Top Banner
CO 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar May 21-22 Washington DC Stuart Dalton Director, Environment/Generation
27

CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

Mar 29, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

CO2 Capture and Storage

2008 EPRI Global Climate Change Research SeminarMay 21-22 Washington DCStuart DaltonDirector, Environment/Generation

Page 2: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

2© 2007 Electric Power Research Institute, Inc. All rights reserved.

Preparing for Carbon Constraints

Variation of Plants Variation Geology

CO2 Capture Cost and Energy

• Plant Efficiency

• Capture Technology

• Capture Pilots

• Capture Demonstrations

Confirmed Long Term Sequestration

Technolgy

• Test Multiple Geologies

• Well Integrity

• Monitoring

Address Societal Concerns

• Liability

• Health

• Public Acceptance

Multiple Challenges Requiring Concurrent Resolution.

Page 3: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

3© 2007 Electric Power Research Institute, Inc. All rights reserved.

Background On Cost

• EPRI has redone capital cost and O&M estimates for Integrated Gasification Combined Cycle with Capture of CO2 (IGCC/CCS) and Pulverized Fuel with CCS (PC/CCS)

• Huge escalation in past few years – world competition • Options are needed • New Federal , Private RD&D should reduce costs and

improve efficiency• Accelerated EPRI / industry funding for projects both

supporting DOE projects and separate RD&D.

Page 4: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

4© 2007 Electric Power Research Institute, Inc. All rights reserved.

IHS/CERA Power Capital Costs Index

Source: IHS/CERA Press Release 2/14/08

“North American Power Construction Costs Rise 27% in 12 Months”“Continuing Cost Pressures Likely to Bring Delays and Postponements”

Escalation hits chemical, energy very hard –”almost double” cost estimates in last two years

Page 5: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

5© 2007 Electric Power Research Institute, Inc. All rights reserved.

Capital Cost Estimates in Press Announcements and Submissions to PUCs in 2007–08—All costs are higher, more than would be predicted from indices (e.g., CEPCI)

Owner Name/Location Net MW Technology/Coal

Estimate Date

Reported Capital $ Million

Reported Capital $/kW

Notes/Status

AEP/Swepco

Hempstead, AK

600 SCPC/PRB Dec. 2006 1680 2800 CPCN issued

Southern Co.

Kemper County, MS

560 Air IGCC/ Lignite

Dec. 2006 1800 3000 FEED in progress

Duke Cliffside, NC 800 SCPC/ Bit May 2007 2400 3000 Permitted

Duke Edwardsport, IN

630 IGCC/ Bit May 2008 2350 In Service

3730 Permitted

AEP Mountaineer, WV

630 IGCC/Bit June 2007 2230 3545 Permit in Review

Tampa Electric

Polk County, FL

630 IGCC/Bit July 2007 1613 (all $?)2013 Serv

2554/3185

Shelved;now NGCC

Sunflower Holcomb, KS 2 x 700 SCPC/PRB Sept. 2007 3600 2572 Permit denied

Am. Muni. Power

Meigs County, OH

1000 SCPC/Bit & PRB

Jan. 2008 2900/3300 2900/3300

Tenaska Sweetwater County, TX

600 SCPC + CCS/PRB

Feb. 2008 3000 5000

Page 6: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

6© 2007 Electric Power Research Institute, Inc. All rights reserved.

405060708090

100110120130

Supercritical PC GE Total Quench Ultrasupercritical PC Conoco Phillips IGCC

30-Y

r lev

eliz

ed C

OE,

$/M

Wh

(con

stan

t 200

6$)

Illinois #6 Bituminous PRB ( Western Coal))

With Current Technology CO2 Capture CostlyNo Clear Winners in Current Designs

No Capture

Retrofit Capture

New Capture

• COE Includes $10/tonne for CO2 Transportation and Sequestration• IGCC & CCS include 10% TPC contingency for first-of-kind

MEA- installed initially

Installed Later

Page 7: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

7© 2007 Electric Power Research Institute, Inc. All rights reserved.

