RECOMMISSIONING: The Low Cost Way to Improved Building Performance CaGBC Building Advisor Program October, 2012 John Kokko, P.Eng., CCP, LEED AP [email protected] 519-743-8777 x2424
49

Re-Commissioning Buildings

Nov 18, 2014

Download

Design

John Kokko of MMM Group presents on recommissioning buildings for the Toronto Certified Sustainable Building Advisor Program
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Re-Commissioning Buildings

RECOMMISSIONING:

The Low Cost Way to Improved Building Performance

CaGBC Building Advisor ProgramOctober, 2012John Kokko, P.Eng., CCP, LEED [email protected] x2424

Page 2: Re-Commissioning Buildings

RECOMMISSIONINGLearning Objectives

► Understand the RCx process► Appreciate RCx costs and

benefits► Know how to prepare RCx

goals and objectivers► See how RCx fits within LEED

EB: O&M

Page 3: Re-Commissioning Buildings

RECOMMISSIONINGWhat is Building RCx

► Taking existing building systems and getting them working as best they can

► A systematic process for review and implementation of mainly operational improvements

► Bring building performance in line with current requirements and expectations

Page 4: Re-Commissioning Buildings

RECOMMISSIONINGWhat Does RCx Do?

► Reviews all building energy related systems including:

► Controls, HVAC, Building Envelope, Electrical, Plumbing

► Improves the operation of existing systems and equipment

► Includes implementation of low cost / no cost measures

► Identifies capital cost improvements► Provides both energy and non-energy

benefits

Page 5: Re-Commissioning Buildings

RECOMMISSIONINGWhy RCx?

► Higher than acceptable energy costs

► Escalating maintenance costs

► Significant occupant complaints

► Building use has changed

► Building is > 5 years old with no RCx

► Retrofits have been made with no RCx

► Staff turnover with minimal training of new staff

Page 6: Re-Commissioning Buildings

RECOMMISSIONINGRCx vs. Energy Audit

Page 7: Re-Commissioning Buildings

RECOMMISSIONINGSample RCx Findings

RCx opportunities found during walk-through:► Outdoor air on rooftop at 80% when it should be 20%► Heating coil and cooling coil operating simultaneously► RTU constantly cycling between heating and cooling► VFD pump with throttled discharge valve► Lighting and ventilation on in the middle of the night► Building doors blowing open due to over-pressurization► Piping that was hot when it should be cold► 3 compressors turning on and off simultaneously► Water storage tanks set higher than boiler output► Humidifier dumping water whenever setpoint reached

Page 8: Re-Commissioning Buildings

RECOMISSIONINGRCx Process in a Nutshell

Planning Phase:► Pre-Screening: Benchmarking, selecting building(s), defining goals

& objectives► MILESTONE: Approval to proceed to Scoping

► Scoping: Select RCx provider, preliminary investigation, RCx plan► MILESTONE: Approval to proceed to Investigation Phase

Investigation:► Kick-off, in-depth investigation, document findings and present

recommendations► MILESTONE: Approval to proceed to Implementation Phase

Page 9: Re-Commissioning Buildings

RECOMISSIONINGRCx Process in a Nutshell

Implementation:► Implementation plan, implement measures, verify improvements

► MILESTONE: Owner accepts Implementation Report

Hand-Off:► Final RCx report, on-going / next RCx plan, staff training

► MILESTONE: Provider holds Hand-Off Meeting

Finally:► Persistence measures and long-term benchmarking

Page 10: Re-Commissioning Buildings

RECOMISSIONINGInformation and Materials

Recomissioning Guide for Building Owners and Managers canmetenergy.nrcan.gc.ca/eng/rcs.html

