Top Banner
52

CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

May 08, 2018

Download

Documents

phungngoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL
Page 2: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

i

CONTENT LIST

S. NO. CONTENTS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3

(i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3

(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 3

(iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY /REGION 4

(iv) DEMAND-SUPPLY GAP 4

(v) IMPORTS VS. INDIGENOUS PRODUCTION 4

(vi) EXPORT POSSIBILITY 4

(vii) DOMESTIC/EXPORT MARKETS 4

(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE

PROJECT

5

3.0

PROJECT DESCRIPTION 5

(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT

PROJECTS, IF ANY

5

(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION,

AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES

5

(iii) DETAILS OF ALTERNATIVE SITE CONSIDERED 7

(iv) SIZE OR MAGNITUDE OF OPERATION 7

(v) PROJECT DESCRIPTION WITH PROCESS DETAILS 7

(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY

SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT

OF RAW MATERIAL AND FINISHED PRODUCT

8

(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE

PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED

8

(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT

AND SOURCE

8

(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND

SCHEME FOR THEIR MANAGEMENT/DISPOSAL

9

4.0 SITE ANALYSIS 9

(i) CONNECTIVITY 9

(ii) LAND FORM, LAND USE AND LAND OWNERSHIP 9

(iii) TOPOGRAPHY 9

(iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON-AGRICULTURE,

FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST

DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE

FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS,

WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF

NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION

10

(v) EXISTING INFRASTRUCTURE 12

(vi) SOIL CLASSIFICATION 12

Page 3: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ii

S. NO. CONTENTS PAGE NO.

(vii) CLIMATIC DATA FROM SECONDARY SOURCES 12

(viii) SOCIAL INFRASTRUCTURE AVAILABLE 12

5.0 PLANNING BRIEF 12

(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND

TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT

AUTHORITY CLASSIFICATION

12

(ii) POPULATION PROJECTION 12

(iii) LAND USE PLANNING 12

(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) 13

(v) AMENITIES/FACILITIES 13

6.0 PROPOSED INFRASTRUCTURE 13

(i) INDUSTRIAL AREA (PROCESSING AREA) 13

(ii) RESIDENTIAL AREA (NON PROCESSING AREA) 13

(iii) GREEN BELT DEVELOPMENT 13

(iv) SOCIAL INFRASTRUCTURE 13

(v) CONNECTIVITY 13

(vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) 14

(vii) SEWERAGE SYSTEM 14

(viii) INDUSTRIAL WASTE MANAGEMENT 14

(ix) SOLID WASTE MANAGEMENT 14

(x) POWER REQUIREMENT & SUPPLY/SOURCE 14

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 14

(i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE PROJECT

AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND

LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN)

14

8.0 PROJECT SCHEDULE & COST ESTIMATES 14

(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF

COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN)

14

(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF

ECONOMIC VIABILITY OF THE PROJECT

14

(iii) ECONOMIC VIABILITY 15

9.0 ANALYSIS OF PROPOSAL 15

Page 4: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

iii

LIST OF TABLES

TABLE NO. NAME PAGE NO.

1. SALIENT FEATURES OF THE PROJECT 1

2. DETAILS OF MANPOWER 5

3. EXCATAION DETAILS 8

4. WATER REQUIREMENT 9

5. ENVIRONMENTAL SETTINGS DETAILS 10

LIST OF FIGURES

FIGURE NO. NAME PAGE NO.

1. LOCATION MAP 6

2. MAP SHOWING 10 KM RADIUS STUDY AREA 11

ANNEXURES LIST

S. NO ANNEXURE ANNEXURE NO.

1. KHASRA MAP I

2. NOTARIZED COPY OF MILING LEASE DOCUMENTS II

3. AUTHORIZATION III

Page 5: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 1

PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

M/s. UltraTech Cement limited (Unit: Bela Cement Works) has Proposed Bela Cement Limestone

Mine-03 (BCLM-03) (ML Area-33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and

90688 Cu.M Overburden per annum located at Village Khamariya, Tehsil- Huzur, District –Rewa

(Madhya Pradesh).

Table – 1

SALIENT FEATURES OF THE PROJECT

S. No. Particulars Details

A. Nature of the Project Bela Cement Limestone Mine-03 (BCLM-03) (ML Area-33.767 ha)

with Production Capacity of 0.15 Million TPA (ROM) 90688 Cu.M

Overburden per annum located at Village Khamariya, Tehsil- Huzur,

District –Rewa (Madhya Pradesh).

B. Size of the Project

1. Mining Lease Area 33.767 ha

2. Production Capacity 0.15 Million TPA (ROM)

C. Location Details

1. Village Khamariya,

2. Tehsil Huzur

3. District Rewa

4. State Madhya Pradesh

5. Latitude & Longitude Latitude - N 240 31’ 34.59” to N 240 31’ 45.6033”

Longitude - E 810 11’ 26.08” to E 810 11’ 36.83”

6. Toposheet No of study area Core zone – 63 H/2

Buffer Zone – 63 H/3, 63 H/6 & 63 H/7

D. Cost Details

1. Total Project Cost Rs. 8.0 Crores/-

2. Cost for Environment Protection

Measures.

Capital Cost: Rs. 45 Lac/-

Recurring Cost: Rs. 25 Lac annum/-

E. Requirements of The Project

1. Water Requirement Water requirement for the project will be 50 KLD, which will be

met from existing water reservoir in mined out area in adjacent

mining lease except small quantity of water required for drinking

purpose which will be sourced from ground water

2. Power Requirement 90 KW per day

Source – Captive Power Plant and MPEB

3. Man Power Requirement Manpower requirement for the project will be 44 Persons. Persons

employed in existing Limestone Mine will be utilized for this ML

area also.

Page 6: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 2

ENVIRONMENTAL MANAGEMENT PLAN

A. Air Quality Management

Drilling machines will be equipped with wet drilling and dust collector arrangements.

Controlled measures will be adopted to minimize the adverse impacts of mining and its

allied operations on air quality.

Water spray on haulage roads, on the dumper before unloading into crusher hopper,

on blasted rock & proper maintenance of haul roads will be done.

Proper maintenance of vehicles will be done to limit gaseous emissions.

Personal Protective Equipment like dust masks will be provided to all employees.

Development of green belt and plantation around mine boundary, roads and other

places will be carried out to control the air pollution.

Periodic air quality monitoring will be carried out.

B. Water Quality Management

There will be no waste water generation during mining process.

Waste water generated from the office toilets will be disposed of in soak pit via septic

tank.

The mining operations will not affect hydrological conditions of the area.

Ground water level and quality on seasonal basis will be assessed in the open/dug wells

to evaluate the impacts of ongoing operations.

C. Noise Level Management

Proper maintenance and lubrication of plant machineries

Plantation in the lease area.

Sharp drill bit with wet drilling arrangements.

Controlled blasting.

Use of Rock breaker in place of secondary blasting.

Use of personal protective equipment like ear plug and ear muffs to all working

persons at the site.

D. Green Belt/ Plantation

At the end of the life of mine total 27.437 ha (11.885 ha on backfilled area, 9.622 ha

around lease periphery and 5.93 ha on Non Mineralized area) area will be covered

under greenbelt and plantation.

Local & fruit bearing plant species will be planted in consultation with forest

department.

Page 7: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 3

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

IDENTIFICATION OF PROJECT

M/s UltraTech Cement limited has proposed Bela Cement Limestone Mine-03 (BCLM-03)

with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden per

annum located at Village Khamariya, Tehsil- Huzur, District Rewa (Madhya Pradesh).

IDENTIFICATION OF PROJECT PROPONENT

An Aditya Birla Group Company

18 Integrated Cement Plants, 1 Clinkerization Plant, 31 Grinding Units and 7 Bulk

Terminals.

Total Installed Capacity: 93 Million TPA (Grey Cement)

Largest Cement player in India

4th Largest Cement player globally (Excluding the chinese players).

Premium Brands - UltraTech Cement, UltraTech Concrete, Birla Super, Birla Super

Ready Mix Concrete, Birla White and Birla Wall care Putty.

(ii) BRIEF DESCRIPTION OF THE NATURE OF PROJECT

Nature of Project

This is a proposed Bela Cement Limestone Mine-03 (BCLM-03) with Production Capacity

of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden per annum at village Khamariya,

Tehsil Huzur, District Rewa (M.P.). Bela Cement Limestone Mine-03 (BCLM-03) is the

captive limestone mine attached to the existing cement Plant of Bela Cement Works.

Mining Lease Status

The letter of Intent (LOI) was issued by Government of Madhya Pradesh; Department

of Mineral resources vide letter no F-3 -22/2016/12-1 dated 16.12.2016 over an area of

33.767 ha in favor of M/s. Jaiprakash Associates Limited.

