More than 70% of Coal Mining is utilized for Power Generation
More than 25% of world Bulk cargo is used for Coal Transportation
More than 60% of Annual Revenue will be spent towards purchase of
coal in any Thermal Power Project.
1000 MW Thermal Plant generates a revenue of approx Rs. 1350 Crs
per annum @ Rs.2.5 per Unit. Out of this, cost of coal would be Rs
900 Crores.
Control on Coal Value chain will improve the business process of
Power Plant tremendously.
Coal in the context of a Power ProjectCoal in the context of a Power Project
8/8/2019 Coal-senario for Power Plant
3/28
MAYTAS INFRA ASSETS LIMITED
Coal Scenario
Coal Quality
Coal Cost
Fuel Agreement
Escalation on coal
Other Important Aspects
In this PresentationIn this Presentation
8/8/2019 Coal-senario for Power Plant
4/28
MAYTAS INFRA ASSETS LIMITED
Major Coal Mining Countries.Major Coal Mining Countries.
USA
South Africa
India
Indonesia
Vietnam
China
Australia
New Zealand
8/8/2019 Coal-senario for Power Plant
5/28
MAYTAS INFRA ASSETS LIMITED
Coal Resources inIndia are inEastern India
8/8/2019 Coal-senario for Power Plant
6/28
MAYTAS INFRA ASSETS LIMITED
Quantity of Coal Reserves in IndiaQuantity of Coal Reserves in India
S.no Resource TotalAccess + Inferred
+ProvedIn Million MT
ProvedIn Million MT
1. Chattisgarh 17145 8403
2. Jharkand 41442 9570
3. MP 73898 36148
4. Orissa 61999 16911
5. West Bengal 27815 11383
6. Other states 31002 13451
TOTAL 253301 95866
8/8/2019 Coal-senario for Power Plant
7/28
MAYTAS INFRA ASSETS LIMITED
Domestic Coal requirement per Year / MW of Power Generation- 6000 MT
Total Coal Availability in India : 95,866 Mill MT ( Proved )
Considering exploitation of 50% of resources, would provide fuel forgeneration of 80,000 MW for 100 Years.
However production of coal (non coking + lignite) is approx. 380 Mill MTduring the year 2004-05. If increasing the production at 7% per annum for next10 years, mining can generate approx. 747 Mill MT.
This would provide fuel to only 85,000 MW.
D
omestic Coal alone cannot support the Growth. Imported Coal will help support the Growth.
8/8/2019 Coal-senario for Power Plant
8/28
MAYTAS INFRA ASSETS LIMITED
Coal- BasicFuel For
Steel
cement
Power(Electricitygeneration)
Coal is the most important fuel for India 's power sector.
source of more than 70 per cent of power generating capacity.
Characteristics of CoalCharacteristics of Coal
8/8/2019 Coal-senario for Power Plant
9/28
MAYTAS INFRA ASSETS LIMITED
8/8/2019 Coal-senario for Power Plant
10/28
MAYTAS INFRA ASSETS LIMITED
Indonesian Coal ( example )Indonesian Coal ( example )
8/8/2019 Coal-senario for Power Plant
11/28
MAYTAS INFRA ASSETS LIMITED
Coal Potential in Indonesia
Reserves 6.8 Bn Tons
Potential Resources 61.3 Bn Tons
Low/Mid CV Coal 80.00% App.
Largest Coal Exporters since 2005
Production -07 198 Mn Tons
Export -07 160 Mn Tons
Share of Product 80.81%
World Export 25 %
8/8/2019 Coal-senario for Power Plant
12/28
MAYTAS INFRA ASSETS LIMITED
Ratio of FC to VM is important todetermine the quality of coal
More Moisture content will increase thecost of transportation
More ash content will reduce
productivity and also increase ashhandling cost at Plant site. However coalwith ash content > 34% is to be washed& then transported
Sulfur content can be controlled at plant
Moisture can be controlled at Pitheadwith chemical treatment. This will savecost in transportation cost by 20%
Typical Test report for Indonesian CoalTypical Test report for Indonesian Coal
8/8/2019 Coal-senario for Power Plant
13/28
MAYTAS INFRA ASSETS LIMITED
8/8/2019 Coal-senario for Power Plant
14/28
MAYTAS INFRA ASSETS LIMITED
ExampleExample
8/8/2019 Coal-senario for Power Plant
15/28
MAYTAS INFRA ASSETS LIMITED
Characteristics ofD
omestic Coal Chatisgarh, Jharkand, Madhya Pradesh are front runners in Coal Production/
availability.
