Colchester Conquers 2014-15 Proposed Student Learning Budget Colchester Administrative Team January 28, 2014
Colchester Conquers 2014-15 Proposed Student
Learning Budget
Colchester Administrative Team January 28, 2014
As a result of this presentation, Board and community members will:
� Recognize how the budget requests address Colchester’s Strategic Plan.
� Understand how the student learning
budget will help Colchester implement Connecticut Core Standards and teacher evaluation to improve student learning.
2
This budget supports Colchester’s Strategic Plan by:
1. Building upon engaging and effective teaching practices to meet and support the needs of individual students
2. Providing a relevant, rigorous and creative learning environment where instruction and curricula are guided by ongoing and varied assessments.
3. Ensuring the highest level of academic excellence as measured by performance standards and real-world applications.
3
1. Engaging and effective teaching practices
4
This budget will provide • Professional development opportunities to
enhance teacher efficacy • Continued training in strategies for the
Connecticut Core Standards implementation in writing and mathematics
2. Relevant, rigorous and creative learning environment
• iPads in libraries to enhance learning opportunities • Library Books funded at the previous levels • Additional databases to teach 21st Century Skills
• IT positions to support online research, software installation, technology skills, teacher proficiency
ü Network engineer ü Technology Integration Specialist
5
This budget will provide
3. Academic excellence as measured by performance standards
• Computers to administer mandatory Smarter
Balanced Assessment • Curriculum materials for Connecticut Core
Standards in mathematics and English • Curriculum materials for new Career and
Technical Education courses at Bacon Academy
6
This budget will provide
Library Collection
7
Currency (average age of books in collection)
Number of books per student
State average for comparable grade level school
CES 2000 24.1 29.7
JJIS 2000 28.3 29.7
Johnston 2003 23.5 21.6
Bacon Academy
1993 16.8 16.6
8
Proposed Budget : Library Books and Software
08-09 09-10 10-11 11-12 12-13 13-14 14-15 Library Books
$92,769 $0 $25,000 $39,480 $4,000 $17,000 $30,457 Based on # of students per school
Library Software
$13,444 $13,490 $13,520 $24,975
$13,078 $14,700 $26,794 Discovery Education; Typing Pal; Infobase learning; Easy Bib
Ipads* $23,968
* Reallocation from library book budget based on $25 and $20 per pupil at secondary and elementary levels; iPads to be used in libraries.
9
Proposed Budget : Instructional Equipment
BA WJ JJIS CES
iPads for Library Media use
$10,089
$6,299 $3,790
$3,790
Zero clients For SBAC testing (3 labs per school)
$18,000
$18,000 $18,000
10
Proposed Budget: Curriculum Implementation
08-09 09-10 10-11 11-12 12-13 13-14 14-15 Total Curriculum Implementation
$126,830 $62,570 $13,900 $0 $10,000 $100,000 $44,104
(Equipment and books to support these curricular areas)
Tech Ed Science