In the meantime, Jaiprakash Associates Ltd (“JAL”) and Jaypee Cement Corporation

Ltd. (“JCCL”) Business was transferred to UltraTech Cement Ltd (UTCL) by National

company Law Tribunal Bench (NCLTB) at Mumbai on 15.02.2017 in case of UTCL and

NCLTB at Allahabad on 02.03.2017 in case of Sellers.

Henceforth, the Jaypee Bela Plant and Mines of M/s Jaiprakash Associates Ltd and

M/s Jaypee cement Corporation Ltd. along with all the contracts, deeds, approvals,

schemes etc have been transferred to UltraTech Cement Ltd (Unit: Bela Cement

Works).

Mining lease has been transferred in favor of M/s. UltraTech Cement Ltd from M/s.

Jaiprakash Associates Ltd by State Govt order no F 3-22/2016/12/1 dated 08.06.2017.

Mining Lease has been executed in favor of M/s. UltraTech Cement Ltd on 10.08.2017.

Page 8: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 4

Screening category of Project

As per EIA Notification dated 14th September, 2006 as amended from time to time, the

project falls under Category “B”, Project or Activity 1(a) – 4.

(iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY AND OR REGION

M/s. UltraTech Cement limited (Unit: Bela Cement Works) has its existing Cement Plant of

Cement Production Capacity 2.5 Million TPA located at Village Madheypur, PO Jaypee

Puram, District Rewa (M.P). The limestone requirement of Bela Plant is 3.75 Million TPA.

UTCL is having three captive limestone mine with rated capacity of 3.0 Million TPA on

combined basis. Therefore, in order to meet the raw material requirement (limestone) for

their existing Cement plant, M/s UTCL has proposed Bela Cement Limestone Mine-03

(BCLM-03) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M

Overburden per annum located at Village Khamariya, Tehsil- Huzur, District –Rewa

(Madhya Pradesh).

Limestone produced from this mine will fulfill the requirement of existing Bela Cement

Plant by M/s. UltraTech Cement Limited due to which there will be revenue generation

like Royalty, DMF and NMET etc from this project.

Apart from the generation of revenue, the project will prove to be beneficial in terms of

socio-economic development of the area. The project activities will increase average

income level, employment opportunities, flow of revenue in the area to ultimately result

in better standard of living of the local people and also earnings to the state exchequer.

With respect to the importance of the project to the nation, the cement demand for

infrastructure projects such as the dedicated freight corridor, housing and roads, is likely

to increase substantially. Keeping this requirement in mind, mining of limestone is

necessary for the nation’s growth and modernization.

(iv) DEMAND – SUPPLY GAP

Limestone produced from the limestone Mine will meet the requirement/demand of

limestone for the Cement Plant of M/s UltraTech Cement Ltd. (Unit- Bela Cement Works)

(v) IMPORTS VS. INDIGENOUS PRODUCTION

Limestone produced from the Bela Cement Limestone Mine - 03 (BCLM - 03) will be used

for captive purpose in the existing Cement Plant of Bela Cement Works.

(vi) EXPORT POSSIBILITY

Limestone produced from the Bela Cement Limestone Mine - 03 (BCLM - 03) will be used

for captive purpose in the Cement Plant of Bela Cement Works.

(vii) DOMESTIC/EXPORT MARKETS

Limestone produced from Bela Cement Limestone Mine - 03 (BCLM - 03) will be utilized

for captive use in the cement plant. Thus there will be no other users for the limestone

produced from this mine.

Page 9: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 5

(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT

The total manpower for this mining project is 44 persons. Combined Man power will be

utilized for this mining project and existing limestone mine. Preference for employment

has been given to locals as per their eligibility & qualification. However, the project will

generate indirect employment opportunities for the locals.

Table -2

Details of Manpower

S .No Particulars Persons

1 Managerial 06

2 Supervisory 04

3 Skill operators 17

4 Maintenance 07

5 Semi-skilled 03

6 Unskilled 04

7 Secretarial and general 03

Total 44

3.0 PROJECT DESCRIPTION

(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY:

M/s. UltraTech Cement Limited has proposed Bela Cement Limestone Mine - 03 (BCLM -

03) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden per

annum located at Village Khamariya, Tehsil- Huzur, District –Rewa (Madhya Pradesh).

S. No Interlinked project

Name of Project along with capacity Status of Environment clearance

1 Existing Cement Plant of cement Production

Capacity 2.5 Million TPA located at Village -

Madhepur, PO: Jaypee Puram, District Rewa (M.P)

by M/s. UltraTech Cement Ltd.

Environment Clearance has been obtained by

MoEFCC, New Delhi vide letter No

J-11011/79/2003-IA.II (I) dated 21.04.2004.

(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT

BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES

Location Details

1. Village Khamariya,

2. Taluka Huzur

3. District Rewa

4. State Madhya Pradesh

5. Mine area coordinates Latitude - N 240 31’ 34.59” to N 240 31’ 45.6033”

Longitude - E 810 11’ 26.08” to E 810 11’ 36.83”

6. Toposheet No of study area Core zone – 63 H/2

Buffer Zone – 63 H/3, 63 H/6 & 63 H/7

Page 10: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 6

Figure 1: Location Map showing general location, specific location, project boundary & project site layout

Page 11: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 7

(iii) DETAILS OF ALTERNATIVE SITE CONSIDERATION AND BASIS OF SELECTING THE

PROPOSED SITE PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GONE SOUND

BE HIGHLIGHTED.

As this is a site specific mining project and the site has been selected as limestone is

available in this area & Mining lease has been transferred in favor of M/s. UltraTech

Cement Ltd from M/s. Jaiprakash Associates Ltd by State Govt order no F 3-22/2016/12/1

dated 08.06.2017. Lease has been executed on 10.08.2017. Therefore, no alternative site

has been selected.

(iv) SIZE OR MAGNITUDE OF OPERATION

The total mine area is 33.767 ha with production capacity 0.15 Million TPA (ROM) and

90688 Cu.M Overburden per annum.

(v) PROJECT DESCRIPTION WITH PROCESS DETAIL

METHOD OF MINING

Mining operation will be carried out by fully mechanized opencast method, utilizing

Heavy Earth Moving Machines (HEMM) in conjunction drilling & blasting. The blasted

mass will be loaded into dumpers with the help of Hydraulic Excavators and then will be

transported to the crusher at cement plant.

Sequence of Mining

I. Top soil and OB removal

The mine working will involve removal of topsoil. Top soil will be stacked

separately and will be simultaneously used in plantation.

II. Drilling

Drilling will be done with the help of 153 mm dia blast hole.

LOADING

TOP SOIL & OB REMOVAL

DRILLING

HAULING

TRANSPORTATION TO CRUSHER

LOCATED PLANT

BLASTING

Page 12: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 8

III. Blasting

Control Blasting will be carried out.

IV. Loading & Transportation

Limestone from quarries will be loaded by hydraulic excavators into the dumpers &

will be dispatched to the crusher located at cement plant.

The total excavation details are given in Table No-3.

Table -3

Excavation Details

Year Total

tentative

Excavation

(Cu.m.)

Top Soil

(Cu.m.)

OB/SB/IB

(Cu.m.)

ROM ROM:

Waste ratio

Ore

(Cu.m.)

Mineral

Reject

(Cu.m.)

Total ROM

(MT)

ROM after 15%

recovery loss

1st 90688 90688 - 0 - 0 0 Nil

2nd 78420 21452 9908 47060 - 100000 40001 1:0.31

3rd 108590 30462 7536 70592 - 150000 60003 1:0.25

4th 100664 21264 8808 70592 - 150000 60003 1:0.20

5th 143534 55392 16650 71492 - 150000 60768 1:0.47

Total 521896 219258 42902 259736 - 550000 220775 1:0.87

Source – Approved Mining Plan along with Progressive Mine Closure Plan; Page No. 25

(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE,

MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL

AND FINISHED PRODUCT

This is a Limestone mining project hence no raw material will be required.

Limestone will be used in captive cement plant, so no marketing area will be

required.

Blasted limestone will be transported from mine to the crusher at Cement Plant by

dumpers.

(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF

ANY, SHOULD BE BRIEFLY OUTLINED.

No waste water will be generated during mining operation

Top soil will be stacked separately and will be used in plantation.

(viii) AVAILABILITY OF WATER, ITS SOURCE, ENERGY /POWER REQUIREMENT AND SOURCE

A. Water Requirement

Total water requirement for the proposed mining project will be 50 KLD, from existing

water reservoir in mined out area except small quantity of water required for drinking

purpose.

Page 13: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 9

Table -4

Water Requirement

S. No Particulars Quantity in KLD

1 Dust suppression 15

2 Green Belt 15

3 Drinking & Sanitation 10

4 Mine Workshop 10

Total 50

B. Power Requirement

Power requirement for proposed lime stone mine will be about 90 KW per day which will

be sourced from Captive power plant and MPEB.

(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR

MANAGEMENT/DISPOSAL

A. Liquid

No waste water will be generated during mining operation.