Most of domestic coal are in Grade F & G
Contains High As content ( up-to 35 40% ) & disposal plan to be made.
Contains Low moisture content ( up-to 5% )
Low Calorific Value ranging from 2000 - 3000 Kcal / Kg
Characteristics of Imported Coal Indonesia, Australia, New Zealand, are important sources of coal
Ash content varies from 5 % to 12 %
Moisture Content varies from 12% to 35%.
Moisture Content can be reduced by chemical treatment at source, which also providessavings in transportation.
High Calorific Value ranging from 5500 - 7500 Kcal / Kg
8/8/2019 Coal-senario for Power Plant
16/28
MAYTAS INFRA ASSETS LIMITED
Costing of Domestic CoalCosting of Domestic Coal
Approx. Cost of Coal per MT
Cost at Pit head Ranging Rs. 500 to Rs. 1000 for GradeD/E. ( consider average of 750 PMt)
Handling Charges to Loading point From 3km to 10km Rs. 20 PMt / From10 to 20 km Rs. 40 PMt / For distances> 20 Km actual cost. Can beconsidered as Rs. 50 PMt.( on average)
Charges for size restriction Ranging from Rs. 35 to 70 per MT.Consider Rs. 50 PMt.
Charges for loading rate > 3500 mt /hr Rs 18 per MT
Royalty Rs. 115 per MT
Transportation to Plant ( Avg 200 Kms) Rs 350 per MT
Taxes / Cess / Misc etc. Rs 167 per MT
Total Rs. 1500 Per MT
8/8/2019 Coal-senario for Power Plant
17/28
MAYTAS INFRA ASSETS LIMITED
Coal Block YieldCoal Block Yield
8/8/2019 Coal-senario for Power Plant
18/28
MAYTAS INFRA ASSETS LIMITED
Costing of Imported CoalCosting of Imported Coal
Cost at Mine incl. Royalty etc.. FromUsd 25 to Usd 35 per MT
(consider average of Usd 30 PMt)Loading Charges at Jetty & againUnLoading & Loading charges at Port
Usd 2 per MT
Transportation Charges from Pit Headto Jetty by Tippers
Usd 3 per MT ( considering 15C perKm / MT)
Transportation Charges from Jetty toPort
Usd 7 per MT for approx.160 Kmsdistance. If it increases, the rate shallbe more say Usd 10 per MT
FOB Charges Usd. 15 to Usd 18 per MT
C, I & F Charges Usd 10 per MT
Handling Charges at Indian Port Rs. 100 per MT
Transportation Charges to Plant Rs. 100 Per MT ( say for 50 kms )
Tax @ 5% + Misc Rs. 150 per MT
Total Usd 70 + Rs 250 = Rs. 3500 per MT
8/8/2019 Coal-senario for Power Plant
19/28
MAYTAS INFRA ASSETS LIMITED
Photo of a typical barge 5000 MTPhoto of a typical barge 5000 MT
8/8/2019 Coal-senario for Power Plant
20/28
MAYTAS INFRA ASSETS LIMITED
Coal outcrops & test pitsCoal outcrops & test pits
8/8/2019 Coal-senario for Power Plant
21/28
MAYTAS INFRA ASSETS LIMITED
Model Fuel Supply agreement
with Coal India 31st May 2008
Model Fuel Supply agreement
with Coal India 31st May 2008
Fuel supply Agreement will be in Force for Minimum 5 Years Agreement can be reviewed after 3 years
BG for 6% of the supply amount shall be deposited to CIL
50% should be deposited before signing the agreement & balance50% after signing ( valid for 3 months after expiry of agreement
period)
Alternative sources should be indicated
Buyer should make arrangements for lifting the scheduled monthsquantities with variations more than 10% per Quarter
No Compensation for Short Supply for upto 60%. Compensation below 60% of quantity shall be as below.