CO2 Capture Can Be Done Today, But….

• As last slides shows It would increase the cost of electric power from coal significantly and there are no clear winners for all coals

• EPRI’s current estimates– Cost of power from a pulverized coal plant with post-combustion

capture would be 60-80% higher– Cost of power from an IGCC with pre-combustion capture would

be 40-50% higher (but IGCCs start out with a higher cost, so won’t necessarily be cheapest option with CCS)

– Cost of oxy-combustion more difficult to estimate with certainty at this stage of development but overall cost of power probably similar to PC + post combustion capture

• Luckily, EPRI also estimates that with a concerted RD&D effort, the cost impact of CCS should decrease dramatically

Page 8: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

8© 2007 Electric Power Research Institute, Inc. All rights reserved.

Cost & Performance Penalties for CO2 Capture(based on retrofit of existing PC or IGCC plant – today’s technolgy)

PC-Bit

PC-Subbit

IGCC E-Gas-Bit

IGCC E-Gas-Subbit

IGCC GE RQ-Bit

IGCC GE Q-Bit

IGCC Shell-Bit

IGCC Shell-Subbit

14%

16%

18%

20%

22%

24%

26%

28%

30%

30% 40% 50% 60% 70% 80% 90%Increase in Capital Cost ($/kW)

Red

uctio

n in

Net

Pow

er O

utpu

t

Page 9: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

9© 2007 Electric Power Research Institute, Inc. All rights reserved.

EPRI Estimates of the Benefits and Timing of RD&D in Gasification of Coal

2005 2010 2015 2020 2025 2030

Tota

l Pla

nt C

ost (

$/kW

, con

stan

t dol

lars

no

rmal

ized

to 2

005

plan

t cos

t)*

30

32

34

36

38

40

Plan

t Net

Effi

cien

cy (H

HV

Bas

is)

Long-Term• Membrane

separation• Warm gas

cleanup• CO2-coal slurry

Mid-Term• ITM oxygen• G-class to H-class CTs• Supercritical HRSG• Dry ultra-low-NOX

combustors

Longest-Term• Fuel cell

hybrids

Near-Term • Add SCR• Eliminate spare

gasifier• F-class to G-class CTs• Improved Hg detection

42

0.6

0.7

0.8

0.9

1.0

1.2

1.3

1.4

1.5

44

46

2005 2010 2015 2020 2025 20302005 2010 2015 2020 2025 2030

Tota

l Pla

nt C

ost (

$/kW

, con

stan

t dol

lars

no

rmal

ized

to 2

005

plan

t cos

t)*

30

32

34

36

38

40

Plan

t Net

Effi

cien

cy (H

HV

Bas

is)

Long-Term• Membrane

separation• Warm gas

cleanup• CO2-coal slurry

Mid-Term• ITM oxygen• G-class to H-class CTs• Supercritical HRSG• Dry ultra-low-NOX

combustors

Longest-Term• Fuel cell

hybrids

Near-Term • Add SCR• Eliminate spare

gasifier• F-class to G-class CTs• Improved Hg detection

42

0.6

0.7

0.8

0.9

1.0

1.2

1.3

1.4

1.5

0.6

0.7

0.8

0.9

1.0

1.2

1.3

1.4

1.5

44

46Presumes public/private partnership

Page 10: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

10© 2007 Electric Power Research Institute, Inc. All rights reserved.

EPRI Estimates of the Benefits and Timing of RD&D in Combustion

2005 2010 2015 2020 2025

Near Mid-Term• Upgrade steam

conditions to 1110°F main steam1150°F reheat steam

Mid-Term• Upgrade steam conditions to

1300°F main & reheat steam, then1400°F main steam & double reheat

30

32

34

36

38

40

Plan

t Net

Effi

cien

cy (H

HV

Bas

is)

