Top Banner
CONCRETE OPERATION CONCRETE OPERATION BY BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)
26

CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Dec 22, 2015

Download

Documents

Cory Whitehead
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

CONCRETE OPERATIONCONCRETE OPERATIONBYBY

DHARAM SINGH H.O.D.GOVT POLY TECHNIC COLLEGE

G.T.B GARH ( MOGA)

Page 2: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

CONCRETING OPERATIONSCONCRETING OPERATIONS

The operations which are The operations which are followed in actual practice in the followed in actual practice in the making of concrete and in improving making of concrete and in improving and maintaining the quality of concrete and maintaining the quality of concrete are known as concreting operations. are known as concreting operations. The following operations are involved in The following operations are involved in concrete making :concrete making :

11

Page 3: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

221)1) Storing of materials Storing of materials

2)2) Batching of materials Batching of materials

3)3) Mixing of various ingredientsMixing of various ingredients

4)4) Transportation of concrete mix Transportation of concrete mix

5)5) Placing of concrete Placing of concrete

6)6) Compaction of concrete Compaction of concrete

7)7) Finishing of concrete surface Finishing of concrete surface

8)8) Curing of concrete Curing of concrete

9)9) Joints in concrete.Joints in concrete.

Page 4: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Storing of concrete materialsStoring of concrete materials

The process of keeping the The process of keeping the ingredients of concrete in ingredients of concrete in their proper place to protect their proper place to protect them from the effect of them from the effect of weathering is called storing.weathering is called storing.

33

Page 5: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

OBJECT TO STORINGOBJECT TO STORING

Maintaining the quality and Maintaining the quality and grading of materials is the main grading of materials is the main objective of storage of materials. objective of storage of materials. Every effort should be made that Every effort should be made that the quality of cement do not the quality of cement do not deteriorate during storage in deteriorate during storage in warehouses or at the site of warehouses or at the site of work.work.

44

Page 6: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Storage of cementStorage of cement Cement is a finely ground material. It Cement is a finely ground material. It

is highly hygroscopic. It absorbs is highly hygroscopic. It absorbs moisture which may be in the form of moisture which may be in the form of free water. An absorption of 1 to 2free water. An absorption of 1 to 2% % of water has no effect ,but further of water has no effect ,but further amount of amount of absorption reduce the absorption reduce the strength of cement. If the absorption strength of cement. If the absorption exceeds 5exceeds 5% the cement is, for all % the cement is, for all ordinary purposes ruined. During the ordinary purposes ruined. During the storing and transporting of cement, storing and transporting of cement, care is always taken to keep it away care is always taken to keep it away from from moisture.moisture.

55

Page 7: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

METHOD OF STORING CEMENT IN METHOD OF STORING CEMENT IN WAREHOUSEWAREHOUSE

1)The cement bags should be placed directly 1)The cement bags should be placed directly over the floor if it is dry and if not then the over the floor if it is dry and if not then the bags should be placed on a raised bags should be placed on a raised platform made of wooden planks.platform made of wooden planks.

2)The space between the exterior walls and 2)The space between the exterior walls and piles should be 0.30 m (A group of number piles should be 0.30 m (A group of number of bags arranged together closely is called of bags arranged together closely is called pile.)pile.)

3)Bags should be placed close together to 3)Bags should be placed close together to avoid circulation of air. avoid circulation of air.

4)The height of pile should not be more than 4)The height of pile should not be more than 2.7m i.e. not more than 15 bags should be 2.7m i.e. not more than 15 bags should be placed one above the other. The width of placed one above the other. The width of pile should not be more than 3m.pile should not be more than 3m.

66

Page 8: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

775)The cement bags should be 5)The cement bags should be

placed in header course and placed in header course and stretcher course alternatively if stretcher course alternatively if height of pile exceeds 1.44m (i.e. height of pile exceeds 1.44m (i.e. 8 bags ). The bags are arranged to 8 bags ). The bags are arranged to avoid danger of over toppling of avoid danger of over toppling of cement bags.cement bags.

(6) Cement bags should not be (6) Cement bags should not be removed on the principle of removed on the principle of first infirst in and and first outfirst out. For this purpose, . For this purpose, each consignment should be piled each consignment should be piled separately and date plates should separately and date plates should be kept for showing date of arrival.be kept for showing date of arrival.

Page 9: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

STORING OF AGGREGATESSTORING OF AGGREGATES

Storing of aggregates should be Storing of aggregates should be done in such a way as to:-done in such a way as to:-

►Maintain the uniformity of Maintain the uniformity of grading grading

►Prevent segregation Prevent segregation ►Maintain uniform surface water Maintain uniform surface water

condition condition ►Avoid mixing of harmful material Avoid mixing of harmful material

in the aggregate.in the aggregate.

88

Page 10: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Precautions for maintaining Precautions for maintaining uniformity of gradinguniformity of grading

►Hard and dry patch of ground Hard and dry patch of ground should be selected for storing of the should be selected for storing of the aggregate. If a hard surface is not aggregate. If a hard surface is not available, provide a platform of available, provide a platform of planks, G.I. sheets, floor of bricks or planks, G.I. sheets, floor of bricks or a weak concrete layer. This a weak concrete layer. This platform is used to avoid the mixing platform is used to avoid the mixing of soil with the aggregates.of soil with the aggregates.

