BTS SITE INSTALLATION Prepared By : Parakramsinh Mahida Date : 27/07/2012
BTS SITE INSTALLATION
Prepared By: Parakramsinh MahidaDate : 27/07/2012
CONTENTS
1. Antenna Installation2. Antenna line installation3. Earthing on Feeder cable4. Installation of Roxtec5. Installation of Surge Arrestors6. Grouting of BTS and TRSM rack7. Installation of Battery Bank8. Installation of Power plant9. Installation of Air conditioner10.Grounding connection inside the shelter11. Power connection 12.Alarm connection13.Labeling pattern of cables
Antenna Installation
1. Assembling2. Installation
1. Assembling
1. Unpack the antenna from the cartoon using knife carefully.
2. Verify it according the RF plan.3. Using D-type 12-13 no spanner assemble it.
2. Installation
1. Connect O/D jumper to the antenna port using 30-32 D-type spanner.
2. Do the weather proofing on Jumper-Antenna connection (only PVC tape).
I
Antenna –jumper connection WP
Connect the antenna 2 clamps on the back side of antenna using 12-13 no D-type spanner.
Then use nylon rope for pulling up the antenna over the tower.Tie the rope with antenna.
Then pull the antenna on the tower by pulling rope through the 6” double bearing pulley.
Now connect the antenna on this pole mount (installed as per RF plan) by the use of 12-13 no D-type spanner.
SATETY BELTS
SHOULD BE USED AT HEIGHTS
Antenna is now installed on the tower along with O/D jumper cable
Antenna Line Installation
1. Routing of O/D jumper
Jumper cable (½” , 50Ω)
II
U-shape loop Circular loop
Route the jumper cable along with tower body Provide cable ties at sufficient distance Provide loop on the jumper cable (U-shape/Circular)
All cable ties are tied in same direction and should have smooth edges
At each loop provide the cable ties.
2. Assembling and installation of RF clamps
6 WAY ,7/8” RF CLAMPWITH FULL THREADED NUTS-BOLTS.
Assembled 6 way clamp
Assemble it by using 12-13 D-type spanner.
3-way RF clamp
6-way RF clams Install RF clamps on HCT and VCT (on the rectangular strips) using 12-13 D-type spanner.
RF clampsOn VCT
NOTE : Distance between 2 clamps should be symmetric.i.e On HCT < 1mtr & on VCT =1 to 1.5mtr
2. Routing of RF cable
Cut the RF cable from the roll/drum as per the desired length using RF cable cutter
Made 6 parts of feeder, 2 for each sector.
RF cable cutterRF cable Drum
Connectrorization procedure at one end of feeder cable:
Using knife remove outer insulation from feeder and then using two 30-32 no D-type spanner and made the connectors on each feeder cable at one end.
Then provide temporary seal on each connector.Using rope and pulley pull up the cables on the tower (Connector ends)Made RF-Jumper connection using D-type 30-32 no. spanners.
J CRF CONCTR
D-type spanner (30-32 no)
RF connector N-M
Provide the weather proofing on the each connection.
PVC TapeRubber TapeButyle Tape
Weather proofing set contains:
4 layers of tapes are provided on each connection. First PVC, Butyle, Rubber and then PVC again.
Weather proofing set 4
3 2
1
1= PVC 3= Rubber2= Butyle 4= PVC
Route the cable straightly through the clamps on the VCT
Give proper bend at HCT-VCT connection ( bending radius ≥ 300mm)
Provide a dummy clamp at the bend
On HCT also routing should be straight and tight enough
Weather proofing
HCT
VCTBend with Dummy clamp
Provide S-bend on feeder routing before it enters through roxtec
Shelter
S-bend
Insert all cables through the roxtec inside the roxtecMark on the cable at the same position for all cable by keeping 0.5 mtr extraRemove them all, cut from the mark Make connectorization outside the shelter insert again all the cables inside the shelter
Earthing on FeederIII
Earthing kit
Earthing kit with weather proofing kit
•Strip out the outer insulation by knife
•Wrap the kit using combinational plier
•Using 12-13no spanner connect kit with C-clamp for termination on tower body
•Before termination of c-clamp paint from tower body is removed by flat file.
Earthing on feeder
Near Roxtec
Near RF-Jumper connection
Installation of RoxtecIV
Roxtec plate with Rubber boots
7/8” Rubber
boot
Accessories for installing roxtec
½” rubber boot
Seal the iron plate of roxtec using silicon gelAfter proper insertion of rubber boots by combinational plier tight the metallic clamp using flat head small duty screw driver
Metallic clamp
Roxtec plate
Rubber boots
Surge Arrestor
Connect the 6 Surge Arrestors to the each connector of feeder cable by using 30-32 no D-type spanner.