Domestic wastewater generated from mines office will be disposed off in soak pit via

septic tank.

B. Solid

At the end of the life of Mine the entire OB /waste generated will be backfilled in the

mined out and followed by plantation.

4.0 SITE ANALYSIS

(i) CONNECTIVITY

The site is well connected with nearest town/city Rewa at about ~6.0 km in ENE direction.

National Highway 7 is about ~3.0 km in South direction and NH-75 is about ~4.0 km in SSW

direction. Nearest railway station is Rewa about ~6.0 km in ENE direction. The nearest

airport is Allahabad Airport about ~115 km in NE direction. The site is well connected with

the communication facilities such as telephone, telefax and internet.

(ii) LAND FORM, LAND USE AND LAND OWNERSHIP

The total Mining lease area is 33.767 ha out of which 32.265 ha Private Land and 1.502 Ha is

Government Land.

(iii) TOPOGRAPHY & DRAINAGE

The area exhibits a slopping topography with some undulations. In general, the area is flat

topography and elevation of the area varies from 321 m AMSL to 328 m AMSL.

The area is drained by seasonal and small streams. All these streams remain dry in all the

season except during rainy season. They charged in the rainy season and flow towards

Page 14: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 10

downstream and meet into the karihari Nadi and Bihara nadi, both flowing towards North

and ultimately meet into the river Tons.

(iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON-AGRICULTURE, FOREST, WATER

BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY

OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE

SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE

RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE

NOTIFICATION.

There is no National Park, Wild Life Sanctuaries, Biosphere Reserves, Tiger Reserves,

Wildlife Corridors, Reserved/ Protected Forests etc. within 10 km radius of the mining lease

area.

Details of Environmental settings around the project site are given in the table below:

Table -5

ENVIRONMENTAL SETTINGS DETAILS

S. No. Particulars Details

1. National Park, Wild Life Sanctuaries,

Biosphere Reserves, Tiger Reserves,

Wildlife Corridors, Reserved/ Protected

Forests within 10 km radius study area

None within 10 km radius of the mining lease area.

2. Water bodies within 10 km radius study

area

Dharm Sagar (~1.0 km in SE direction)

Semar Talab (~2.0 km in SSE direction)

Dhirma Nala (~4.0 km in NE direction)

Chanduwa Nala (~4.0 km in East direction)

Kaiari Nadi (~4.0 km in NNW direction)

Canal (~5.0 km in NNW direction)

Lilji Nadi (~5.5 km in South direction)

Rani Talab (~6.0 km in ESE direction)

Kollaha Talab (~8.5 km in SW direction)

4. Nearest Town/City Rewa (~6.0 km in ENE direction)

5. National/State Highway within 10 km

radius study area.

NH-7 (~3.0 km in South direction)

NH-75 (~4.0 km in SSW direction)

6. Nearest Railway Station Rewa (~6.0 km in ENE direction)

7. Nearest Airport Allahabad Airport (~115 km in NE direction)

Khajuraho Airport (~132 km in WNW direction)

9. Seismic Zone Zone – II as per IS: 1893 (Part-I) : 2002

Page 15: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 11

Figure -2: Map showing Environmental Settings of the study area

Page 16: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 12

(v) EXISTING INFRASTRUCTURE

As the project is new, so the proposed site is a vacant land presently no infrastructure exists.

(vi) SOIL CLASSIFICATION

The soil cover forms the loose over burden over the deposit. The area mainly consists of two

types of soil i.e. black cotton soil and yellowish colour soil spread over major part of the lease

area.

(vii) CLIMATIC DATA FROM SECONDARY SOURCES

The area is having tropical climate with maximum and minimum temperature range of the

area is 45.80C & 4.50C respectively.

Mid-June to Mid-September is rainy season. The average rainfall is 1040 mm. Rain is also

experienced in January and February. The dry wind blows from NW & NE with high

velocity at times. In summer dust storms are frequent

(viii) SOCIAL INFRASTRUCTURE AVAILABLE

Nearest town is at Rewa, which is ~6.0 km in ENE direction from the mine site. The area has

good network of public roads. Telephone, Electric connections, Medical facilities and

Telegraph facilities are available in the area.

5.0 PLANNING BRIEF

(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN

AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION

This is a new mining project. Proposed mining area falls in Govt & Private land. National

Highway 7 is about ~3.0 km in South direction and NH-75 is about ~4.0 km in SSW direction.

Transportation of limestone from mine up to crusher located at cement plant will be by

dumpers.

(ii) POPULATION PROJECTION

Temporary influx of people will be there as the managerial and supervisory staff will

generally be from outside the area.

(iii) LAND USE PLANNING

Total mine area of the project is 33.767 ha out of which 32.265 ha is Pvt land and 1.502 ha

is Govt land.

Land use planning for proposed project will be as per the approved mining plan. At the

end of life of mine, out of total excavated area i.e. 17.215 ha out of which 11.885 ha area

will be backfilled and reclaimed by plantation and 5.33 ha area will be converted into

water reservoir.

At the end of the life of mine total 27.437 ha (11.885 ha on backfilled area, 9.622 ha around

lease periphery and 5.93 ha on Non Mineralized area) area will be covered under

greenbelt and plantation.

Page 17: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 13

iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL)

UTCL will asses the demand of infrastructure (Physical & Social) in nearby area of the mine

site and same will be developed under corporate social responsibilities programmes. This is

a proposed Mine. There will be positive impact on existing infrastructure facilities in the

area.

v) AMENITIES/FACILITIES

UTCL will develop the Amenities/Facilities in the nearby area of the proposed mine site as

per requirement of local people of the nearby area under corporate social responsibilities

programmes. Amenities/facilities for employees like residential colony, school, market

complex, hospital are already available in Bela Cement Works of M/s. UltraTech Cement Ltd.

6.0 PROPOSED INFRASTRUCTURE

(i) INDUSTRIAL AREA (PROCESSING AREA)

Proposed limestone mining lease area is 33.767 ha. and all the required infrastructures like

Mine office, other statuary requirement etc. will be constructed in mine area.

(ii) RESIDENTIAL AREA (NON- PROCESSING AREA)

The company has already developed a residential colony for the mines and cement plant

employees. The colony is well designed having electricity and water supply and laid with

plantation, parks, recreation facilities, telephone, school, post office, banking, hospital and

market facilities.

(iii) GREEN BELT DEVELOPMENT

At the end of the life of mine total 27.437 ha (11.885 ha on backfilled area, 9.622 ha

around lease periphery and 5.93 ha on Non Mineralized area) area will be covered

under greenbelt and plantation.

Native species will be planted in consultation with Forest Department.

(iv) SOCIAL INFRASTRUCTURE

Proposed project will result in growth of the surrounding areas by increased indirect

employment opportunities in the region including ancillary development and supporting

infrastructure. The project will also all its established social infrastructure for its employees

as well as for the local community.

(v) CONNECTIVITY

The site is well connected with nearest town/city Rewa at about ~6.0 km in ENE direction.

National Highway 7 is about ~3.0 km in South direction and NH-75 is about ~4.0 km in SSW

direction. Nearest railway station is Rewa about ~6.0 km in ENE direction. The nearest

airport is Allahabad Airport about ~115 km in NE direction. The site is well connected with

the communication facilities such as telephone, telefax and internet.

Page 18: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 14

(vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)

The total water requirement will be 50 KLD. Water requirement will be met from existing

water reservoir in mined out area except small quantity of water required for drinking

purpose which will be taken from ground water.

(vii) SEWERAGE SYSTEM

The domestic wastewater generated from mine office will be disposed off in soak pits via

septic tanks.

(viii) INDUSTRIAL WASTE MANAGEMENT

There will be no industrial waste generation from mining process.

(ix) SOLID WASTE MANAGEMENT

Topsoil will be stacked separately and will be used for plantation by spreading over

mature backfilled area.

The O.B. will be dumped at earmarked sites as per approved mining plan and from third

year of mining it will be started backfilling into the mined out area.

(x) POWER REQUIREMENT & SUPPLY/SOURCE

Total Power requirement for limestone mine will be 90 KW per day which will be sourced

from Captive power plant and MPEB.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE PROJECT AFFECTED

PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS (BRIEF

OUTLINE TO BE GIVEN)

The total Mining lease area is 33.767 ha. No forest land is involved. R&R rules/acts/laws of

the Central and State Government will be followed.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION

Limestone Production from mine will be started after obtaining all clearances and consents

from concerned authorities.

(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY

OF THE PROJECT (KINDLY PROVIDE THE SAME)

Capital Cost of the Project: Rs. 8.0 Crores/-

Cost for Environment Protection for this Project:

Capital cost –Rs. 45 lacs/-

Recurring cost- Rs 25 lacs per annum.

Page 19: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Bela Cement Limestone Mine-03 (BCLM-03) (ML Area- 33.767 ha) with Production Capacity of 0.15 Million TPA (ROM) and 90688 Cu.M Overburden/annum

located at Village –Khamariya, Tehsil- Huzur, District- Rewa (M.P.).

