Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation F. Geiser and S. Commend GeoMod ing. conseils SA
35

Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Mar 28, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Numerical Simulation of Earthworks and Retaining System for an Excavation

F. Geiser and S. CommendGeoMod ing. conseils SA

Page 2: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Introduction

• Offices and commercial building

• Lausanne region

• 120 x 35(max) x 9.3 m

Numerical modelling: 3D numerical simulation (Z_Soil)30’000 continuum elements

Page 3: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Slurry wall

Geometry: structural elements

Page 4: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Hydrogeotechnical conditions

9.3 m

8.0 m

3.5 mRemblai

Glacio-sableux

Glacio-argileux mou

Fluvio-glaciaire

Glacio-argileux

Moraine

412.7 msm = 0.0

Molasse imperméable Puits de décharge

Page 5: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

Piles

T = 0. Etat initial

Page 6: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Piles realisation

Page 7: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Slurry wall realisation

Page 8: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 1. Excavation globale jusqu’à -3.0 m

Page 9: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 2. Excavation zone A à -7.0 m, puis étayage à -2.5 m

zone A

Page 10: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Page 11: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 3. Excavation du reste à -7.0 m

Page 12: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 3.2. Excavation zone A jusqu’à -9.3 m (f.f.)

Page 13: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 3.4. Excavation de la moitié du reste jusqu’à -9.3 m

Page 14: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 3.6. Sous-radier à -9.3 m sur la moitié de la surface

Page 15: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Excavation stages

T = 5

T = 4. Excavation du reste à -9.3 m, puis fin du sous-radierT = 5. Application des charges de service du bâtiment

Page 16: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: final horizontal displacements

uz

A

B

Page 17: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: horizontal displacements evolution

-0.01

0

0.01

0.02

0.03

0.04

0.05

0 1 2 3 4 5

Etape

Dép

lace

men

t [m

]

Point A Point B

Page 18: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: final horizontal displacements

Page 19: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: final vertical displacements

Page 20: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: forces in the bracing

Page 21: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: moments in the slurry wall

Page 22: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Results: moments in the slurry wall

Page 23: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : particular study

15 m

17.2 m

Page 24: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : simplified 3D model

9.3 m

8.0 m

3.5 mRemblai K = 10-5 m/s épaisseur = 3.5 à 7.5 m

Glacio-sableux K = 10-5 m/s épaisseur = 4 m

Glacio-argileux mou K = 10-10 m/s épaisseur = 7.6 m

Fluvio-glaciaire K = 10-3 m/s épaisseur = 3.7 m

Glacio-argileux K = 10-8 m/s épaisseur = 4 m

Moraine K = 10-9 m/s épaisseur = 6 m

412.7 msm = 0.0

Molasse imperméable Well (model with/without) K = 10-3 m/s e= 15 m

Page 25: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : simplified 3D model with well

A = 15 * 17.2 = 258 m2

0.0-25

.0-50

.0

-100.0 -75.0 -50.0 -25.0 0.0

FLUID VELOCITIESt = 4.0 [day] Z_SOIL.PC 2003 v.6.26 Expert License No: -------- Company : ZACE Author : ZACE Date : 2007-02-15 09:46:01 File : C:\Mandats\GeoMod\M686_Orange\Technique\14fev\2D\orange_coupeCFF_2x2_paroiBeam_puits_Eunl_OKTitle : Zsoil example

3.207e+00

EXTR-VX5.131e+00-9.283e-01

EXTR-VY4.483e+00-2.413e+00

MAX-VEL.5.157e+00

UNIT[m/day]

Coupe 2D avec tranchées drainantesTranche 3D avec puits, esp. = 15 m

Page 26: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : simplified 3D model

eClay – low permeability

Model Thickness of the « impermeable »

layer

Well Flow in the excavated area

( 258 m2)

Flow for the entire

excavation (3200 m2)

Simple 1 5.30 m Yes 65.7 m3/d 815 m3/d

Simple 2 5.30 m No 2.4e-3 m3/d 30 litres/d

Simple 3 1.35 m No 9.7e-3 m3/d 120 litres/d

Page 27: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : 3D model

Low permeability

High permeability

Page 28: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : 3D model

Page 29: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : 3D model

1625 m3 / jour

Page 30: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Water : 3D model

0.04 m3 / jourImpermeable wall

Page 31: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Impermeable wall

Page 32: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Temperature effect on bracing : 2D modelgeneral considerations for T = 30 °

Free truss: l = T L/2 = 5 mm

Fixed conditions F = 1000 kN

Imposed displacement F = 165 kN

0.0

-7.5

-15

.0

-7.5 0.0 7.5 15.0

DEFORMED MESHt-ref.= 4.0 [day] t = 5.0 [day] Z_SOIL.PC 2003 v.6.26 Expert License No: -------- Company : ZACE Author : ZACE Date : 2007-03-08 08:29:12 File : C:\Mandats\GeoMod\M686_Orange\Technique\14fev\2D\orange_coupeCFF_2x2_paroiBeam_puits_Eunl_OK_deltaU5mmTitle : Zsoil example

2.771e-03

EXTR-U4.022e-04-5.849e-03

EXTR-V9.101e-04-9.855e-04

MAX-DISP5.896e-03

UNIT[m]

ux imposé = - 5 mmux = - 4.2 mm

Page 33: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Temperature effect on bracing : 2D modelimposing T on bracing (Q4)

0.0

-5.0

-10

.0

-5.0 0.0 5.0 10.0 15.0

TEMPERATUREt = 2.0 [day] Z_SOIL.PC 2003 v.6.26 Expert License No: -------- Company : ZACE Author : ZACE Date : 2007-03-08 09:14:18 File : C:\Mandats\GeoMod\M686_Orange\Technique\Simple_heat\orange_coupeCFF_heat2Title : Zsoil example

0 1.000e+01

1 1.150e+01

2 1.300e+01

3 1.450e+01

4 1.600e+01

5 1.750e+01

6 1.900e+01

7 2.050e+01

8 2.200e+01

9 2.350e+01

10 2.500e+01

11 2.650e+01

12 2.800e+01

13 2.950e+01

14 3.100e+01

15 3.250e+01

16 3.400e+01

17 3.550e+01

18 3.700e+01

19 3.850e+01

20 4.000e+01

UNIT[C]

T : from 10 °C to 40 °C => T = 30 °C

T = 10 °C = cte

Page 34: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Temperature effect on bracing : 2D modelimposing T on bracing

0.0

-7.5

-15

.0

-15.0 -7.5 0.0 7.5 15.0

DEFORMED MESHt-ref.= 1.0 [day] t = 2.0 [day] Z_SOIL.PC 2003 v.6.26 Expert License No: -------- Company : ZACE Author : ZACE Date : 2007-03-08 10:39:04 File : C:\Mandats\GeoMod\M686_Orange\Technique\Simple_heat\orange_coupeCFF_heat+mech2Title : Zsoil example

1.885e-03

EXTR-U4.055e-04-6.979e-03

EXTR-V7.084e-03-1.010e-03

MAX-DISP7.084e-03

UNIT[m]

ux = 0 (imposed)

N=230 kN

Page 35: Commend, Mellal, Geiser – 08.2007 Z_Soil Day 2007 Lausanne, 27th August 2007 Numerical Simulation of Earthworks and Retaining System for an Excavation.

Commend, Mellal, Geiser – 08.2007

Z_Soil Day 2007Lausanne, 27th August 2007

Conclusions

Currently under construction

•Predictions in the range of deformations and forces

•Horizontal displacements slightly > measurements•Linked mainly to:

- « conservative » evaluation of and c- real water behaviour