Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings
31

Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Jan 11, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Commissioning:

A University Perspective

May 3, 2006

Rebuild Michigan WorkshopAdvanced Energy Technologies for

Commercial Buildings

Page 2: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Terry Pahl, P.E., LEED, Facilities Engineer

Grand Valley State UniversityEnergy Department

Energy

EstimatesUtilities

CxP Project Management

Technical Assistance

EMS

Budgets

EquipmentLEED/Energy Star

Page 3: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Commissioning

Commissioning - Defined What Commissioning Does Not Solve Reasons for Commissioning The Commissioning Process Commissioning Findings Recommendations

Page 4: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Commissioning - Defined

Verify and ensure that fundamental building elements and systems are designed, installed and calibrated to operate as intended.

Page 5: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

AHU System

Page 6: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Testing Controls

Page 7: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

What Commissioning Does Not Solve

Does not correct an improper design of the building or systems within the building.

Page 8: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Steel Beam Penetrations

Page 9: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

What Commissioning Does Not Solve

Does not correct an improper design of the building or systems within the building.

Does not correct a poorly constructed building or poor installation of the building systems.

Page 10: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Poor Conduit Connection

Page 11: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Reasons for Commissioning

Design and construction errors are identified early.

Building system errors are identified early. Energy savings. Operational savings. Satisfied clients

Page 12: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

The Commissioning Process - Past

Historically In-house staffCursory inspectionsPunch list

Page 13: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Gold Certified – LEED Building

Michigan Alternative Renewable Energy Center

Page 14: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Silver Certified – LEED Building

Lake Ontario Hall

Page 15: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

The Commissioning Process - Present

Current Engage a commissioning authority. Develop design intent and basis of design documentation. Include commissioning requirements in the construction

documents. Develop and utilize a commissioning plan. Verify installation, functional, performance, training and

documentation. Complete a commissioning report.

Current - additional Review the design prior to the CDs. Review the CDs prior to completion. Review selected commissioned equipment submittals. Develop a system and energy management manual. Contract for near-warranty or post-occupancy review.

Page 16: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Commissioning Findings . . .

Page 17: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Duct Connection

Page 18: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Duct Connection

Page 19: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Duct Connection

Page 20: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Flexible Connection

Page 21: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Proper Duct Seal During Construction

Page 22: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Missing Insulation

Page 23: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Leaks

Page 24: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Improper Return Duct Seal During Construction

Page 25: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Proper Return Duct Seal During Construction

Page 26: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Proper Duct Seal During Construction

Page 27: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Design Issue

Page 28: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Construction Issue

Page 29: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Design Issue

Page 30: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Construction Issue

Page 31: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.

Recommendations

Choose your design firms and contractors based on their commitment to detail and solving problems.

Always commission. In-house Outsource

Strengthen specifications to include commissioning tasks.

Add the commission costs as part of the budget process.