Top Banner
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS
34

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

Mar 28, 2015

Download

Documents

Reagan Everly
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CONSTRUCTION DRILLING INC.

SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL

SOLUTIONS

Page 2: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

25 YEARS OF EXPERIENCE

• ROCK AND SOIL DRILLING• CUT-OFF/DIAPHRAGM WALLS• STRUCTURAL WALLS• BUILDING AND BRIDGE FOUNDATIONS• EXCAVATION SUPPORT• PILEDRIVING• SHEET PILES• WIND and ELECTRICAL TOWER FOUNDATIONS

Page 3: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

ROCK AND SOIL DRILLING

• 6” to 2.5 METER DIAMETER DRILLS• DEPTHS REACHING OVER 100 METERS• DRILLING IN MARINE AND LAND BASED

ENVIRONMENTS• DRILLING THROUGH ANY ROCK OR SOIL

Page 4: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CDI DRILLING SYSTEMS

Page 5: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

BARBER DR40

• DRILLS THROUGH ROCK AND SOIL EFFICIENTLY

• DRILLS OVER 100 METERS DEEP

• DRILLS UP TO 40“ DIAMETER

• MOBILE

• QUICK SETUP

Page 6: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

WIRTH DRILL

• DEEP DRILL DEPTHS

• DRILLS THOUGH ANY ROCK AND SOIL

• UP TO 3.5 METER DIAMETER

• REVERSE CIRCULATION CLOSED SYSTEM

Page 7: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

WIRTH DRILL SYSTEM

Page 8: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SOILMEC R-416

• FAST DRILLING/AUGERING

• QUICK SETUP

• MOBILE

• 16”- 4 METER DIAMETER

Page 9: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

DOWN-HOLE HAMMER

• FAST

• DRILLS THROUGH HARD ROCK

• WORKS WELL WITH CASING

• UP TO 2.4 METERS DIAMETER

Page 10: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

LODRILL• LOW HEAD ROOM

WORKING CONDITIONS

• ROUGH TERRAIN

• MOBILE

• FAST

Page 11: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

ROTATOR• CDI DESIGNED AND

BUILT

• DRILLS THROUGH ROCK AND SOIL

• UP TO 40” DIAMETER

• COMPACT

• VERSATILE

Page 12: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

WORKING IN ENVIRONMENTALLY SENSITIVE AREAS

Page 13: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

DRILLING IN ALL TERRAINS

Page 14: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

TRANSPORT BY RAIL

Page 15: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

WORKING ON SLOPES

Page 16: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CUT-OFF and DIAPHRAGM WALLS

• PREVENT UNDERGROUND MIGRATION OF CONTAMINANTS

• GROUNDWATER CONTROL• EXCAVATION SUPPORT (vertical walls)• STRUCTURAL CAPABILITIES• DELINIATE CLEAN FROM CONTAMINATED AREAS• PROPERTY LINES

• PASSIVE WALLS– ACTIVE FILTRATION OF GROUNDWATER

Page 17: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

TYPICAL CUT-OFF WALL OPERATION

Page 18: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CUT-OFF WALLS ENABLE VERTICAL EXCAVATION

Page 19: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT DESIGN AS STRUCTURAL WALL

Page 20: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL AS SHORING

Page 21: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT REINFORCEMENT DESIGNS

Page 22: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CLOSE PROXIMITY TO PROPERTY LINES AND BUILDINGS

Page 23: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

LOW DISTURBANCE INSTALLATION

Page 24: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CASE STUDIES

Page 25: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL, Victoria BC

• CHALLENGES– Foreshore Installation of Secant Wall– Boulder/Rip Rap Substrate– Caissons 10 meters below sea level– Tidally Influenced– Concerns of caisson deviation

Page 26: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL, Victoria BC

• SOLUTIONS– Installation of earth berms to contain water– Specially designed tools for drilling and removing

obstructions– Pumps and Bailers to remove water– Specialized tremie pipe system for pouring

concrete under water– Design and build specific guide wall to align

caissons

Page 27: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

WALL GUIDE

Page 28: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL MINE SHAFT, Ontario

• CHALLENGES– Sub-surface layer of fractured rock– High ground water inflow rate– Running sand at 10-12 meters

Page 29: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL MINE SHAFT, Ontario

• SOLUTIONS– Advance socket through fractured layer– Utilize special tool to remove sand– Create positive head pressure with water to

prevent sand from re-entering caisson

Page 30: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL GUIDE

Page 31: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

SECANT WALL MINE SHAFT

Page 32: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

HEALTH & SAFETY AND ENVIRONMENTAL PROTECTION

• CORE CERTIFIED• COMPREHENSIVE HEALTH AND SAFETY

PROGRAM– Toolbox Meetings– Safe Work Practices– Hazard Control Procedures– Near Miss Reporting

• SPILL RESPONSE TRAINED• EXPERIENCED SUPERVISORS/FOREMAN

Page 33: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CONSTRUCTION DRILLING INC.SUMMARY

• SPECIALIZE IN UNIQUE AND DIFFICULT DRILLING/AUGERING AND CUT-OFF WALL SOLUTIONS.

• 150+ YEARS OF COMBINED EXPERIENCE• INNOVATIVE SOLUTIONS• WORLDWIDE CAPABILITIES

Page 34: CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.

CONSTRUCTION DRILLING INC.

SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL

SOLUTIONS