Building Size 1011697plusmn square feet
Building Dimensions 500 feet x 2000 feet
Total Site Size 16485 acres
Construction Concrete tilt panel exterior bearing walls Conventional steel frame
Roof White TPO membrane over R-10 rigid insulation
Clear Height 40 feet
Truck Loading Type Cross Dock
Column Spacing Racking bays 45 feet x 56 feet
Speed Bays 70 feet
Floor Slab Slab on grade 7 inch 4000 psi
Fire Protection EFSR fire suppression system
Electrical Service Frontier Communications fiber optic
Warehouse Lighting LED lights
Overhead Doors 238 dock doors
Clerestory Windows North and South Elevations
Trailer Parking 263 trailers
Auto Parking 254 cars (expandable)
Truck Court 190 feet
Utilities City of Lakeland sewer amp water
Zoning PUD Industrial City of Lakeland
CenterState Logistics Park East | Building 400 Specifications
2000-0
500
-0
135 75
60
140 60
80
BUILDING 4001011697 SQ FT
500 x 2000-(238) 9x10 DOCK DOORS
-263 TRAILER SPACES-254 PARKING SPACES
70
TYP
70 TY
P
TYP
(131) 9x10 DOCK DOORS
132 TRUCK PARKING
131 TRUCK PARKING
5648
60
60
BUILDING 400 SITE PLAN
Dee Seymour MCR SIOR+1 813 495 6247deeseymourcollierscom
Deborah Mickler SIOR+1 407 362 6161deborahmicklercollierscom
Ed Miller CCIM SIOR+1 813 871 8507edmillercollierscom
David Wilson+1 407 362 6125dwilsoncollierscom
This documentemail has been prepared by Colliers International for advertising and general information only Colliers International makes no guarantees representations or warranties of any kind expressed or implied regarding the information including but not limited to warranties of content accuracy and reliability Any interested party should undertake their own inquiries as to the accuracy of the information Colliers International excludes unequivocally all inferred or implied terms conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from This publication is the copyrighted property of Colliers International and or its licensor(s) copy 2019 All rights reserved This communication is not intended to cause or induce breach of an existing listing agreement
Contact us
Regional Distribution Centers | Central Florida
Fort Myers MSA1 Hour
13 Million People
Tampa Bay MSA1 Hour 10 Min
36 Million People
ACCESS TO 155 MILLION PEOPLE WITHIN 4 HOURS
WHY LOCATE IN CENTERSTATE LOGISTICS PARK
Orlando MSA31 Million People
Miami MSA4 Hours61 Million People
Jacksonville MSA2 Hours 20 Min15 Million People