.04manguera de
1/225.000.399.8728,8000.00ppies12Winche
electricohm9.456.528.1352.96Ventiladores de 30,000
CFMgdia.1.000.698.005.52piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.697.675.29Aguzadoragdia.1.000.692.671.84 Camion
Utilitariohm3.002.077.0714.62261.80261.8026%36%197.53
TOTAL COSTO DIRECTO723.09100%73%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.380.0790.11Fulminante
# 8und2.001.380.0810.11Fulminante fanelund7652.491.03454.28Cordn
detonantem30.0020.690.1202.48Conectoresund2.001.380.1350.19Examon
"P"kgr.111.6577.000.47036.19Dinamita Semexa
65%und7652.490.1347.03100.39100.3910%38%51.0016.002.2GASTOS
GENERALES y UTILID.23%166.31166.3117%62%43.0013.49
TOTAL COSTO INDIRECTO266.70100%27%113.88
3.0COSTO TOTAL989.80100%5356%442.10Los precios unitarios no
incluyen IGV
anday3.5 x 3.5443$/ml
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De mt
perf.xrend.piespp$Aceros de
Perforacinpiesm./unid.m.m.talad.ml.ml/unid.$$/pie6.00Barreno
integral 7/8" de 6'
und300911.801.201.5076.12114.171.25115.110.386.00456.69175.24Barreno
integral 7/8" de
4'und30091.441.801.201.5076.12114.171.2595.800.326.00456.69145.84und2,000609.603.002.801.071.001.070.00235.200.126.006.000.71und400121.923.002.801.071.001.070.01252.000.636.006.003.78und4,0001,2193.002.801.077681.550.0777.280.026.00456.698.82und8,0002,4383.002.801.077681.550.03375.000.056.00456.6921.41und750228.600.460.461.000.460.00165.150.226.006.001.32
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies Avancemang/pp$/m$/tramo$/pp4
mesesManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02tramo$$/tramovida
util pies$/pieManguera de lona 1/2" 100
psiml100.0090.00424.0038,1600.000033.65365.400.01manguera de
1100.000.000.0028,8000.00Aceite de perforacinglnmanguera de
1/225.000.000.0028,8000.00mts.piedra afilar3,600Copas de
afiladound1.00100.00
piesmin.pies/min.EQUIPOSNo. Taldpies perf.total piesveloc.
Pie/hr.hrs 76.126456.69960.000.48Jumbo
electrohidrulico76.1211.00837.27160.005.23distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalrend. Segn catalogocapc.
Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezatn/hr.realm3/hr.p.e.p.e.
Esponj.m3c/cargas/carga30%real
cuch.viajesmin.hr.ciclos/hr.2.602.00Scooptram de 3.5
yd32.685.504.0022.006.007.001.4531.9041.472.2718.23100.00116.67200.000.752.000.51.711.506.46117.852.360.502.8650.007.7317.5935.19
capac tnvel.m/min.capac.realvolumenp.e.tn/disparolong.
Limp.tiempoxcuch.tiemp.realNo. Ciclo x
ftemin/ftehrs/fte.winche0.9015.000.8131.903.0095.7060.004.004.40118.15519.859.45
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"76.1231.903.50111.65
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x5.5LONGITUD DE
AVANCEmDatos GeneralesTIPO DE ROCAANCHO FRENTEm5.5ALTURA
FRENTEm4.0AREA DEL FRENTEm222.0LONGITUD DE BARRENOpies6.0LONGITUD
DE BARRENOm1.8LONGITUD DE TALADROm90%1.65AVANCE
ESTIMADOm85%1.40DIAMETRO DE TALADROmm33.0N TALADRO DE
ALIVIOund.1.0TALADROS DISPARADOSund.75TALADROS
PERFORADOSund.76LONGITUD DE PERFORACIONm72.4
Calculo del N taladros
N taladros = (P/dt) + (c+s)76P = V s x 523.45dt = dist. Taladros
(m)rocas tenaces y duras0.50.5rocas intermedias0.60.6rocas
friables0.70.7c = coeficiente factor de rocarocas tenaces y
duras2.0rocas intermedias1.5rocas friables1.0s = dimen. de la secc.