Math Art PE
S Studies
Reading (JJIS) Math
Tech Ed
Reading (JJIS) Virtual
HS
Reading (BA) (WJJMS)—
Unspent due to Budget Freeze July
2012
Math (CES) Reading (CES)
(BA)
Math (K-5) Tech Ed (new
courses at BA)
English (HS)
11
Curriculum Spending Trends
$-
$20,000.00
$40,000.00
$60,000.00
$80,000.00
$100,000.00
$120,000.00
$140,000.00
2008 2009 2010 2011 2012 2013 2014
Budgeted
12
Proposed Budget : Teacher PD BUDGETED 09-10 10-11 11-12* 12-13* 13-14 14-15 Selective out of district training for staff
$500
$2,600
$6,370
$4,745
$7,930
$7,930
School PD (book clubs etc)
$267 $4,000 $4,000 $3,500 $7,400 $15,650
District Professional Development
$14,912
$9,244
$13,186
$10,460
$14,695
$26,145
Presenters for K-5 Math, AP institutes, Laying the Foundation, Columbia Writing Project
TOTAL $15,679 $15,844 $23,556 $18,705 $30,025 $49,725
[
13 *Budget Freezes in 11-12 and 12-13 resulted in limited use of
funds]
Needs Left Unmet after Superintendent Cuts to Proposed Budget
Support the needs of individual students � Board Certified Behavior Analyst � Special educator at Bacon Academy � .5 math teacher CES
Real-world applications • Additional iPads in each school • Laptops for teachers • .3 Technology teacher at CES • .5 Technology teacher at JJIS
14
Special Education
October 2009 October 2010 October 2011 October 2012 October 2013 Projected
CECP 2.0 FTE # Students: 40 S/T Ratio: 20:1
2.0 FTE # Students: 27 S/T Ratio: 13.5:1
2.0 FTE # Students: 38 S/T Ratio: 19:1
2.0 FTE # Students: 33 S/T Ratio: 16.5:1
2.0 FTE # Students: 33 S/T Ratio: 16.5:1
2.0 FTE # Students: 29 S/T Ratio: 14.5:1
CES 4.5 FTE # Students: 72 S/T Ratio: 16:1
4.5 FTE # Students: 76 S/T Ratio: 16.89:1
4.5 FTE # Students: 68 S/T Ratio: 15.11:1
4.0 FTE # Students: 52 S/T Ratio: 13:1
3.0 FTE # Students: 39 S/T Ratio: 13:1
3.0 FTE # Students: 59 S/T Ratio: 19.7:1
JJIS 5.0 FTE # Students: 77 S/T Ratio: 15.4:1
5.0 FTE # Students: 71 S/T Ratio: 14.2:1
5.0 FTE # Students: 67 S/T Ratio: 13.4:1
5.0 FTE # Students: 76 S/T Ratio: 15.2:1
5.0 FTE # Students: 79 S/T Ratio: 15.8:1
5.0 FTE # Students: 86 S/T Ratio: 17.2:1
WJJMS 6.0 FTE # Students: 92 S/T Ratio: 15.33:1
6.0 FTE # Students: 90 S/T Ratio: 15:1
6.0 FTE # Students: 88 S/T Ratio: 14.67:1
5.0 FTE # Students: 74 S/T Ratio: 16.8:1
5.0 FTE # Students: 78 S/T Ratio: 15.6:1
5.0 FTE # Students: 73 S/T Ratio: 14.6:1
BA 7.0 FTE # Students: 95 S/T Ratio: 13.57:1
7.0 FTE # Students: 99 S/T Ratio: 14.14:1
7.0 FTE # Students: 101 S/T Ratio: 14.43:1
6.0 FTE # Students: 108 S/T Ratio: 18:1
6.0 FTE # Students: 101 S/T Ratio: 16.83:1
6.0 FTE # Students: 113 S/T Ratio: 18.8:1
Summary 24.5 FTE 376 Students 27 Out of District 403 Total Students
24.5 FTE 363 Students 32 Out of District 395 Total Students
24.5 FTE 362 Students 22 Out of District 384 Total Students
22.0 FTE 353 Students 26 Out of District 379 Total Students
21.0 FTE 330 Students 23 Out of District 353 Total Students
21.0 FTE 360 Students 30 Out of District 390 Total Students
16
Special Education Enrollment
History and Projection based on Oct 1 counts