Surge Arrestor with Grounding
cable
At the other end connect the six indoor jumper with that six surge arrestors using 30-32 no D-type spanner.
And third terminal of S.A are terminated by the grounding cable 16/25 sq.mm green/black cable It is connected by 16-17 no spanner
Installation of Surge ArrestorsV
Surge Arrestor SA – RF connection
SA – jumper connection
Outdoor installation is done
Installation of Indoor Equipment
4000
2000
5000TOWER
50
50
100
100
10 010 0
100
010
00
100
100
100
600
600
600
25030 0
250
30 0
60 0
100
0
1000
600
80 0
100
0
100
010
00
300
0
125
60 0
150
10 010 0
B.B / P.PPIU
A/C
TRSM EXPANSION BTS
BTS
DDF
DOOR
W.F.T
450
1000
ANNEXTURE II FLOOR PLAN
Site Details Drawing Details
Site Name : Nizampura Scale : 650mm = 1"
Site ID : A39P7Z Ht of Tower : 60 mtr
Address : RNC cmpx Ht of S1 : 40 mtr
Location : Vadodara Ht of S2 : 42 mtr
Customer : Vodafone Ht of S3 : 38 mtr
Submitted By :Parakramsinh Mahida On 13/07/2012
Grouting of BTS and Transmission RackVI
ANCHOR FASTNERS –M10,75L FOR BTS & TRSM GROUTING
Mark for the drilling on shelter floor by referring floor planUsing drill machine make 4 holes for BTS and 4 for TRSMFix the BTS cabinet with floor using anchor fasteners using 16-17 no Spanner (D-type) and use nylon washor.Also fix the TRSM rack Use the sprit level during the installation to maintain the horizontal level
Cabinet of BTSTRSM rack
1. Attach the Cabinet to the Base.2. Adjust the Cabinet feet firmly to the floor.3. Check that the cabinet is leveled, if required then adjust the anchor bolt & feet.
NYLON WASHERS FOR ISOLATION
Cabinet floor
Shelter / room floor
Cross sectional view of grouting
Installation of Battery Bank and Power plantVII
Iron Garter
Stack of BB filled with cells
Horizontal strips
Vertical strips
Install the BB on Iron garterAssemble the battery bank stacks by using sixteen 16 no steel nut bolts and also use 2 washor (normal & pressure)at each side of nut-bolts and tight them 16-17 no d-type spannerInsert the cells (2V) in the stackConnect all cells using horizontal, vertical / cross strips (made up of lead alloy)Use 10no. Bolt to connect the strips (lead alloy) by using 10-11no spannerDuring installation use sprit level for the proper leveling of the BB.
Remove the paints on frame & Connect the frame To the main grounding bus bars of the equipment room by proper cables using flat file.
Install the base plate over the B.B by eight 16no nut bolts and install the Power plant over the B.B by using 16-17 no d-type spanner
Base plate
Power plant
BACK MOUNT FRAME
DISCONNECTIONMODULES
DDF BOX WITHBACKMOUNT FRAME
DISCONNECTIONEARTH MODULE
Installation of DDFVIII
Using poker and hammer(ball peen) make proper holes on shelter wall (use sprit level for horizontal installation)Install the DDF frame on wall using full threaded screw along with washor using flat head small duty S.DJack in the DDF block (punching type) inside the frame using FH small duty SD
Installation of Air conditionerIX
Capacity of AC 2.5 ton.Two Acs are installed on shelter wallTemperature detector/ Thermister is also installed along with AC.
Thermister
DDF
IGB
Indoor Cable Tray
Label
25 sq.mm Green cable25 sq.mm lugUsing knife strip out the outer insulation of cableCrimp the lug using crimping toolProvide the green PVC tape over the connectionAlso provide the labeling on both ends of cableRoute the cable straightly over the cable tray
Grounding connection of BTS and DDF
Grounding connection inside the shelterX
Grounding connection of Surge arrestors
Using 12-13no D-type spanner connect the grounding cable at surge arrestor and at IGB use 10-11 no D-type spanner and 10no nut bolts
25 sq.mm
Surge arrestors
Routing of grounding cable on cable tray
Routing of cables on CT is straight and tight enoughProvide the cable ties at each strips in cross patternDo not cross the cables in routingDo not provide any loop in routing Make the Edge of the cable ties smooth
Grounding connection at IGB
Terminate the all grounding cable coming from indoor equipments to IGB10no nut-bolts and 10-11 o d-type spanner for connectionProvide green PVC tape at the connectionGive the label near the IGB that contain from where the cable is coming
Power connectionXI
Earthing cable- Grounding bar Neutral cable- Contactor Phase cable- 32A MCB
3C 6.5 sq.mm Cu cable
E N P
Power connection from PIU to Power plant
PIUPower plant
Power connection from Battery Bank to Power plant
Positive terminal of Battery – Bus bar Of P.P Negative Terminal – Fuse of P.P
Termination of Cables
Label
Power connection from Power plant to BTS
35 sq.mm blue
35 sq.mm black
Termination of Cables
Blue cable- Bus bar of PPBlack cable- 63A MCB
Power plant
BTS
Power connection from Power plant to DCDB2C 4 sq.mm Cu cable
Termination of cable at both cable
32A MCB of P.P – MCB (6A)channel of DCDBBus bar of P.P – Bus bar of DCDB
Power plant
TRSM Rack
DCDB
Alarm cable connectionXII
Alarm cable connection from BTS to DDF
37 pinD-type connector
Alarm cable
Alarm DDF
DDF
FROM SENSORS/ FAP/ DG-AMF FROM BTS FLEXI BTS alarm cable type is D37 .