Tunel m222ancho (m)5.5altura (m)4.0
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
$/unid.piespp$Aceros de
Perforacinpiesm./unid.m.m.talad.$/unid.$/pie6.00Barrenos exagonales
de 4'und4001221.201.201.0076.1252.870.136.00456.6960.36Barrenos
exagonales de
6'und400121.921.801.201.5076.1265.840.166.00456.6975.17Brocas de 36
mmund4112.501.802.800.6476.1216.660.416.00456.69185.61321.141.45221.48221.43
Pique ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.taladros :62FECHA.MAYO
2002Partida Pique inclinado de 4 x 5.5 - 36785.77Rendimiento 1.45
mtrs/gd.hh/gdia :10.0031.9 m3 insitu10.5 pp/m3
insituActividadesDesatado, regado, perforacin, voladura y limpieza
de frente hasta 100 m.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.251.72
Administrador: Cant. x hh gdia /
Rdto4.908.44Perforistahh2.0013.794.1356.95Ayud.
Perforistahh2.0013.793.8152.53Operador
Winchehh1.006.904.1328.484.005.0020.00794.16Operador
Scoophh0.503.454.1314.244.005.5022.00873.58Personal Servicios
Minahh1.006.903.1721.85Ayudante
Topografahh0.503.453.1710.92Bodeguerohh0.251.722.784.80198.21198.2125%35%78.131.2MATERIALESAceros
de PerforacinBarrenos exagonales de 4'pp334.80230.900.13Barrenos
exagonales de 6'pp334.80230.900.16Brocas de 36
mmpp334.80230.900.4193.8493.8442.30Accesorios de Perforacin
Manguera de lona 1" 100 psipp334.80230.900.023.75Manguera de lona
1/2" 100 psipp334.80230.900.012.21Aceite de
perforacingln1.000.698.966.18Copas de
afiladound1.000.6915.7510.8623.004.45Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml1.501.034.206.526.520.41100.00mts
para3.00mese180.000.56Herramientas vida util
barreno1,200piesHerramientas manuales
%mo0.059.91133.2717%24%3.141.634
mesesvida3.00meses1.3EQUIPOS0.6352.56tramo$$/tramovida util
pies$/pieN0. Disparos270.00Perforadora
Neumaticapp334.80230.900.1124.71manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm3.142.1760.00130.04manguera de
1/225.000.399.8728,8000.00ppies12Winche
electricohm9.456.528.1352.96Ventiladores de 30,000
CFMgdia.1.000.698.005.52piedra afilar3,600vida pies165,240Cargador
de Anfogdia.1.000.697.675.29Aguzadoragdia.1.000.692.671.84 Camion
Utilitariohm3.002.077.0714.62234.98234.9830%41%197.53
TOTAL COSTO DIRECTO566.46100%72%328.222.0COSTO
INDIRECTO2.1EXPLOSIVOSGua de seguridadm2.001.380.0790.11Fulminante
# 8und2.001.380.0810.11Fulminante fanelund6242.761.03444.21Cordn
detonantem30.0020.690.1202.48Conectoresund2.001.380.1350.19Examon
"P"kgr.111.6577.000.47036.19Dinamita Semexa
65%und6242.760.1345.7389.0289.0211%41%51.0016.002.2GASTOS GENERALES
y UTILID.23%130.29130.2917%59%43.0013.49
TOTAL COSTO INDIRECTO219.31100%28%113.88
3.0COSTO TOTAL785.77100%5356%442.10Los precios unitarios no
incluyen IGVpropuesta:989.80Diferencia:-204.03
anday3.5 x 3.5443$/ml
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
$/unid.piespp$Aceros de
Perforacinpiesm./unid.m.m.talad.$/unid.$/pie6.00Barrenos exagonales
de 4'und4001221.201.201.0062.0052.870.136.00334.8044.25Barrenos
exagonales de
6'und400121.921.801.201.5062.0065.840.166.00334.8055.10Brocas de 36
mmund41
Costos 01:
4112.501.802.800.6462.0016.660.416.00334.80136.07235.431.45162.36221.43
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacinglnmts.piedra afilar3,600Copas de
afiladound1.00100.00
EQUIPOS
distanciacarguiotransp.descarg.retornimprev.total ciclotiempo
detiempo detrasladostotalrend. Segn catalogocapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezatn/hr.realm3/hr.p.e.p.e.