Pre- Feasibility Repot

M/s. UltraTech Cement Ltd. (Unit- Bela Cement Works) 15

9.0 ANALYSIS OF PROPOSAL

Proposed limestone mine project will result in growth of the surrounding areas by community

development to be undertaken by the company. Direct and indirect employment will be

generated in nearby village surroundings. Special emphasis on Financial and Social benefits will be

given to the local people including tribal population, if any, in the area.

Development of social amenities will be in the form of medical facilities, education to

underprivileged and creation of self-help groups. No major adverse effect on environment is

envisaged as the required mitigation measures are inbuilt in the project.

Page 20: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ANNEXURE -I

KHASRA MAP

Page 21: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL
Page 22: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ANNEXURE -II

NOTARIZED COPY OF MINING LEASE DOCUMENTS

Page 23: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

.l l; I .' , '),rrl i : i :

ii t::r_rt I rli,,,l Lt :i - ,'r;r1';:.]''.,'l-. I r.lr ili: l:.:r::ii

_r,!r, r I I

_'r.l i il l"iil :.1,,'1r:rl,:,: i I ,ll:- ',il:

.ifrqq Teq' (

fu'E-r.Trq';;:.,.,, ,,, ,, ,.srft?'d qfu'q'r crq

* ',.,,,t ,.'.'.1,.,, '.,' .,.

Bq rifi{€

q-d€r qt+qrttqr fror-tfl q.c.

g* snt-fr Ri6

tr €rqi+. {fiT€ ftrfres,,..i . Sfuyn*+ t,.: ','..'r,'', '' . ,",

' : : si-<rl+. rtt€ fttftLs, ifr gu, n fr*a qd rtqr q.v., tqT, qlq qhr, qr,{f,

) :::: ,1 :r li: l:i I r, i,,i,r_: .

Page I of 28 MP3284920r7 Lr4849r7 | or

Page 24: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

..,.i.

MP328492017A1484917 | 0tPnse 2 of 28

Page 25: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

1...' 010t3223082017 003602,

188 I 36r,'it,r0r. l::rr,r-::::i.frrrlr, 1'/1ir t\i : a,r ,,i

EFI II.FR ' .q{Cf

l 'ir rj. -r'r i.l.: .:'.:'..'.. 'i)r".,;

3{F[,,r ,':]:i ,.'i 't,. r..: :, ir'i 1r.r, r,rr' MINING LEASE

ITiIT

flrqT lcfor-{qr q.c.

+.rqidq 6-eff et+q rrqr fuor-tqr q.c.

Iii

3qrls rfrt€ ftfiTls; ifi grq, +6r trt€ qd tqr q.q.

I

:i .l.r l; I ,.; 1,,:: I ,',,,ri ',al ,..,r.: I .r,l t.i.r,..,1,),).i.:.,1..ll ''

lsee Rule,9(l l)i s(4), ?(2), l2(txc)lMINING LEASEThis deed for grant of mining lease ("Lease") is made by ancl beiu'een

SCHEDULE VII

"a1..: '

:

' ':f

I i, l ,:i'rr l

I rrt; ili\;ria,lI ::,1,,1 I rt.,,',1'.|.j

: l!,i I t. '' ,l'.:I .:i I I lr it:., :

''i: r_r ii:iI iij

:t r :,,ij:r l:, ri:lii:'-i:,ii:'r: " I r:i :4::r: - -!: :: l' i l-tl,r,'rl!rri,. -r r,t r't)i'.] I .r1,,,1 :l ..r,!, ',1;'.i llr::'.,:lilit:.:i ..,1: l::-: ::i 1l.r),,ll,i' "'r'il

'.], i); lii . 1r ilii'.: r l-.:l il a",,i.- i. ti: r:l rrj, ll :,1.:'i :,.: 'i;-1":;: rli\.1../:'. ll';i"):. ,: lii.i. ir il,i,:lrr,t :,,'lilrl),,-:i:ri:1.1i.1,,r;..tir:l:..]i''-':: -(ri.)i:;:i1i'1lj:i,,,],.ii:|-'l

:I, ,:i:]:?fl l.ll il:'-ir i,.:,1 :1,: ,1i1'r.'i-:i li :l: l rl:;'rl.li, -'::l?r:j:i, r,lilli.):,,,i.1:-: '-lii;:':l,:t:,;.r''.

'-.:', :,1',;'

,.: t; t\: :

MP328492017t\ 01013223082017003602

Page 26: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

I,age 4 of 28

Page 27: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

w wrq frlTFT

t.

"'.",',',257115i2;," .,'. .:-,-., ,,, ,.-r. '.. i, ., ",,;.,...,, ,",',..,

'.,.,12508480:.:.:.:.,:.: ...)t..-:i.,r r',;,.r) r;,',,:ti: (

n' i,:, r. ::1.) ,.i'rr:),,1,,:t:0, ,.1-r,:: li r;liii:'.t 1.: . , ,ii_.l.:r jt,r,- :_,tr 1!: 1 .; ..i:,,r : tt,r- rilr,l:

-ir qrfum.:. 23/08/2017.,72t50:52,,i' :,i, i:r! r\r, iir, :: : , ,;.:i I l

ftdfr ; , ,:.,

FN rft +.rorsfu Fr wFT vgr, ffi' siilrff, €ffi{-Tgr {T Brr.-Tst iItTI o},gt,*,G,w;H ur

fu* ci sr rfrs-{ur o.-{+ + fu +€ orn qFTbd tr'::r,,tfr v}.*'q$1 *+ wEFT 0.75 cfr{rcr ' r i',MINING LEASE

srqtdq +-&€T eftq rner fuor-rtqr q.c.

I

Tftr+q

TIrffi Efi-f ,JfE[: I

€r<r-*. {fri-€ ftfiT}s, ifr gtr, tor tt qd tqr q.c.

I

:.,

SCHEDULE VII [See Rule 7(tt), s(+), s(z),:lz(r)(o)]MINING LEASEThis deed for grant of mining lease ("Lease"), is matle by and betwcerl

l,l: ll :)

MP3284920r7 41484917 0t013223082017002203

Page 28: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Paee 6 of 28

Page 29: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

fqSftTTrei,wfrsnt.' , \qq trE{r

,i,, , ..r,:..,.', . ,. ' ....., . .a,.,,'.,.l.l,,... ,.'

ernor of M P g through The Collector, ict.

hya Prades p eologY and Mining of M a'r- '------ Jt

Pradesh)

. , ,, ,,.,. ,i.,,, ,:,.,.]:.,,AND. j r ,,,,, ,,, r , . .i

t. t:, :t t)il , ,t it .., .' ::, ::., rl.l , l':,, I : ..:,: .

?', M/s UltraTech Ce,meht,;Limited; incOrpOF!ed, in tndia u,nde.r t!,e Companiesrporate ldentis at 'B'Wing,mbai,400 09

buiinessis :Bela Cement Works (A Unit.JaypeeBuram, Tahsil- Huzur , District Rewa (Madhya Pradesh)..,(the "Lessee")

BACKCROUND:

see has received approval of transf n u[ over' of 33.767 Ha inVillages Khamariya l' in

Rewa vide Grant Order No: F 3-221 8. 7 from:97,i laiprakash Associates Limited(Ml deed dated 02.05 .20L7 over an area of'3'i'.,767 Ha and registered as no. MP32 84920L7AL235836 on 09.05',2,,0,'L7.dt

,the office of the Sub-Registrar of Rewa (M.P.) after filing of,,Joint Trahsferapp!ication pursuant to scheme of arrangement approved by Natignal r ;

Company Law Tribunal (NCLT) orders dated February, l5 'ZOf Z by MUmbai,H'i9hCourtandMarch,220I7byAl|ahabadHighCourt..l'...