8/8/2019 Coal-senario for Power Plant
22/28
MAYTAS INFRA ASSETS LIMITED
Compensation below 60% of delivery0.1 x P x (( 100 LD or LL) 40 /100) x ACQ
Level ofDelivery (LD) / Level of Lifting (LL) is calculated as below
LD =DQ+DDQ+FM+RF x 100 / ACQ
DQ -Delivery Quantity
DDQ -DeemedDelivered Quantity - Quantity unable to be delivereddue to failure on the part of Purchaser not deploying adequateresources for lifting such as Rail-wagons / Tippers. Also quality ofcoal not acceptable by Purchaser.
Force Majeure ACQ x Nos of days lost due to Force Majeure/365
RF Quantity no able to be supplied because of rail wagons withreference of agreement between Seller & Railways.
8/8/2019 Coal-senario for Power Plant
23/28
MAYTAS INFRA ASSETS LIMITED
Performance Incentive to be paid by Purchaser in case CIL suppliesmore than 90% of ACQ in a Year.
Quality to be assessed by the Seller and supplied. Samples shall becollected by Purchase at loading point for quality testing
Purchaser shall install & maintain weigh bridge at Loading point
Purchaser to submit programe for Railwagons / Tippers
Payment shall be by means of Irrecoverable LC
8/8/2019 Coal-senario for Power Plant
24/28
MAYTAS INFRA ASSETS LIMITED
Escalation Calculation as per CERCEscalation Calculation as per CERC
Annual Escalation Rates for payment purpose as per PPA
Escalation rates for Coal subcomponent in Energy Charge 115.13%
Escalation rate for coal transportation in Energy Charge 66.14%
Escalation rate for inland handling of Coal in Energy Charge 8.86%
Escalation rate for captive Coal mine 8.16%
In case of Imported Fuel, escalation rates applicable for bid evaluationshall be applicable
Escalation rates for Coal subcomponent in Energy Charge 7.61%
Escalation rate for coal transportation in Energy Charge 14.79%
Escalation rate for inland handling of Coal in Energy Charge 4.98%
8/8/2019 Coal-senario for Power Plant
25/28
MAYTAS INFRA ASSETS LIMITED
The ratio of Minimum & Maximum Energy Charges should not bemore than 0.5 ( to avoid front loading)
For projects based on Imported fuel component, the bids shouldindicate the Usd component for Coal/Transportation/Handling
Each will have separate escalable & Non esclable sub components
Dollar Exchange Rate is based on 3 years Moving Avg Rate ( 0.22)
Imported Coal is based on Barlow Jonkar Index for last 12 yearsPeriod data ( 7.61%)
Coal Transportation is based on Singapore 380 CST Bunker Fuelindex for last 12 years data (14.79%)
Inland Coal Handling is based on Mean of WPI & CPI Series for forlast 12 years data ( 4.98%)
8/8/2019 Coal-senario for Power Plant
26/28
MAYTAS INFRA ASSETS LIMITED
The above indicate that effective 25% of tariff will be subjected toescalation rates fixed by CERC.
So effectively the tariff would increase by not more than 3% every
year.
This do not fully compensate the actual increase in Cost ( both
domestic & imported coal )
8/8/2019 Coal-senario for Power Plant
27/28
MAYTAS INFRA ASSETS LIMITED
Other Important AspectsOther Important Aspects
Coal Block allotment ( for domestic coal )
Coal Mine Lease / development / Imported Coal
Technical Parameters of Coal / Yield / Type of Mine
Means of Transportation from Loading Point to plant site
Global Bulk Freight capacity needs careful watch . For increase & decrease of
freight prices.
Global Coal Prices are subjected to variation up-to 200% on demand &Supply
Availability of Mining equipment
Productivity at Mines ( Surface /UG )
Relationship at Production / Mine Company
Environmental & other Cess which may operate because of pollution factors