Esponj.m3c/cargas/carga30%real
cuch.viajesmin.hr.ciclos/hr.2.602.00Scooptram de 3.5
yd32.685.504.0022.006.007.001.4531.9041.472.2718.23100.00116.67200.000.752.000.51.711.506.46117.852.360.502.8650.007.7317.5935.19
capac tnvel.m/min.capac.realvolumenp.e.tn/disparolong.
Limp.tiempoxcuch.tiemp.realNo. Ciclo x
ftemin/ftehrs/fte.winche0.9015.000.8131.903.0095.7060.004.004.40118.15519.859.45
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"ERROR:#REF!31.903.50111.65
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x5.5Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)62TIPO DE ROCAP = V s x 523.45ANCHO FRENTEm5.5dt = dist.
Taladros (m)ALTURA FRENTEm4.0rocas tenaces y duras0.50.5AREA DEL
FRENTEm222.0rocas intermedias0.60.6LONGITUD DE BARRENOpies6.0rocas
friables0.70.7LONGITUD DE BARRENOm1.8c = coeficiente factor de
rocaLONGITUD DE TALADROm90%1.65rocas tenaces y duras2.0AVANCE
ESTIMADOm85%1.40rocas intermedias1.5DIAMETRO DE TALADROmm33.0rocas
friables1.0N TALADRO DE ALIVIOund.1.0s = dimen. de la secc. Tunel
m222TALADROS DISPARADOSund.61ancho (m)5.5TALADROS
PERFORADOSund.62altura (m)4.0LONGITUD DE PERFORACIONm72.4
&A
DesqERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:51.33FECHA.MAYO -
2002Partida Desquinches23.04Rendimiento 88m3 rotos /gdia.hh/gdia
:10.0070.4m3 insitu15.1pp/m3 insituDescripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.034.900.14Operador
Jumbohh1.000.114.130.47Ayud. Operador
Jumbohh1.000.113.810.43Operador Scoophh0.500.064.130.23Cargador /
disparadorhh0.500.063.490.20Ayud. Cargador /
disparadorhh0.500.063.170.18Personal Servicios
Minahh0.500.063.170.18Ayudante
Topografahh0.500.063.170.18Bodeguerohh0.250.032.780.082.092.099%1.2MATERIALES5.00Aceros
de PerforacinBarra de extensinpp1,061.812.070.050.63Broca de
botonespp1,061.812.070.333.96Adaptador
pilotopp1,061.812.070.121.42Manguito de
acoplepp1,061.812.070.020.23Shank
adapterpp1,061.812.070.050.576.81Accesorios de PerforacinManguera
de lona 1" 100 psipp1,061.812.070.020.26Aceite de
perforacingln0.500.018.960.05Copas de
afiladound0.200.0015.750.040.35Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.014.200.010.01100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales %mo0.050.107.2732%4
mesesvida3.00meses1.3EQUIPOStramo$$/tramovida util pies$/pieN0.
