Community Presentations– February - May, Community Presentations– February - May, 2010 2010
55

Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Dec 26, 2015

Download

Documents

Baldric Baker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Community Presentations– February - May, 2010Community Presentations– February - May, 2010

Page 2: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

2

George McShan, Member Dr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member

Verna Young,Vice President

Javier De Leon,President

Lyle Garza,Secretary

Page 3: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/233

District determines that there are enough major renovations, need for new school(s), and facility improvements to move forward with a study.

District hires a Demographer to project growth over next 10 years, evaluate growth patterns, and recommend areas of improvement.

Board of Trustees builds a community based task force to evaluate need by visiting campuses, talking with staff, and evaluating “best practices” by visiting other school districts.

Harlingen CISD called this community task force a Future Facility Needs Committee with subcommittees that looked at Elementary Schools and Facilities, Secondary Schools and Facilities, Other Facilities, Finance, and Technology.

It’s a process of identifying current and future facility improvements:

Page 4: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/234

Future Facility Needs Committee evaluated facilities improvements to finalize a project list of their recommendations and then presented to the Board of Trustees.

Board of Trustees asks voters for permission to sell bonds to finance construction projects and major purchases such as building additions/renovations, new schools, and facilities.

School district repays bonds over extended period of time from the debt service fund.

District is not required to build bond projects but funds cannot be used for different purposes without voter approval.

It’s a process of identifying current and future facility improvements:continuedcontinued

Page 5: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

• Elementary Schools $ 32,987,801.05• Middle Schools 26,939,399.38• High Schools 21,502,181.38• Support & Miscellaneous 4,019,368.19

Total of Estimated Costs $ 85,448,750.00

PAIDPAID

PAIDPAID

PAIDPAID

Page 6: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

15,857

18,159

Growth rate 1 – 3% per year

17,011

17,608

Demographer: Continued growth of 1% per year over the next 10 years

Page 7: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

OverviewOverview18,292 students – snapshot 9/25/20092 High Schools1 Early College High School5 Middle Schools17 Elementary Schools1 Alternative High School – KEYS Academy2 Discipline Alternative Education Campuses

7

Page 8: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Committee chair and members announced October 8, 2009 Future Facilities Taskforce members announced November 5, 2009 First meeting with Facility Needs committee November 17, 2009 Potential Future Facilities Taskforce member breakfast November 20, 2009 Meeting with Principals and Instructional staff November 23, 2009 Campus meetings with staff Nov. 23 – Dec. 3, 2009 First general committee meeting December 3, 2009 Status and progress report January 12, 2010 Second general committee meeting January 19, 2010 Third general committee meeting January 26, 2010 Special Board meeting January 28, 2010 Facilities Committee – Status Update February 4, 2010 Special Board workshop February 6, 2010 Information presented to Principals/Instructional Staff February 9,2010 Report to Board February 9, 2010 Board action taken for possible bond election February 9, 2010 Presentations to community throughout DistrictPresentations to community throughout District Feb. 10 – May 2010Feb. 10 – May 2010 Bond Election May 8, 2010

04/19/238

Page 9: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Elementary Chair: Marisa Chapa

Secondary Chair:Katherine Uhlhorn

Other Facilities Chair:Greg Powers

Finance Chair:Nathan Winters,Dr. Sid Brown

Technology Chair:Tito Resendez

Facility Needs Committee

Chair – Jim Solis

Board of Trustees

Future Facilities Task Force

Resource: Tricia Morrow

Resource:Arturo Cavazos

Resource: Oscar Tapia,Roger Harms, Randy Cretors

Resource: Julio Cavazos

Resource: Rosalinda Vargas,James Pearcy, Allen Aleshire

04/19/239

HCISD Community – Combes, Harlingen, Palm Valley , Primera

Page 10: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Marisa Martinez Chapa – ChairMarisa Martinez Chapa – Chair Tricia Morrow, Assistant Superintendent for Curriculum and Tricia Morrow, Assistant Superintendent for Curriculum and

Instruction PreK – 16; Luis Garcia, Assistant Principal – Houston Instruction PreK – 16; Luis Garcia, Assistant Principal – Houston (Resource)(Resource)

