    INTRODUCTION:

    PROJECT DETAILS:

    The proposed project involves construction of group housing project Manglam Tarang on a

    plot measuring as 11,572.93 sq. m. and will gain a built-up area of 46,801.63 sq. m. The

    project will have three towers, B+S+12 floors each with 480 flats of 2 BHK, Club (1,481.83 sq.

    m.) Swimming Pool etc.

    LOCATION OF PROJECT

    The project site is located at Khasra No. 1774/1, 1775/1 & 242, Village Muhana, Tehsil

    Sanganer, District Jaipur, Rajasthan. The geographical coordinates of the project site are

    2647'55.15"N, 7544'09.95"E. Google map of 500 m. radius showing surrounding features is

    enclosed as Annexure- V

    BUILT UP AREA DETAILS:

    Sr. No. Blocks (A & B) Gross Built up Area (sq. m.)

    FAR (sq. m.)

    1. Basement Floor 4289.97 0

    2. Stilt Floor 3323.90 316.21

    3. 1st Floor 3258.74 2649.85

    4. 2nd Floor 3239.84 2705.95

    5. 3rd Floor 3239.84 2705.95

    6. 4th Floor 3239.84 2705.95

    7. 5th Floor 3239.84 2705.95

    8. 6th Floor 3239.84 2705.95

    9. 7th Floor 3239.84 2705.95

    10. 8th Floor 3239.84 2705.95

    11. 9th Floor 3239.84 2705.95

    12. 10th Floor 3239.84 2705.95

    13. 11th Floor 3239.84 2705.95

    14. 12th Floor 3239.84 2705.95

    15. Terrace Floor 290.78 0

  • Project: Manglam Tarang CP & EMP

    Promoted by: Manglam Build Developers Ltd.

    Enkay Enviro Services Pvt. Ltd., Jaipur

    Total 46801.63 32731.51

    PARKING REQUIREMENT:

    1. Residential:

    FAR area: 28,231.42 sq. m.

    1 ECU per 75 sq. m. of FAR area

    = 376.42 ECU

    2. Commercial

    FAR area: 291 sq. m.

    1 ECU per 50 sq. m. of FAR area

    = 5.82 ECU

    3. Visitors

    25% Visitors Parking

    = 95.56 ECU

    Total ECU required: 477 ECU

    Total ECU provided: 481 ECU

    Details of parking are provided in Form 1 under section 1.17.

    POWER REQUIREMENT:

    Connected load : 3705 KW

    Maximum Demand : 2059 KW

    Load Details:

    Sl. No.

    Type of Flat

    Total no. of each type

    Total BUA per Flat (sq.

    ft)

    Connected Load per sq. ft. as

    per RSEB norms (KW)

    Assessed Connected Load per Unit (KW)

    Assessed Connected

    load per Flat (KW)

    Total Connected Load (KW)

    for each type

    Unit

    Residential & Commercial Load

    S + 12 Blocks

  • Project: Manglam Tarang CP & EMP

    Promoted by: Manglam Build Developers Ltd.

    Enkay Enviro Services Pvt. Ltd., Jaipur

    3

    A, B, C type (2BHK)

    480 836 0.008 6.688 7 3360

    4 Shops 14 1893 0.008 15.144 0.025 47

    Total Connected Load for Residential & Commercial Units (in KW) 3407 KW

    Common Load

    Qnty KW/ Blk

    1 Passenger Lifts

    12 8 96

    2 Parking/ Lobby/ Stair Lights

    35

    3 Water Pump Sets 32

    4 Guard Room, Area Lights, Fountains, Signage etc.(KW) 35

    5 Club, Community Hall etc 35

    6 Street Lighting

    5

    7 Landscape Area

    10

    8 S.T.Plant 50

    Total Connected Load for Common (in KW)

    298

    Total Connected Load

    3705 KW

    Considering a Div.Factor of 0.5 the Maxm. Power Demand (in KW) is likely to be 1853 KW

    Maximum Demand in KVA Unit (Assuming P.F. of 0.9)

    2059 KVA

    Maximum Power Demand in the Colony in KVA Unit, say,

    2059 KVA

    Selection of Transformers:

    Total load requirement : 3705 KW

    Applying power factor of 0.9 : 2059 kVA

    Load requirement

    Considering 80% loading of rated transformer capacity,

    Minimum rating of transformer required : 2422 kVA

    Hence, 1500 kVA 1 nos., 1000 kVA 1 nos., 33/ 0.433 kV transformers will be used.