Disparos270.00Jumbo electrohidrulicohm3.210.0495.003.46manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm5.160.0660.003.52manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.018.000.09piedra afilar3,600vida pies165,240Cargador
de Anfogdia.0.500.017.670.04Aguzadoragdia.1.000.012.670.03Camion
Utilitariohm1.000.017.070.087.237.2331%
TOTAL COSTO DIRECTO16.602.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.020.0790.00Fulminante #
8und2.000.020.0810.00Fulminante fanelund881.011.0341.04Cordn
detonantem30.000.340.1200.04Conectoresund2.000.020.1350.00Examon
"P"kgr.264.003.000.4701.41Dinamita Semexa
65%und88.491.010.1340.132.632.6311%2.2GASTOS GENERALES y
UTILID.23%3.823.8217%
TOTAL COSTO INDIRECTO6.45
3.0COSTO TOTAL23.04100%Los precios unitarios no incluyen IGV
anday3.5 x 3.5443$/ml
0.3048L.barraV.Util.V.Util.Long-
perf.L.avanceRelacionNo.mallaLon. BarraRend. xNo.piesPPUS$Aceros de
Perforacinpiesm./unid.m.m.Talad.ebm3/ml3.00gdia
(m3)TaladrosUS$$/pie12.00Barra de
extensinund8,0002,4381.000.851.181.000.600.650.330.9988.0088415.000.0512.001,061.8455.08Broca
de
botonesund30091.443.000.853.530.000.600.650.330.9988.008898.560.3312.001,061.84348.85Adaptador
pilotound2,000609.603.000.853.531.000.600.650.330.9988.0088235.200.1212.001,061.84124.87Broca
escariadoraund400121.923.000.853.531.000.600.650.330.9988.0088252.000.6312.001,061.84668.96Manguito
de
acopleund4,0001,2193.000.853.53510.600.650.330.9988.008877.280.0212.001,061.8420.51Shank
adapterund8,0002,4383.000.853.53510.600.650.330.9988.0088375.000.0512.001,061.8449.77Barreno
integral 7/8" de 8'
und750228.600.461.000.600.650.000.0088.00165.150.2212.000.000.00
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (m)m. Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
No.PiesTotalveloc.veloc.EQUIPOSTaladPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico51.3310.00513.33160.002.673.21distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga35%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.681.001.001.006.007.0088.0088.00118.802.2752.23100.00116.67100.000.751.000.50.861.504.61240.624.810.355.16
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"0.0088.003.00264.00
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEm2.6Datos GeneralesN taladros = (P/dt) +
(c+s)51TIPO DE ROCAP = V s x 520.00ANCHO FRENTEm4.0dt = dist.
Taladros (m)ALTURA FRENTEm4.0rocas tenaces y duras0.50.55AREA DEL
FRENTEm216.0rocas intermedias0.60.65LONGITUD DE
BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.7c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.29rocas tenaces
y duras2.0AVANCE ESTIMADOm85%2.80rocas intermedias1.5DIAMETRO DE
TALADROmm33.0rocas friables1.0N TALADRO DE ALIVIOund.1.0s = dimen.
de la secc. Tunel m216TALADROS DISPARADOSund.50ancho (m)4.0TALADROS
PERFORADOSund.51altura (m)4.0LONGITUD DE
PERFORACIONm72.4Long5.5m
&A
Desq ModifyERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.Taladros:45.00FECHA.MAYO -
2002Partida Desquinches12.94Rendimiento 88m3 insitu /gdia.hh/gdia
:10.0070.4m3 roto5.5pp/m3 insituDescripcin
InsumoUnd.Cant.Incid.PrecioParcialS-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.034.900.14Operador
Jumbohh0.500.064.130.23Ayud. Operador
Jumbohh0.500.063.810.22Operador Scoophh0.500.064.130.23Cargador /
disparadorhh0.500.063.490.20Ayud. Cargador /
disparadorhh0.500.063.170.18Personal Servicios
Minahh0.500.063.170.18Ayudante
Topografahh0.500.063.170.18Bodeguerohh0.250.032.780.081.641.6413%1.2MATERIALES4.00Aceros
de PerforacinBarra de extensinpp484.35.500.050.29Broca de
botonespp484.35.500.331.81Adaptador
pilotopp484.35.500.120.65Manguito de acoplepp484.35.500.020.11Shank
adapterpp484.35.500.050.263.10Accesorios de PerforacinManguera de
lona 1" 100 psipp484.35.500.020.12Aceite de
perforacingln0.500.018.960.05Copas de
afiladound0.200.0015.750.040.21Accesorios de
Ventilacindispmm/dispMangas de Ventilacin - 24"
ml0.560.014.200.010.01100.00mts para3.00mese180.000.56Herramientas
vida util barreno1,200piesHerramientas manuales %mo0.050.083.4126%4
mesesvida3.00meses1.3EQUIPOStramo$$/tramovida util pies$/pieN0.