► Recommissioning Guide► Pre-Screening Tool► Benchmarking Tool► Case Studies

Other Resources:► Peci.org/resources/commissioning.html► ASHRAE► LEED EB: O&M

Page 11: Re-Commissioning Buildings

MMM GROUP LIMITED

PLANNING

Page 12: Re-Commissioning Buildings

RECOMMISSIONINGIdentify Candidate Building

Page 13: Re-Commissioning Buildings

RECOMMISSIONINGSet RCx Goals and Objectives

Energy Issues:► Reduce energy consumption by

15% annuallyIEQ Issues:► Reduce occupant comfort

complaints by 50%Operational Issues:► Update O&M documentation and

provide staff training, needed to maintain performance

Page 14: Re-Commissioning Buildings

MMM GROUP LIMITED

INVESTIGATION

Page 15: Re-Commissioning Buildings

RECOMMISSIONINGBenchmarking – Energy Star

Page 16: Re-Commissioning Buildings

RECOMMISSIONINGUtility Bill Breakdown

Two years utility data

Modeling used to identify load breakdown

1% 3%

6%

14%

19%

22%

35%

Base Case Energy End Use

Exterior Electric (1%)

Electric Hot Water (3%)

Fan Electric (6%)

Lights (14%)

Cooling Electric (19%)

Plug Loads (22%)

Space Heat Electric (35%)

Page 17: Re-Commissioning Buildings

RECOMMISSIONINGEnvelope Air Tightness and Thermal Bridging

Page 18: Re-Commissioning Buildings

RECOMMISSIONINGLighting

► Indoor lighting 2x4 T-12 Troffers at 2.4 W/ft2 with minimal zoning. Discoloured lenses , low light levels

► Outdoor lighting and signage remains on 24 hr/day due to malfunctioning timer

Page 19: Re-Commissioning Buildings

RECOMMISSIONINGHVAC

► Electric heaters in ceiling space above boardroom and other offices on 3rd floor running continuously

► Economizer not operational due faulty to sensor and broken damper linkage

Page 20: Re-Commissioning Buildings

RECOMMISSIONINGAir and Heat Delivery

► Non-powered diffusers, some inoperable, others mismatched masters and slaves

► Electric baseboard heaters operating at the same time as cooling due to excessively high t’stat control setting

Page 21: Re-Commissioning Buildings

Electricity Retrofit Incentive Program (ERIP) – OPA► For retrofit of existing facilities focuses on lighting, motors, HVAC

and overall electricity savings► Chiller Re-Commissioning

Enbridge Gas Retrofit Incentives ► Provides up to $0.10 per m3 of natural gas saved for saving

measures based on projected first year gas savings.

Union Gas Run it Right► Provides 100% of implementation costs up to $5,000 ► Plus up to $3,000 to provide monitoring showing savings

21

RECOMMISSIONINGIncentives

Page 22: Re-Commissioning Buildings

RECOMMISSIONINGNext Steps

► Review of recommendations, costs, and paybacks with owner

► Owner decides which options to accept and which to reject

► Has hired 3rd party PM firm to oversee installation ► Next steps will be retrofit of lighting, air handlers, and

other capital cost items► RCx will then include Cx of newly installed systems

and remainder of RCx items

Page 23: Re-Commissioning Buildings

MMM GROUP LIMITED

COSTS AND BENEFITS

Page 24: Re-Commissioning Buildings

RECOMMISSIONINGApproximate RCx Costs

► Planning ~$5,000 to $8,000► Investigation, Implementation, and Hand-off $1.40 to $10.84/m2 for the

total RCx process depending on:

► External consultant costs range from 35% to 71% of total costs

Building size Complexity of systems Up-to-date

Documentation BMS data availability

Project scope Subcontractor requirements Implementation involvement Owner involvement

Page 25: Re-Commissioning Buildings

RECOMMISSIONINGIssues Identified with RCx

Top Cumulative Savings Measures and % of Savings

Key Measure Mix % of Total SavingsRevise control sequence 21%

Reduce equipment runtime 15%Optimize airside economizer 12%

Add / optimize SAT reset 8%Add VFD to pump 6%

Reduce coil leakage 4%Reduce / reset DSP setpoint 4%

Add / optimize optimum start/stop 3%

Add / optimize CWST reset 2%A study on Energy Savings and Measure Cost Effectiveness of EBCx