'S entlylthe,Lessee has completed the requirements, u'nder.the.'Mines andM (DeVefopmerit A negulation) Act,L,957,anA rna,"Miiie,rali,1Trinsfer ofMining,Lease,Grinte-d otherwiie than,through Auction for Captive Pijr:pose)

Rules, 201,6'sliih al'Pa--ent'of 'Upfroht pay,ment,Rs,,,1,53:,',2),',i,000/-,(l,ndian

RupeeS Ohe Crore Fifty Thr,ee lakhs.Twenty Two Thousands onlV) on date

2'9".6.2AiL7',and regis,ter:ed on., date os "+F;

Yim

Page 7 of 28

Page 30: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

IW*Tq W grq frt+rtrqq q+il

u-qftg<r:

*-&€{ qfre?nsrfuor-tdrq.q.

eftftfod:- g* eTrrft Ri€

N q-<rlsfr+dfufu2s qftftfu€:- * rt{ gn *r )y/

*'am sc fuor gg fuor t* + Bq ri*{*' m.rqi@ i drfiq nlol/2oti 6l qta6 5{rcerc T{tlkr 0l:46:32

eSrqct+-qr rrqrr

ASHOK SINGH PARIHAR3q rifi{fr3q rifr{€ +.rqioc tqr

Page 8 of 28

Page 31: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

] 1. DEFINITIONS.tl:a.t-. Itttt _...a.:.:.::.a-:::.a,1::..tr:::.:1-:.t:t:.,ttt -:..u.:.,tr....-.1r:,,::r::,.::,::.::::::.t -1i,,,

The,expieslions. us,efl,ip,lhfs;,Leas,et,lhaf l:have,tfte lame me;4ning aSla.Sc;ib9d to. th€m Under thelAct arid,:"thefrules made thereuhd€r;,

,

, 2:,GRANT ,oi,.LEASE.i ..:.. )

' ',2.L ihe State Government hereby grants the Lease to the, Lessbe oVei,an,a''readescribed in Schedule ll (Lease Rrel) for conducting mining operations for a

. pefiod,upto 10.05,2067 years, commencing from the date,on:whiah this dUly

, .. ,exec.uted mining lease deed is registered with respect to the;tollowing , , ll ,

I :fiin€ral(s), :Limestone("Minerals"). ' ' ' ',, '. : .

2,21'The Lease shall be with respect to atl those the mine beds/veins, seams otthe tVtiherals situated lying and being in or under the Lease Area.'',

,2;'g Subject to the Lessee paying the royalties and making other paynientirequir:ed,to be paid and observing and performing all the covenant5,an{,

,

igieeme-nts herein contained and on part of the Lessee to b,e. obpelved,ancip,erformed shall and may quietly hold and enjoy the rigfrts and.premii.e,s of .theLease,Alga for and during the term hereby granted Without:an'y unlawfuf '

ihteirup-tion:from or by the State Covernment or any person,rightfully clairningunder it.

RIGHTS AND OBLIGATION "

1. l.

Page 9 of 28 Ntp 3284920 17 Al 4849 1 7 | 0 1 0 13223 0820 l7 003 602 | 0 I 0 I 3 2 23 0820 1 7 0022 03

Page 32: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

{M+TuTW1gWfr,+rtr\q?4 trtrt

gS sTrrfr Ri6

* rt{Tcn +{

Wonorttfsqkd q<r ffie qftq6i+qr rrqr qr *r cPdso*f.f sqe o crq dqttaqr rsqq o e+tft sqRffr fr TsT+ rr+ + .+r cPdwo +1 {sTcr rsq Fqg o qq 'rfi t, !il

q'fi{rr t eK crq frfr r arfre23/08/2017

eftftfo€:-

qftftfud:-

qf,r: srqtdq 6'&€{ qfte fl-qr fror-ltEr q.c.

qdl: srqlh S+€ lctft|s, ifi gu, totfr+€ qd rt* q.q.

ASHOK SINGH PARIHAR3q rifr{frBqtfr{€ q.nidc tqr

Pase l0 of 28

Page 33: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

@qigqfrqrl,t'..\

qFT tr{{T

, :,:'; : . i l, "l'--i::::ii:; , i 1l lli llllrlrll ,'' .'illl 'l l.

3 . 2 Withou.! .p,rej.ud ice ;,!o the ge ne ra:lity.;gf.lthe fore go i ng,

,.. Plese,lt.thqre,at;,' ..' ' '] ,., .

, . 1;1 11 all timei comply Witfr thi-pioVisions Of,the,Att,and, the.Rules,made. I .

,. theregnder. dnd any other,:ipplitable law;,,,,,' "'.',' .,' ,,,.:..,,]...,..].':i:'i":;l..':..,....]............1..i.:.., (!i),niake p,romptip,ay,menl.gf ,roydtty,ahd.rantt,other, payme,nt:.r.equfred,.to: be"

,Tad":bythe, Les.see'i.i '.,,.,..-r" ,.,.,.,,, i,,' ,,,,.,,,i, '

. (iii),pay5Ll;6 co;pensation as may be assessed by lawful authority,;n ' ',i '

.....actordince''withthe|awinforceonthesubjectfora||,.damage,,injury.;oidijtur:bance'which may be done by the Lessee in exercise,of the boWer:j

-granted.Uy this Lease and to indemnifli and keep indemnifibd,futly anAiompletely the State Government against all claims which may be by anyperson'or persons in respect of any such damage, injury oi,.distur:bance and all,CostS'andexpensesinconnectiontherewith;l.'.

'. i"l r....,,,1,..

.(iv).tike measures, at his own expense, for the production of elrvir,onment tite. planting of trees, reclamation of mined land, use of pollution-control,dbviies,

,l ind such other measures as may be prescribed by the Central or State

, ,Government from time to time;

I '(v),Without delay send to the Deputy CommissionerlCollector,a igpoi't.of any

-.qc ing death or seriously bodily injury or serious:, or ffecting or endangering life or property which' co opqrations under this Lease; ' '.,', , , ,

: :\i:,:r :ll t-1:,,1 _t.,,rr1,,,',:rl,-,- ...,r:,: :. ,::

,, (Vi) weigh,or:,tin'Se.,tb be measured or weigh€'ti,up,on !'ome,piii,of,.iire,[ease, Area all .mlherals frbm time]to Ums ,won, fiom the,Lease Are,a, With 15 days, , piior.hoticq .b:eing given.tothe Deip-0V'Commiss,ioner:lCollettor eveiy such

. measurlng,pr:,WEighing'in,;ordel that,lhe.ot',s.ome.pe!:son on his.behalf may be

Page ll of28

Page 34: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ffi"Trwvrqfrqn\qtIT tr{{T

5{/3nirM DC SARMA

5{/€ffiTE R K MISHRA

Efi ms Tcto ftqrc*' I Frqrc+I e1 frr+rq + frq.q q +t qfr t t erfto n /08/2017

ASHOK SINGH PARIHARgq qfr{€3q tfr{*, +.rqidc {-qr

rrqrd 5{r :

SANJAY SARMA

PRATEEK MISHRA

rIdI: BANK COLONY SATNA

qdl: GHOGHAR REWA

Pase t2 of 28 Mp328492017 At4849t7 | 010t32230820t7 003602 | 0t013223082017 002203

Page 35: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

{Wr+TtTwsrqfr,+rq'..:1.....'i,...i;.-,,,1 ::r-, L.t, .,. :, tir\ lr'..ii..:r,.1_ .:',,, rll,,,.l ',. . rr, : I 1:l .l ': ,1,',

..]]....'.......,',i,,,':.]''''l']']''.:ITq[l{E{I.,:....',..:..::'-..i...

(vjii) Pay stamp duty andof this,deed.

G ove rlhme nt.,on,d e. mand, al!, exp ense's, whlch shall',be incu rred in s uch carrying

(i) have, the, r'igh! to',lat all times to ente-r into and,upoltand ,to grant or,demise' to anyiperson,or, pers.ons whOmsoeverrliberry to ,en!er into and.upon the Lease

all or any purposes other than those for rvhich s and Lease

by expresity.ionfe.rred upon the Lesse.e, includi t limitation,on, civer or through the said lands such roads, t and

,, , ropeways,,aS shall be considered hecessary or expedient for ahy pUrposeis',and

,to obtain from and out of the said lands such stone, earth or other materials. ,as may be necessaryor requisite for making, repairing or maihtaining such], roads;rrtramways, railways and ropeways for all purposes and as occasion shall

req uire;

i11;; 1'13ve the right to appropriate any performance security p he

Lessee in accordance with terms of such performance securi by the, ' LeSSee in accordance with terms of such performance securi re',the

Lei;ee to replenish the performancesecurity. In case the performance security,has been provided through a security deposit after termination of the Lease

; ,and fulfilment of all obligations of the Lessee, such security'dePQsit.Shall be

..,, ,fQturned to the Lessee after appropriate deductions. lt is clarifi€.d, thqt'thel

, s,ecufiV deng-sit shall not carry any interest; and , , ',,,

(iii),have the,,r.ight'to carry out or perform any woik or matters which in, iciordance ''th tht' icivenants in that behalf,iit :fe 5sr63iiieO out or

, , peiformed by ghei Le5S.ee.;.6ut have, not bben, s,o,carried out,,or peiformedI 'within,the timb,specifid'dlinrthatr,behalf;

"nO,a1'te''Leisbe shall.paV the State

Page 13 of 28

Page 36: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ffiftTq qei rertq fr,+rtrqq r{fl'

sigs fu€ Tir .

qq (Rr+q + ftqffi gfr sTrrfr fr€ + @ or ftrm it arcAfr 3qRft iF,ir+ zztoetzorz +] fuqr.rqr r

ASHOK SINGH PARIITAR

3q qfiq{F

w rifi++ q.rqi-dc tqr

ASHOK SINGH PARITIARgqri*{fi3qrifi{tr e.rqidc tsr

vq (Rr}q +nqco S riESqR +{+.ruorfumit amAftBcfuftfr Rqio 23108/2017 +Jfuqr.rqr r

TFII-6SEI I

SANJAY SARMA

Pase 14 of 28

Page 37: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

@,-TrT fr..'rrT

: 3:4ln the event,of the ce,of la state of war or emergency (lexistence the,Presiden a strali bt fhe sole judge .nd

" not to

this ifiect in the 51..6s,e1;in6li lhalt Ue,ioiclus,Me'proof) the.stateGoverhme'nt with the consent of the Central Government shall frrom time to, .

time and at all times.:duiing the said term haVe the r:ight.(to be eiercised'by anotjce in writing'to the Lessee/Lesseesrforthwith take posseSsion ahd controlof the works; plant; :machiner.y ahd premises of,the Lessee on or in,connection

,with the Lease Area or the.operations under this Lease 1ndld11ing,such:possessiohror control, the Lessee shall conform to and obey all directions .,

given'6-- or on behalf of the Central or State Government rgOardin$.the use ofemployment of such works, plants, premises and miner.ali provided that,faircompensation, which shall be determined in default of agreement by the StateGovernment shall be paid to the Lessee for all loss or damage,sustained byhim/them by reason or in consequence of the exercise of therrpoWers i

conferred by this clause and provided also that the exercise of,such powershall not determine the said term hereby granted or affect the.terms andploViiions of this clause.