Disparos270.00Jumbo electrohidrulicohm3.030.0362.002.13manguera de
1100.006.21620.5528,8000.02talad.510.004616.002.31Scooptram de
3.5yd3hm2.500.0360.001.70manguera de
1/225.000.399.8728,8000.00ppies12Ventiladores de 30,000
CFMgdia.1.000.018.000.09piedra afilar3,600vida pies165,240Cargador
de Anfogdia.0.500.017.670.04Aguzadoragdia.1.000.012.670.03Camion
Utilitariohm1.000.017.070.084.084.0832%
TOTAL COSTO DIRECTO9.132.0COSTO INDIRECTO2.1EXPLOSIVOSGua de
seguridadm2.000.020.0790.00Fulminante #
8und2.000.020.0810.00Fulminante fanelund450.511.0340.53Cordn
detonantem30.000.340.1200.04Conectoresund2.000.020.1350.00Examon
"P"kgr.200.002.270.4701.07Dinamita Semexa
65%und45.000.510.1340.071.711.7113%0.612.2GASTOS GENERALES y
UTILID.23%2.102.1016%
TOTAL COSTO INDIRECTO3.81
3.0COSTO TOTAL12.94100%Los precios unitarios no incluyen
IGVpropuesta:23.04Diferencia:-10.10
anday3.5 x 3.5443$/ml
0.3048L.barraV.Util.V.Util.Long-
perf.L.avanceRelacionNo.No.InsumospiesEffPPUS$Aceros de
Perforacinpiesm./unid.m.m.Talad.TaladrosUS$US$/PP11.96PerfBarra de
extensinund8,0002,4381.000.851.181.0045.00415.000.0511.9690.0%484.2725.12Broca
de
botonesund30091.443.000.853.530.0045.0098.560.3311.9690.0%484.27159.10Adaptador
pilotound2,000609.603.000.853.531.0045.00235.200.1211.9690.0%484.2756.95Broca
escariadoraund400121.923.000.853.531.0045.00252.000.6311.9690.0%484.27305.09Manguito
de
acopleund4,0001,2193.000.853.534545.0077.280.0211.9690.0%484.279.36Shank
adapterund8,0002,4383.000.853.534545.00375.000.0511.9690.0%484.2722.70Barreno
integral 7/8" de 8'
und750228.600.461.0045.00165.150.2211.9690.0%484.27106.64684.96duracionavancevida
utilincidenciaAccesorios de Perforacincant.diasdia (m)m.
Avancemang/mlManguera de lona 1" 100
psiml100.0090.002.80252.000.004Cancamos agua-aire y
electricidadundAceite de perforacinglnmts.Copas de
afiladound1.00100.00
No.PiesTotalveloc.veloc.EQUIPOSTaladPerf.Pies
PerfPie/hr.Pie/minHrs Jumbo
electrohidrulico45.0010.76484.27160.002.673.03distanciacarguiotransp.descarg.retornimprev.total
ciclotiempo detiempo detrasladostotalcapc. Cuch.secc.
Tunelareavelocidadlongitudvolumenesponj.capac.No.m7min.c/cargam/min
s/cargam.min.min.min.min.min.min.limpiezalimpiezam3c/cargas/carga30%real
cuch.viajesmin.hr.Scooptram de 3.5
yd32.681.001.001.006.007.0088.0088.00114.402.2750.29100.00116.67100.000.751.000.50.861.504.61231.714.630.354.98
rend. Segn catalogotn/hr.realm3/hr.p.e.p.e.
Esponj.ciclos/hr.2.602.0050.0010.8524.6949.37
EXPLOSIVOSCordn detonante3.504.007.5015.00No. Talad.m3f.pot.
Kg/m3Examon "P"0.0088.003.00264.00
BASE DE DATOSTIPO LABOR / SECCIONSECC.: 4 x 4Calculo del N
taladrosLONGITUD DE AVANCEmDatos GeneralesN taladros = (P/dt) +
(c+s)4569TIPO DE ROCAP = V s x 525.12ANCHO FRENTEm5.1dt = dist.