MembersMembers Iris AlvaradoIris Alvarado Mario AlvaradoMario Alvarado Claudine BenavidezClaudine Benavidez Melissa BoykinMelissa Boykin Amy CanoAmy Cano Ismael CasarezIsmael Casarez John DavisJohn Davis Fabian DiazFabian Diaz Sam GorenaSam Gorena

Nora GraciaNora Gracia Diane LaFeverDiane LaFever Lupita MuñizLupita Muñiz Angela RamirezAngela Ramirez Guadalupe SaldivarGuadalupe Saldivar Anna Maria TopeteAnna Maria Topete Martin VillafrancaMartin Villafranca

04/19/2310

Page 11: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

AC for Multi-purpose Buildings Campus Renovations at all Elementary Campuses

Heating/cooling Electrical capacity Sidewalks Canopies Drainage Restrooms Parking

New Classroom Wing at Jefferson Additional Classrooms at Treasure Hills, Lamar,

Rodriguez, and Crockett

04/19/2311

Fencing Security gates Playground equipment Campus beautification Storage Roof renovations

$18,615,500$18,615,500

Page 12: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Click–a-CampusClick–a-Campus

AustinBonhamBowieCrockettDishmanHoustonJeffersonLamarMeans

04/19/2312

LongMilamRodriguezStuartTravisTreasure HillsWilsonZavala

If the Bond passes, how will each campus be affected?

Page 13: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Katherine Uhlhorn – ChairKatherine Uhlhorn – Chair Arturo Cavazos, Deputy Superintendent School Support Arturo Cavazos, Deputy Superintendent School Support

Services; Jesse Gallegos, Assistant Principal - HHS Services; Jesse Gallegos, Assistant Principal - HHS (Resource)(Resource)

MembersMembers Jessica BandaJessica Banda Lori BellLori Bell Anita BoswellAnita Boswell Jill BuddJill Budd Reagan Florence Reagan Florence Sallie GonzalezSallie Gonzalez Alan JohnsonAlan Johnson

Connie MedleyConnie Medley Stephanie MesquiasStephanie Mesquias Randy RhodesRandy Rhodes Alex RiosAlex Rios Dora RodriguezDora Rodriguez Chris WhiteChris White

04/19/2313

Page 14: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/2314

Ninth Grade Academy New Middle School (Memorial Middle School will

be repurposed to an administrative annex) Vernon Band Hall/Renovations Gutierrez/Vela Bathrooms Renovations at all Secondary Campuses

Heating/cooling Electrical capacity Drainage Parking Lots Upgrade classroom lighting

$50,023,465$50,023,465

Plumbing Sprinkler systems Additional Storage Roof renovations

Page 15: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Click–a-CampusClick–a-Campus

Harlingen High SchoolHarlingen High School SouthECHSKEYS AcademyCoakleyGutierrezMemorialVelaVernon Secondary Alternative Center04/19/23

15

If the Bond passes, how will each campus be affected?

Page 16: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Greg Powers – ChairGreg Powers – Chair Oscar Tapia, Assistant Superintendent for District Operations; Oscar Tapia, Assistant Superintendent for District Operations;

Randy Cretors, Athletic Director; Roger Harms, Director Music Randy Cretors, Athletic Director; Roger Harms, Director Music Education (Resource)Education (Resource)

MembersMembers Chris BoswellChris Boswell Allan BrumleyAllan Brumley Mike BuckMike Buck Frank BoggusFrank Boggus Ruthie EwersRuthie Ewers Sandra FlinnSandra Flinn Gerald GathrightGerald Gathright Rene LugoRene Lugo Rudy MartinezRudy Martinez Lee MeansLee Means

Mike RamirezMike Ramirez Ernesto SilvaErnesto Silva Belinda TorresBelinda Torres Gus TorresGus Torres Manny VelaManny Vela Jesse VillarrealJesse Villarreal

04/19/2316

Page 17: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Boggus Stadium Renovations

Track Artificial turf Field lighting (east side) Additional parking

Performing Arts Center 1,200 seats, concession, restrooms Practice rooms, dressing rooms, woodshop, set area, prop storage, costume storage, dance warm up rooms, black room Large stage with lighting

District Operations/Transportation Parking Lot Maintenance to Vertec Building (parking improvements, new welding, painting, carpentry shops, offices, inventory warehouse facilities)

Aquatic Center 25 yard competition pool Small warm pool (special education students) Dressing rooms, restrooms Office, weight room, classroom Spectator seating area (400 – 500 seats)