Near-Term • Upgrade solvent from MEA to

MHI KS-1 (or equivalent)• Upgrade steam conditions from

1050°F main & reheat steamto 1100°F main & reheat steam

Long-Term• Upgrade

solvent to <10% energy penalty and <20% COE penalty

1.1

0.6

0.7

0.8

0.9

1.0

1.2

1.3

42

44

Tota

l Pla

nt C

ost (

$/kW

, con

stan

t dol

lars

no

rmal

ized

to 2

005

plan

t cos

t)*

2005 2010 2015 2020 20252005 2010 2015 2020 2025

Near Mid-Term• Upgrade steam

conditions to 1110°F main steam1150°F reheat steam

Mid-Term• Upgrade steam conditions to

1300°F main & reheat steam, then1400°F main steam & double reheat

30

32

34

36

38

40

Plan

t Net

Effi

cien

cy (H

HV

Bas

is)

Near-Term • Upgrade solvent from MEA to

MHI KS-1 (or equivalent)• Upgrade steam conditions from

1050°F main & reheat steamto 1100°F main & reheat steam

Long-Term• Upgrade

solvent to <10% energy penalty and <20% COE penalty

1.1

0.6

0.7

0.8

0.9

1.0

1.2

1.1

0.6

0.7

0.8

0.9

1.0

1.1

0.6

0.7

0.8

0.9

1.0

1.2

1.3

42

44

Tota

l Pla

nt C

ost (

$/kW

, con

stan

t dol

lars

no

rmal

ized

to 2

005

plan

t cos

t)*

Presumes public/private partnership

Page 11: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

11© 2007 Electric Power Research Institute, Inc. All rights reserved.

Fresh Water

PCBoiler SCR

SteamTurbine

ESP FGDCO2

Removale.g., MEA

CO2 to use or Sequestration

Flue Gasto Stack

Fly Ash Gypsum/Waste

CoalAir

• MEA or “Amine-based” CO2 capture • In use at 3 coal power plants, but at

no larger than 35 MWe scale• Requires ultra-low SO2, NO2, PM• Uses lots of steam in stripper• Produces CO2 at low pressure

Flue Gas from Plant

CO2 to Cleanupand Compression

Cleaned Flue Gas to Atmosphere

Absorber Tower

CO2Stripper Reboiler

CO2Stripper

Pulverized Coal With CO2 Capture –Commercial Technology Status

$/ton Cost of Capture Is High – Need More Economical Processes

Page 12: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

12© 2007 Electric Power Research Institute, Inc. All rights reserved.

• Partial project funding with support of >35 collaborative funders

• Pilot testing

• Performance/economic evaluation

• Partial project funding

• Pilot plant owner

• Responsible for:

– Design

– Construction

– Operation

– Maintenance

– Demolition

• Partial project funding

• Host Site

• Plant interface, permitting, utilities

Pilot Project Team Members

Dedicated February 2008

Pleasant Prairie Power Plant, Pleasant Prairie, Wis.

1.7 MWe CO2 Capture R&D Pilot Plant

Page 13: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

13© 2007 Electric Power Research Institute, Inc. All rights reserved.

Chilled Ammonia Pilot Plant

Page 14: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

14© 2007 Electric Power Research Institute, Inc. All rights reserved.

Post-combustion CO2 Capture with Storage –Expected Major Contributor to CO2 Reduction

Two capture processes• (1) Chilled ammonia (2010-2014)

• AEP Mountaineer• (2) Different capture process (2011-2015)

• DOE SECARB (SSEB)• Southern Co. plant (early FGD)

Value• Reduce risk of facing CO2 limits with:

• Only 60-80% ∆COE technology • Storage not accepted

• Have time to learn in low-risk environment• Demonstrate permitting for injection, MMV

• Technologies ready (or nearly ready) for scale-up

• Early storage tests on anthropogenic CO2

Page 15: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

15© 2007 Electric Power Research Institute, Inc. All rights reserved.