Taladros (m)ALTURA FRENTEm5.0rocas tenaces y duras0.50.55AREA DEL
FRENTEm225.3rocas intermedias0.60.65LONGITUD DE
BARRENOpies12.0rocas friables0.70.75LONGITUD DE BARRENOm3.6c =
coeficiente factor de rocaLONGITUD DE TALADROm90%3.28rocas tenaces
y duras2.0AVANCE ESTIMADO (88 m3/16 m2)m85%2.79rocas
intermedias1.5DIAMETRO DE TALADROmm33.0rocas friables1.0N TALADRO
DE ALIVIOund.1.0s = dimen. de la secc. Tunel m225.25TALADROS
DISPARADOSund.44ancho (m)5.1TALADROS PERFORADOSund.45altura
(m)5.0LONGITUD DE PERFORACIONm72.4Long2.7881188119m
&A
PERNOSERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.FECHA.MAYO - 2002Partida Colocado
de pernos helicoidales13.98Rendimiento 23.0
Und./gd.hh/gdia:10.00Longitud perf. 55.2 m-perf/gd.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialSub-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.114.900.53Operario A
(Perforista)hh1.000.433.491.52Operario B (Ayud.
Perf.)hh1.000.433.171.38Operario C
(Servicios)hh0.330.142.780.40Bodeguerohh0.250.112.780.304.134.1330%36%1.2MATERIALESInsumosPerno
( EMISA)und0.000.000.00Cemento (EMISA)und0.000.000.000.000.00Aceros
de PerforacinBarreno integral 7/8" de 4' pp92.004.00.240.96Barreno
integral 7/8" de 6' pp138.006.00.291.73Barreno integral 7/8" de 8'
pp184.008.00.252.034.72Accesorios de PerforacinManguera de lona 1"
100 psi (25m)pp414.0018.000.020.29vida util
barreno1,200piesManguera de lona 1/2" 100 psi
(25m)pp414.0018.000.010.17Aceite de perforacingln0.500.026.830.154
mesesPiedra de Afilarund0.500.0215.750.340.96tramo$$/tramovida util
pies$/pieHerramientas manguera de
125.006.21155.1428,8000.01Herramientas manuales
%mo0.050.215.88manguera de
1/225.003.6591.3528,8000.001.3EQUIPOSPerforadora Neumtica 60
lbhm3.000.134.670.61Inyectora de
Cementohm4.000.171.290.22Escalerahm6.000.260.210.05Aguzadoragdia.1.000.043.790.16Camion
Utilitariohr.1.000.047.070.311.361.3610%12%
TOTAL COSTO DIRECTO11.448%81%
2.0COSTO INDIRECTO2.1GASTOS GENERALES23%2.612.6119%100%
TOTAL COSTO INDIRECTO2.61100%19%
3.0COSTO TOTAL13.9858%100%
Los precios unitarios no incluyen IGV
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
piespp$Aceros de Perforacinpiesm./unid.m.m.talad.$$/pie6.00Barreno
integral 7/8" de 6'
und4001221.801.201.5023.00115.110.290.000.000.00Barreno integral
7/8" de 4'und400121.921.201.201.0023.0095.800.240.000.000.00Barreno
integral 7/8" de 8'
und650198.122.402.800.861.00165.150.250.000.000.00
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacingln
mallaERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.FECHA.MAYO - 2002Partida
Colocacion de malla12.31Rendimiento 20m2/gdiahh/gdia:10.00Longitud
perf. 46.8 m-perf/gd.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialSub-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.250.134.900.63Operario A
(Perforista)hh10.563.491.97Operario B (Ayud.
