Top Banner
1 INTRODUCTION REINVEST INNOVATE PRESERVE CONCLUSION Reinvest Alternative in Oak Park Sertus 2009
35

CMAP Reinvest for Oak Park

Apr 14, 2017

Download

Documents

Andrew Keller
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CMAP Reinvest for Oak Park

1

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Reinvest Alternative in Oak Park

Sertus 2009

Page 2: CMAP Reinvest for Oak Park

2

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

CONTEXT

PROBLEM

CMAP VISION

COMPARISON

Page 3: CMAP Reinvest for Oak Park

Left image from ForRent.com, Right image from Downtown Oak Park

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Downtown Oak Park

3

Page 4: CMAP Reinvest for Oak Park

Redeveloping Downtown Oak Park INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

• Remake of Marion Street

– Led to rebirth of businesses

4

http://www.pps.org/great_public_spaces/on

e?public_place_id=1007#

Page 5: CMAP Reinvest for Oak Park

Redeveloping Downtown Oak Park INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

• Mid-1990’s experience development of national retailers

– Gap, Old Navy

5

secondcitystyle.typepad.com/.a/6a00d83451595d...

Page 6: CMAP Reinvest for Oak Park

Redeveloping Downtown Oak Park INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

• Followed by smaller building interior and exterior remodeling

– Chipotle, Borders, etc.

Left image from OakParkDining.com 6

Page 7: CMAP Reinvest for Oak Park

Image from the Oak Park Greater Downtown Master Plan

Greater Downtown Master Plan INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

7

Page 8: CMAP Reinvest for Oak Park

Image from the Oak Park Greater Downtown Master Plan

Intermodal Transportation INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

8

Page 9: CMAP Reinvest for Oak Park

Image from the Oak Park Greater Downtown Master Plan

Opportunities Beyond Parking Lots INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

9

Page 10: CMAP Reinvest for Oak Park

10

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

PROBLEM

CONTEXT

CMAP VISION

COMPARISON

Page 11: CMAP Reinvest for Oak Park

Problem Statement INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

• Oak Park is built out

• Oak Park will experience a population increase

• Lack of mixed use development

• Overdependence on automobile

11

Page 12: CMAP Reinvest for Oak Park

12

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

CMAP VISION

CONTEXT

PROBLEM

COMPARISON

Page 13: CMAP Reinvest for Oak Park

Image from CMAP Community Workshop for Arlington Heights

Reinvest INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

13

Page 14: CMAP Reinvest for Oak Park

Reinvest

14

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

What if we reinvest in our existing communities, by rebuilding current infrastructure to support growth and development? Instead of developing in areas that have never had development before, we could focus growth in existing communities that already have roads, water and sewer lines to support them.

Page 15: CMAP Reinvest for Oak Park

CMAP Scenario – Reinvest Goals

15

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

This scenario benefits the region in many ways, including:

1.More efficient land use

2.Less congestion

3.Improved Mode Share

4.More Jobs – Housing Access

Page 16: CMAP Reinvest for Oak Park

The Benefits of Reinvesting

16

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

1. More efficient land use. Land consumption will improve with 18% more infill

Page 17: CMAP Reinvest for Oak Park

The Benefits of Reinvesting

17

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

2. Less congestion 14% reduction in auto travel times and 9% reduction in

transit travel times.

Looking

East on

Lake

Street in

Oak Park Image: www.livehereoakpark.com

Page 18: CMAP Reinvest for Oak Park

The Benefits of Reinvesting

18

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

3. Improved Mode Share Mode share improves with 10% more transit use,

walking and biking due to more Transit Oriented Development.

Page 19: CMAP Reinvest for Oak Park

The Benefits of Reinvesting

19

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

4. More Jobs – Housing Access Jobs- Housing access improves with 12% - 52% more

accessible jobs due to high density near transit.

Page 20: CMAP Reinvest for Oak Park

20

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

COMPARISON

CONTEXT

PROBLEM

CMAP VISION

Page 21: CMAP Reinvest for Oak Park

Reinvestment at Lake and Forest Ave

21

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Sertus 2009

Page 22: CMAP Reinvest for Oak Park

Current Conditions at Lake and Forest

22

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Deteriorating Parking Structure, housing 340 public

parking spaces…

Maguire 2010

Page 23: CMAP Reinvest for Oak Park

Current Conditions at Lake and Forest Ave:

23

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

…and vacant building with adjacent unoccupied

parking lot.

Maguire 2010 Maguire 2010

Page 24: CMAP Reinvest for Oak Park

Transit Oriented Development

• Transit Oriented Developments are a primary tool in CMAP’s reinvest scenario.

• CMAP defines a TOD as an area with

– Mixed land uses

– Moderate to high density residences

– High quality access to transit stations

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

24

Page 25: CMAP Reinvest for Oak Park

Proposed Development at Lake and Forest

Ave

25

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Sertus 2009

Page 26: CMAP Reinvest for Oak Park

Transit Oriented Development

Mixed Land Uses

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Height: 20 stories (190 feet)

Retail: 28,000 sq feet

Service [Hotel]: 140 rooms

Residential: 85

condominiums

Parking: 510 spaces

300 public spaces

180 private spaces [hotel

and residential]

30 shared public/private

spaces

26

Page 27: CMAP Reinvest for Oak Park

Transit Oriented Development

Moderate to High-Density Residences

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Retail-(floors 1-4) Condominiums (5-20)

Hotel

Ground Space- 75,000 square feet- 1.7 acres Total Utilized Space- 450,400 square feet 10.3 acres Residential Units per Acre- 50

27

Page 28: CMAP Reinvest for Oak Park

Transit Oriented Development

High-Quality Walking Environments to Transit Stations

Lake Street near Forest Image from Village of Oak Park Greater Downtown Master Plan

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

28

Page 29: CMAP Reinvest for Oak Park

Transit Oriented Development Community Impact

Residents of transit oriented developments spend more of their money locally

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Lake Street near Forest Image from Village of Oak Park Greater Downtown Master Plan 29

Page 30: CMAP Reinvest for Oak Park

Transit Oriented Development

Community Impact- Housing Stock

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

http://p.rdcpix.com/v01/l3ded5a42-m0m.jpg

30

Page 31: CMAP Reinvest for Oak Park

Transit Oriented Development

Community Impact- Congestion

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Image provided by: city-data.com 31

Page 32: CMAP Reinvest for Oak Park

Transit Oriented Development

Regional Impact- Congestion

32

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Page 33: CMAP Reinvest for Oak Park

Transit Oriented Development

Regional Impact- Agricultural Land

33

INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

http://central.illinoisfarmbeginnings.org/Images/red_farm.jpg

or

Page 34: CMAP Reinvest for Oak Park

Conclusion INTRODUCTION REINVEST INNOVATE

PRESERVE CONCLUSION

Sertus 2009 34

Page 35: CMAP Reinvest for Oak Park

Works Cited

35

• “Go to 2040.” Chicago Metropolitan Agency for Planning.

<http://www.goto2040.org/> (2010).

• “Planning Together: Character Plans for Oak Park Commercial Districts.”

University of Illinois at Chicago. <http://www.oak-

park.us/public/pdfs/UIC/10.31.03 planningtogether3.pdf> (2003).