Repurpose Memorial Middle School to a new administrative annex building New Agriculture Building Kitchen Renovations Projects for Various Schools

04/19/2317

$27,761,035$27,761,035

Page 18: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Tito Resendez– ChairTito Resendez– Chair Rosalinda Vargas, Assistant Superintendent for Human Rosalinda Vargas, Assistant Superintendent for Human

Resources; James Pearcy, Director Technology; Allen Aleshire, Resources; James Pearcy, Director Technology; Allen Aleshire, Director Public Information/KHGN TV/Web Services (Resource)Director Public Information/KHGN TV/Web Services (Resource)

MembersMembers Orlando ArguellesOrlando Arguelles Eloy Cano Jr.Eloy Cano Jr. Blas CantuBlas Cantu Nick ConsiglioNick Consiglio Janine DealJanine Deal Bob DunkinBob Dunkin Robert HarveyRobert Harvey Edward HinojosaEdward Hinojosa

Dean LaFeverDean LaFever Rick LedesmaRick Ledesma Dr. Francisco LoyaDr. Francisco Loya Ruben LozanoRuben Lozano Yolanda LozanoYolanda Lozano Joe PerezJoe Perez Crisanne ZamponiCrisanne Zamponi

04/19/2318

Page 19: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/2319

$ 2,200,000$ 2,200,000

Network Operations Center (NOC)/District technology infrastructure requirements

$4,000,000 combined with Other Facilities and Secondary for repurposing of Memorial MS to accommodate NOC

Preparing classrooms for 21st Century Learning $2,200,000

Page 20: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Nathan Winters/Dr. Sid Brown – Co-Chair Nathan Winters/Dr. Sid Brown – Co-Chair Julio Cavazos, Assistant Superintendent for Business Julio Cavazos, Assistant Superintendent for Business

Services; Elena Mata, Assistant Business Manager Services; Elena Mata, Assistant Business Manager (Resource)(Resource)

MembersMembers Quentin AndersonQuentin Anderson Col. H. William Card JrCol. H. William Card Jr Arnold Celis IIIArnold Celis III Julie CrockettJulie Crockett Liz DotyLiz Doty Freddy ElizondoFreddy Elizondo Peggy FrugePeggy Fruge Dr. Phillip FrugeDr. Phillip Fruge

Gabriel GonzalesGabriel Gonzales Eddie GutierrezEddie Gutierrez Nat LopezNat Lopez Cesar MoralesCesar Morales Rick RodriguezRick Rodriguez Felix SanchezFelix Sanchez

04/19/2320

Page 21: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Overview with CostsOverview with CostsOverview with CostsOverview with Costs

Area Total CostsElementary $ 18,615,500.00Secondary $ 50,023,465.00Other Facilities $ 27,761,035.00 Technology $ 2,200,000.00

Total $ 98, 600,000.00

04/19/2321

Page 22: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/2322

Page 23: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Important Facts – IFA and EDAImportant Facts – IFA and EDA(IFA Instructional Facility Allotment - EDA Existing Debt Allotment)(IFA Instructional Facility Allotment - EDA Existing Debt Allotment)

State will have instructional facility allotment (IFA) monies in June 2010 – one of the highest allotments since it started in 1997.

EDA – additional option for District to access State funds.EDA has been permanently rolled forward.State funds will pay approximately 50% of the annual debt service. Other federal funds may also become available. If we do not qualify for State of Texas funding, then HCISD will not sell

bonds.

04/19/2323

Page 24: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Bond Size $ 98,600,000 Value of Home: Annual Increase Monthly Increase

$ 50,000.00 $ 48.50 $ 4.04

$ 75,000.00 $ 72.75 $ 6.06

$ 89,123.00 $ 86.45 $ 7.20

$ 100,000.00 $ 97.00 $ 8.08

$ 150,000.00 $ 145.50 $ 12.13

$ 250,000.00 $ 242.50 $ 20.21

$ 500,000.00 $ 485.00 $ 40.42

Note: Above increase takes into consideration $15,000 allowance for homestead exemption. The above does not take into consideration increase/decrease in appraised property value. Estimated Annual Increase of 9.7 cents is based on the current market interest rate of 4.0%

Property Tax Impact to HomeownersProperty Tax Impact to HomeownersEstimated Effect on Taxpayers – 30 years

04/19/2324

Avg. Value

90% value less than

Page 25: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Taxpayers over 65 years of age will see no increase in taxes on existing properties, since levies are frozen for those taxpayers once they have been granted the exemption of over 65, unless they make improvements to their homesteads.

