Coal-Fired Power Plants in Indonesia - other islands Barru Location: South Sulawesi Operator: PT PLN Persero Configuration: 2 X 50 MW Fuel: coal Operation: 2011 Boiler supplier: Hangzhou T/G supplier: Nanjing EPC: Hubei Hongyuan Power Engineering Co Ltd, PT Bagus Karya, PT Gemilang Pratama Karya Quick facts: Emerson supplied an Ovation control system for PLTU Labuanm Banten. The first unit was connected in Jul 2009 and officially opened by President Susilo Bambang Yudhoyono on 28 Jan 2010 Photograph by iqbal.bakaru (Panoramio) Posted 18 Aug 2012 Bukit Asam Location: South Sumatra Operator: PT PLN Configuration : 4 X 65 MW Operation: 1989-1995 Fuel: subbituminous coal, oil Boiler supplier: Stein T/G supplier: Rateau, GEC-Alsthom EPC: Sogeah, Japan Jurong Engineering Photograph courtesy of PT Bukit Asam Batubara Posted 2 Nov 2005 Lampung Location: South Sumatra Operator: PT PLN Configuration: 2 X 100 MW Operation: 2012 Fuel: coal Boiler supplier: Jinan T/G supplier: Wuhan Turbine EPC: Jiangxi Electric Power Overseas Engineering, PT Adhi Karya Quick facts: In Mar 2008, PLN broke ground on PLTU Lampung in Kec Katibung, Tarahan Lampung. In Jul 2009, PLN secured financing for the $154.3mn project from Bank Rakyat Indonesia. Photograph by RiZaL MuKhTaR (Panoramio) Posted 30 Sep 2012 Nagan Raya Location: Aceh Operator: PT PLN Configuration: 2 X 110 MW Operation: 2013-2014 Fuel: coal Boiler supplier: Wuxi T/G supplier: Nanjing EPC: Sinohydro, Sinohydro No 8, Northwest Power Construction Group Corp Quick facts: Nagan Raya is atSuak Puntong Village, Kuala District, Nagan Raya Regency. The kickoff meeting was held on on 8 May 2008, the first pile was driven on 25 Nov. It was a $247mn contract for Sinohydro. Photograph courtesy of PT PLN Posted 25 Jan 2014 Ombilin Location: West Sumatra Operator: PT PLN Configuration: 2 X 100 MW Operation: 1996-1997 Fuel: subbituminous coal, oil Boiler supplier: Stein T/G supplier: GEC-Alstho m EPC: GEC-Alstom, Cegelec, Lahmeyer Quick facts: EPC contract awarded in late 1993. The ESPs were built by Walther. Photograph courtesy of PT Bukit Asam Batubara Posted 2 Nov 2005 Palu Location: Central Sulawesi Operator: PT Pusaka Jaya Palu Power Configuration: 2 X 15 MW Operation: 2006 Fuel: coal Boiler supplier: Wuxi T/G supplier: Qingdao, Jinan EPC: SEPCO No 3 Quick facts: This is an IPP project of PT Toba Sejahtera. Coal is supplied by PT PLN via barge from East Kalimantan. Photograph courtesy of SEPCO No 3 Posted 6 Nov 2011 Page 1 of 2 st-coal-indonesia 2/12/2014 http://www.industcards.com/st-coal-indonesia.htm