Prefabricated cable should be used. Connector have to be correct type. All cables have to be labeled on both
end of the cable. Proper tools have to be used during
alarm cable installation. Cabling from the BTS have to be
connected on upper side of disconnection module.
Cabling from the sensors have to be connected on bottom side of disconnection module.
Proper tools have to be used during alarm cable installation.
All cables have to be fixed properly.
AlarmsNumb
er Alarm DetailAlarm
DefinationPolari
tyColour Code of BTS Alarm
Cable
Alarm17401 Mains Failure
Minor NO Green & Green/White
Alarm2 7402 Rectifier Module Failure-RFA Major NO Blue & Blue/White
Alarm3 7403 Battery at 47v Critical NO Violate & White/Violate
Alarm4 7404 Load on Battery Major NO Grey & White/Grey
Alarm5 7405 Load on DG Minor NO Pink & Black/Red
Alarm6 7406 DG LLOP Major NO Light Green & Black/Green
Alarm7 7407 Low Fuel Critical NO Light Blue & Black/BlueAlarm8 7408 DG Fail to Start Critical NO White & Black/White
Alarm9 7409 AC Fail(AC-1/AC-2) Major NO Light Grey & Light Grey/Black
Alarm10 7410 Door Open Minor NC Red/Black & Red/Blue
Alarm10 7411 High Temperature Critical NO Orange/Red & Orange/Light Grey
Alarm12 7412 Fire/Smoke Critical NO Orange/Black & Orange/Green
List of External alarms for Flexi BTS
Labeling of cablesXII
1. LABELING OF CABLES,FUSES SHOULD BE MADE ON BOTH END OF CABLE.
2. LABELS SHOULD BE VISIBLE .3. LABELS SHOULD BE TIED WITH
CABLE TIES.
Labeling stickers
Sr No Equipment Label No From To1 BTS Gnd 1010 IGB BTS2 Site Main Gnd 1000 IGB GI strip3 DDF Gnd 1006 IGB DDF4 Internal Ladder Gnd 1009 IGB Int Ladder5 Bat Body Gnd 1005 IGB Battery6 PP Body 1004 IGB PP7 positive bus bar gnd 1008 IGB PP8 Site Main Gnd 1001 EGB Strip9 EMP Busbar 1002 EMP Busbar EGB
10BTS Power
(positive) 3110 BTS PP
11BTS Power
(Negative) 3111 BTS PP12 Bat-1 Positive 3000 PP Bat-113 Bat-1 Negative 3001 PP Bat-114 Bat-2 Positive 3002 PP Bat-216 AC Power Cable 2000 PP PIU/ACDB
Labeling codes for FLEXI BTS Nokia
Sr No Equipment Label No From To17 IF Cable MW-1 4010 BTS/FIU MW-118 IF Cable MW-2 4011 BTS/FIU MW-219 IF Cable MW-3 4012 BTS/FIU MW-320 IF Cable MW-4 4013 BTS/FIU MW-421 E1 Cable/PCM 5110 BTS DDF22 BTS Alarm Cable 6001 BTS DDF23 PIU Alarm 6110 PIU DDF24 Rect Alarm 6120 PP DDF25 Feeder-TX/RX,Sec-1 4110 BTS Ant-126 Feeder-RX,Sec-1 4111 BTS Ant-127 Feeder Sec-1 RxD 4112 BTS Ant-128 Feeder-TX/RX,Sec-2 4120 BTS Ant-229 Feeder-RX,Sec-2 4121 BTS Ant-230 Feeder Sec-2 RxD 4122 BTS Ant-231 Feeder-TX/RX,Sec-3 4130 BTS Ant-333 Feeder Sec-3 RxD 4132 BTS Ant-3
Labeling codes for FLEXI BTS Nokia