31 5 lf'after the receipt of an offer of compensation for any damage which is

likely to arise from the proposed operation of the Lessee, the occupier of thesurface of any part of the said lands shall refuse his consent to the exerciserightsandpowersreserVedtotheStateGovernmentand9ian1ed'bythisLease, the Lessee shall report the matter to the State Covernment and shalldeposit with it an amount offered as compensation and if the rstate

,Coternment is satisfied that the amount of compensation is reasonable or if iti5 11e1 5e satisfied and the Lessee shall have deposited'with'it such fuitheramount as the State Government may considei re,isbnable,,the,stateCovernmentrshall,irrd€,r,;thei,ocCupier to allow the LesSee to enter upon the'said

r land ahd carry ou-t's'uch,,opbr:ations as malt:be,necessary for the':puipos.e of.theLessee. In'assess'ing,rt!e. amount 0f ,pugh.compensation the State GoVelnment

- shall be guided by,the:p-r:ingiples,,ot $q Right',to,Fait: Compehsatioh:and, ,' Transparency in, Land ,Acquisition; Rehablf itation,& re,settlement Act, -2013 ,l

3.6 Every hotice rdquired to,be given to the Lessee shall be given in rvriting tosuCh person as mav,be nominated by t be

r',ilii l',r :.: ,.: ,l i i , , l

Page 15 of 28

Page 38: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ffi*TurWerqfrqrtr\qtrT trffT

PRATEEK MISHRA

(l

Paee 16 of'28

Page 39: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Fi,.glq.,frFn:t_:.,.,,r,. . illl .:,:, i ,,,.:.,1,,'

; i, : ,, illil: -i, i , r:'r'l :l

,rr ,i ii '. i:].:t -:' I lr.'','i-rt-i-,rj:,;

3.7 lf in any eVent th,e, ordelsl,of the,$tate GoVernment afe revisted, reviewed orcancelled:bythe.Central.GOVernment in pUr.suanc€,of,procq,edings,underthe

ha.n,Atomic and Hydro Ca n

Lessee shall not be entitleLessee in exercise of the

upon,the, Lessee by these presents. ., , ,, , . , , ,..,, .

+.,coveRNlNG LAW .,

This Lease and all questions of its interpretation shall be construed in

accordance with the laws of India. ln the event of any disput lation',torthis,l.it. ,;nJ in ,.rp..t of all matters touching the relaiionthip 1t-e'piie indiheljtite Government, suits of petitions shall be filed in civil iit'iiUtri',.,

, Oiitritt,and is hereby expressly agreed that neither party shall file r 5;1[.6f ,

appea,l,or bring any actions at any place other than the courtis.nameud aboVe.

SCHEDULE A- LIST OF PERSONS3- NOT APPLICABLE: ' i

SCHEDULE B: AREA OF MINING LEASE (33.767 hectares)l,'1,:,'1i ::l!.1:'!:l:1, .r: ir:: -r,t__'|r i: lflll.:r ' iril,"l 'l';

-

, t..., ., 1... . :' ,t-.) .:,i : r,li,l--:r,r;irrr'l l, 1,, - lli: :, i li,:._:rl. ,:::,r :_ :,,1,:lr'lll ",1,1 ":l, l :-. ri,...,rlll.l I: '- i\..1 :i ' I

166 Minihgl Leaie ,ar€a.i5 ,iituate,.d lat,Khamaiiya,',jn rT-ehsil if u2ui, Disi,;. Rewa

i (M.P,),tlielQab,ottt,g,elineated,on,!he,plan1r, .: l; ,, ,1, ' , :.. , ,

Page 17 of 28

Page 40: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

€IuT {€tr'TCI:

{M*TuTWvrqfrqn

2508480

0

0

250848

0

qF4 q+{r

ASHOK SINGH PARIHAR

sq tfi{+,sqttr{s q.rqidc tqr

MP328492017 4t4849t7 | 0l

€rsr {@'aqfrq g6vtqq qqr+d qw'3IF5T

efttro qo'gs-r{fi rrcl RIq qG 2759328

Paee 18 of 28

Page 41: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

,r: -: t,j ':.r:\ll r: I lr. :-i :i\', r:,lr .r. rr.:. i,rt lttr it'-... I ,--|rr ill , i, .:1, a .t a/l:. lhil $-t,,,;l

-:i':ttri t,r: : t,i :r ", . i: 1..: |: tr,:lii,,i ::ii ::i,,f',:'lril:r

rr',:l-atitUde,,,l,.:.f,;',-r'i 24'3'L',34.59,'NtOZ+ 5L'1); i-Ni:rri ; ' i l :- l

l"rgiarda ,ri,,:- 81; LL'26.08"E to 81'Li136;BCl:h.,r'' ,;,, 1'1":":'.,,1 'l-"''.,,,',

:/ -:. r ;l i:i r, l. ':.'r -.:;-'l !i: i,::,iili r rl,i I lrl' iri i'r: i: rr' I "" ii i

I '.

, ,tn with€ss':whereof there pr€s€hts have been execute6 311,de-Wa,on.

, ,., 1,0,.'08'i2OL7 ,

1.,.,' ,:.1; ii .'r .:, lr:,.,!

a.'.,:,il, iiiil:,i,1

i,t I "il

Page 19 of 28 MP 3284920 r7 Al 4849 17 | O rO 13223 O82O 17 OO3 602 | 0 I 0 1 3 223 082 0 17 00220 3

Page 42: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

frcc 35 - Tfi

{M*TqWsqfrr+rtrqq q+{r

qq {K5}q ii qqr+.n + qqft iFr qqR {eT 0 Fq+ sil+,d fuqr t, qefu. T6 qqFfi sT wfr srEn {€ 0 Fq+

don o'rer ft 1 q-5ssq RTq q@. + stil{ m{ft Fq+ 188136 s't erq orn} 61 qqrs'R vord t t €rfr,

q-1-fiq srq erfuftqs, tsss at qra rs *'Kfi (q) $ ergvn qqrs'R ERT Tff'6'rt roq * s1S fr qsqt

€rtrT Eq <<rlq $qrq fr$ qftt t

ASHOK SINGH PARIHARBqrifi{frsqrifi{fi e.rqi-dc tqr

Paee 20 of 28

Page 43: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

!:,i:,,i,l ',...1 ,::: ..a,,: l,';,,1'.:-lir',, ,l,i I ! l

:l-:,;:.]::.!:]]i]i.,:]|.i|l..)l:].1-i/..,..'-.i\:.]::;].,i:1,:]:}l:;,:i.l].,,:l']:1i.]].iii'.'j].]]':.\],i.',.'\,]ll]i'il]'-:i,1;.j]:'.i,ij'1i:i.'-]..1]i.;]]i.'i.:;'..tq

t:i:. ':' .t .al.: r'l: r:ri.-ii,i:.r:r.ir1a::it,t r,t"arjr:1.:ir rit::lrl tl i. i,1,.:-: .1a'.i- ,l,rt, ,r:^.: -:l i.i|r.. -:.iii i t.,'. ,',i,'tl .',il:.'... : | .r r,ll i :i:l r: i-\l/,,':l;: i lf

Page 2l of 28

Page 44: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Pase 22 of 28

Page 45: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

€t-trT frt+rtf

i i I iia\.,. l,]j

. . : ],

t;t"r,,lt,r r ::,,1 ,l l i itr lrrl _-r ,,-, riri ,:. :, ir it,r I rl ri:-r-'l

sEMd, zsfrlaq+ srf8 6483

ffT}ac"ftw@*tif;,aen +

ilq6f- aoF& a,q+.e /e ft*r P-rea' O o*-

(Arrr{Lz':l - (yoa sBa{ (}ql|) ft

,t.