Pupil Services Contracted Services Accounts
Service 10-11 11-12 12-13 13-14 Proposed
Cyberslate $1,605 $1,700 0 0 0
ABA Consult $17,262 $79,230 $55,000 $31,650 $27,500
SOAR Consult $2,975 $ 2,975 0 0 0
Homebound $36,435 $27,000 $30,000 $32,880 $27,850
NAEYC $350 $350 600 0 $600
Audiological $46,499 $51,149 $51,590 $52,956 $32,780
Evaluations $49,655 $54,491 $59,940 $64,229 $57,440
Drug Testing $75 $75 $75 $75 $75
Educational Consult
0 0 0
0 $18,375
NECHEAR 0 0 0 0 $7,000
TOTAL $154,856 $216,970 $197,205 $181,790 171,620
17
Enrollment Trends
10.5
11
11.5
12
12.5
13
13.5
14
Special Education
Percent of District Population
2009 2010 2011 2012 2013 2014
18
Tuition /Transportation Budget
DESCRIPTION 10-11 11-12 12-13 13-14 Proposed
Tuition Public $177,312 $529,738 $579,159 $959,221 $918,812
Tuition Private $479,088 $753,200 $686,642 $491,482 $831,438
Tuition SAP $552,990 $361,362 $240,340 $173,080 0
Transport Public $119,631 $186,649 $234,778 $368,294 $303,820 Transport Private $417,998 $343,894 $249,067 $251,019 $453,746
Transport SAP $182,224 $86,287 $91,059 $19,842 0 Transport In District $193,052 $232,415 $237,359 $222,117 $206,491
19
Students Placed Out of District PUBLIC
17 Public Tuition students include:
7 magnet school students (1 w/aide)
1 vocational/transition student
2 parent choice schools
7 LEA Placed
PRIVATE 25 Private Tuition students include:
13 vocational/transition students
2 parent choice schools
10 LEA placed
20
STATE AGENCY PLACEMENTS
None at this time
Facilities and Grounds
Facilities Budget ORIGINAL
SUBMISSION REVISED 01/14/14
∆
OPERATIONS PLANT & MAINT - CES
CLEANING / REPIARING MAINT (BUILDING REPAIRS)
260001 46420 25,000 20,000 (5,000)
NON-INSTRUCTIONAL EQUIPMENT
260001 48731 6,500 0 (6,500)
OPERATIONS PLANT & MAINT - JJIS
CLEANING / REPIARING MAINT (BUILDING REPAIRS)
260002 46420 26,000 21,000 (5,000)
OPERATIONS PLANT & MAINT - WJJMS
CLEANING / REPIARING MAINT (BUILDING REPAIRS)
260003 46420 38,000 33,000 (5,000)
NON-INSTRUCTIONAL EQUIPMENT
260001 48731 6,500 0 (6,500)
OPERATIONS PLANT & MAINT - BA
CLEANING / REPIARING MAINT (BUILDING REPAIRS)
260004 46420 38,000 33,000 (5,000)
FACILITIES / GROUNDS / OPERATIONS
GROUNDS MAINTENANCE SUPPLIES
260007 42614 30,400 26,400 (4,000)
CAPITAL OUTLAY 260007 48734 1,000,000 300,000 (700,000)
TOTAL REDUCTIONS
(737,000)
22
Facilities Department Capital Budget Submission
BACON ACADEMY FY 2014/15 FY 2015/16 FY 2016/17
Roof Repairs – Multiple Locations 30,000 10,000 10,000
Install Grease Trap Interceptor in Academy Cafe
7,500
Boiler #2 – Replace Leaking Sections 15,000 0 0
Install Split AC System – Server Room 22,000 0 0
HVAC Repairs 77,500 20,000 20,000
Replace Defective Stage Curtain Winches (3) in Auditorium
12,000 0 0
Install Domestic Water Line to Field Block House
4,000 0 0
Auditorium Sound System Replacement 30,000 0 0
Install Additional Swipe Card Door Entry Systems
7,500 0 0
Floor Finish (Carpeting) Replacement 20,000 20,000 20,000
Exterior Window Blind Replacement / Door Shades
15,000 10,000 10,000
TOTAL 240,500 60,000 60,000
23
