Page 1
E01
Existing Brick Wall Replacedwith Fence
DP
CP
CD P01
Proposed Office Building
Existing Single StoreyBuilding
Existing Double StoreyResidential Building
Existing Double StoreyResidential Building
Existing Double StoreyResidential Building
Existing Single StoreyBuilding
Existing Trees Removed
CP
P02
P032960
2400
2400
2300
1900 4500 VIF
3632
1233
SP1SP3
SP2
19.23m
96°32’20’’
19.21m
276°35’00’’
18.0
7m
6°2
7’3
0’’
18.0
2m
6°2
2’2
0’’
Remove Existing Fence
3806
877
Refer to LandscapeArchitect
Refer to LandscapeArchitect
New Retaining Wall
Holmwood Place
Union Place
LPD
44.47
43.44
44.38
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 100
Site Plan1/MAY/2011
Xiaolan Wang
Tim Derham
A01
No. Description Date
North
1 : 100
Site1
CP - Concrete PavingCD - Concrete DrivewayP01, P02, P03 - CarparkE01 - Sewerage EasementSP1, SP2 - Telecommunication Service PitSP3 - Sewerage Service PitDP - Downpipe
Sewerage Pipe
Fence Line
1 Preliminary Submission 3/May
Site Area: 351.43 sqr.mBuilding Coverage: 133.59 sqr.m
LPD - Legal Point of Discharge
2 Final Submission 19/May
Page 2
A05
1
A061A08 1
A07
1
A B C D E F
1
2
3
4
D
1
D
2
D
6
D
7
D
8
D
5
D
4
D
3
CW
10
CW
9
CW
8
CW
7
CW
6
CW
11
CW
12
CW
13
CW
14
CW
1
CW
2
CW
3
CW
4
CW
5
W
2W
1
W
3
W
4
A
A09
A
A09
B
A10
B
A10
C
A11
18300
3100 2980 3600 5896 2280
300 1400 150 1400 150 1400 150 1275 150 1080 740 4950 150 4705 300
18300
3100 2980 3600 5896 2280
300 1400 150 1400 150 1400 150 1275 150 2215 4300 1425 95140 2600 850 300
300 VIF VIF150 1400 150 1400 150 1275 250 1830 285 EQ EQ EQ 1660 1300 1300 1150
1890 1304 3661 2700 95 2045 300
7300
1435
4145
1420
300
1703
95
2328
150
946
79
1400
300
7300
1650
4000
1650
OVEROVER OVER OVER
11215 740 300 740 405 2400 220 1900 380
FLOOR ABOVE
Wall
Type 1
Wall
Type 2
Wall
Type 3
Belo
w L
andin
g
RL 44.47
RL 43.44
RL 45.71
Exhibition and Meeting Area
Reception
Kitchenette
Storage
Toilet
FFL 45.71
FFL 45.71
FFL 45.71
FFL 45.71
FFL 45.71
FW
FW
FW
Finish: PC
Finish: PC
Finish: CT
Finish: PC
Finish: CT
FW
1
2
3
4
1 2 3 4 5 6 7 8 9 10 11 12
18 17 16 15 14 13
FFL 45.71
G
J
I
7
6
5
EX
PO
SE
D B
EA
M A
BO
VE
H
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
Ground Floor Plan1/MAY/2011
Xiaolan Wang
Tim Derham
A02
No. Description Date
1 : 50
Ground FloorA
North
D - DoorW - WindowCW - Curtain Window
Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall
Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted
Metal Finishing on Both Sides
Finish: PC - Polished Concrete Floor FinishFinish: CT - Ceramic Tile Floor FinishFinish: TB - Timber Board Floor FinishFinish: GC - General Carpet Floor FinishFinish: RM - Corten Rusted Metal Floor Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor Waste
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 3
A05
1
A061A08 1
A07
1
A B C D E F
1
2
3
4
D
9
D
10
D
11
D
12 CW
19CW
20CW
21CW
22 CW
23
CW
17 CW
18
CW
16
CW
15
CW
30
CW
29
CW
28
CW
27
CW
25
CW
24
D
13
A
A09
A
A09
B
A10
B
A10
C
A11
1
A13
16210
160
3423
95
3653
95
8625
160
230
VIF / EQ
1118
VIF / EQ
1118
VIF / EQ
111895
VIF / EQ
1218
VIF / EQ
1218
VIF / EQ
121895
VIF / EQ
1426
VIF / EQ
1426
VIF / EQ
1426
VIF / EQ
1426
VIF / EQ
1426
VIF / EQ
1426
105.00°
15.00°
10030
4090
1830100160
6985
160
5604
126
935
130
5320
Wall
Type 1
Wall
Typ
e 3
Wall
Typ
e 4
FFL 77.51
Deck
FFL 77.71
General Office
FFL 77.71
Manager's Office
FFL 77.71
Board Room
Void
Finish: GC
Finish: GC
Finish: GC
Finish: RM
Finish: PC
Fall Minimal
1 2 3 4 5 6 7 8 9 10 11 12
18 17 16 15 14 13
FFL 77.51
Fall Min.