Perf.)hh10.543.171.71Operario C
(Servicios)hh10.512.781.43Bodeguerohh0.250.132.780.366.096.0949%61%1.2MATERIALESInsumosmalla
(EMISA)und0.000.000.00Aceros de PerforacinBarreno integral 7/8" de
6' pp117.006.00.291.731.73Accesorios de PerforacinManguera de lona
1" 100 psi (25m)pp117.006.000.020.10vida util
barreno1,200piesManguera de lona 1/2" 100 psi
(25m)pp117.006.000.010.06Aceite de perforacingln0.500.036.830.184
mesesPiedra de Afilarund0.500.0315.750.400.73tramo$$/tramovida util
pies$/pieHerramientas manguera de
125.006.21155.1428,8000.01Herramientas manuales
%mo0.050.302.76manguera de
1/225.003.6591.3528,8000.001.3EQUIPOSPerforadora Neumtica 60
lbhm1.500.084.670.36Escalerahm6.000.310.210.06Aguzadoragdia.1.000.053.790.19Camion
Utilitariohr.1.500.087.070.541.161.169%12%
TOTAL COSTO DIRECTO10.072%81%
2.0COSTO INDIRECTO2.1GASTOS GENERALES23%2.302.3019%100%
TOTAL COSTO INDIRECTO2.30100%19%
3.0COSTO TOTAL12.3178%100%
Los precios unitarios no incluyen IGV
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
piespp$Aceros de Perforacinpiesm./unid.m.m.talad.$$/pie6.00Barreno
integral 7/8" de 6'
und4001221.801.201.5019.50115.110.290.000.000.00Barreno integral
7/8" de 4'und400121.921.201.201.0019.5095.800.240.000.000.00Barreno
integral 7/8" de 8'
und650198.122.402.800.861.00165.150.250.000.000.00
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacingln
shotcreteERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.FECHA.MAYO - 2002Partida Lanzado
de shotcrete, espesor 2" - sin dumper13.54Rendimiento
40.0m2/gdiahh/gdia:10.00Longitud perf. 96.0 m-perf/gd.Descripcin
InsumoUnd.Cant.Incid.PrecioParcialSub-TotalTotal1.0COSTO
DIRECTO1.1MANO DE OBRACapatazhh0.330.084.900.40Operario A
(Shotcretero)hh10.253.490.87Operario B (Ayud.
Shotc.)hh10.253.170.79Operario Chh30.752.782.09Operador
scoophh10.134.130.52Bodeguerohh0.250.062.780.174.854.8536%44%1.2MATERIALESInsumosCementobls0.000.000.00Agregadom30.000.000.020.00vida
util barreno1,200piesFibra de
acerokg0.000.000.010.00AditivosGal.0.000.006.830.004
mesesCalibradoresund1.001.000.140.140.14tramo$$/tramovida util
pies$/pieHerramientas manguera de
125.006.21155.1428,8000.01Herramientas manuales
%mo0.050.240.38manguera de
1/225.003.6591.3528,8000.001.3EQUIPOSMaquina Lanzadora de
shotcretehm4.000.1024.302.43Scoop de 3.5hm2.000.0560.003.00Camion
Utilitariohr.2.000.057.070.355.785.7843%53%
TOTAL COSTO DIRECTO11.097%81%
2.0COSTO INDIRECTO2.1GASTOS GENERALES23%2.532.5319%100%
TOTAL COSTO INDIRECTO2.53100%19%
3.0COSTO TOTAL13.5497%100%
Los precios unitarios no incluyen IGV
0.3048l.barrav.utiliv.utililong- perf.l.avancerelacionNo. De
piespp$Aceros de Perforacinpiesm./unid.m.m.talad.$$/pie6.00Barreno
integral 7/8" de 6'
und4001221.801.201.5040.00115.110.290.000.000.00Barreno integral
7/8" de 4'und400121.921.201.201.0040.0095.800.240.000.000.00Barreno
integral 7/8" de 8'
und650198.122.402.800.861.00165.150.250.000.000.00
duracionavancevida utilincidenciaAccesorios de
Perforacincant.diasdia (pies)pies
Avancemang/pp$/m$/tramo$/ppManguera de lona 1" 100
psiml100.0090.00424.0038,1600.000036.21620.550.02Manguera de lona
1/2" 100 psiml100.0090.00424.0038,1600.000033.65365.400.01Aceite de
perforacingln
c y transp. desm. m3-km.EJC20ERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.FECHA.MAYO - 2002Partida Carguio
y transporte de desmonte (esponjado)m3/kmunid.Rendimiento
:19.3m3/hr.hrs.1.006.27 VolqueteTAMROCK EJC
20Material:DesmonteRendimiento
:39.40m3/hr.Scoop3.50DescripcinUnidadCantidadIncidenc.PrecioParcial1.0MANO
DE OBRACapatazhh0.250.014.900.06Operador de equipos A
(Dumper)hh1.000.054.130.21Operador de equipos
A(scoop)hh1.000.034.130.10Bodeguerohh0.250.012.780.04
Sub-total Mano de Obra0.420.427%2.00MATERIALESHerramientas
Herramientas manuales %mo0.030.010.013.0MAQUINARIA Y EQUIPOSTAMROCK
EJC 20hm1.000.0560.613.14Scooptram 3.5 yd3
hm1.000.0360.001.52Sub-total Equipos4.664.6692%
Total Costo Directo 5.095.0898%
GG y Ut.23%1.171.17
Carguio y transporte hasta 1 km.TOTAL$m3/km.6.276.25
ciclo - 1 km.viajes en 1 hr.capac. Realcapac.