    Selection of DG sets :

    Total load requirement : 298 KW

  • Project: Manglam Tarang CP & EMP

    Promoted by: Manglam Build Developers Ltd.

    Enkay Enviro Services Pvt. Ltd., Jaipur

    Applying power factor of 0.8 : 261 kVA

    Considering 80% loading of rated DG capacity

    Minimum rating of Genset required : 326 kVA

    Hence, 1 nos. 380 kVA DG set may be selected.

    Back Up Source :

    There will be power backup through DG set of capacity of 380 kVA used in case of power cut or

    failure. DG set will be provided with a effective safe stack height of 48.00 m. The fuel

    requirement is tabulated as under:

    S.No. Capacity of DG set Fuel Fuel consumption

    1. 380 kVA HSD 64 l/hr /DG

    CRITERIA OF WATER DEMAND:

    The daily water requirement for the proposed development will be 246 KLD (fresh water demand:

    170 KLD and the recycled water demand: 76 KLD). Criteria for water demand is given as:

    S.

    No.

    Particulars Population

    (nos.)

    Fresh

    Water

    Basis

    (lpcd)

    Fresh

    Water

    Demand

    (L)

    Water

    Basis

    (lpcd)

    Treated

    Wastewater

    Demand

    (L)

    Total

    water

    demand

    (KLD)

    1. Residents 2400 65 156000 21 50400 206.4

    KLD

    2. Club & Shops 442 21 9282 9 3978 13.2 KLD

    3. Staff 50 30 1,500 15 750 2.2 KLD

    4. Visitors 360 9 3240 6 2160 5.4 KLD

    Total (a) 3,252 170022 57288 227.5

    KLD

    Say

    227 KLD

    5. Landscaping

    Softscape

    Hardscape

    1205.5 sq.m.

    500.8 sq.m.

    704.7 sq.m.

    10 [email protected] per sq.m.

    05 [email protected] per sq.m.

    5008

    3523.5

    8.5 KLD

    6. General

    Washing

    4670.89 sq.m. 0.5 [email protected] per sq.m. 2335.4 2.5 KLD

    7. Filter Backwash @ 30 cu.m. / hr. for 15 min 7.5 KLD

    Total (b) 10866.9 18.5 KLD

    Grand Total (a+b) 3252 170022 246 KLD

  • Project: Manglam Tarang CP & EMP

    Promoted by: Manglam Build Developers Ltd.

    Enkay Enviro Services Pvt. Ltd., Jaipur

    WATER BALANCE

    Fresh

    water

    169.9 KLD

    Say

    170 KLD

    Recycled /

    Reuse

    treated

    water

    76.0 KLD

    199.3 KLD

    Waste

    water Say

    200 KLD

    S

    T

    P

    Capacity

    250 KLD

    Sludge &

    evaporation

    losses

    (10.0 KLD)

    Daily water demand : 170 KLD + 76 KLD = 246 KLD

    1.2 KLD

    Residential

    (156.0 KLD)

    124.8 KLD

    Staff ( 1.5 KLD)

    57.5 KLD in Flushing

    2.0 KLD2.5 KLD in General Washing

    8.5 KLD in Landscaping

    57.5 KLD

    Area

    Surrender in

    H.T. Line

    Green

    Corridor

    (37.0 KLD)

    Club & Shops

    (9.2 KLD)

    7.3 KLD

    2.5 KLDVisitors (3.2 KLD)

    Filter backwash 7.5 KLD4.0 KLD

    Excessive

    Treated

    Water

    (77.0 KLD)

    IDENTIFICATION, PREDICTION AND EVALUATION OF IMPACTS:

    Environmental impact can be defined as any alteration of environmental conditions, adverse or

    beneficial, caused or induced by the action or set of actions under consideration.

    Various operations involved in the project have been studied in details to identify, predict and

    evaluate impacts on various environmental components. The identified impacts were quantified

    using mathematical models to a possible extent so as to estimate the future environmental

    scenario.

    AIR ENVIRONMENT:

    AMBIENT AIR MONITORING REPORT

    Agency hired: Vison Labs; (Vendor code: EES/ ADM / LSUP/ 031/ 032)

    Instrument used: Respirable Dust Sampler (SLE-RDS 103 & SLE-GA 133) & Fine Particle Sampler APM 550)

    Sampling date: 08-09.09.2016, Duration: 24 hrs.

  • Project: Manglam Tarang CP & EMP

    Promoted by: Manglam Build Developers Ltd.

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.