We Energies Pilot Is Only 1st Step

Goals – Affordable, Energy Efficient, Accepted

2005 2010 2015 20202007 2010 2015 20252020

We Energies Chilled Ammonia PilotOther Pilots (Post-Combustion

and Oxy-Combustion)

●Pilots

Demonstration

Integration

Other Demonstrations

AEP MountaineerSouthern/SSEB Ph. III

●●

UltraGen Projects

Other (e.g., Oxy-Combustion)

●IGCC + CCS Projects●

Ion Transport Membrane O2 Scale-up●

AEP Northeastern●

20MW chilled ammoniascaled-up demoIncludes storage –

injection into wells

20MW chilled ammoniascaled-up demoIncludes storage –

injection into wells

Alternative CCS technology, geologyAlternative CCS technology, geology

200MW chilled ammoniaCO2 for EOR200MW chilled ammoniaCO2 for EOR

1.7 MW size1.7 MW size

Page 16: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

16© 2007 Electric Power Research Institute, Inc. All rights reserved.

Near Zero Emissions (NZE) Concept – Needed for Post Combustion Capture ?

Sorbent Injection

Scrubber

Boiler/Comb Mods

StackESP/FF

CoalCleaning

Additives

SCR PM/GasPolishing

Mg/Nm3 NOx PM SO2 SO3 HgCurrent 86 14 184 - -NZE 12 1 7 < 1ppm <0.1µg/Nm³

Page 17: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

17© 2007 Electric Power Research Institute, Inc. All rights reserved.

Retrofit Required…What Plant Modifications are Required?

• For the PC plant to accommodate CO2 capture from an MEA process, the following modifications to the plant are required:– Ability to extract significant quantities of LP steam– Ability to extract IP steam intermittently for MEA reclaiming– Ability to receive significant quantities of hot condensate

return– Ability to supply large increase in cooling water load to meet

PC demands– Ability to handle increase in electrical distribution capacity to

meet large PCC power demands– Ability to reroute flue gas ducting to handle the flue gas to,

and from, the PCC

Page 18: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

18© 2007 Electric Power Research Institute, Inc. All rights reserved.

Plot Plan for USC PC Power Plant with Post-Combustion CO2 Capture

Base PC Plant PC Plant with Capture

Page 19: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

19© 2007 Electric Power Research Institute, Inc. All rights reserved.

Design Considerations for CO2 Capture Report

• Version 1 published in December 2007• Outlines key aspects that could be considered in new-build coal plant

design to ease future transition to CO2 capture mode• Version 1 currently covers

– Post-combustion capture– IGCC

• Expand to include:– Steam turbine modifications– Oxy-fuel – Chilled ammonia– Process X?

• Input derived from existing (IEA), ongoing (Nexant, FWI), and future studies

• Incorporated into AdvancedPC Design Guideline and UDBS for IGCC

EPR I

Design Considerations For CO2 Capture

Page 20: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

20© 2007 Electric Power Research Institute, Inc. All rights reserved.

Showcase: Accelerate CO2 Capture Development

The Problem:

• No commercially available post‐combustion capture systems available

• Near‐commercial options costly; $$$ and BTUs

The Response:  

• Aggressively seek and propel dramatic improvements

• TI Showcase Project: identify the most promising emerging post‐combustion carbon capture technologies and assist in their development to accelerate their time to market.  

Read more about CO2 Capture and Storage in the Spring 2007 

issue of the EPRI Journal

Page 21: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

21© 2007 Electric Power Research Institute, Inc. All rights reserved.

EPRI Found Many Process Being Developed for Post-Combustion CO2 Capture

Carbon Capture TechnologiesCarbon Capture Technologies

• Amines (many)

• Ammonia

• Carbonates

• Hydroxide

• Limestone

• Carbonaceous Sorbents

• Metal Organics

• Zeolites

• Fibers

• Microporous

• Microalgae

• Cyanobacteria

• Cold Separation

• Hybrid Capture

Adsorption Membranes Biological OtherAbsorption

Few Approach Goal of < 10% Energy Penalty, < 20% COE Increase

Report #1012796 (30 processes, 20 more since report [2/07])

Page 22: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

22© 2007 Electric Power Research Institute, Inc. All rights reserved.