'li:i' -

.t.:

T

g#- -r'.# de-q-{/:- *,pfu'raaia''<- *ofcqxfi{dr f"rq*'liry''-q:D

ffidq sqmrdmerilmI * rgm-t'arq Ftn ffi1 ry arrr

,--?n{ #r (vic* f-*otlt,t-}Nl f,

\trt: - j, dfrr&-, ,),.1).gr'g. *ol7't\i4-tl<^v

gFI qn-fi{ I qrrffi ts (ri Edrrl iln fril w'l arrr-

t -"y''

\L /

kr'":rn6 2 # *tt rrv' $i,i*I t'"n'o-t'

ydr l7-J,n

H$***k#^#"- -'"?i

&,M r-lif"'l* W'{))

A.*tt"* * q-121 :+?suY: zltl )'1,,,

t i

Page 23 of 28

Page 46: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Pase 24 of 28

: ::: ,:jf:;::' : :

Mp328492017 At 4849 t7 | 010t32230820t7 003 602 | 0 1013223082017 002203

Page 47: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

r:' :.,' ,l! iil-;,)r:,: l/Jl j:):'l ,:ii j;:: rir.'

i,,i :,,, ,-)l fii.. r_.11, -,r:r:' | :lll .,ri-i.,, i;,'r! ,'I |r

,,.; .- trlia::r {ll:i.,: l)l.i ,i\',.:)1i,r,'I tt::..-t ti '-,r.r ::r'a:):.t :il,_ ,:i."1)::, I ',i,'," I I i")l rl rrl 'j i:1,:, I il"::r.r iii\:i) iti: i\':

: , * ,i.;:: i:i".1 -|:, : :;! :.'! i,):,1 ,i,:: l.i I : rl, ,1' ::.;

i_.,.1 t:i :.,rj.,,ril:lil I l-.rt j,r:,,11 :rii"!lil'ilir lrl i-;f 'lailr-,trri: ,:'','l al'rlrl':r:,f ,',ii.il'3l.lt;rt;l.lr i.i:f i,.,:rriit .lljf).'::i-l\:la'fr: f :iiii i"r';rrli-'.11] :1a,,'l-l'i',ir.ll: ;ii-,'1.!tit,:fi:1\iii:i'

.: .:"i:i,r,i.,ll ,.:it::.,.,:)t:tiii:ri),.,i:i-.jtt-i":t,r:I::r,rtii".i,.:-1 rli,:r:Jllii ri.i.il-;ll l':iirfi:::ill',, r:,iii trr,:t-i:,,,!f,:l,.:)l; i:Ii.,,,]1':..J1)..tr .i: :.:lillir] ''airli::,:\.,'iIr/ '-

f,i,::(r i::i"'.ilf iii'iri..,rl ,, '.,rlr: lii\lr::i;.ijl-;:1",,:iii1l,:i,rl l1-:: ri.i:l )r$ rlir ialri:i:,:3lA'it:)ii:;il ,'!il i'

ii,::,:.ii..,:,ir Iri i)'i-l'tr,.ll'l-ll.l:: (1:ir r.\-()lirl'at,.:;;i)i, ".1li)irlr,rr,l','lli ji-::;r;;l-:r-li,,1,.1;I)r,i;r\!1:-r'i)1)1.:;:.'.'Ililirrf.i;i)i::i:rlllri -fl.r.-:li'.,i\r:l i'ii-r:!:r'irr:f":r''\in:i''i,i.\:_1 :l-ir..r:ii:,.ii:i:i,J!. Tllllit'i.);rlir.;:aj'lli,lai:ri:\1;f,ili ""r'l'lil;1.,r:f),rl :lf, l'

, | .l ': .t:':i::.1t l

:., I i.:; t,l,t.:'ai: il.1 lr.,r\i al\l-)i:ri .:,'11'i;i\, ' ,i); Si 1)li i l,r'ii ; 'i)l,l .:i, al :.:l ) ii, r-""',: :' a'r j :i,irr .lili,-.!:\l,:.1!,':r'.i-r',:;, \ lrrr:.l

i,. :,t )i- i::l'"r it :i,i, \ j" i :l'l ;1: ;i.; :-r 7: t:t,tli,:t i.'r i-t:r{;) ii)l I i.\l i.rt':,r'\i'.'. .-i:,\:.;ii:l1.. i iJl; ni-.1),:)l n,rl. I i.-i:.i .:ilir') li;.r\':l-r':;i\ i ,..'fi l:.i:r_.. .:t:'rrr?ri; :li\l !i,tl.'l: iAVf 'frr,; i..:,rr 1: ! {rrlil 'rii.'i a},! ia.li. ) :l'l ,'rr'j': :;:\, i i")r' fili ::.) :)' i,,-r i il.:,li :' r,: ) l;t I i\:'al I

:ir,

l.rl ,-rt lrll:1.: l'::,t, ,.,::.),,ri::l- '1i-" il r)

t\: i.)r;r !:ii Ii lrr Yi.'i l"ll\,.:\,:i lr) l:r;:,.:lr.:

ir : i)l,il I,i rrr) l l.l,.l (":ri r\ll.ll ltl''.'t''!'i:,f i)|r 1ii t.,:lII::lri r.)i..1 ll,:.:'r: :l'::,:,11-r.l

i2l t ',,rr' I iriI :--l Jr i:t;'f 1,1

t-:1" i:r':rli i. r-rr':-i'n:t:_r:,]ri 1.,.f f i i.ir:!ll-'virr:r:

I ll.;:.11, I lll,i I

i;; trrrti:.1-1 l" i-f\,ti.' -,;ii it ?\, :

: .,ir

,i:j! li ",j!r\, i

i ,!. l::. I i i .'r- '\r i

i .. ] I I'lra ' ii: f\r i

ttl !r, i::i:i i , .i! I

I :],,'tirl '- , l' \ ', , :r:rfl -.',:l!'.1

-, t-':,;t , ii,i:.tr I

,_.rt..'i'r,iii : f.ill' l-

-.,1i:it ;rril 1,, :::i,l;a'ti:!: ir,li- I irr:1,--i

' :,, !:, .ja,,!.4

:. r ll.,t"l:;'1.1\:: ' t' -,:1,,:l " ir l -l\lI ti '.!:: rrrl -i,-';f,- :

I:.i:.r:t:.-f,,rrr ll, .r.r)irl,i , l.t::::,. i

i.)t. i ,,li I i: ,'..:'l:ll\ I'

i,;i,;.,rlt-l : :r_l!":t-ti:i) r'i":::r:i,-;',1r 'r'll-l rr.,:, .,,i. 1.jl t! t

r-:r.1' :l l:.':i-:1l. r:i)..r ) - l!,.::i,iTI :f i:.i.1: ilvai\li,:i: !'.rii f.-r:.rlr r

l.'.,1r',,),1r :r':f!, ;

!-). fi.'l '';i:r\.;'';ilrlil,':,1 li lif_ I

. _rlr.,,'',iii' fjlir i

,:l':'l r"iilf,i:l); l ).{tr-r" lr::. \, i:.,r- r,,\li-i::{i:: J;\l:ri );i,r :"f i;.!; |'.ll .;f rr rii i l': a-\ li)r:P;rli: t:lr..i! |

l1:i, rl li r : :i:a:, :'i, il :l j:.i:''i, f:\il! :._ i: ,,1 I l.!il t! I

:-.i I'il[i'i,i]. L l

I ii i)r: i i't,rf-l I i

i',i i):':.i'i f,: irir \lf \r:fr,.:\*:-liir:\ i

t-.::: i ),t:i I :'.rll: j

; \ ,: :ifi ' j,j I i\-:i :lrr:-..'!fi) I l.:i:f"_l

lrrr ll : I l: t'i,.j t:i.. :a j-: :'.,'.1 t.i'-'

lia;r.:l :) iii'.:,:i i ,:il.':r ii ,'\Yl'rrir',.:-:-l ;j rii.l,,1';1., ilr,)\f lir "' r' il

afl- :rr'r,.-i i illl .,' i: l:i:-i.: ::'l'r Ir.r tr')"f;.: j"l i,.i ;:-, ; i: r.:lS'

'il..::rl-i.ii I ,l)f; i., i r':l:i,,:,..it_)t:::1 .i; i i l'.1 .rl:,r- .irl I i.r jf :

. '. a'. ,.) . :ir;, : I jfl: ,":r.11") :i : . r',ll.l;.]; :) i':i'': I ,i.:f'; ri'1:'-) ':-l: i l"rlir'

, t.t,it fi t, I :)l!: \i.. I l"i I i'r'.:i;:>: Ii.:t:l |.ri,| -:r\i ;1,\:-':r.i,lr,'I;.': i | : r;.ctir.*r!;\i i.)r; ii.t::. ir:,:..,ii-'1;

:: ' .f :.1 l:r'. Ij'.r ii;1'l i:,.\']' j l-i-1 l,' i r1'

