Cool to be Cool *Paint procurement & Instrument procurement *Building selection for coating and data logger installation – 50 buildings in the slum and 1 garment factory *People identified for thermal comfort survey & health survey *Questionnaires prepared *Volunteers and staff recruited *Test coating (2 bldgs.) – identifying the appropriate method for application
3

Cool to be Cool - UNFCCC

Feb 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cool to be Cool - UNFCCC

Cool to be Cool

*Paint procurement & Instrument procurement*Building selection for coating and data logger installation –

50 buildings in the slum and 1 garment factory*People identified for thermal comfort survey & health survey *Questionnaires prepared*Volunteers and staff recruited*Test coating (2 bldgs.) –

identifying the appropriate method for application

Page 2: Cool to be Cool - UNFCCC
Page 3: Cool to be Cool - UNFCCC

15

20

25

30

35

40

Swapan House Temperature: Before and After Test Painting

Plot Title: HOBO NO 14 Temp, °C (Roof)

After Before

15

20

25

30

35

40

Saddam House Temperature: Before and After Test Painting

Plot Title: HOBO No. 13 Temp, °C (Roof)

Before After

Way Forward:

*Paint arrives - Sept. 15*Painting starts - Oct. 10*Datalogging - 1 Sept. 20 to June - 4 times*Questionnaire survey --Personal comfort sensation & Health conditions - 1 Sept. 20 to June 21 - 4 times