04/19/2325

Page 26: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Bond Election – May 8, 2010Early Voting M- F April 26 – May 4………. 8 a.m. – 5 p.m.Also, Saturday May 1st ………………………… 8 a.m. – 5 p.m.Location for early voting: 407 North 77 Sunshine Strip

(HCISD Administration Building)

Election Day, Saturday, May 8, 2010 voting will be from 7 a.m. – 7 p.m.

04/19/2326

Page 27: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Bond Election – May 8, 2010

04/19/2327

Page 28: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

04/19/2328

Page 29: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Austin ElementaryAir Conditioning in Multipurpose BuildingCarpet replacementElectrical upgradesHVAC upgradesDrainageSidewalks leveledCampus and playground beautificationPlayground equipment ADA compliant

Blacktop asphalt overlayPlumbing upgradesCanopies

Page 30: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Bonham ElementaryAir Conditioning in Multipurpose BuildingCanopiesFencingHVAC upgrades including cafeteria unit noiseDrainageStoragePlayground levelingPlayground equipment ADA compliant

Carpet ReplacementPlayground blacktop and parking lot asphalt overlayPlumbing upgrades

Page 31: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Bowie ElementaryAir Conditioning in the Multipurpose BuildingElectrical upgradesFencingHVAC upgradesRoof repairReplace ceiling tiles in cafeteriaRestrooms in kinder classroomPlayground canopy shadeFront paversPlayground equipment ADA compliant

Cracks in classrooms repairedPlumbing upgrades

Page 32: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Crockett Elementary Air Conditioning in the Multipurpose Building Additional classrooms HVAC upgrades Roof repair Repair uneven foundation New tile Repair pavilion roof Panic bar gates Playground equipment

Electrical upgrades Bus turn around and playground blacktop asphalt Plumbing upgrades

Paint Reconfigure teacher parking lot

Page 33: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Dishman Elementary Air Conditioning in the Multipurpose Building Library carpet Electrical upgrades HVAC upgrades Plumbing upgrades Roof replacement Campus beautification Repair storage room Reconfigure office secretarial area Lighting Drainage Repair classroom cracks Playground equipment ADA compliant

Fencing Replace playground blacktop Paint

Page 34: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Houston Elementary Air Conditioning in the Multipurpose Building Carpet upgrades Electrical upgrades HVAC upgrades Drainage Panic bar gates Add Air Conditioning to coach’s office Bus driveway for off street loading/unloading Fencing Playground equipment ADA compliant

Storage Playground blacktop asphalt overlay Plumbing upgrades

Additional Parking

Page 35: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Jefferson Elementary

Air Conditioning in the Multipurpose BuildingReconstruct classroom wings, restrooms, and

administration areaElectrical upgradesDrainageRoof in cafeteria areaPlayground equipment

HVAC upgradesPlumbing upgrades

Page 36: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Lamar Elementary Air Conditioning in the Multipurpose Building Additional classrooms Restroom renovations Storage Electrical upgrades Fencing HVAC upgrades Drainage Roof replacement Designated pick up and drop off area Playground equipment ADA compliant

Canopies Outdoor water fountains Sidewalks Plumbing upgrades

Page 37: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Long ElementaryAir Conditioning in the Multipurpose BuildingReplace tile in Multipurpose BuildingCanopiesElectrical upgradesReconstruct front driveway and add parkingHVAC upgradesPlayground equipment ADA compliant

Plumbing upgrades

Page 38: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Means Elementary

Air Conditioning in the Multipurpose BuildingCanopy extensionFencingSidewalksPanic bar gatesPlayground beautificationPlayground equipment

Page 39: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Milam Elementary Air Conditioning in the Multipurpose Building Storage Restroom renovations Electrical upgrades HVAC upgrades Drainage Roof replacement in cafeteria Sidewalks Additional restrooms Replace and add outdoor water fountains Playground canopy shade Playground equipment