Portland Energy Conservation, Inc. Dec 15th, 2009

Page 26: Re-Commissioning Buildings

RECOMMISSIONINGApplicability of RCx Measures

Comparison of key measure mix to building attributesBuilding Attribute

Sub-CategoryPercent of savings achieved

through key measure mixBuilding TypeLarge Office 72%Hotel/Motel 64%

Building Size0-200 73%

200-350 55%350-550 69%

>550 69%Building Age

<1920 63%1980-1989 72%

2000-Present 71%Climate Zone

3B 77%3C 78%

Page 27: Re-Commissioning Buildings

RECOMMISSIONINGEnergy Savings and Payback

Page 28: Re-Commissioning Buildings

RECOMISSIONINGAdditional RCx Benefits

Protect of enhance property value:► Maintain high occupancy rates► Reduce tenant turnover► Gain marketplace competitive edge

Protect against future liability:► Reduce potential for sick building syndrome► Identify and address indoor environmental issues

Reduce repair and replacement costs:► Increase equipment life► Reduce maintenance requirements► Reduce comfort complaints

Page 29: Re-Commissioning Buildings

RECOMMISSIONINGValue of Non-Energy Impacts

For typical commercial buildings≈ $1.61 to $3.23/m2

Median value:$1.94/m2

Range:$1.08 - $4.84/m2

1%

5%5%

7%

10%

17%21%

33%

Liability (1%)

Change Orders & WarrantyClaims (5%)Productivity/Safety (5%)

Ongoing Labour Cost (7%)

Other First Cost (10%)

Indoor Air Quality (17%)

Thermal Comfort (21%)

Equipment Life (33%)

Reported NEIs for 36 projects in existing buildings (USA)

Source: Lawrence Berkeley National Laboratory, “The Cost Effectiveness of Commercial-Buildings Commissioning,” December 2004.

Page 30: Re-Commissioning Buildings

MMM GROUP LIMITED

OTHER CASE STUDIES

Page 31: Re-Commissioning Buildings

RECOMMISSIONINGOffice Tower - Winnipeg

Courtesy NRCan: www.canmetenergy.nrcan.gc.ca/eng/rcx.html

Page 32: Re-Commissioning Buildings

RECOMMISSIONINGAdult Ed Centre, Sherbrooke, QC

Courtesy NRCan: www.canmetenergy.nrcan.gc.ca/eng/rcx.html

Page 33: Re-Commissioning Buildings

RECOMMISSIONINGCase Studies

Savings Items Office Winnipeg Ed Center Sherbrooke

Energy Savings1 (GJ/yr, %) 6,652 GJ (25%) 763 GJ (12%)

% Natural Gas; % Electricity 75% NG; 25% E 84% NG; 16% E

Financial Savings2 ($/yr) $59,000/yr $13,300/yr

GHG Reduction (t CO2 e/yr) 363 t/yr(66 cars)

42 t/yr(8 cars)

Simply Payback3 (yr) 3.3 yr 3.9 yr

1 Savings verified 12 months after implementation of the RCxmeasures and weather-normalized.

2 Monetary savings don’t include non-energy impacts (NEIs) such as equipment durability or reduction of tenant complaints.