Facilities Department Capital Budget Submission
WILLIAM J. JOHNSTON MIDDLE SCHOOL FY 2014/15 FY 2015/16 FY 2016/17
Phone / Intercom System Replacement 78,000 0 0
Fire Alarm System Upgrades 20,000 0 0
Fire Alarm System Replacement 0 200,000 0
HVAC Repairs 20,000 20,000 20,000
Interior Door Lock Replacements 34,000 0 0
Roof Repairs / Skylight Repairs – Multiple Locations
45,000 10,000 10,000
Exterior Door Replacements 40,000 10,000 10,000
Building A Entrance – Stair, Ramp & Railing Replacement
25,000 0 0
Floor Finish (Carpeting) Replacement 75,000 50,000 50,000
Asbestos Abatement (Café Floor Tile & Under Carpeting)
40,000 20,000 20,000
Exterior Window Blind Replacement / Door Shades
60,000 15,000 15,000
Window Repairs 50,000 25,000 25,000
24
Facilities Department Capital Budget Submission
WILLIAM J. JOHNSTON MIDDLE SCHOOL FY 2014/15 FY 2015/16 FY 2016/17
Courtyard Roof Drain / Drainage Repairs 9,000 0 0
Replacement of Security Camera Recorder 6,500 0 0
Additional Security Cameras 12,000 6,000 6,000
Interior Painting 40,000 30,000 30,000
Additional Lighting – Front Parking Lot 22,000 0 0
Additional Exterior Security Lighting 12,000 0 0
Plumbing Repairs (Nurse’s Office / Student Bathrooms, Etc.)
34,000 20,000 10,000
Ceiling Mounts for Projectors & Outlet Installations
15,000 0 0
Sound System Installation – Gym A 13,000 0 0
Locker Replacements & Repairs 15,000 10,000 10,000
Clock System Replacement 33,000 0 0
Install Electronic Display School Sign 15,000 0 0
TOTAL 713,500 416,000 206,000
25
Facilities Department Capital Budget Submission
JACK JACKTER INTERMEDIATE SCHOOL
FY 2014/15 FY 2015/16 FY 2016/17
Zone Valves Replacements - Heating System
12,000
Repair Retaining Wall - EOC Entrance 8,000
Clock System Repairs 6,000
Hallway Painting 5,000
Install Additional Swipe Card Door Entry Systems
7,500
TOTAL 38,500
26
COLCHESTER ELEMENTARY SCHOOL FY 2014/15 FY 2015/16 FY 2016/17
Install Additional Swipe Card Door Entry Systems
7,500
TOTAL 7,500
Facilities Department Capital Budget Original Submission
Summary
School FY 2014/15
BACON ACADEMY
$240,500
WILLIAM J. JOHNSTON MIDDLE SCHOOL
$713,500
JACK JACKTER INTERMEDIATE SCHOOL
$38,500
COLCHESTER ELEMENTARY SCHOOL
$7,500
TOTAL $1,000,000
27
2014-2015 Capital Budget Submission - Revised
BACON ACADEMY
FY 2014-15
Install Split AC System – Server Room 22,000
Install Grease Trap Interceptor in Academy Cafe 7,500
Boiler #2 – Replace Leaking Sections 15,000
Roof Repairs – Multiple Locations 20,000
HVAC Repairs 35,500
TOTAL 100,000
28
WILLIAM J. JOHNSTON MIDDLE SCHOOL
FY 2014-15
Exterior Window Blind Replacement / Door Shades
60,000
HVAC Repairs 20,000
Phone / Intercom System Replacement 78,000
Building A Entrance – Railing Installation 8,000
Window Repairs 22,000
TOTAL 188,000
2014-2015 Capital Budget Submission - Revised
JACK JACKTER INTERMEDIATE SCHOOL
FY 2014/15
Zone Valves Replacements - Heating System
12,000
TOTAL 12,000
29
School FY 2014/15
BACON ACADEMY 100,000
WILLIAM J. JOHNSTON MIDDLE SCHOOL
188,000
JACK JACKTER INTERMEDIATE SCHOOL
12,000
TOTAL 300,000
Questions/ Comments