►The aggregates of various sizes The aggregates of various sizes should be kept separately. Piles of should be kept separately. Piles of sand and coarse aggregate should sand and coarse aggregate should be kept separatebe kept separate. .

99

Page 11: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

PRECAUTIONS FOR PREVENTION OF PRECAUTIONS FOR PREVENTION OF SEGREGATIONSEGREGATION

► During stock piling successive consignments During stock piling successive consignments should not be dropped on the same place to should not be dropped on the same place to form a pyramid. It will lead to segregation i.e. form a pyramid. It will lead to segregation i.e. the coarser material rolls down the sides of the coarser material rolls down the sides of piles and fine material will concentrate in the piles and fine material will concentrate in the centre.centre.

► The aggregates should be placed in layer not The aggregates should be placed in layer not thicker than one truck dumped at same place.thicker than one truck dumped at same place.

► The aggregates should not fall from a height The aggregates should not fall from a height while being transported and dumped. while being transported and dumped.

► The pile should be as near as possible to the The pile should be as near as possible to the mixer to avoid greater distance of transport.mixer to avoid greater distance of transport.

1010

Page 12: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

PRECAUTIONS FOR PRESERVING PRECAUTIONS FOR PRESERVING

UNIFORMITY OF MOISTURE CONTENTUNIFORMITY OF MOISTURE CONTENT ►The area occupied by each pile should The area occupied by each pile should

be as large as possible. The height of be as large as possible. The height of pile should be from 1.25m to 1.75m .pile should be from 1.25m to 1.75m .

►The pile should be allowed to stand for The pile should be allowed to stand for 24 hours at least before being used so 24 hours at least before being used so that the moisture has time to settle.that the moisture has time to settle.

► In the case of sand, the bottom layer In the case of sand, the bottom layer (last 300mm) should not be used as (last 300mm) should not be used as the bottom layer becomes saturated the bottom layer becomes saturated with water.with water.

1111

Page 13: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

PRECAUTIONS FOR CLEALINESS OF PRECAUTIONS FOR CLEALINESS OF AGGREGATES .AGGREGATES .

The piles of aggregates should be The piles of aggregates should be kept clean of leaves, kept clean of leaves, bidis ,vegetable debris, animal bidis ,vegetable debris, animal refuse etc. refuse etc.

1212

Page 14: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

STORING OF WATER STORING OF WATER Water is stored at site in a masonry Water is stored at site in a masonry

tank built for the purpose or in other tank built for the purpose or in other clean containers . The walls of the tank clean containers . The walls of the tank should be somewhat higher than the should be somewhat higher than the surrounding ground. surrounding ground. Sufficient quantity of water Sufficient quantity of water should be stored in advance to ensure should be stored in advance to ensure the continuity of concreting the continuity of concreting operations. If the water obtained from operations. If the water obtained from a source contains dust etc. it should be a source contains dust etc. it should be collected a day in advance to allow collected a day in advance to allow such suspended impurities to settle such suspended impurities to settle down before use. down before use.

13

Page 15: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

BATCHING BATCHING

The process of measurement of The process of measurement of ingredients (cement, fine ingredients (cement, fine aggregate, coarse aggregate and aggregate, coarse aggregate and water ) for making concrete is water ) for making concrete is called batching.called batching.

Batching is done in two ways :-Batching is done in two ways :-

1) 1) Volume batching Volume batching

2) 2) Weigh batchingWeigh batching

1414

Page 16: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Volume batchingVolume batching (a)(a) Batching of cementBatching of cement :-Cement is :-Cement is

always batched by weight. Cement always batched by weight. Cement should never be batched by volume, should never be batched by volume, because its weight per unit volume because its weight per unit volume varies according to the way container varies according to the way container (forma) is filled. (forma) is filled.

(b)(b) Batching of aggregatesBatching of aggregates :- Wooden :- Wooden batch boxes known as formas are used batch boxes known as formas are used for batching of fine and coarse for batching of fine and coarse aggregates by volume. The formas aggregates by volume. The formas should be made of 30 mm thick timber.should be made of 30 mm thick timber.

1515

Page 17: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

1616

(c)(c) Batching of waterBatching of water :-It is practice in the :-It is practice in the field to add water by tin cans or buckets. field to add water by tin cans or buckets. It is not an accurate method. It results in It is not an accurate method. It results in variable strength of concrete. variable strength of concrete.

Some of mixers are equipped with Some of mixers are equipped with calibrated water tank attached calibrated water tank attached permanently to the mixers. For the mixers permanently to the mixers. For the mixers not provided with water tank calibrated not provided with water tank calibrated syphon system can be easily got installed, syphon system can be easily got installed, such as the one used in cisterns of water such as the one used in cisterns of water closets. If, however, there are no such closets. If, however, there are no such automatic devices, water should be automatic devices, water should be measured in calibrated cans very measured in calibrated cans very accurately and then only should be added accurately and then only should be added in the mixer. in the mixer.