G
J
I
7
6
5
4070
1090
3550
3748
8753
H
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
First Floor Plan1/MAY/2011
Xiaolan Wang
Tim Derham
A03
No. Description Date
1 : 50
First Floor1
North
D - DoorW - WindowCW - Curtain Window
Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall
Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted
Metal Finishing on Both Sides
Finish: PC - Polished Concrete Floor FinishFinish: CT - Ceramic Tile Floor FinishFinish: TB - Timber Board Floor FinishFinish: GC - General Carpet Floor FinishFinish: RM - Corten Rusted Metal Floor Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor Waste
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 4
A05
1
A061A08 1
A07
1
A
A09
A
A09
B
A10
B
A10
C
A11
Fall 2°
Fall 2°
Fall 2°
Fall 2°
Fall 2°
350mm Box Gutter
DP
OF
Ground Floor Outline
Overhang
160mm Parapet Wall
First Floor Deck
Flashings
Sump
Aluminium TrimdekSheeting
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
Roof Plan1/MAY/2011
Xiaolan Wang
Tim Derham
A04
No. Description Date
North
1 : 50
Roof1
OF - OverflowDP - Downpipe
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 5
Ground Floor
4571
First Floor
7771
Roof
10971
ABCDEF
D
1
CW
11
CW
12
CW
13
CW
14
CW
1
CW
2
CW
3
CW
16
CW
15
D
10
D
11CW
17
CW
18
D
12CW
19
CW
20
CW
21
CW
22
CW
23
D
3CW
4
CW
5
B
A10
B
A10
C
A11
2210
990
750
350
2100
700
Finish: RM
Finish: RM
Finish: RC
CL 7421
FFL
CL 10621
RL
FFL
Downpipe
Corten Metal Handrail
F F F F F F F F F F
F F F F F F F F F
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
North Elevation1/MAY/2011
Xiaolan Wang
Tim Derham
A05
No. Description Date
1 : 50
North Elevation1
D - DoorW - WindowCW - Curtain Window
Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 6
Ground Floor
4571
First Floor
7771
Roof
10971
1234
A
A09
A
A09
Finish: RM
Finish: RC
CL 7421
FFL
CL 10621
RL
FFL
Finish: RC
Finish: RM
Finish: RC
Finish: RC
700
2100
350
900
3050
700
2100
1100
3200
375
Expansion Joints
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
East Elevation1/MAY/2011
Xiaolan Wang
Tim Derham
A06
No. Description Date
1 : 50
East Elevation1
D - DoorW - WindowCW - Curtain Window
Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 7
Ground Floor
4571
First Floor
7771
Roof
10971
A B C D E F
CW
26
CW
25
CW
24
CW
6
CW
7
CW
8CW
9
CW
10
CW
30
CW
29
CW
28
CW
27
W
2
W
1
W
3
W
4
D
2
B
A10
B
A10C
A11
Finish: RM
Finish: RC
CL 7421
FFL
CL 10621
RL
FFL
Finish: RM
Downpipe
D
13
4050
3050
700
2100
1100
3441
F
F
F
F
F
F
F
F
F
F
F
F
F F
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
South Elevation1/MAY/2011
Xiaolan Wang
Tim Derham
A07
No. Description Date
1 : 50
South Elevation1
D - DoorW - WindowCW - Curtain Window
Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 8
Ground Floor
4571
First Floor
7771
Roof
10971
1 2 3 4
A
A09
A
A09
Finish: RC
Finish: RC
CL 7421
FFL
CL 10621
RL
FFL
Finish: RM
Finish: RC
Downpipe
4050
3050
700
6680
Expansion Joints
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
West Elevation1/MAY/2011
Xiaolan Wang
Tim Derham
A08
No. Description Date
1 : 50
West Elevation1
D - DoorW - WindowCW - Curtain Window
Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish
RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 9
Ground Floor
4571
First Floor
7771
Roof
10971
A B C D E F
B
A10
B
A10
C
A11
1A12
Exhibition and Meeting Area Storage
General OfficeManager's OfficeBoard Room
80mm gap betweenceiling and walls
Wall Type 1
Wall Type 4
Strip Footing
D
10
D
11
D
12
D
4
D
1D
3
CW
12
CW
13
CW
14
CW
1
CW
2
CW
3
CW
19
CW
20
CW
21
CW
22
CW
23