Canopy repairs and canopy additions Carpet replacement and carpet to tile Cracks in classrooms repaired Plumbing upgrades Campus beautification Cover exposed pipes on buildings

Page 40: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Rodriguez ElementaryAir Conditioning in the Multipurpose BuildingAdditional classroomsElectrical upgradesFencingHVAC upgradesDrainageStoragePlayground equipment ADA compliant

Repair cracks in classroomsPlumbing upgradesCampus beautification

Page 41: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Stuart ElementaryAir Conditioning in the Multipurpose BuildingElectrical upgradesSidewalkHVAC upgradesRoofStorageExterior doorsPlayground equipment ADA compliant

CanopiesRepair cracks in classroomsRefurbish front entrance Plumbing upgrades

Page 42: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Travis ElementaryAir Conditioning in the Multipurpose BuildingElectrical upgradesAdditional parkingPlayground blacktop asphalt overlayHVAC upgradesPlayground canopy shadeFaculty restroomAdditional student restroomsPlayground equipment ADA compliant

Replace floor tile in cafeteriaCarpet upgradesFencingPlumbing upgrades

Page 43: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Treasure HillsAir Conditioning in the Multipurpose BuildingAdditional classroomsElectrical upgradesHVAC upgradesRoof replacementRestroom renovationsSidewalk repairsPlayground equipment ADA compliant

Repair cracks in wallsFront circle driveway repairsPavilion roof repairs

Additional parkingPaint

Page 44: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Wilson Elementary Air Conditioning in the Multipurpose Building Electrical upgrades HVAC upgrades Drainage Canopies Intercom system upgrade Roof repairs Fencing Campus beautification Playground equipment

Replace doors Library carpet replacement Restroom renovations additions Reconstruct circle drive and bus area Plumbing upgrades

Page 45: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Zavala ElementaryAir Conditioning in the Multipurpose BuildingRepair cracks in wallsElectrical upgradesHVAC upgradesRoof replacementCanopy repairsFencingDrainagePlayground canopy shadePlayground equipment

Carpet replacementRestroom renovationsReconstruct parking lotPlumbing upgrades

Page 46: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Harlingen High School

Carpentry upgrades – Mini gym floor, Wing 4 alcove and deck, canopyUpgrade T-12 lighting to T-8Reconstruct front parkingHVAC upgradesRoofing – Vocational Building, Band Hall, and Library

Painting upgradesPlumbing upgradesSprinkler systemsElectronic upgrades

Page 47: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Harlingen High School South

Carpentry upgrades – renovate stage, restrooms by cafeteria, canopy, repair cracks in wall

Parking lot – overlay front and west side parkingHardware upgradesHVAC upgrades

Electronic upgradesPlumbing upgrades

Hardware upgrades

Page 48: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Early College High School

Lighting upgrades – T-12 to T-8HVAC upgradesRoofing replacement – old campus building

Electronics upgradesPlumbing upgrades

Page 49: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

KEYS Academy

HVAC upgrades

Electronic upgrades

Page 50: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Secondary Alternative Center

Carpentry upgrades – Construct multi-purpose buildingLighting upgrades – T-12 to T-8ParkingRoofing

Electronics upgradeHVAC upgradesPlumbing upgrades

Page 51: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Coakley Middle SchoolCarpentry upgrades – redo stucco, upgrade floors/bleachers in the gymLighting upgrades – T-12 to T-8Reconstruct parking and sidewalksReplace lockersHVAC upgradesRoof restoration

Electronic/security upgradesPaint upgradesPlumbing upgrades

Page 52: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Gutierrez Middle SchoolCarpentry upgrades – repair cracks in walls, replace bleachers and install glass in

gymDriveway repairHVAC upgradesPaint upgrades

Plumbing upgrades

Electronic upgrades

Page 53: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Memorial Middle SchoolRepurpose buildingNew middle school

Page 54: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Vela Middle School

Add sidewalks

Electronic upgrades

Page 55: Community Presentations– February - May, 2010. 2 George McShan, MemberDr. Cesar Maldonado, MemberGerry Fleuriet, MemberOmar Cano, Member Verna Young,

Vernon Middle SchoolCarpentry upgrades – reconstruct front of school, add canopyReplace lockersHVAC upgradesPainting upgradesRoof replacement

Lighting upgrades – T-12 to T-8Electronic upgradesParking lotPlumbing upgrades