Page 18: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

MIXING OF CONCRETEMIXING OF CONCRETE

The process of mixing of various The process of mixing of various ingredients of concrete in specified ingredients of concrete in specified proportions is termed as mixing of proportions is termed as mixing of concrete. concrete.

Methods of mixing :- There are two Methods of mixing :- There are two methods of mixing :methods of mixing :

(a)(a) Hand mixing Hand mixing

(b)(b) Machine mixing Machine mixing

1717

Page 19: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

HAND MIXINGHAND MIXING

The process of mixing the The process of mixing the ingredients of concrete by manual ingredients of concrete by manual labour is called hand mixing .labour is called hand mixing .

Hand mixing is adopted for small and Hand mixing is adopted for small and unimportant works and where unimportant works and where quantity of concrete used is small. quantity of concrete used is small. Hand mixing method requires more Hand mixing method requires more cement(10%more) than machine cement(10%more) than machine mixing for obtaining the small mixing for obtaining the small strength of concrete. strength of concrete.

1818

Page 20: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

FOLLOWING IS STEP WISE FOLLOWING IS STEP WISE PROCEDURE FOR MIXING BY HANDPROCEDURE FOR MIXING BY HAND

► A platform of bricks ,lean concrete or iron A platform of bricks ,lean concrete or iron sheets is constructed. The size of the platform sheets is constructed. The size of the platform depends upon the quantity of concrete to be depends upon the quantity of concrete to be mixed at a time.mixed at a time.

► Spread out a measured quantity of sand Spread out a measured quantity of sand evenly on the mixing platform. evenly on the mixing platform.

► Spread the cement uniformly on this sand and Spread the cement uniformly on this sand and mix it till the colour of mixture is uniform. mix it till the colour of mixture is uniform.

► Spread this mixture evenly again on platform. Spread this mixture evenly again on platform. ► Spread the measured coarse aggregate Spread the measured coarse aggregate

evenly on the mixing platform.evenly on the mixing platform.► Mix the material dry.Mix the material dry. . .

1919

Page 21: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

2020

► Make a hollow in the centre of the mixed Make a hollow in the centre of the mixed material. After this 75% of the required material. After this 75% of the required quantity of water based on water-cement quantity of water based on water-cement ratio is added and then start remixing ratio is added and then start remixing taking care that no water escapes the taking care that no water escapes the mixture.mixture.

► The remaining water is added with the The remaining water is added with the continuation of mixing process.continuation of mixing process.

► Normally mixing time should not exceed 3 Normally mixing time should not exceed 3 min.min.

► The platform should be cleaned at the end The platform should be cleaned at the end of day's work so that it is ready for use on of day's work so that it is ready for use on the next day. the next day.

Page 22: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

MACHINE MIXINGMACHINE MIXING The process of mixing the ingredients The process of mixing the ingredients

of concrete by a machine is called of concrete by a machine is called machine mixing. machine mixing.

In this case where a large quantity of In this case where a large quantity of concrete is to be produced, hand concrete is to be produced, hand mixing becomes costly even if the mixing becomes costly even if the labour is cheap. The machine mixing labour is cheap. The machine mixing becomes essential. The concrete can becomes essential. The concrete can thus be produced at a faster rate and at thus be produced at a faster rate and at a lesser cost. The quanlity of concrete a lesser cost. The quanlity of concrete by machine mixing is also better.by machine mixing is also better.

2121

Page 23: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

TRANSPORTATION OF CONCRETETRANSPORTATION OF CONCRETE

The process of carrying concrete The process of carrying concrete mix from the place of its mixing to mix from the place of its mixing to final position or deposition is called final position or deposition is called transportation of concrete. transportation of concrete.

Transportation of concrete mix is Transportation of concrete mix is very important because in very important because in transportation, time factor is transportation, time factor is involved. The mix should be involved. The mix should be transported as quickly as possible.transported as quickly as possible.

2222

Page 24: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Precaution in Transportation of Precaution in Transportation of concreteconcrete

The following precaution should be The following precaution should be taken during transporting concrete from taken during transporting concrete from the mixing place :the mixing place :

►Concrete should be transported as Concrete should be transported as quickly as possible to the formwork quickly as possible to the formwork within the initial setting time of cement.within the initial setting time of cement.

►Efforts should be made to prevent Efforts should be made to prevent segregation.segregation.

►Transportation cost should be as low as Transportation cost should be as low as possible. possible.

2323

Page 25: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

►The concrete mix should be protected The concrete mix should be protected from drying in hot weather and from from drying in hot weather and from rain during transportation.rain during transportation.

►The concrete should be kept agitated The concrete should be kept agitated in truck mixer so that it does not in truck mixer so that it does not become stiff when transportation is become stiff when transportation is likely to take more time.likely to take more time.

►No water should be lost from the mix No water should be lost from the mix during transportation. during transportation.

►The permissible duration of transport The permissible duration of transport of concrete should be determined in of concrete should be determined in the laboratory. the laboratory.

2424

Page 26: CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)

Thanking youThanking you