1 CM23 - CKOV Status Report • CKOV1/2 Installed and cabled in DSA • T %RH recording • Pulser Runs Aug '08 to set HV – MICE Note 225 • Electron run Sep '08 – MICE Note 226 (more Nov/Dec '08) • Nov/Dec '08 run analyses in progress L. Cremaldi U. Mississippi MICE CM22 RAL Oct 19, 2008 Jan '08 Jan '08
CM23 - CKOV Status Report. CKOV1/2 Installed and cabled in DSA T %RH recording Pulser Runs Aug '08 to set HV – MICE Note 225 Electron run Sep '08 – MICE Note 226 (more Nov/Dec '08) Nov/Dec '08 run analyses in progress. Jan '08. Jan '08. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
CM23 - CKOV Status Report• CKOV1/2 Installed and cabled in DSA• T %RH recording• Pulser Runs Aug '08 to set HV – MICE Note 225• Electron run Sep '08 – MICE Note 226 (more Nov/Dec '08)• Nov/Dec '08 run analyses in progress
L. Cremaldi U. Mississippi MICE CM22 RAL Oct 19, 2008
• To ensure dry conditions in damp UK weather! • Temperature and %RH sensors installed + N2 Flow ~ 0.1 SCFH. • One T / %RH set per CKOV.• Readback in control room. • Temperature monitor chips have failed (non-critical). • MOM daily checklist appreciated!
• Large Ckov signals may indicate some fADC problem?• fADC looks bistable or pions vs protons? JSG?
p
13
Future plans
• Work on LED Calibration Pulser.• Rework T/%H Monitor. • Install 500 MHz fADC - no shaper needed for higher rates? JSG• More analysis w G4MICE package – tagged beam.• Thank you for your attention!