1 Boiler Coal Air Steam Power generation and heat recovery Flue gas conditioning Flue gas CO 2 capture system CO 2 dehydration and compression SO 2 , NO 2 Clean flue gas CO 2 CO 2 to Pipeline Scope of Work Bojonegara (2x1000 MWe) Sumsel-6 (1x600 MWe) STUDY OF CO 2 CAPTURE FOR BOJONEGARA AND SUMSEL-6 POWER PLANT 4 subsystem will be evaluated 1 2 3 4 Plant retrofit
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Boiler
Coal
Air
Steam
Power generation and heat recovery
Flue gas conditioning
Flue gas
CO2 capture system
CO2 dehydration and
compression
SO2, NO2
Clean flue gas
CO2
CO2 to Pipeline
Scope of Work
Bojonegara (2x1000 MWe) Sumsel-6 (1x600 MWe)
STUDY OF CO2 CAPTURE FOR BOJONEGARA AND SUMSEL-6 POWER PLANT
4 subsystem will be evaluated
1 2
3
4
Plant retrofit
CO2 Clean Gas
Feed Gas
Absorber Column
CO2 Gas
Reboiler
Regeneration ColumnSolvent
Makeup
Blower
DirectContactCooler
Flue gas from FGD
2
Post Combustion CO2 Capture – 2nd subsystem
Flue gas stream which contains CO2 is captured utilizing absorptive acid gas.
MEA (Monoethanolamine) amine solvent is selected as the basis of the study.