3 Includes all 4 phases costs of project

Page 34: Re-Commissioning Buildings

RECOMMISSIONINGCase Studies

Adult Ed Centre

Sherbrooke, QC

Office Tower

Winnipeg, MB:

Courtesy NRCan: www.canmetenergy.nrcan.gc.ca/eng/rcx.html

Page 35: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 1. Turn off equipment that should be off► Over-ridden schedules, systems

set for 24/7 operation► Broken or out of calibration timers► Poor original sequence► Optimum start/stop not working► Equipment set to operate in

HAND rather than Auto

Page 36: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 2. Improper ventilation / outdoor quantities► not set to match current

requirements

Page 37: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 3. Verify dampers and valves on central AHUs operating property► Sticking due to long time

non-use► Broken or damaged linkages► Improper repairs

Page 38: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 4. Verify terminal units operating properly► Inoperative actuators / valves► Defective receiver/controller► Out of calibration sensors► Deficient or excessive flow► Dirty rads or coils not heating

the space► Malfunctioning secondary

loop temperature control

Page 39: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 5. Verify Supply Static Pressure Setpoint (Air and Water Systems)

► 6. Verify Supply Air and Water Temperature Reset Schedule

► 7. Eliminate Simultaneous Heating and Cooling

Page 40: Re-Commissioning Buildings

RECOMMISSIONINGTop RCx Tasks

► 8. Return VFD to Variable Speed Operation

► 9. Calibrate Sensors and Instrumentation

► 10. Interference with Room Controls

Page 41: Re-Commissioning Buildings

MMM GROUP LIMITED

RCx and LEED EB:O&M

Page 42: Re-Commissioning Buildings

RECOMISSIONINGRCx and LEED EB:O&M

EAp1: Energy Efficiency Best Practices Management :

► Planning, Documentation and Opportunity Assessment

EAp2: Minimum Energy Efficiency Performance► EAc2.1: Existing Building Commissioning:

Investigation and Analysis (2 points)► EAc2.2: Existing Building Commissioning:

Implementation (2 points)► EAc2.3: Existing Building Commissioning:

Ongoing Commissioning (2 points)

Page 43: Re-Commissioning Buildings

RECOMMISSIONINGEAp1: Planning, Documentation, and Opportunity Assessment

► 1. Building Operating Plan► 2. Systems Narrative► 3. Sequence of Operations► 4. Preventative Maintenance

Plan► 5. ASHRAE Level I Audit

► Utility Bills review► Energy Utilization Index► Low Cost/No Cost

Improvements

Page 44: Re-Commissioning Buildings

RECOMISSIONINGEAp2: Minimum Energy Efficiency Performance

Option A:► Energy Star® : Energy Performance Rating min 69

Option B:► 19% better efficiency than cohort average

Page 45: Re-Commissioning Buildings

RECOMISSIONINGEAc2.1: Investigation & Analysis

Option A – Commissioning Process:► Site Assessment► Building Energy End-Use Breakdown► Diagnostic Monitoring And Functional Testing► Master List Of Findings

Option B:► ASHRAE Level II Audit► Building Energy End-Use Breakdown► Cost - Savings Analysis► Listing of capital improvements

Page 46: Re-Commissioning Buildings

RECOMISSIONINGEAc2.2: Implementation

1. Implement low cost / no cost measures

2. Provide building staff training

3. Provide the following documentation:► Listing of measures, operational improvements and/or

repairs implemented► Update or revise the Building Operating Plan► Recommended capital plan for major retrofits or

upgrades► Summary of staff training program

Page 47: Re-Commissioning Buildings

RECOMMISSIONINGEAc2.3: Ongoing Commissioning

1. Update the Systems Manual

2. Produce an On-Going Commissioning Plan

3. Implement Ongoing Commissioning

Page 48: Re-Commissioning Buildings

RECOMMISSIONINGConclusions

► RCx is a systematic process that optimize comfort and energy savings of existing buildings

► RCx can reduce whole-building energy uses by 5% to 30%

► Paybacks typically in the 0.5 to 5 yr range► RCx helps the persistence of energy and non-energy

benefits ► RCx can help obtain LEED EB:O&M Certification

Page 49: Re-Commissioning Buildings

MMM Group Limited100 Commerce Valley Drive WestThornhill, ON Canada L3T 0A1t: 905.882.1100 | f: 905.882.0055e: [email protected]