, i: l) rrr I I I l. I i ,ll t'l' ;.-: l:' l '"

ii" i)' 1{l ^ ii I iiA I i'l,i r,',: ' :-: l ,rl'}il;;'

, :, ii:. r..:t i ari.l,,, i i )',1 :i:.i; :.r ! /-\,t'i I ).,; :,i.ll .i l::::1r': r;rl ,,,,.i.1., ,r1

';,, ;iia )l'ilj,.i i)Tiir'i1' r.lli': .",''i l r'), r"':i r',

i :.,)l ii.li l:1,;:::!,\ I i:i.; /llil,.) ll l,\'r':i:i-,i\,

-t i: 1 f.: i' 1"; I i.i, :' -ii ; (,1 \i :l.l\. ii iri' ;':"!: i :'rl

ii I ,:l lii::::t) 1n...:.; 0l,l ril,\lj:'i:l\1,liri.

f,-l i":l: l:il.ijl.ir ri^-i.i rli -iil\ii: ir :{"-tl:r'.rr

i.tl ,l)l ir,ii:i:r,ii:1,:: .' ,,)i! ,lfit, )i i ',,;;i1:,:,. i ,i'iir !r,,,rr i',rr:,-r.i-J ,,'i; i,{,ti.i'l;ri' )fii> I i;t: : rir r..,irl I :,i,i I :.li:,', l'\:' ! l,^,',.:titi

i\l (.ltl l,ii .:l,r.l :l;ii :,,i1 rit:!,,; j,:r.1:,.$

'trr:ll::l i"ll r,' I r.,'i" a:li'r 5 ; f\1\rl:i:il:r.r -f :!:1, "i i.lir EJiltrii. iii;',

.tl

Page 25 of 28

Page 48: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

Pase.26 of.28

Page 49: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

,f--::lr: i:l::.j :i ,i:.1;,;ir, ilr;:'r\i:iii:,]:1. i i)lir i:'r"- iil:'r:-l :,)f.i i,r\ll) rrl :'i.'r:l':l:;'ti)r., lf tli; ri1,:ili])ri:irr: -.,:l-1-ii:i,-i :;i t| r.r'iil:i'1 ir,.)a; r:.Nf)il::,:.iill::t

..1

l\],j!l)[:|)Jl]j1:,.ji:i.]:|]]].l::.i::,jii\":.:]:1\'...\::..|..:|\).'':::.'::

,'.l1]]!l}i:i1)]i].,]i:i'):i::]:']]::-.-.,:.-,|il\"]]'i..?.i]\..]j]i.,,il::]).;)....^...,:l,]].11'.].;l-:]:.];li.l:]lJt,]j:li.,|:],|,]]1]1..i-i...ii.],':1-|:]1]i:i]li

,,',,i,ir).) l'iir,,

:: t,,,,r 1..1 t..l:": l.1r I'i l-iI : I ':r .i'l"l'1.. i:Ti'lii i, i:! :'lt :1 I'r-l

r r: i"tii'irt;: li i

r 'i .f i'."1 , itli l. i

I ),,f 'rtl:.r':-ill.. L-'i'jii)l^1i-l', r.ii;i-.,:r fu,rrll :'l lii t,1

:Ir.i'i:.:I!rlrri"]:,1 tri!.:l.'l.lll\l::'i ;ri:.t'r i.'iri,.:a t. ;i!i!llrlr'-:,.f ;., :Ij; iair, al:-:\,

,'i:'/!ji r.r-|,: ,. riil",:- I I i\r'

:i tl'""r,,r\li :, ,;:'--r,-t,r'il:_:': ,l 1, \.ir'tr_1,,:r. l:_lf:... ,. : 'a::::.': 1.1{..:.1,: ii ::i: i r, : l./,ll 1,, :

':: r:", iti"l', 1

l:: i';\':!'. i,:: ': i '.1: f,':. l'.,.,;,,rj tr:'irif. l

1r i', ;i r,'l:i 'r t : ,, .:-l ;, :l', :

j_,: r,:,.::::: :!\,_''l i rfi i, ;:.,, :: ri : r\.1::l i '1-1, l

i.l;.. ;r.i:i I jf ;!-

r'rr: :r:-t.,itlr,i,i;i ri::, i,r:\':i t_ i,,,,!:; i\ t-:\ i

,'l-l),,,:.;i/;:i:-r-. i)tr]*"f.lr'rit--i.: ,_' il< I :1,:I ;l-r i'til i. I ;r:,t:;\ 'lt;1:r,.;riy'. i,,i)i i Iit\i:ir..tiii

tt;r:i,, \s- li:irt-I l;:l ,.1': i. ri;i\-li-.l-:/\t:i'|';':'!'-':.--;

r,ir,l i-f,'i.r:., :

i ) ::a t,i.:.: "l

S i i.:: \, :l

r ,l 'r

',t' l :r:l-'lil i,,i"'' ('!

:,r i /\:r,.:i:-l\:1.1 I _.:rrl)'lir.\ :

lr,.r,.: 1,: i.-', trr; ,il )'f,, i i\, i

I l:l ^'l l';ri\ l

l')t I r,r,r, -i I I' i.i-'

i",1...i't:il: li';r"i\lr .li:i t,rr ita i f; ! 1,!lI ::i'.'',,,i'l,':rvi rt I )a,:.: : l;i" i. r

i.r1 ::,'::lii r !'...ila I .:

... .fl- l:l', 'i 1, 1:1.

i..'ll r.r,,ri ' L r'; ir -'

l:iii:,. ti-i. l;:,,-:I i:?,.{r"l:.,r:\,'-ili] r!:,: l'i:\.iri t)4i,"...; r,

(.:a: 1-,! ii li I I if-ll I i:r: lll :l I I :i': ,

llr i ?1r.i-l tir) I i l:1 :

i| irli-.,r1 i |r'ii.i r

:. ,:,.,lr. i , :;

,..: ::, _ 1,:.:ii .r'l-:ili:: t: ..i :i.l , I i ,,t

r1,1, t,:'irl lll:: rt,Iii : ll,-,t,:,i,:,. I t. ..i

., .. r.-.,i-,tii,:i.-t;)ilrrf;).it:,,,r,j,):t. : : ,,, ,li:lir,:t i;ri i)il ',.i:i:'i:;,..11...l , , ,lti",:-)l:i,.,irriir:l '.f.ll,i.lr:, r,r'-'. .'.. : il| r.:r;i-;-j\;i , :.)..1 ir.:t'i.....; :;' ;':i,r l

,')F tlii a::,1;i i, i: {liri :;\i: j,:;':.. t::1r: !l

: : ' !); 1l:.r;ii: i r:':i\: :.:i; r'rl,;'' i; I rlr:rrl:. r, i.lr;:i ::il-;:i.;'i,il,i: I I )fi ii,,,-t i) : ,:, : I ri.r,

. .:, ,, i'i, :ir liiirl,:::rii;l.itt 1ii,,:i,_... ii:,i,';'i,'rl,. ,,:'::f "' ,/jl iiifi:::i;::lA: ';:f i ii,'r i'ii'::"iI : r:,:.,i:.:r,,- ,'-tr :il-,t:,t.'i,{.!a tt,j,1.1., ,.ii, :.,r,:i

i'.}l!i1''l$i|"],],i.)|.]i]i'.1]i:;:...l,.;'..,';,'...,::'...,alliR; 1,,::lli,t,,',,, 1r;\ri.:lrt,i::l'il:_j,- : .' :,r:i:r'i':::,,';i)lr::r;iil .rl;.l/il'l.il\.'irl,'h', liil]:l''j'-,:i]:lli.]':]'i..].;.t,]].]]l!1'i)1;]:,i-.]':il-]l...:..',..11,1iii:ll:::]]l!:'.';l!..]\'];ii]i'1:i;:iijl]'i]].,\]ll:];i\.

:jl ilr Cliri l !.i: '( li'l i|;i.l S ; t\V'i$

i)r ltl li S,]!.lj:i :.)fJ

Page 27 of 28

. .. , i .'

MP328492017 A1484917 | or

Page 50: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

qfrs-{ur lEr :

ffiftTqGsrqfrr+rtr\qtIT trffiT

gq Emr+q q.r ff+o qfifi fuio n / 08 /2017 +1 oqi-+

r\4p3284s20r71:r484s17 t OC fSCFrqr tr frsq zs ge wnfre t

€FI q@',

{fi+r Uo'qftftrfr {@erfu*,

+.r

2'159328

1881360

0

0

1881360

ASHOK SINGH PARIHAR

iqtft{+'3q tfr{fi q,rqfdc ftr

Pase 28 of 28

Page 51: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL

ANNEXURE -III

AUTHORIZATION

Page 52: CONTENT LIST - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11_Jan...Capital Cost: Rs. 45 Lac/- ... (Unit- Bela Cement Works) 2 ENVIRONMENTAL