CW
15
CL 7421
FFL
CL 10621
RL
FFL
Verify neighbouringbuilding footingdeepth on site
CW
17
Aluminium Trimdek
Sarking/Insulation/Sarking/Safety Mesh
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
Section A-A1/MAY/2011
Xiaolan Wang
Tim Derham
A09
No. Description Date
1 : 50
Section A-AA
D - DoorW - WindowCW - Curtain Window
Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall
Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted
Metal Finishing on Both Sides
RL - Relative LevelFFL - Finished Floor Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 10
Ground Floor
4571
First Floor
7771
Roof
10971
1 2 3 4
A
A09
A
A09
Reception
Manager's Office
D
6
80mm gap betweenceiling and walls
CL 7421
FFL
CL 10621
RL
FFL
Aluminium TrimdekRoof Sheeting
150UB Roof Beams
150UB
250UB
5mm Corten RustedMetal Sheeting
150UB Partially Exposed
Sarking/Insulation/Sarking/Safty Mesh
350mm Box Gutter
New Retaining Wall
Parapet
RL 11321
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 50
Section B-B1/MAY/2011
Xiaolan Wang
Tim Derham
A10
No. Description Date
1 : 50
Section B-BB
D - DoorW - WindowCW - Curtain Window
Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall
Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted
Metal Finishing on Both Sides
RL - Relative LevelFFL - Finished Floor Level
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 11
Ground Floor
4571
First Floor
7771
Roof
10971
3-12TM Trench Mesh Reinforcement
Edge Beam
Waterproof Membrane
50mm Sandbed
Slab Reinforcement
Polished Concrete Floor Finish
Connection Per Manufacturer Specification
Styrofoam Insulation Layer (Thermal Mass System)
Thermal Mass Connector
Expansion Joint Per Manufacturer Specification
Connection Per Manufacturer Specification
150mm Bondek Slab
250UB
5mm Corten Metal Sheeting
Plasterboard Suspended Ceiling
80mm Gap Between Window & Ceiling 150UB
150UB Roof BeamC Purlins
Capping & Roof Flashing
CL 7421FFL
CL 10621RL
FFL
Plasterboard Suspended Ceiling
Polished Concrete Rendered Ceiling
Aluminium Trimdek Roof Sheeting
Blinding Concrete Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 20
Detail Section1/MAY/2011
Xiaolan Wang
Tim Derham
A11
No. Description Date
1 : 20
Detail SectionC
RL - Relative LevelFFL - Finished Floor Level
1 Preliminary Submission 3/May
Parapet
RL 11321
2 Final Submission 19/May
Page 12
Styrofoam Insulation Layer (Thermal Mass System)
Thermal Mass Connector
Connection Per Manufecturer Specification
150mm Bondek Slab
30mm Fibre Cement Sheet
250UB
1mm Corten Rusted Metal Sheeting
Support Stud
1mm Corten Rusted Metal Sheeting
Carpet
Metal Wall Stud
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 5
Vertical Detail1/MAY/2011
Xiaolan Wang
Tim Derham
A12
No. Description Date
1 : 5
Vertical Detail1
1 Preliminary Submission 3/May
2 Final Submission 19/May
Page 13
1mm Corten Rusted MetalSheeting
125SHS
Aluminium Window Frame
Handrail (First Floor Gallery)
Handrail (Frist Floor Deck)
1mm Corten Rusted Metal Sheeting
Support Stud1mm Corten Rusted MetalSheeting
1mm Corten Rusted MetalSheeting
Double Glazing Window
30mm Fibre Cement Sheet
Metal Wall Stud
Scale
Tutor
Drawn by
Date
Project Description:
Notes:
ABPL-30041ConstructionDesign
Student No: 320815Name: Xiaolan Wang
Tutor: Tim DerhamGroup: 1Scheme: 1
Sheet Size A2
Project Address:
Commercial Office BuildingDevelopment - Scheme 1
1 Holmwood Place, Carlton 3053 VIC
1 : 5
Horizontal Detail1/MAY/2011
Xiaolan Wang
Tim Derham
A13
No. Description Date
1 : 5
Horizontal Detail1
1 Preliminary Submission 3/May
2 Final Submission 19/May