Technologies in Database

Absorption, Liquid• MHI, KS-1 • CAP, Chilled Ammonia• CANSOLV• "7/2" MEA & PZ*• CASTOR• IFP, Dual Phase* • Econamine FG+• ECO2• Ionic Liquids, Notre Dame• Sargas• SkyMine• AWL*• WowClean*• Ionic Liquids, U. S. Carolina• MEA:MDEA• RITE -- COCS Solvent• GRT*• Immobilized Activator*• Enzyme Catalysis* • AEEA• HTC PurEnergy*• InnoSepra*• CarbonTrap*• TNO CASTOR2*• JustCatch*

Absorption, Solid• CO2 Wheel• RTI• Hyperbranched Polyamine*• Polyethyleneimine (PEI)*• Amine on inert support*

Adsorption• Metal Organic Frameworks• Advanced Mesoporous Materials• Heavy Reflux PSA*• CO2CRC Adsorbent• U. Akron

• Biological Fixation• Carbon Capture Corp.*• GreenFuel• CO2 Solutions• GSCleanTech*• Conc. Solar Photoreactor• Multiple New Algae Energy

Systems*

Membrane, Active• MTR• RITE, Cardo polyimide• Tetramer Technologies*• Poly(Ionic Liquid) Membrane

Membrane, Support• Carbozyme• Coral• Kvaerner Membrane Contactor

Cryogenic• CO2 Frosting • Enecogen*

* New since publication of 1012796

Page 23: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

23© 2007 Electric Power Research Institute, Inc. All rights reserved.

What Could We Do With CO2?

• Saline reservoirs– 100’s yr capacity– Little experience

• Economical, but lesser capacity options– Depleted oil and gas

reservoirs/enhanced oil recovery

– Unmineable coal beds/enhanced coal-bed methane recovery

• Deep ocean injection not acceptable today

• Mineralization highly uncertain

• No use for large amountsCourtesy of Peter Cook, CO2CRC

Storage in Saline Reservoirs Likely Choice

Page 24: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

24© 2007 Electric Power Research Institute, Inc. All rights reserved.

DOE Regional Carbon Sequestration Partnerships

• Phase 1: Data collection• Phase 2: Small pilots

– 22 Geologic Injection Tests• 8 EOR/Saline• 6 Saline reservoirs• 8 ECBM/EGR

– EPRI involved in three saline

• Phase 3: Demonstrations– Several possibilities for EPRI

involvement

Page 25: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

25© 2007 Electric Power Research Institute, Inc. All rights reserved.

DOE Phase 3 Update

• WESTCARB– Original focus on BP Carson project,

changed to Clean Energy Systems (CES)– 500k t/y for 4 years starting in 2010

• SECARB– Two part injection into same saline reservoir

in two geologically separate locations– Cranfield: Purchased CO2 @ 1Mt/y for 1.5 y– Anthropogenic test: Inject 100-250 kt/y from

a CO2 capture pilot located at a Southern Company site

Page 26: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

26© 2007 Electric Power Research Institute, Inc. All rights reserved.

RD&D Funding Needs for Advanced Coal Power Generation Technologies with CO2 Capture (Reference Sept 7,2007 Testimony S Dalton House Select Comm. on Energy Independence & Global Warming )

2008–2012

2013–2017

2018–2022

2023–2027

2028–2032

Total Estimated RD&D Funding Needs (Public + Private Sectors)

$830M/yr $800M/yr $800M/yr $620M/yr $400M/yr

Advanced Combustion, CO2 Capture

25% 25% 40%

Integrated Gasification Combined Cycle (IGCC), CO2 Capture 50% 50% 40%

CO2 Storage 25% 25% 20% 20% 20%

80% 80%

Page 27: CO2 Capture and Storage - EPRIeea.epri.com/pdf/epri-energy-and-climate-change-research... · 2019-03-05 · 2 Capture and Storage 2008 EPRI Global Climate Change Research Seminar

27© 2007 Electric Power Research Institute, Inc. All rights reserved.Image from Image from NASA Visible EarthNASA Visible Earth