RealTRANSPORTECapac. M3c. Tmveloc. X (km/hr.)carg.transp.
C/carg.ERROR:#REF!descrretornoimprev.ciclom3/hr.camion
m3m3/hrNL1212.0020.0015.0010.904.0001.504.0001.5021.902.5121TAMROCK
EJC
2010.520.0011.0010.415.4551.005.4551.0023.322.5719.37.5019.30TAMROCK
EJC 5331830.0011.0010.905.4551.505.4552.5025.812.1327
capac. Cuchcapac. Cuch.velocidadvelocidaddistanciacapac. RealNo
.cuch.TOTALcapac. Cuchtiempo opt, min.tiempo opt, min.tiempo opt,
(min)tiempo real(min.)tiempo real (min.)tiempo real(min)carguiotipo
equipoequipoYd3eq.m3c/cargas/cargam/min.c/cm/min.s/cx. Cuch.
M3p.llenarcarguio(min.)transp.(min.)descarg.(min.)retorn(min.)imp.(min)trasladosCICLOtm
- seg catatm/hr.m3/hr.carguio c. 10m3carguio c. 10.5m3carguio c.
18m3carguio c. 12m3carguio c. 10.5m3carguio c. 18m31toro
0076.004.596.007.00100.00116.6725.003.672.861.000.250.500.210.501.003.468.00115.46ERROR:#DIV/0!9.912.293.9219.824.587.852scoop
3.53.502.686.007.00100.00116.6725.002.274.621.000.250.500.210.501.003.465.7098.7239.400.063toro
1512.001.536.007.00100.00116.6725.001.221.000.250.500.210.501.003.463.5050.52ERROR:#DIV/0!0.114
velocidadvelocidaddistanciaTOTALRELLENOvol-tnequipoYd3eq.m3c/cargas/cargam/min.c/cm/min.s/ccarguio(min.)transp.(min.)descarg.(min.)retorn(min.)imp.(min)CICLOm3/hr.1toro
007100.006.004.596.007.00100.00116.67200.000.502.000.501.710.505.2135.192scoop
3.50.003.902.986.007.00100.00116.67200.000.502.000.501.710.505.2121.813toro
1512.001.536.007.00100.00116.67200.000.502.000.501.710.505.2111.734
v. Utill. Perf.tald.incidencial. TotalrendimACEROSBarra de
extensin m.br. Rimad.br.bot.45shank adpt+b. Exte.br.
Rimad.perf.barrabr. Rimbr. Botnsha
adp.1823.00200.00200.002,400.003.960.000.000.000.000.002823.00200.00200.002,400.003.9676.470.090.380.380.033823.00200.00200.002,400.003.960.000.000.000.000.004
MANGUERA tramom. (1")v.util.m.v.util tmrend.
M/ml1100.00450.0010,125.000.222100.00450.004,950.000.2234
EXPLOSIVOSf. Potencia anf.dinm. 80%peso din.
(Kg.)Anfo10.450.000.141.8020.4531.100.142.4530.450.000.142.454
transp. desm. m3-km.EJERROR:#REF!
ANALISIS DE PRECIOS UNITARIOSPROYECTOEXCAVACION PIQUE INCLINADO
- MINA LIMPE CENTROCLIENTEEMPRESA MINERA ISCAYCRUZ
S.A.UBICACINPACHANGARA, OYN, LIMA.FECHA.MAYO - 20